81 FR 36536 - Wells Rural Electric Company; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 109 (June 7, 2016)

Page Range36536-36537
FR Document2016-13424

Federal Register, Volume 81 Issue 109 (Tuesday, June 7, 2016)
[Federal Register Volume 81, Number 109 (Tuesday, June 7, 2016)]
[Notices]
[Pages 36536-36537]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-13424]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No 848-037]


Wells Rural Electric Company; Notice of Application Tendered for 
Filing With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule for Relicensing and a Deadline for 
Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New License.
    b. Project No.: P-848-037.
    c. Date filed: May 18, 2016.
    d. Applicant: Wells Rural Electric Company.
    e. Name of Project: Trout Creek Hydroelectric Project.
    f. Location: On Trout Creek, near the Town of Wells, Elko County, 
Nevada. The project's intake structure, pipeline, debris collection 
box, surge tank and approximately 1,500 feet of penstock are located on 
federal land managed by the United States Forest Service.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Lonnie Abbott, Manager of Loss Control and 
Risk Services, Wells Rural Electric Company, P.O. Box 365, Wells, 
Nevada 89835, (775) 752-1516 or [email protected].
    FERC Contact: Joseph Hassell, 202-502-8079 or 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: July 18, 2016.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426. The first page of any filing should include 
docket number P-848-037.
    m. The application is not ready for environmental analysis at this 
time.
    n. The existing Trout Creek project consists of: (1) An intake 
structure on a spring feeding Trout Creek; (2) a 14-inch-diameter, 715-
foot-long steel pipe; (3) a debris collection box; (4) a 15-inch-
diameter, 1900-foot-long PVC pipe; (4) an 8-foot-diameter, 20-foot high 
surge tank; (5) a 16-inch-diameter, 2,125-foot-long penstock; (6) a 
powerhouse with a 125-kilowatt turbine-generator unit (7) a 5 to 7-
foot-wide, 30-foot-long tailrace; (8) a 4,412-foot-long, 24.9-kV 
transmission line; and, (9) appurtenant facilities. The project is 
estimated to generate an average of 325,000 kilowatt-hours annually.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    q. Procedural schedule and final amendments: The application will 
be processed according to the following preliminary Hydro Licensing 
Schedule. Revisions to the schedule will be made as appropriate.

[[Page 36537]]



------------------------------------------------------------------------
 
------------------------------------------------------------------------
Issue Notice of Acceptance.............  May 2016.
Issue Scoping Document 1 for comments..  June 2016.
Comments on Scoping Document 1.........  July 2016.
Issue Scoping Document 2...............  October 2016.
Issue notice of ready for environmental  October 2016.
 analysis.
Commission issues EA, draft EA, or       April 2017.
 draft EIS.
Comments on EA or draft EA or draft EIS  May 2017.
Commission issues final EA of final EIS  July 2017.
------------------------------------------------------------------------

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: May 26, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-13424 Filed 6-6-16; 8:45 am]
 BILLING CODE 6717-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 36536 