81_FR_32419 81 FR 32320 - Swanton Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

81 FR 32320 - Swanton Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 99 (May 23, 2016)

Page Range32320-32320
FR Document2016-12065

Federal Register, Volume 81 Issue 99 (Monday, May 23, 2016)
[Federal Register Volume 81, Number 99 (Monday, May 23, 2016)]
[Notices]
[Page 32320]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-12065]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14773-000]


Swanton Hydro, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On April 1, 2016, Swanton Hydro, LLC (Swanton Hydro) filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Lower Swanton Dam Hydroelectric Project (project) to be located on the 
Missisquoi River in the Village of Swanton, Franklin County, Vermont. 
The sole purpose of a preliminary permit, if issued, is to grant the 
permit holder priority to file a license application during the permit 
term. A preliminary permit does not authorize the permit holder to 
perform any land-disturbing activities or otherwise enter upon lands or 
waters owned by others without the owners' express permission.
    The proposed project would consist of: (1) An existing 335-foot-
long, 12-foot-high concrete gravity dam (Swanton dam) with a 331-foot-
long spillway with 2-foot-high wooden flashboards; (2) an existing 170-
acre impoundment with a normal water surface elevation of 112 feet 
above mean sea level; (3) a new 35-foot-long, 55-foot-wide intake 
structure with trashracks; (4) a new 100-foot-long, 55-foot-wide, 25-
foot-high powerhouse containing two turbine-generator units with a 
total installed capacity of 850 kilowatts; (5) a new 45-foot-long, 45-
foot-wide, 18-foot-deep tailrace and 50-foot-long training wall; (6) a 
new 210-foot-long, 12.47-kilovolt transmission line and transformer; 
and (7) appurtenant facilities. The project would produce an estimated 
average annual generation of 3,580 megawatt-hours. There are no federal 
lands associated with the project.
    Applicant Contact: William F. Scully, P.O. Box 338, North 
Bennington, Vermont 05257; phone: (802) 379-2469.
    FERC Contact: Tom Dean (202) 502-6041.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14773-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14773) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: May 17, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-12065 Filed 5-20-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                32320                           Federal Register / Vol. 81, No. 99 / Monday, May 23, 2016 / Notices

                                                DEPARTMENT OF ENERGY                                    receive email notification when a                     3,580 megawatt-hours. There are no
                                                                                                        document is added to a subscribed                     federal lands associated with the
                                                Federal Energy Regulatory                               docket(s). For assistance with any FERC               project.
                                                Commission                                              Online service, please email                             Applicant Contact: William F. Scully,
                                                [Docket No. OR16–18–000]                                FERCOnlineSupport@ferc.gov, or call                   P.O. Box 338, North Bennington,
                                                                                                        (866) 208–3676 (toll free). For TTY, call             Vermont 05257; phone: (802) 379–2469.
                                                American Airlines, Inc. v. Plantation                   (202) 502–8659.                                          FERC Contact: Tom Dean (202) 502–
                                                Pipe Line Company; Notice of                              Comment Date: 5:00 p.m. Eastern                     6041.
                                                Complaint                                               Time on June 13, 2016.
                                                                                                                                                                 Deadline for filing comments, motions
                                                                                                          Dated: May 17, 2016.                                to intervene, competing applications
                                                   Take notice that on May 13, 2016,
                                                                                                        Kimberly D. Bose,                                     (without notices of intent), or notices of
                                                pursuant to Rule 206 of the Rules of
                                                Practice and Procedure of the Federal                   Secretary.                                            intent to file competing applications: 60
                                                Energy Regulatory Commission                            [FR Doc. 2016–12064 Filed 5–20–16; 8:45 am]           days from the issuance of this notice.
                                                (Commission), 18 CFR 385.206, section                   BILLING CODE 6717–01–P                                Competing applications and notices of
                                                343.2 of the Commission’s Rules                                                                               intent must meet the requirements of 18
                                                Applicable to Oil Pipeline Proceedings,                                                                       CFR 4.36.
                                                18 CFR 343.2, American Airlines, Inc.                   DEPARTMENT OF ENERGY                                     The Commission strongly encourages
                                                (American or Complainant) filed a                                                                             electronic filing. Please file comments,
                                                formal complaint against Plantation                     Federal Energy Regulatory
                                                                                                                                                              motions to intervene, notices of intent,
                                                Pipe Line Company (Plantation or                        Commission
                                                                                                                                                              and competing applications using the
                                                Respondent), alleging that Plantation                   [Project No. 14773–000]                               Commission’s eFiling system at http://
                                                unlawfully proposed to suspend jet fuel                                                                       www.ferc.gov/docs-filing/efiling.asp.
                                                transportation service in violation of                  Swanton Hydro, LLC; Notice of                         Commenters can submit brief comments
                                                sections 1, 3, 6, 13, and 15 of the                     Preliminary Permit Application                        up to 6,000 characters, without prior
                                                Interstate Commerce Act, 49 U.S.C. app.                 Accepted for Filing and Soliciting                    registration, using the eComment system
                                                1, 3, 6, 13, and 15 (1988) and that its                 Comments, Motions To Intervene, and                   at http://www.ferc.gov/docs-filing/
                                                transmix policy is unduly                               Competing Applications                                ecomment.asp. You must include your
                                                discriminatory and unduly preferential,                                                                       name and contact information at the end
                                                all as more fully explained in the                         On April 1, 2016, Swanton Hydro,
                                                                                                                                                              of your comments. For assistance,
                                                complaint.                                              LLC (Swanton Hydro) filed an
                                                                                                                                                              please contact FERC Online Support at
                                                   American certifies that copies of the                application for a preliminary permit,
                                                                                                                                                              FERCOnlineSupport@ferc.gov, (866)
                                                complaint were served on the contacts                   pursuant to section 4(f) of the Federal
                                                                                                                                                              208–3676 (toll free), or (202) 502–8659
                                                for Plantation as listed on the                         Power Act (FPA), proposing to study the
                                                                                                                                                              (TTY). In lieu of electronic filing, please
                                                Commission’s list of Corporate Officials.               feasibility of the Lower Swanton Dam
                                                                                                                                                              send a paper copy to: Secretary, Federal
                                                   Any person desiring to intervene or to               Hydroelectric Project (project) to be
                                                                                                                                                              Energy Regulatory Commission, 888
                                                protest this filing must file in                        located on the Missisquoi River in the
                                                                                                                                                              First Street NE., Washington, DC 20426.
                                                accordance with Rules 211 and 214 of                    Village of Swanton, Franklin County,
                                                                                                                                                              The first page of any filing should
                                                the Commission’s Rules of Practice and                  Vermont. The sole purpose of a
                                                                                                                                                              include docket number P–14773–000.
                                                Procedure (18 CFR 385.211 and                           preliminary permit, if issued, is to grant
                                                385.214). Protests will be considered by                the permit holder priority to file a                     More information about this project,
                                                the Commission in determining the                       license application during the permit                 including a copy of the application, can
                                                appropriate action to be taken, but will                term. A preliminary permit does not                   be viewed or printed on the ‘‘eLibrary’’
                                                not serve to make protestants parties to                authorize the permit holder to perform                link of the Commission’s Web site at
                                                the proceeding. Any person wishing to                   any land-disturbing activities or                     http://www.ferc.gov/docs-filing/
                                                become a party must file a notice of                    otherwise enter upon lands or waters                  elibrary.asp. Enter the docket number
                                                intervention or motion to intervene, as                 owned by others without the owners’                   (P–14773) in the docket number field to
                                                appropriate. The Respondent’s answer                    express permission.                                   access the document. For assistance,
                                                and all interventions, or protests must                    The proposed project would consist                 contact FERC Online Support.
                                                be filed on or before the comment date.                 of: (1) An existing 335-foot-long, 12-                  Dated: May 17, 2016.
                                                The Respondent’s answer, motions to                     foot-high concrete gravity dam                        Kimberly D. Bose,
                                                intervene, and protests must be served                  (Swanton dam) with a 331-foot-long                    Secretary.
                                                on the Complainants.                                    spillway with 2-foot-high wooden                      [FR Doc. 2016–12065 Filed 5–20–16; 8:45 am]
                                                   The Commission encourages                            flashboards; (2) an existing 170-acre                 BILLING CODE 6717–01–P
                                                electronic submission of protests and                   impoundment with a normal water
                                                interventions in lieu of paper using the                surface elevation of 112 feet above mean
                                                ‘‘eFiling’’ link at http://www.ferc.gov.                sea level; (3) a new 35-foot-long, 55-foot-           DEPARTMENT OF ENERGY
                                                Persons unable to file electronically                   wide intake structure with trashracks;
                                                should submit an original and 5 copies                  (4) a new 100-foot-long, 55-foot-wide,                Federal Energy Regulatory
                                                of the protest or intervention to the                   25-foot-high powerhouse containing two                Commission
                                                Federal Energy Regulatory Commission,                   turbine-generator units with a total
                                                888 First Street NE., Washington, DC                    installed capacity of 850 kilowatts; (5) a            Combined Notice of Filings #2
sradovich on DSK3TPTVN1PROD with NOTICES




                                                20426. This filing is accessible on-line                new 45-foot-long, 45-foot-wide, 18-foot-
                                                at http://www.ferc.gov, using the                       deep tailrace and 50-foot-long training                  Take notice that the Commission
                                                ‘‘eLibrary’’ link and is available for                  wall; (6) a new 210-foot-long, 12.47-                 received the following electric rate
                                                review in the Commission’s Public                       kilovolt transmission line and                        filings:
                                                Reference Room in Washington, DC.                       transformer; and (7) appurtenant                         Docket Numbers: ER16–533–001.
                                                There is an ‘‘eSubscription’’ link on the               facilities. The project would produce an                 Applicants: Midcontinent
                                                Web site that enables subscribers to                    estimated average annual generation of                Independent System Operator, Inc.


                                           VerDate Sep<11>2014   18:25 May 20, 2016   Jkt 238001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\23MYN1.SGM   23MYN1



Document Created: 2018-02-07 15:07:12
Document Modified: 2018-02-07 15:07:12
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: