81_FR_36279 81 FR 36171 - Safety Zones; Sector Upper Mississippi River Annual and Recurring Safety Zones Update

81 FR 36171 - Safety Zones; Sector Upper Mississippi River Annual and Recurring Safety Zones Update

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 81, Issue 108 (June 6, 2016)

Page Range36171-36174
FR Document2016-13239

The Coast Guard is amending and updating its annual and recurring safety zones that take place in the Coast Guard Sector Upper Mississippi River area of responsibility (AOR). This regulation informs the public of regularly scheduled events that require additional safety measures through establishing a safety zone. Through this interim rule the current list of recurring safety zones is updated with revisions, additional events, and removal of events that no longer take place; and we are requesting comments on additional changes necessary to update the permanent list of recurring safety zones in Sector Upper Mississippi River's AOR. When these safety zones are enforced, vessel traffic is restricted from specified areas. Additionally, this one rulemaking project serves to provide notice of the known recurring safety zones throughout the year.

Federal Register, Volume 81 Issue 108 (Monday, June 6, 2016)
[Federal Register Volume 81, Number 108 (Monday, June 6, 2016)]
[Rules and Regulations]
[Pages 36171-36174]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-13239]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 165

[Docket Number USCG-2015-1079]
RIN 1625-AA00


Safety Zones; Sector Upper Mississippi River Annual and Recurring 
Safety Zones Update

AGENCY: Coast Guard, DHS.

ACTION: Interim rule with requests for comments.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is amending and updating its annual and 
recurring safety zones that take place in the Coast Guard Sector Upper 
Mississippi River area of responsibility (AOR). This regulation informs 
the public of regularly scheduled events that require additional safety 
measures through establishing a safety zone. Through this interim rule 
the current list of recurring safety zones is updated with revisions, 
additional events, and removal of events that no longer take place; and 
we are requesting comments on additional changes necessary to update 
the permanent list of recurring safety zones in Sector Upper 
Mississippi River's AOR. When these safety zones are enforced, vessel 
traffic is restricted from specified areas. Additionally, this one 
rulemaking project serves to provide notice of the known recurring 
safety zones throughout the year.

DATES: This rule is effective June 11, 2016. Comments and related 
material must be received by the Coast Guard on or before June 27, 
2016.

ADDRESSES: To view documents mentioned in this preamble as being 
available in the docket, go to http://www.regulations.gov, type USCG-
2015-1079 in the ``SEARCH'' box and click ``SEARCH.'' Click on Open 
Docket Folder on the line associated with this rule.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, 
call or email LCDR Sean Peterson, Chief of Prevention, U.S. Coast 
Guard; telephone 314-269-2332, email [email protected].

SUPPLEMENTARY INFORMATION: 

I. Table of Abbreviations

AOR Area of Responsibility
CFR Code of Federal Regulations
COTP Captain of the Port
DHS Department of Homeland Security
FR Federal Register
NPRM Notice of proposed rulemaking
Sec.  Section
U.S.C. United States Code

II. Background Information and Regulatory History

    On April 8, 2016, the Coast Guard published a notice of proposed 
rulemaking (NPRM) titled Safety Zones; Sector Upper Mississippi River 
Annual and Recurring Safety Zones Update (81 FR 20592). There we stated 
why we issued the NPRM, and invited comments on our proposed regulatory 
action related to this fireworks display. During the comment period 
that ended May 9, 2016, we received information from event sponsors 
providing updated locations for 2 of the events listed in the NPRM. 
Therefore, we are requesting comments through this interim rule related 
to these two location changes before issuing a final rule. These 
changes are discussed further below.
    We are issuing this rule, and under 5 U.S.C. 553(d)(3), the Coast 
Guard finds that good cause exists for making it effective less than 30 
days after publication in the Federal Register. Though we are not 
providing a full 30 day notice period, the Coast Guard did provide 
notice and opportunity to comment through the NPRM process and is now 
providing five days notice before the first updated recurring safety 
zone enforcement is required the weekend of June 11-12. It is 
impracticable to provide a full 30-days notice because this rule must 
be effective June 11, 2016.

III. Legal Authority and Need for Rule

    The Coast Guard is issuing this rule under authority in 33 U.S.C. 
1231. The Captain of the Port (COTP) Upper Mississippi River has 
determined that potential hazards associated with the recurring events 
will cause safety concerns. The purpose of this rule is to ensure 
safety of vessels and the navigable waters in the safety zones, before, 
during, and after the scheduled events.

IV. Discussion of Comments, Changes, and the Interim Rule

    As noted above, during the comment period for our NPRM that 
published April 8, 2016, we received information from event sponsors 
updating the location for two events. This information lead to the need 
to propose changes to the location details for two of the recurring 
safety zones listed in the NPRM. Therefore, there are two new proposed 
changes to the regulatory text of this rule that are different from the 
proposed rule in the NPRM. The first corrects the location of event 
number 14; Prairie du Chien Area Chamber Fireworks, taking place 
annually on one day during the second weekend of July. The location 
listed in the proposed rule was Upper Mississippi River mile marker 
633.8 to 634.2; the correct location for this event is Upper 
Mississippi River mile marker 635.2 to 635.7. The second corrects the 
location of event number 31; Hermann 4th of July event taking place one 
day over the 4th of July weekend. The location listed in the proposed 
rule was Missouri River mile marker 99.0 to 98.0; the correct location 
for this event is Missouri River mile marker 97.0 to 98.0.
    All other changes, removals, and additions proposed under the NPRM 
remain the same as listed in the proposed rule. This interim rule 
establishes recurring safety zones to restrict vessel transit into and 
through specified areas to protect spectators, mariners, and other 
persons and property from potential hazards presented during certain 
events taking place in Sector Upper Mississippi River's AOR. This 
interim rule amends, updates, and replaces Table 2 in 33 CFR 165.801, 
and requests comments on two additional changes as discussed above 
before issuing a final rule. No vessel or person will be permitted to 
enter the safety zones without first obtaining permission from the COTP 
or a designated representative.

V. Regulatory Analyses

    We developed this rule after considering numerous statutes and 
Executive orders related to rulemaking. Below we summarize our analyses 
based on a number of these statutes and Executive orders, and we 
discuss First Amendment rights of protestors.

A. Regulatory Planning and Review

    Executive Orders 12866 and 13563 direct agencies to assess the 
costs and benefits of available regulatory alternatives and, if 
regulation is necessary, to select regulatory approaches that maximize 
net benefits. Executive Order 13563 emphasizes the importance of 
quantifying both costs and benefits, of reducing costs, of harmonizing 
rules, and of promoting flexibility. This rule has not been designated 
a ``significant regulatory action,'' under Executive Order 12866. 
Accordingly, it has not been reviewed by the Office of Management and 
Budget.

[[Page 36172]]

    This rule establishes safety zones limiting access to certain areas 
under 33 CFR 165 within Sector Upper Mississippi River's AOR. The 
effect of this proposed rulemaking will not be significant because 
these safety zones are limited in scope and duration. Additionally, the 
public is given advance notification through local forms of notice, the 
Federal Register, and/or Notices of Enforcement and thus will be able 
to plan operations around the safety zones in advance. Deviation from 
the safety zones established through this rulemaking may be requested 
from the COTP Upper Mississippi River or a designated representative 
and requests will be considered on a case-by-case basis.

B. Impact on Small Entities

    The Regulatory Flexibility Act of 1980, 5 U.S.C. 601-612, as 
amended, requires Federal agencies to consider the potential impact of 
regulations on small entities during rulemaking. The term ``small 
entities'' comprises small businesses, not-for-profit organizations 
that are independently owned and operated and are not dominant in their 
fields, and governmental jurisdictions with populations of less than 
50,000. The Coast Guard received no comments from the Small Business 
Administration on this rulemaking. The Coast Guard certifies under 5 
U.S.C. 605(b) that this rule will not have a significant economic 
impact on a substantial number of small entities.
    While some owners or operators of vessels intending to transit the 
safety zone may be small entities, for the reasons stated in section 
V.A. above, this rule will not have a significant economic impact on 
any vessel owner or operator.
    Under section 213(a) of the Small Business Regulatory Enforcement 
Fairness Act of 1996 (Pub. L. 104-121), we want to assist small 
entities in understanding this rule. If the rule would affect your 
small business, organization, or governmental jurisdiction and you have 
questions concerning its provisions or options for compliance, please 
contact the person listed in the FOR FURTHER INFORMATION CONTACT 
section.
    Small businesses may send comments on the actions of Federal 
employees who enforce, or otherwise determine compliance with, Federal 
regulations to the Small Business and Agriculture Regulatory 
Enforcement Ombudsman and the Regional Small Business Regulatory 
Fairness Boards. The Ombudsman evaluates these actions annually and 
rates each agency's responsiveness to small business. If you wish to 
comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR 
(1-888-734-3247). The Coast Guard will not retaliate against small 
entities that question or complain about this rule or any policy or 
action of the Coast Guard.

C. Collection of Information

    This rule will not call for a new collection of information under 
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

D. Federalism and Indian Tribal Governments

    A rule has implications for federalism under Executive Order 13132, 
Federalism, if it has a substantial direct effect on the States, on the 
relationship between the national government and the States, or on the 
distribution of power and responsibilities among the various levels of 
government. We have analyzed this rule under that Order and have 
determined that it is consistent with the fundamental federalism 
principles and preemption requirements described in Executive Order 
13132.
    Also, this rule does not have tribal implications under Executive 
Order 13175, Consultation and Coordination with Indian Tribal 
Governments, because it does not have a substantial direct effect on 
one or more Indian tribes, on the relationship between the Federal 
Government and Indian tribes, or on the distribution of power and 
responsibilities between the Federal Government and Indian tribes. If 
you believe this rule has implications for federalism or Indian tribes, 
please contact the person listed in the FOR FURTHER INFORMATION CONTACT 
section.

E. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) 
requires Federal agencies to assess the effects of their discretionary 
regulatory actions. In particular, the Act addresses actions that may 
result in the expenditure by a State, local, or tribal government, in 
the aggregate, or by the private sector of $100,000,000 (adjusted for 
inflation) or more in any one year. Though this rule will not result in 
such an expenditure, we do discuss the effects of this rule elsewhere 
in this preamble.

F. Environment

    We have analyzed this rule under Department of Homeland Security 
Management Directive 023-01 and Commandant Instruction M16475.lD, which 
guide the Coast Guard in complying with the National Environmental 
Policy Act of 1969 (42 U.S.C. 4321-4370f), and have determined that 
this action is one of a category of actions that do not individually or 
cumulatively have a significant effect on the human environment. This 
rule involves establishing safety zones limiting access to certain area 
under 33 CFR part 165 within Sector Upper Mississippi River's AOR. It 
is categorically excluded from further review under paragraph 34(h) of 
Figure 2-1 of the Commandant Instruction. An environmental analysis 
checklist supporting this determination and a Categorical Exclusion 
Determination are available in the docket where indicated under 
ADDRESSES. We seek any comments or information that may lead to the 
discovery of a significant environmental impact from this rule.

G. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. 
Protesters are asked to contact the person listed in the FOR FURTHER 
INFORMATION CONTACT section to coordinate protest activities so that 
your message can be received without jeopardizing the safety or 
security of people, places or vessels.

V. Public Participation and Request for Comments

    We view public participation as essential to effective rulemaking, 
and will consider all comments and material received during the comment 
period. Your comment can help shape the outcome of this rulemaking. If 
you submit a comment, please include the docket number for this 
rulemaking, indicate the specific section of this document to which 
each comment applies, and provide a reason for each suggestion or 
recommendation.
    We encourage you to submit comments through the Federal eRulemaking 
Portal at http://www.regulations.gov. If your material cannot be 
submitted using http://www.regulations.gov, contact the person in the 
FOR FURTHER INFORMATION CONTACT section of this document for alternate 
instructions.
    We accept anonymous comments. All comments received will be posted 
without change to http://www.regulations.gov and will include any 
personal information you have provided. For more about privacy and the 
docket, you may review a Privacy Act notice regarding the Federal 
Docket Management System in the March 24, 2005, issue of the Federal 
Register (70 FR 15086).
    Documents mentioned in this interim rule or the preceding NPRM as 
being available in the docket, and all public

[[Page 36173]]

comments, will be in our online docket at http://www.regulations.gov 
and can be viewed by following that Web site's instructions. 
Additionally, if you go to the online docket and sign up for email 
alerts, you will be notified when comments are posted or a final rule 
is published.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Security measures, Waterways.

    For the reasons discussed in the preamble, the Coast Guard amends 
33 CFR part 165 as follows:

PART 165--REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS

0
1. The authority citation for part 165 continues to read as follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1, 6.04-1, 
6.04-6, and 160.5; Department of Homeland Security Delegation No. 
0170.1.


0
2. Amend Sec.  165.801 by revising Table 2 to read as follows:


Sec.  165.801  Annual fireworks displays and other events in the Eighth 
Coast Guard District requiring safety zones.

* * * * *

           Table 2 of Sec.   165.801--Sector Upper Mississippi River Annual and Recurring Safety Zones
----------------------------------------------------------------------------------------------------------------
                                                                     Sector Upper
               Date                        Sponsor/name           Mississippi River           Safety zone
                                                                       location
----------------------------------------------------------------------------------------------------------------
1. 1 day--4th weekend of July.....  Marketing Minneapolis LLC/  Minneapolis, MN......  Upper Mississippi River
                                     Target Aquatennial                                 mile marker 853.2 to
                                     Fireworks.                                         854.2.
2. 1 day--4th of July weekend.....  Radio Dubuque/Radio         Dubuque, IA..........  Upper Mississippi River
                                     Dubuque Fireworks and Air                          mile marker 581.0 to
                                     show.                                              583.0.
3. 1 day--2nd weekend of June.....  City of Champlin/Father     Champlin, MN.........  Upper Mississippi River
                                     Hennepin Fireworks                                 mile marker 870.5 to
                                     Display.                                           872.0.
4. 1 day--4th of July weekend.....  Downtown Main Street/       Red Wing, MN.........  Upper Mississippi River
                                     Mississippi Alumination.                           mile marker 790.8 to
                                                                                        791.2.
5. 1 day--4th of July weekend.....  Tan-Tar-A Resort/Tan-Tar-A  Lake of the Ozarks,    Lake of the Ozarks mile
                                     4th of July Fireworks.      MO.                    marker 025.8 to 026.2.
6. 1 day--1st weekend of September  Tan-Tar-A Resort/Tan-Tar-A  Lake of the Ozarks,    Lake of the Ozarks mile
                                     Labor Day Fireworks.        MO.                    marker 025.8 to 026.2.
7. 1 day--Last Sunday in May......  Tan-Tar-A Resort/Tan-Tar-A  Lake of the Ozarks,    Lake of the Ozarks mile
                                     Memorial Day fireworks.     MO.                    marker 025.8 to 026.2.
8. 1 day--4th of July weekend.....  Lake City Chamber of        Lake City, MN........  Upper Mississippi River
                                     Commerce/Lake City 4th of                          mile marker 772.4 to
                                     July Fireworks.                                    772.8.
9. 1 day--4th of July weekend.....  Greater Muscatine Chamber   Muscatine, IA........  Upper Mississippi River
                                     of Commerce/Muscatine 4th                          mile marker 455.0 to
                                     of July.                                           456.0.
10. 1 day--Last weekend in June/    Friends of the River        Kansas City, KS......  Missouri River mile
 First weekend in July.              Kansas City/KC Riverfest.                          marker 364.8 to 365.2.
11. 1 day--4th of July weekend....  Louisiana Chamber of        Louisiana, MO........  Upper Mississippi River
                                     Commerce/Louisiana July                            mile marker 282.0 to
                                     4th Fireworks.                                     283.0.
12. 1 day--4th of July weekend....  Guttenberg Development and  Guttenberg, IA.......  Upper Mississippi River
                                     Tourism/Stars and Stripes                          mile marker 615.0 to
                                     River Day.                                         615.5.
13. 4 days--1st or 2nd week of      Riverfest, Inc./La Crosse   La Crosse, WI........  Upper Mississippi River
 July.                               Riverfest.                                         mile marker 697.5 to
                                                                                        698.5 (Wisconsin).
14. 1 day--2nd weekend in July....  Prairie du Chien Area       Prairie du Chien, WI.  Upper Mississippi River
                                     Chamber of Commerce/                               mile marker 635.2 to
                                     Prairie du Chien Area                              635.7.
                                     Chamber Fireworks.
15. 1 day--4th of July weekend....  JMP Radio/Red White and     Peoria, IL...........  Illinois River mile
                                     Boom Peoria.                                       marker 162.5 to 162.1.
16. 1 day--Last weekend in June/    Hudson Boosters/Hudson      Hudson, WI...........  St. Croix River mile
 First weekend in July.              Booster Days.                                      marker 016.8 to 017.2.
17. 2 days--4th of July weekend...  City of St. Charles/St.     St. Charles, MO......  Missouri River mile
                                     Charles Riverfest.                                 marker 028.2 to 028.8.
18. 1 day--4th of July weekend....  Minneapolis Park and        Minneapolis, MN......  Upper Mississippi River
                                     Recreation Board/Red,                              mile marker 853.5 to
                                     White, and Boom                                    854.5.
                                     Minneapolis.
19. 1 day--4th of July weekend....  Davenport One Chamber/Red   Davenport, IA........  Upper Mississippi River
                                     White and Boom.                                    mile marker 482.0 to
                                                                                        482.7.
20. 2 days--3rd weekend of July...  Amelia Earhart Festival     Kansas City, KS......  Missouri River mile
                                     Committee/Amelia Earhart                           marker 422.0 to 424.5.
                                     Festival.
21. 1 day--4th of July weekend....  Alton Exposition            Alton, IL............  Upper Mississippi River
                                     Commission/Mississippi                             mile marker 202.5 to
                                     Fireworks Festival.                                203.0.
22. 1 day--3rd Sunday in June.....  Burlington Steamboat Days/  Burlington, IA.......  Upper Mississippi River
                                     Burlington Steamboat Days.                         mile marker 403.5 to
                                                                                        404.5.
23. 1 day--Last Sunday in May.....  Lodge of the Four Seasons/  Lake of the Ozarks,    Lake of the Ozarks mile
                                     Lodge of the Four Seasons   MO.                    marker 013.8 to 014.2.
                                     Memorial Day Fireworks.
24. 1 day--First weekend of         Lodge of the Four Seasons/  Lake of the Ozarks,    Lake of the Ozarks mile
 September.                          Labor Day Fireworks.        MO.                    marker 013.8 to 014.2.
25. 1 day--4th of July weekend....  Lodge of the Four Seasons/  Lake of the Ozarks,    Lake of the Ozarks mile
                                     Lodge of the Four Seasons   MO.                    marker 013.8 to 014.2.
                                     4th of July.
26. 2 days--3rd weekend in July...  Hasting Riverboat Days/     Hasting, MN..........  Upper Mississippi River
                                     Rivertown Days.                                    mile marker 813.7 to
                                                                                        815.2.

[[Page 36174]]

 
27. 1 day--Sunday of Father's Day   Winona Steamboat Days/      Winona, MN...........  Upper Mississippi River
 weekend.                            Winona Steamboat Days                              mile marker 725.4 to
                                     Fireworks.                                         725.7.
28. 3 days--4th of July weekend...  Fair of St. Louis/Fair St.  St. Louis, MO........  Upper Mississippi River
                                     Louis.                                             mile marker 179.2 to
                                                                                        180.0.
29. 1 day--Last weekend in June/    Bellevue Heritage Days/     Bellevue, IA.........  Upper Mississippi River
 First weekend in July.              Bellevue Heritage Days.                            mile marker 556.0 to
                                                                                        556.5.
30. 1 day--4th of July weekend....  Main Street Parkway         Parkville, MO........  Missouri River mile
                                     Association/Parkville 4th                          marker 378.0 to 377.5.
                                     of July Fireworks.
31. 1 day--4th of July weekend....  Hermann Chamber of          Hermann, MO..........  Missouri River mile
                                     Commerce/Hermann 4th of                            marker 097.0 to 098.0
                                     July.                                              (Missouri).
32. 1 day--4th of July weekend....  Grafton Chamber of          Grafton, IL..........  Illinois River mile
                                     Commerce/Grafton Chamber                           marker 001.5 to 000.5
                                     4th of July Fireworks.                             (Illinois).
33. 1 day--4th of July weekend....  Salute to America           Jefferson City, MO...  Missouri River mile
                                     Foundation, Inc./Salute                            marker 143.5 to 143.0
                                     to America.                                        (Missouri).
34. 1 day--4th of July weekend....  McGregor/Marquette Chamber  McGregor, IA.........  Upper Mississippi River
                                     Commerce/Independence Day                          mile marker 635.7 to
                                     Celebration.                                       634.2.
35. 2 days--2nd weekend in August.  Tug Committee/Great River   Port Byron, IL.......  Upper Mississippi River
                                     Tug.                                               mile marker 497.2 to
                                                                                        497.6 (Illinois).
36. 1 day--4th of July weekend....  City of Stillwater/St.      Stillwater, MN.......  St. Croix River mile
                                     Croix Events/Stillwater                            marker 022.9 to 023.5
                                     4th of July.                                       (Minnesota).
37. 2 days--3rd weekend of          Riverside Chamber of        Riverside, MO........  Missouri River mile
 September.                          Commerce/Riverfest.                                marker 371.8 to 372.2.
38. 4 days--3rd week of July......  St. Croix Events/           Stillwater, MN.......  St. Croix River mile
                                     Lumberjack Days.                                   marker 022.9 to 023.5
                                                                                        (Minnesota).
39. 2 days--Weekend that precedes   Lake of the Ozarks          Lake of the Ozarks,    Lake of the Ozarks mile
 Labor Day Weekend.                  Shootout, Inc./Lake of      MO.                    marker 032.5 to 034.5.
                                     the Ozarks Shootout.
40. 2 days--1st weekend of          City of Keithsburg/         Keithsburg, IL.......  Upper Mississippi River
 September.                          Keithsburg Fireworks                               mile marker 427.5 to
                                     Display.                                           427.3.
41. 1 day--4th of July weekend....  City of East Moline/City    East Moline, IA......  Upper Mississippi River
                                     of East Moline Fireworks.                          mile marker 490.2 to
                                                                                        489.8.
42. 2nd Weekend in August.........  Lansing Lion's Club/        Lansing, IA..........  Upper Mississippi River
                                     Lansing Fish Days                                  mile marker 662.8-663.9.
                                     Fireworks.
43. 3rd Weekend in August.........  River Action/Floatzilla...  Rock Island, Illinois  Upper Mississippi River
                                                                                        mile marker 479.0-486.0.
44. 1 day--Weekend before           Main Street Parkway         Parkville, MO........  Missouri River mile
 Thanksgiving.                       Association/Parkville                              marker 377.5 to 378.0.
                                     Christmas on the River.
45. 2 days--A weekend in September  St. Louis Drag Boat         New Athens, IL.......  Kaskaskia River mile
                                     Association/New Athens                             marker 119.7 to 120.3.
                                     Drag Boat Race.
46. 1 day--4th of July weekend....  City of Marquette/          Marquette, IA........  Upper Mississippi River
                                     Marquette Independence                             mile marker 634.2 to
                                     Day Celebration.                                   635.7.
----------------------------------------------------------------------------------------------------------------

* * * * *

    Dated: May 26, 2016.
M.L. Malloy,
Captain, U.S. Coast Guard, Captain of the Port Upper Mississippi River.
[FR Doc. 2016-13239 Filed 6-3-16; 8:45 am]
 BILLING CODE 9110-04-P



                                                                     Federal Register / Vol. 81, No. 108 / Monday, June 6, 2016 / Rules and Regulations                                         36171

                                                  Dated: May 15, 2016.                                  I. Table of Abbreviations                              of the recurring safety zones listed in
                                                M.H. Day,                                               AOR Area of Responsibility
                                                                                                                                                               the NPRM. Therefore, there are two new
                                                Captain, U.S. Coast Guard, Captain of the               CFR Code of Federal Regulations                        proposed changes to the regulatory text
                                                Port, New York.                                         COTP Captain of the Port                               of this rule that are different from the
                                                [FR Doc. 2016–13341 Filed 6–3–16; 8:45 am]              DHS Department of Homeland Security                    proposed rule in the NPRM. The first
                                                BILLING CODE 9110–04–P                                  FR Federal Register                                    corrects the location of event number
                                                                                                        NPRM Notice of proposed rulemaking                     14; Prairie du Chien Area Chamber
                                                                                                        § Section                                              Fireworks, taking place annually on one
                                                DEPARTMENT OF HOMELAND                                  U.S.C. United States Code                              day during the second weekend of July.
                                                SECURITY                                                II. Background Information and                         The location listed in the proposed rule
                                                                                                        Regulatory History                                     was Upper Mississippi River mile
                                                Coast Guard                                                                                                    marker 633.8 to 634.2; the correct
                                                                                                           On April 8, 2016, the Coast Guard                   location for this event is Upper
                                                33 CFR Part 165                                         published a notice of proposed                         Mississippi River mile marker 635.2 to
                                                                                                        rulemaking (NPRM) titled Safety Zones;                 635.7. The second corrects the location
                                                [Docket Number USCG–2015–1079]                          Sector Upper Mississippi River Annual                  of event number 31; Hermann 4th of
                                                                                                        and Recurring Safety Zones Update (81                  July event taking place one day over the
                                                RIN 1625–AA00
                                                                                                        FR 20592). There we stated why we                      4th of July weekend. The location listed
                                                Safety Zones; Sector Upper                              issued the NPRM, and invited                           in the proposed rule was Missouri River
                                                Mississippi River Annual and                            comments on our proposed regulatory                    mile marker 99.0 to 98.0; the correct
                                                Recurring Safety Zones Update                           action related to this fireworks display.              location for this event is Missouri River
                                                                                                        During the comment period that ended                   mile marker 97.0 to 98.0.
                                                AGENCY:Coast Guard, DHS.                                May 9, 2016, we received information                     All other changes, removals, and
                                                      Interim rule with requests for
                                                ACTION:                                                 from event sponsors providing updated                  additions proposed under the NPRM
                                                comments.                                               locations for 2 of the events listed in the            remain the same as listed in the
                                                                                                        NPRM. Therefore, we are requesting                     proposed rule. This interim rule
                                                SUMMARY:   The Coast Guard is amending                  comments through this interim rule                     establishes recurring safety zones to
                                                and updating its annual and recurring                   related to these two location changes                  restrict vessel transit into and through
                                                safety zones that take place in the Coast               before issuing a final rule. These                     specified areas to protect spectators,
                                                Guard Sector Upper Mississippi River                    changes are discussed further below.                   mariners, and other persons and
                                                area of responsibility (AOR). This                         We are issuing this rule, and under 5               property from potential hazards
                                                regulation informs the public of                        U.S.C. 553(d)(3), the Coast Guard finds                presented during certain events taking
                                                regularly scheduled events that require                 that good cause exists for making it                   place in Sector Upper Mississippi
                                                additional safety measures through                      effective less than 30 days after                      River’s AOR. This interim rule amends,
                                                establishing a safety zone. Through this                publication in the Federal Register.                   updates, and replaces Table 2 in 33 CFR
                                                interim rule the current list of recurring              Though we are not providing a full 30                  165.801, and requests comments on two
                                                safety zones is updated with revisions,                 day notice period, the Coast Guard did                 additional changes as discussed above
                                                additional events, and removal of events                provide notice and opportunity to                      before issuing a final rule. No vessel or
                                                that no longer take place; and we are                   comment through the NPRM process                       person will be permitted to enter the
                                                requesting comments on additional                       and is now providing five days notice                  safety zones without first obtaining
                                                changes necessary to update the                         before the first updated recurring safety              permission from the COTP or a
                                                permanent list of recurring safety zones                zone enforcement is required the                       designated representative.
                                                in Sector Upper Mississippi River’s                     weekend of June 11–12. It is
                                                AOR. When these safety zones are                        impracticable to provide a full 30-days                V. Regulatory Analyses
                                                enforced, vessel traffic is restricted from             notice because this rule must be                         We developed this rule after
                                                specified areas. Additionally, this one                 effective June 11, 2016.                               considering numerous statutes and
                                                rulemaking project serves to provide                                                                           Executive orders related to rulemaking.
                                                notice of the known recurring safety                    III. Legal Authority and Need for Rule                 Below we summarize our analyses
                                                zones throughout the year.                                 The Coast Guard is issuing this rule                based on a number of these statutes and
                                                DATES: This rule is effective June 11,                  under authority in 33 U.S.C. 1231. The                 Executive orders, and we discuss First
                                                2016. Comments and related material                     Captain of the Port (COTP) Upper                       Amendment rights of protestors.
                                                must be received by the Coast Guard on                  Mississippi River has determined that
                                                                                                                                                               A. Regulatory Planning and Review
                                                or before June 27, 2016.                                potential hazards associated with the
                                                                                                        recurring events will cause safety                        Executive Orders 12866 and 13563
                                                ADDRESSES: To view documents
                                                                                                        concerns. The purpose of this rule is to               direct agencies to assess the costs and
                                                mentioned in this preamble as being                                                                            benefits of available regulatory
                                                                                                        ensure safety of vessels and the
                                                available in the docket, go to http://                                                                         alternatives and, if regulation is
                                                                                                        navigable waters in the safety zones,
                                                www.regulations.gov, type USCG–2015–                                                                           necessary, to select regulatory
                                                                                                        before, during, and after the scheduled
                                                1079 in the ‘‘SEARCH’’ box and click                                                                           approaches that maximize net benefits.
                                                                                                        events.
                                                ‘‘SEARCH.’’ Click on Open Docket                                                                               Executive Order 13563 emphasizes the
                                                Folder on the line associated with this                 IV. Discussion of Comments, Changes,                   importance of quantifying both costs
                                                rule.                                                   and the Interim Rule                                   and benefits, of reducing costs, of
mstockstill on DSK3G9T082PROD with RULES




                                                FOR FURTHER INFORMATION CONTACT: If                        As noted above, during the comment                  harmonizing rules, and of promoting
                                                you have questions on this rule, call or                period for our NPRM that published                     flexibility. This rule has not been
                                                email LCDR Sean Peterson, Chief of                      April 8, 2016, we received information                 designated a ‘‘significant regulatory
                                                Prevention, U.S. Coast Guard; telephone                 from event sponsors updating the                       action,’’ under Executive Order 12866.
                                                314–269–2332, email Sean.M.Peterson@                    location for two events. This                          Accordingly, it has not been reviewed
                                                uscg.mil.                                               information lead to the need to propose                by the Office of Management and
                                                SUPPLEMENTARY INFORMATION:                              changes to the location details for two                Budget.


                                           VerDate Sep<11>2014   16:21 Jun 03, 2016   Jkt 238001   PO 00000   Frm 00035   Fmt 4700   Sfmt 4700   E:\FR\FM\06JNR1.SGM   06JNR1


                                                36172                Federal Register / Vol. 81, No. 108 / Monday, June 6, 2016 / Rules and Regulations

                                                  This rule establishes safety zones                    wish to comment on actions by                          determined that this action is one of a
                                                limiting access to certain areas under 33               employees of the Coast Guard, call 1–                  category of actions that do not
                                                CFR 165 within Sector Upper                             888–REG–FAIR (1–888–734–3247). The                     individually or cumulatively have a
                                                Mississippi River’s AOR. The effect of                  Coast Guard will not retaliate against                 significant effect on the human
                                                this proposed rulemaking will not be                    small entities that question or complain               environment. This rule involves
                                                significant because these safety zones                  about this rule or any policy or action                establishing safety zones limiting access
                                                are limited in scope and duration.                      of the Coast Guard.                                    to certain area under 33 CFR part 165
                                                Additionally, the public is given                                                                              within Sector Upper Mississippi River’s
                                                advance notification through local forms                C. Collection of Information                           AOR. It is categorically excluded from
                                                of notice, the Federal Register, and/or                   This rule will not call for a new                    further review under paragraph 34(h) of
                                                Notices of Enforcement and thus will be                 collection of information under the                    Figure 2–1 of the Commandant
                                                able to plan operations around the                      Paperwork Reduction Act of 1995 (44                    Instruction. An environmental analysis
                                                safety zones in advance. Deviation from                 U.S.C. 3501–3520).                                     checklist supporting this determination
                                                the safety zones established through this               D. Federalism and Indian Tribal                        and a Categorical Exclusion
                                                rulemaking may be requested from the                                                                           Determination are available in the
                                                                                                        Governments
                                                COTP Upper Mississippi River or a                                                                              docket where indicated under
                                                designated representative and requests                     A rule has implications for federalism              ADDRESSES. We seek any comments or
                                                will be considered on a case-by-case                    under Executive Order 13132,                           information that may lead to the
                                                basis.                                                  Federalism, if it has a substantial direct             discovery of a significant environmental
                                                                                                        effect on the States, on the relationship              impact from this rule.
                                                B. Impact on Small Entities                             between the national government and
                                                   The Regulatory Flexibility Act of                    the States, or on the distribution of                  G. Protest Activities
                                                1980, 5 U.S.C. 601–612, as amended,                     power and responsibilities among the                     The Coast Guard respects the First
                                                requires Federal agencies to consider                   various levels of government. We have                  Amendment rights of protesters.
                                                the potential impact of regulations on                  analyzed this rule under that Order and                Protesters are asked to contact the
                                                small entities during rulemaking. The                   have determined that it is consistent                  person listed in the FOR FURTHER
                                                term ‘‘small entities’’ comprises small                 with the fundamental federalism                        INFORMATION CONTACT section to
                                                businesses, not-for-profit organizations                principles and preemption requirements                 coordinate protest activities so that your
                                                that are independently owned and                        described in Executive Order 13132.                    message can be received without
                                                operated and are not dominant in their                     Also, this rule does not have tribal                jeopardizing the safety or security of
                                                fields, and governmental jurisdictions                  implications under Executive Order                     people, places or vessels.
                                                with populations of less than 50,000.                   13175, Consultation and Coordination
                                                The Coast Guard received no comments                    with Indian Tribal Governments,                        V. Public Participation and Request for
                                                from the Small Business Administration                  because it does not have a substantial                 Comments
                                                on this rulemaking. The Coast Guard                     direct effect on one or more Indian                       We view public participation as
                                                certifies under 5 U.S.C. 605(b) that this               tribes, on the relationship between the                essential to effective rulemaking, and
                                                rule will not have a significant                        Federal Government and Indian tribes,                  will consider all comments and material
                                                economic impact on a substantial                        or on the distribution of power and                    received during the comment period.
                                                number of small entities.                               responsibilities between the Federal                   Your comment can help shape the
                                                   While some owners or operators of                    Government and Indian tribes. If you                   outcome of this rulemaking. If you
                                                vessels intending to transit the safety                 believe this rule has implications for                 submit a comment, please include the
                                                zone may be small entities, for the                     federalism or Indian tribes, please                    docket number for this rulemaking,
                                                reasons stated in section V.A. above,                   contact the person listed in the FOR                   indicate the specific section of this
                                                this rule will not have a significant                   FURTHER INFORMATION CONTACT section.                   document to which each comment
                                                economic impact on any vessel owner                                                                            applies, and provide a reason for each
                                                or operator.                                            E. Unfunded Mandates Reform Act                        suggestion or recommendation.
                                                   Under section 213(a) of the Small                      The Unfunded Mandates Reform Act                        We encourage you to submit
                                                Business Regulatory Enforcement                         of 1995 (2 U.S.C. 1531–1538) requires                  comments through the Federal
                                                Fairness Act of 1996 (Pub. L. 104–121),                 Federal agencies to assess the effects of              eRulemaking Portal at http://
                                                we want to assist small entities in                     their discretionary regulatory actions. In             www.regulations.gov. If your material
                                                understanding this rule. If the rule                    particular, the Act addresses actions                  cannot be submitted using http://
                                                would affect your small business,                       that may result in the expenditure by a                www.regulations.gov, contact the person
                                                organization, or governmental                           State, local, or tribal government, in the             in the FOR FURTHER INFORMATION
                                                jurisdiction and you have questions                     aggregate, or by the private sector of                 CONTACT section of this document for
                                                concerning its provisions or options for                $100,000,000 (adjusted for inflation) or               alternate instructions.
                                                compliance, please contact the person                   more in any one year. Though this rule                    We accept anonymous comments. All
                                                listed in the FOR FURTHER INFORMATION                   will not result in such an expenditure,                comments received will be posted
                                                CONTACT section.                                        we do discuss the effects of this rule                 without change to http://
                                                   Small businesses may send comments                   elsewhere in this preamble.                            www.regulations.gov and will include
                                                on the actions of Federal employees                                                                            any personal information you have
                                                who enforce, or otherwise determine                     F. Environment                                         provided. For more about privacy and
                                                compliance with, Federal regulations to                   We have analyzed this rule under                     the docket, you may review a Privacy
mstockstill on DSK3G9T082PROD with RULES




                                                the Small Business and Agriculture                      Department of Homeland Security                        Act notice regarding the Federal Docket
                                                Regulatory Enforcement Ombudsman                        Management Directive 023–01 and                        Management System in the March 24,
                                                and the Regional Small Business                         Commandant Instruction M16475.lD,                      2005, issue of the Federal Register (70
                                                Regulatory Fairness Boards. The                         which guide the Coast Guard in                         FR 15086).
                                                Ombudsman evaluates these actions                       complying with the National                               Documents mentioned in this interim
                                                annually and rates each agency’s                        Environmental Policy Act of 1969 (42                   rule or the preceding NPRM as being
                                                responsiveness to small business. If you                U.S.C. 4321–4370f), and have                           available in the docket, and all public


                                           VerDate Sep<11>2014   16:21 Jun 03, 2016   Jkt 238001   PO 00000   Frm 00036   Fmt 4700   Sfmt 4700   E:\FR\FM\06JNR1.SGM   06JNR1


                                                                     Federal Register / Vol. 81, No. 108 / Monday, June 6, 2016 / Rules and Regulations                                                    36173

                                                comments, will be in our online docket                   requirements, Security measures,                             Authority: 33 U.S.C. 1231; 50 U.S.C. 191;
                                                at http://www.regulations.gov and can                    Waterways.                                                 33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5;
                                                be viewed by following that Web site’s                                                                              Department of Homeland Security Delegation
                                                instructions. Additionally, if you go to                   For the reasons discussed in the                         No. 0170.1.
                                                the online docket and sign up for email                  preamble, the Coast Guard amends 33
                                                alerts, you will be notified when                        CFR part 165 as follows:                                   ■ 2. Amend § 165.801 by revising Table
                                                comments are posted or a final rule is                                                                              2 to read as follows:
                                                                                                         PART 165—REGULATED NAVIGATION
                                                published.                                                                                                          § 165.801 Annual fireworks displays and
                                                                                                         AREAS AND LIMITED ACCESS AREAS
                                                List of Subjects in 33 CFR Part 165                                                                                 other events in the Eighth Coast Guard
                                                                                                                                                                    District requiring safety zones.
                                                  Harbors, Marine safety, Navigation                     ■ 1. The authority citation for part 165
                                                (water), Reporting and recordkeeping                     continues to read as follows:                              *          *    *    *      *

                                                             TABLE 2 OF § 165.801—SECTOR UPPER MISSISSIPPI RIVER ANNUAL AND RECURRING SAFETY ZONES
                                                                                                                                                     Sector Upper
                                                                   Date                                         Sponsor/name                          Mississippi                            Safety zone
                                                                                                                                                     River location

                                                1. 1 day—4th weekend of July ..............        Marketing Minneapolis LLC/Target              Minneapolis, MN ...           Upper Mississippi River mile marker
                                                                                                     Aquatennial Fireworks.                                                      853.2 to 854.2.
                                                2. 1 day—4th of July weekend ..............        Radio Dubuque/Radio Dubuque Fire-             Dubuque, IA ..........        Upper Mississippi River mile marker
                                                                                                     works and Air show.                                                         581.0 to 583.0.
                                                3. 1 day—2nd weekend of June ............          City of Champlin/Father Hennepin              Champlin, MN .......          Upper Mississippi River mile marker
                                                                                                     Fireworks Display.                                                          870.5 to 872.0.
                                                4. 1 day—4th of July weekend ..............        Downtown Main Street/Mississippi              Red Wing, MN ......           Upper Mississippi River mile marker
                                                                                                     Alumination.                                                                790.8 to 791.2.
                                                5. 1 day—4th of July weekend ..............        Tan-Tar-A Resort/Tan-Tar-A 4th of             Lake of the                   Lake of the Ozarks mile marker 025.8
                                                                                                     July Fireworks.                               Ozarks, MO.                   to 026.2.
                                                6. 1 day—1st weekend of September ...              Tan-Tar-A Resort/Tan-Tar-A Labor              Lake of the                   Lake of the Ozarks mile marker 025.8
                                                                                                     Day Fireworks.                                Ozarks, MO.                   to 026.2.
                                                7. 1 day—Last Sunday in May ...............        Tan-Tar-A Resort/Tan-Tar-A Memorial           Lake of the                   Lake of the Ozarks mile marker 025.8
                                                                                                     Day fireworks.                                Ozarks, MO.                   to 026.2.
                                                8. 1 day—4th of July weekend ..............        Lake City Chamber of Commerce/Lake            Lake City, MN .......         Upper Mississippi River mile marker
                                                                                                     City 4th of July Fireworks.                                                 772.4 to 772.8.
                                                9. 1 day—4th of July weekend ..............        Greater Muscatine Chamber of Com-             Muscatine, IA ........        Upper Mississippi River mile marker
                                                                                                     merce/Muscatine 4th of July.                                                455.0 to 456.0.
                                                10. 1 day—Last weekend in June/First               Friends of the River Kansas City/KC           Kansas City, KS ....          Missouri River mile marker 364.8 to
                                                  weekend in July.                                   Riverfest.                                                                  365.2.
                                                11. 1 day—4th of July weekend ............         Louisiana Chamber of Commerce/Lou-            Louisiana, MO .......         Upper Mississippi River mile marker
                                                                                                     isiana July 4th Fireworks.                                                  282.0 to 283.0.
                                                12. 1 day—4th of July weekend ............         Guttenberg Development and Tourism/           Guttenberg, IA ......         Upper Mississippi River mile marker
                                                                                                     Stars and Stripes River Day.                                                615.0 to 615.5.
                                                13. 4 days—1st or 2nd week of July .....           Riverfest, Inc./La Crosse Riverfest ......    La Crosse, WI .......         Upper Mississippi River mile marker
                                                                                                                                                                                 697.5 to 698.5 (Wisconsin).
                                                14. 1 day—2nd weekend in July ............         Prairie du Chien Area Chamber of              Prairie du Chien,             Upper Mississippi River mile marker
                                                                                                     Commerce/Prairie du Chien Area                WI.                           635.2 to 635.7.
                                                                                                     Chamber Fireworks.
                                                15. 1 day—4th of July weekend ............         JMP Radio/Red White and Boom Peo-             Peoria, IL ..............     Illinois River mile marker 162.5 to
                                                                                                     ria.                                                                          162.1.
                                                16. 1 day—Last weekend in June/First               Hudson Boosters/Hudson Booster                Hudson, WI ...........        St. Croix River mile marker 016.8 to
                                                  weekend in July.                                   Days.                                                                         017.2.
                                                17. 2 days—4th of July weekend ...........         City of St. Charles/St. Charles               St. Charles, MO ....          Missouri River mile marker 028.2 to
                                                                                                     Riverfest.                                                                    028.8.
                                                18. 1 day—4th of July weekend ............         Minneapolis Park and Recreation               Minneapolis, MN ...           Upper Mississippi River mile marker
                                                                                                     Board/Red, White, and Boom Min-                                               853.5 to 854.5.
                                                                                                     neapolis.
                                                19. 1 day—4th of July weekend ............         Davenport One Chamber/Red White               Davenport, IA ........        Upper Mississippi River mile marker
                                                                                                     and Boom.                                                                   482.0 to 482.7.
                                                20. 2 days—3rd weekend of July ..........          Amelia Earhart Festival Committee/            Kansas City, KS ....          Missouri River mile marker 422.0 to
                                                                                                     Amelia Earhart Festival.                                                    424.5.
                                                21. 1 day—4th of July weekend ............         Alton    Exposition   Commission/Mis-         Alton, IL .................   Upper Mississippi River mile marker
                                                                                                     sissippi Fireworks Festival.                                                202.5 to 203.0.
                                                22. 1 day—3rd Sunday in June .............         Burlington Steamboat Days/Burlington          Burlington, IA ........       Upper Mississippi River mile marker
                                                                                                     Steamboat Days.                                                             403.5 to 404.5.
                                                23. 1 day—Last Sunday in May .............         Lodge of the Four Seasons/Lodge of            Lake of the                   Lake of the Ozarks mile marker 013.8
mstockstill on DSK3G9T082PROD with RULES




                                                                                                     the Four Seasons Memorial Day                 Ozarks, MO.                   to 014.2.
                                                                                                     Fireworks.
                                                24. 1 day—First weekend of September               Lodge of the Four Seasons/Labor Day           Lake of the                   Lake of the Ozarks mile marker 013.8
                                                                                                     Fireworks.                                    Ozarks, MO.                   to 014.2.
                                                25. 1 day—4th of July weekend ............         Lodge of the Four Seasons/Lodge of            Lake of the                   Lake of the Ozarks mile marker 013.8
                                                                                                     the Four Seasons 4th of July.                 Ozarks, MO.                   to 014.2.
                                                26. 2 days—3rd weekend in July ...........         Hasting Riverboat Days/Rivertown              Hasting, MN ..........        Upper Mississippi River mile marker
                                                                                                     Days.                                                                       813.7 to 815.2.



                                           VerDate Sep<11>2014   16:21 Jun 03, 2016   Jkt 238001   PO 00000   Frm 00037   Fmt 4700   Sfmt 4700   E:\FR\FM\06JNR1.SGM           06JNR1


                                                36174                 Federal Register / Vol. 81, No. 108 / Monday, June 6, 2016 / Rules and Regulations

                                                     TABLE 2 OF § 165.801—SECTOR UPPER MISSISSIPPI RIVER ANNUAL AND RECURRING SAFETY ZONES—Continued
                                                                                                                                                             Sector Upper
                                                                    Date                                            Sponsor/name                              Mississippi                         Safety zone
                                                                                                                                                             River location

                                                27. 1 day—Sunday of Father’s Day                    Winona       Steamboat      Days/Winona               Winona, MN ..........       Upper Mississippi River mile marker
                                                  weekend.                                            Steamboat Days Fireworks.                                                           725.4 to 725.7.
                                                28. 3 days—4th of July weekend ...........          Fair of St. Louis/Fair St. Louis .............        St. Louis, MO ........      Upper Mississippi River mile marker
                                                                                                                                                                                          179.2 to 180.0.
                                                29. 1 day—Last weekend in June/First                Bellevue Heritage Days/Bellevue Herit-                Bellevue, IA ...........    Upper Mississippi River mile marker
                                                  weekend in July.                                    age Days.                                                                           556.0 to 556.5.
                                                30. 1 day—4th of July weekend ............          Main Street Parkway Association/Park-                 Parkville, MO ........      Missouri River mile marker 378.0 to
                                                                                                      ville 4th of July Fireworks.                                                        377.5.
                                                31. 1 day—4th of July weekend ............          Hermann Chamber of Commerce/Her-                      Hermann, MO .......         Missouri River mile marker 097.0 to
                                                                                                      mann 4th of July.                                                                   098.0 (Missouri).
                                                32. 1 day—4th of July weekend ............          Grafton Chamber of Commerce/Graf-                     Grafton, IL .............   Illinois River mile marker 001.5 to
                                                                                                      ton Chamber 4th of July Fireworks.                                                  000.5 (Illinois).
                                                33. 1 day—4th of July weekend ............          Salute to America Foundation, Inc./Sa-                Jefferson City, MO          Missouri River mile marker 143.5 to
                                                                                                      lute to America.                                                                    143.0 (Missouri).
                                                34. 1 day—4th of July weekend ............          McGregor/Marquette Chamber Com-                       McGregor, IA ........       Upper Mississippi River mile marker
                                                                                                      merce/Independence Day Celebra-                                                     635.7 to 634.2.
                                                                                                      tion.
                                                35. 2 days—2nd weekend in August .....              Tug Committee/Great River Tug ..........              Port Byron, IL ........     Upper Mississippi River mile marker
                                                                                                                                                                                        497.2 to 497.6 (Illinois).
                                                36. 1 day—4th of July weekend ............          City of Stillwater/St. Croix Events/Still-            Stillwater, MN ........     St. Croix River mile marker 022.9 to
                                                                                                      water 4th of July.                                                                023.5 (Minnesota).
                                                37. 2 days—3rd weekend of September                 Riverside Chamber of Commerce/                        Riverside, MO .......       Missouri River mile marker 371.8 to
                                                                                                      Riverfest.                                                                        372.2.
                                                38. 4 days—3rd week of July ................        St. Croix Events/Lumberjack Days ......               Stillwater, MN ........     St. Croix River mile marker 022.9 to
                                                                                                                                                                                        023.5 (Minnesota).
                                                39. 2 days—Weekend that precedes                    Lake of the Ozarks Shootout, Inc./Lake                Lake of the                 Lake of the Ozarks mile marker 032.5
                                                  Labor Day Weekend.                                  of the Ozarks Shootout.                               Ozarks, MO.                 to 034.5.
                                                40. 2 days—1st weekend of September                 City of Keithsburg/Keithsburg Fire-                   Keithsburg, IL ........     Upper Mississippi River mile marker
                                                                                                      works Display.                                                                    427.5 to 427.3.
                                                41. 1 day—4th of July weekend ............          City of East Moline/City of East Moline               East Moline, IA .....       Upper Mississippi River mile marker
                                                                                                      Fireworks.                                                                        490.2 to 489.8.
                                                42. 2nd Weekend in August ...................       Lansing Lion’s Club/Lansing Fish Days                 Lansing, IA ............    Upper Mississippi River mile marker
                                                                                                      Fireworks.                                                                        662.8–663.9.
                                                43. 3rd Weekend in August ...................       River Action/Floatzilla ...........................   Rock Island, Illinois       Upper Mississippi River mile marker
                                                                                                                                                                                        479.0–486.0.
                                                44. 1 day—Weekend before Thanks-                    Main Street Parkway Association/Park-                 Parkville, MO ........      Missouri River mile marker 377.5 to
                                                  giving.                                             ville Christmas on the River.                                                     378.0.
                                                45. 2 days—A weekend in September ..                St. Louis Drag Boat Association/New                   New Athens, IL .....        Kaskaskia River mile marker 119.7 to
                                                                                                      Athens Drag Boat Race.                                                            120.3.
                                                46. 1 day—4th of July weekend ............          City of Marquette/Marquette Independ-                 Marquette, IA ........      Upper Mississippi River mile marker
                                                                                                      ence Day Celebration.                                                             634.2 to 635.7.



                                                *      *      *       *      *                              ACTION:     Temporary final rule.                               Folder on the line associated with this
                                                  Dated: May 26, 2016.                                                                                                      rule.
                                                                                                            SUMMARY:   The Coast Guard is                                   FOR FURTHER INFORMATION CONTACT: If
                                                M.L. Malloy,
                                                                                                            establishing a temporary safety zone on                         you have questions on this rule, call or
                                                Captain, U.S. Coast Guard, Captain of the                   the navigable waters of Raritan Bay near
                                                Port Upper Mississippi River.                                                                                               email, Marine Science Technician
                                                                                                            Perth Amboy, NJ for a fireworks display.                        Daniel Vazquez, U.S. Coast Guard;
                                                [FR Doc. 2016–13239 Filed 6–3–16; 8:45 am]                  This temporary safety zone is necessary                         Telephone (718) 354–4154, email
                                                BILLING CODE 9110–04–P                                      to protect spectators and vessels from                          daniel.vazquez@uscg.mil.
                                                                                                            the hazards associated with fireworks
                                                                                                                                                                            SUPPLEMENTARY INFORMATION:
                                                                                                            displays. This rule is intended to restrict
                                                DEPARTMENT OF HOMELAND                                      all vessels from a portion of Raritan Bay                       I. Table of Abbreviations
                                                SECURITY                                                    during the fireworks event unless                               CFR Code of Federal Regulations
                                                Coast Guard                                                 authorized by the Captain of the Port                           DHS Department of Homeland Security
                                                                                                            (COTP) New York or a designated                                 FR Federal Register
                                                33 CFR Part 165                                             representative.                                                 NPRM Notice of proposed rulemaking
                                                                                                                                                                            § Section
                                                                                                            DATES: This rule is effective from 8:45                         U.S.C. United States Code
mstockstill on DSK3G9T082PROD with RULES




                                                [Docket Number USCG–2016–0297]                              p.m. until 10:30 p.m. on July 1, 2016.
                                                                                                            ADDRESSES: To view documents                                    II. Background Information and
                                                RIN 1625–AA00                                               mentioned in this preamble as being                             Regulatory History
                                                Safety Zone; Raritan Bay, Perth                             available in the docket, go to http://                            The Coast Guard is issuing this
                                                Amboy, NJ                                                   www.regulations.gov, type USCG–2016–                            temporary rule without prior notice and
                                                                                                            0297 in the ‘‘SEARCH’’ box and click                            opportunity to comment pursuant to
                                                AGENCY:    Coast Guard, DHS.                                ‘‘SEARCH.’’ Click on Open Docket                                authority under section 4(a) of the


                                           VerDate Sep<11>2014    16:21 Jun 03, 2016   Jkt 238001    PO 00000     Frm 00038     Fmt 4700    Sfmt 4700     E:\FR\FM\06JNR1.SGM         06JNR1



Document Created: 2016-06-04 00:16:28
Document Modified: 2016-06-04 00:16:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionInterim rule with requests for comments.
DatesThis rule is effective June 11, 2016. Comments and related material must be received by the Coast Guard on or before June 27, 2016.
ContactIf you have questions on this rule, call or email LCDR Sean Peterson, Chief of Prevention, U.S. Coast Guard; telephone 314-269-2332, email [email protected]
FR Citation81 FR 36171 
RIN Number1625-AA00
CFR AssociatedHarbors; Marine Safety; Navigation (water); Reporting and Recordkeeping Requirements; Security Measures and Waterways

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR