81_FR_36645 81 FR 36536 - Wells Rural Electric Company; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

81 FR 36536 - Wells Rural Electric Company; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 109 (June 7, 2016)

Page Range36536-36537
FR Document2016-13424

Federal Register, Volume 81 Issue 109 (Tuesday, June 7, 2016)
[Federal Register Volume 81, Number 109 (Tuesday, June 7, 2016)]
[Notices]
[Pages 36536-36537]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-13424]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No 848-037]


Wells Rural Electric Company; Notice of Application Tendered for 
Filing With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule for Relicensing and a Deadline for 
Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New License.
    b. Project No.: P-848-037.
    c. Date filed: May 18, 2016.
    d. Applicant: Wells Rural Electric Company.
    e. Name of Project: Trout Creek Hydroelectric Project.
    f. Location: On Trout Creek, near the Town of Wells, Elko County, 
Nevada. The project's intake structure, pipeline, debris collection 
box, surge tank and approximately 1,500 feet of penstock are located on 
federal land managed by the United States Forest Service.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Lonnie Abbott, Manager of Loss Control and 
Risk Services, Wells Rural Electric Company, P.O. Box 365, Wells, 
Nevada 89835, (775) 752-1516 or labbott@wrec.coop.
    FERC Contact: Joseph Hassell, 202-502-8079 or 
joseph.hassell@ferc.gov.
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: July 18, 2016.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426. The first page of any filing should include 
docket number P-848-037.
    m. The application is not ready for environmental analysis at this 
time.
    n. The existing Trout Creek project consists of: (1) An intake 
structure on a spring feeding Trout Creek; (2) a 14-inch-diameter, 715-
foot-long steel pipe; (3) a debris collection box; (4) a 15-inch-
diameter, 1900-foot-long PVC pipe; (4) an 8-foot-diameter, 20-foot high 
surge tank; (5) a 16-inch-diameter, 2,125-foot-long penstock; (6) a 
powerhouse with a 125-kilowatt turbine-generator unit (7) a 5 to 7-
foot-wide, 30-foot-long tailrace; (8) a 4,412-foot-long, 24.9-kV 
transmission line; and, (9) appurtenant facilities. The project is 
estimated to generate an average of 325,000 kilowatt-hours annually.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    q. Procedural schedule and final amendments: The application will 
be processed according to the following preliminary Hydro Licensing 
Schedule. Revisions to the schedule will be made as appropriate.

[[Page 36537]]



------------------------------------------------------------------------
 
------------------------------------------------------------------------
Issue Notice of Acceptance.............  May 2016.
Issue Scoping Document 1 for comments..  June 2016.
Comments on Scoping Document 1.........  July 2016.
Issue Scoping Document 2...............  October 2016.
Issue notice of ready for environmental  October 2016.
 analysis.
Commission issues EA, draft EA, or       April 2017.
 draft EIS.
Comments on EA or draft EA or draft EIS  May 2017.
Commission issues final EA of final EIS  July 2017.
------------------------------------------------------------------------

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: May 26, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-13424 Filed 6-6-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    36536                           Federal Register / Vol. 81, No. 109 / Tuesday, June 7, 2016 / Notices

                                                    DEPARTMENT OF ENERGY                                      Dated: June 1, 2016.                                 application on its merit, the resource
                                                                                                            Kimberly D. Bose,                                      agency, Indian Tribe, or person must file
                                                    Federal Energy Regulatory                               Secretary.                                             a request for a study with the
                                                    Commission                                              [FR Doc. 2016–13406 Filed 6–6–16; 8:45 am]             Commission not later than 60 days from
                                                                                                            BILLING CODE 6717–01–P
                                                                                                                                                                   the date of filing of the application, and
                                                    [Docket Nos. EL16–74–000; QF99–56–004]                                                                         serve a copy of the request on the
                                                                                                                                                                   applicant.
                                                    North Hartland, LLC; Notice of Petition                 DEPARTMENT OF ENERGY                                      l. Deadline for filing additional study
                                                    for Enforcement                                                                                                requests and requests for cooperating
                                                                                                            Federal Energy Regulatory                              agency status: July 18, 2016.
                                                       Take notice that on May 31, 2016,                    Commission                                                The Commission strongly encourages
                                                    pursuant to section 210(h)(2)(B) of the                                                                        electronic filing. Please file additional
                                                                                                            [Project No 848–037]                                   study requests and requests for
                                                    Public Utility Regulatory Policies Act of
                                                    1978 (PURPA), 16 U.S.C. 824a–3(h),                      Wells Rural Electric Company; Notice                   cooperating agency status using the
                                                    North Hartland, LLC filed a Petition for                                                                       Commission’s eFiling system at http://
                                                                                                            of Application Tendered for Filing With
                                                    Enforcement requesting the Federal                                                                             www.ferc.gov/docs-filing/efiling.asp. For
                                                                                                            the Commission and Soliciting
                                                    Energy Regulatory Commission                                                                                   assistance, please contact FERC Online
                                                                                                            Additional Study Requests and
                                                    (Commission) exercise its authority and                                                                        Support at FERCOnlineSupport@
                                                                                                            Establishing Procedural Schedule for
                                                    initiate enforcement action against the                                                                        ferc.gov, (866) 208–3676 (toll free), or
                                                                                                            Relicensing and a Deadline for
                                                    Vermont Public Service Board to                                                                                (202) 502–8659 (TTY). In lieu of
                                                                                                            Submission of Final Amendments
                                                    remedy its implementation of PURPA,                                                                            electronic filing, please send a paper
                                                    all as more fully explained in the                        Take notice that the following                       copy to: Secretary, Federal Energy
                                                    petition.                                               hydroelectric application has been filed               Regulatory Commission, 888 First Street
                                                                                                            with the Commission and is available                   NE., Washington, DC 20426. The first
                                                       Any person desiring to intervene or to                                                                      page of any filing should include docket
                                                                                                            for public inspection.
                                                    protest this filing must file in                          a. Type of Application: New License.                 number P–848–037.
                                                    accordance with Rules 211 and 214 of                      b. Project No.: P–848–037.                              m. The application is not ready for
                                                    the Commission’s Rules of Practice and                    c. Date filed: May 18, 2016.                         environmental analysis at this time.
                                                    Procedure (18 CFR 385.211, 385.214).                      d. Applicant: Wells Rural Electric                      n. The existing Trout Creek project
                                                    Protests will be considered by the                      Company.                                               consists of: (1) An intake structure on a
                                                    Commission in determining the                             e. Name of Project: Trout Creek                      spring feeding Trout Creek; (2) a 14-
                                                    appropriate action to be taken, but will                Hydroelectric Project.                                 inch-diameter, 715-foot-long steel pipe;
                                                    not serve to make protestants parties to                  f. Location: On Trout Creek, near the                (3) a debris collection box; (4) a 15-inch-
                                                    the proceeding. Any person wishing to                   Town of Wells, Elko County, Nevada.                    diameter, 1900-foot-long PVC pipe; (4)
                                                    become a party must file a notice of                    The project’s intake structure, pipeline,              an 8-foot-diameter, 20-foot high surge
                                                    intervention or motion to intervene, as                 debris collection box, surge tank and                  tank; (5) a 16-inch-diameter, 2,125-foot-
                                                    appropriate. Such notices, motions, or                  approximately 1,500 feet of penstock are               long penstock; (6) a powerhouse with a
                                                    protests must be filed on or before the                 located on federal land managed by the                 125-kilowatt turbine-generator unit (7) a
                                                    comment date. On or before the                          United States Forest Service.                          5 to 7-foot-wide, 30-foot-long tailrace;
                                                    comment date, it is not necessary to                      g. Filed Pursuant to: Federal Power                  (8) a 4,412-foot-long, 24.9-kV
                                                    serve motions to intervene or protests                  Act 16 U.S.C. 791(a)–825(r).                           transmission line; and, (9) appurtenant
                                                    on persons other than the Applicant.                      h. Applicant Contact: Lonnie Abbott,                 facilities. The project is estimated to
                                                       The Commission encourages                            Manager of Loss Control and Risk                       generate an average of 325,000 kilowatt-
                                                    electronic submission of protests and                   Services, Wells Rural Electric Company,                hours annually.
                                                    interventions in lieu of paper using the                P.O. Box 365, Wells, Nevada 89835,                        o. A copy of the application is
                                                    ‘‘eFiling’’ link at http://www.ferc.gov.                (775) 752–1516 or labbott@wrec.coop.                   available for review at the Commission
                                                    Persons unable to file electronically                     FERC Contact: Joseph Hassell, 202–                   in the Public Reference Room or may be
                                                    should submit an original and 5 copies                  502–8079 or joseph.hassell@ferc.gov.                   viewed on the Commission’s Web site at
                                                    of the protest or intervention to the                     j. Cooperating agencies: Federal, state,             http://www.ferc.gov using the
                                                    Federal Energy Regulatory Commission,                   local, and tribal agencies with                        ‘‘eLibrary’’ link. Enter the docket
                                                    888 First Street NE., Washington, DC                    jurisdiction and/or special expertise                  number excluding the last three digits in
                                                    20426.                                                  with respect to environmental issues                   the docket number field to access the
                                                                                                            that wish to cooperate in the                          document. For assistance, contact FERC
                                                       This filing is accessible on-line at                 preparation of the environmental                       Online Support. A copy is also available
                                                    http://www.ferc.gov, using the                          document should follow the                             for inspection and reproduction at the
                                                    ‘‘eLibrary’’ link and is available for                  instructions for filing such requests                  address in item h above.
                                                    review in the Commission’s Public                       described in item l below. Cooperating                    You may also register online at http://
                                                    Reference Room in Washington, DC.                       agencies should note the Commission’s                  www.ferc.gov/docs-filing/
                                                    There is an ‘‘eSubscription’’ link on the               policy that agencies that cooperate in                 esubscription.asp to be notified via
                                                    Web site that enables subscribers to                    the preparation of the environmental                   email of new filings and issuances
                                                    receive email notification when a                       document cannot also intervene. See, 94                related to this or other pending projects.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    document is added to a subscribed                       FERC ¶ 61,076 (2001).                                  For assistance, contact FERC Online
                                                    docket(s). For assistance with any FERC                   k. Pursuant to section 4.32(b)(7) of 18              Support.
                                                    Online service, please email                            CFR of the Commission’s regulations, if                   q. Procedural schedule and final
                                                    FERCOnlineSupport@ferc.gov, or call                     any resource agency, Indian Tribe, or                  amendments: The application will be
                                                    (866) 208–3676 (toll free). For TTY, call               person believes that an additional                     processed according to the following
                                                    (202) 502–8659.                                         scientific study should be conducted in                preliminary Hydro Licensing Schedule.
                                                       Comment Date: 5:00 p.m. Eastern                      order to form an adequate factual basis                Revisions to the schedule will be made
                                                    Time on June 21, 2016.                                  for a complete analysis of the                         as appropriate.


                                               VerDate Sep<11>2014   19:13 Jun 06, 2016   Jkt 238001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\07JNN1.SGM   07JNN1


                                                                                             Federal Register / Vol. 81, No. 109 / Tuesday, June 7, 2016 / Notices                                                                                     36537

                                                    Issue Notice of Acceptance ..............................................................................................................................................................   May 2016.
                                                    Issue Scoping Document 1 for comments .......................................................................................................................................               June 2016.
                                                    Comments on Scoping Document 1 ................................................................................................................................................             July 2016.
                                                    Issue Scoping Document 2 ..............................................................................................................................................................     October 2016.
                                                    Issue notice of ready for environmental analysis .............................................................................................................................              October 2016.
                                                    Commission issues EA, draft EA, or draft EIS .................................................................................................................................              April 2017.
                                                    Comments on EA or draft EA or draft EIS .......................................................................................................................................             May 2017.
                                                    Commission issues final EA of final EIS ..........................................................................................................................................          July 2017.



                                                       Final amendments to the application                                  Matthew J. Agen, Senior Counsel,                                        copies of the environmental documents,
                                                    must be filed with the Commission no                                    Columbia Gas Transmission, LLC, 5151                                    and will be notified of meetings
                                                    later than 30 days from the issuance                                    San Felipe Suite 2400, Houston, Texas                                   associated with he Commission’s
                                                    date of the notice of ready for                                         77056; telephone (713) 386–3619; or by                                  environmental review process.
                                                    environmental analysis.                                                 email magen@cpg.com .                                                   Environmental commenter’s will not be
                                                      Dated: May 26, 2016.
                                                                                                                               Any person may, within 60 days after                                 required to serve copies of filed
                                                                                                                            the issuance of the instant notice by the                               documents on all other parties.
                                                    Kimberly D. Bose,
                                                                                                                            Commission, file pursuant to Rule 214                                   However, the non-party commentary,
                                                    Secretary.                                                              of the Commission’s Procedural Rules                                    will not receive copies of all documents
                                                    [FR Doc. 2016–13424 Filed 6–6–16; 8:45 am]                              (18 CFR 385.214) a motion to intervene                                  filed by other parties or issued by the
                                                    BILLING CODE 6717–01–P                                                  or notice of intervention. Any person                                   Commission (except for the mailing of
                                                                                                                            filing to intervene or the Commission’s                                 environmental documents issued by the
                                                                                                                            staff may, pursuant to section 157.205 of                               Commission) and will not have the right
                                                    DEPARTMENT OF ENERGY                                                    the Commission’s Regulations under the                                  to seek court review of the
                                                                                                                            NGA (18 CFR 157.205) file a protest to                                  Commission’s final order.
                                                    Federal Energy Regulatory                                               the request. If no protest is filed within                                 The Commission strongly encourages
                                                    Commission                                                              the time allowed therefore, the proposed                                electronic filings of comments, protests,
                                                    [Docket No. CP16–462–000]                                               activity shall be deemed to be                                          and interventions via the internet in lieu
                                                                                                                            authorized effective the day after the                                  of paper. See 18 CFR 385.2001(a) (1) (iii)
                                                    Columbia Gas Transmission, LLC;                                         time allowed for protest. If a protest is                               and the instructions on the
                                                    Notice of Request Under Blanket                                         filed and not withdrawn within 30 days                                  Commission’s Web site (www.ferc.gov)
                                                    Authorization                                                           after the time allowed for filing a                                     under the ‘‘e-Filing’’ link. Persons
                                                                                                                            protest, the instant request shall be                                   unable to file electronically should
                                                       Take notice that on May 20, 2016                                     treated as an application for                                           submit original and 5 copies of the
                                                    Columbia Gas Transmission, LLC                                          authorization pursuant to section 7 of                                  protest or intervention to the Federal
                                                    (Columbia), 1300 Main Street, Houston,                                  the NGA.                                                                Energy Regulatory Commission, 888
                                                    Texas 77002 filed a prior notice request                                   Pursuant to section 157.9 of the                                     First Street NE., Washington, DC 20426.
                                                    pursuant to sections 157.205,                                           Commission’s rules, 18 CFR 157.9,
                                                    157.208(c), 157.213(b) and 157.216(b) of                                                                                                          Dated: June 1, 2016.
                                                                                                                            within 90 days of this Notice the
                                                    the Commission’s regulations under the                                  Commission staff will either: complete                                  Kimberly D. Bose,
                                                    Natural Gas Act (NGA). Columbia seeks                                   its environmental assessment (EA) and                                   Secretary.
                                                    authorization to abandon and modify                                     place it into the Commission’s public                                   [FR Doc. 2016–13410 Filed 6–6–16; 8:45 am]
                                                    certain storage facilities in the                                       record (eLibrary) for this proceeding; or                               BILLING CODE 6717–01–P
                                                    Majorsville-Heard Storage Complex                                       issue a Notice of Schedule for
                                                    (Storage Complex) in Marshall County,                                   Environmental Review. If a Notice of
                                                    West Virginia. The authorizations                                       Schedule for Environmental Review is                                    DEPARTMENT OF ENERGY
                                                    proposed in this proceeding do not                                      issued, it will indicate, among other
                                                    relate to mining activities, thus as                                    milestones, the anticipated date for the                                Federal Energy Regulatory
                                                    Columbia’s blanket authorization issued                                 Commission staff’s issuance of the final                                Commission
                                                    in Docket No. CP95–61–000 is limited to                                 environmental impact statement (FEIS)                                   [Project No. 3127–023]
                                                    those activities related to coal mining                                 or EA for this proposal. The filing of the
                                                    activities in the Storage Complex,                                      EA in the Commission’s public record                                    Ware River Power, Inc.; Notice of
                                                    Columbia is seeking abandonment                                         for this proceeding or the issuance of a                                Application Accepted for Filing,
                                                    authority under its blanket certificate                                 Notice of Schedule for Environmental                                    Soliciting Comments, Motions To
                                                    issued in Docket No. CP83–76–000, all                                   Review will serve to notify federal and                                 Intervene, and Protests
                                                    as more fully set forth in the application                              state agencies of the timing for the                                      Take notice that the following
                                                    which is on file with the Commission                                    completion of all necessary reviews, and                                hydroelectric application has been filed
                                                    and open to public inspection. The                                      the subsequent need to complete all                                     with the Commission and is available
                                                    filing may also be viewed on the web at                                 federal authorizations within 90 days of                                for public inspection:
                                                    http://www.ferc.gov using the                                           the date of issuance of the Commission                                    a. Type of Application: Application to
                                                    ‘‘eLibrary’’ link. Enter the docket                                     staff’s FEIS or EA.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                                                    amend 5 MW exemption from licensing.
                                                    number excluding the last three digits in                                  Persons who wish to comment only                                       b. Project No.: 3127–023.
                                                    the docket number field to access the                                   on the environmental review of this                                       c. Date Filed: January 27, 2016.
                                                    document. For assistance, contact FERC                                  project should submit an original and                                     d. Applicant: Ware River Power, Inc.
                                                    at FERCOnlineSupport@ferc.gov or call                                   two copies of their comments to the                                       e. Name of Project: Ware River
                                                    toll-free, (866) 208–3676 or TTY, (202)                                 Secretary of the Commission.                                            Project.
                                                    502–8659.                                                               Environmental commenter’s will be                                         f. Location: The project is located on
                                                       Any questions regarding this                                         placed on the Commission’s                                              the Ware River in Hampshire County,
                                                    application should be directed to                                       environmental mailing list, will receive                                Massachusetts.


                                               VerDate Sep<11>2014        19:13 Jun 06, 2016        Jkt 238001     PO 00000       Frm 00022       Fmt 4703      Sfmt 4703      E:\FR\FM\07JNN1.SGM            07JNN1



Document Created: 2018-02-08 07:31:50
Document Modified: 2018-02-08 07:31:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 36536 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR