81_FR_40412 81 FR 40293 - ANR Pipeline Company; Notice of Application

81 FR 40293 - ANR Pipeline Company; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 119 (June 21, 2016)

Page Range40293-40294
FR Document2016-14595

Federal Register, Volume 81 Issue 119 (Tuesday, June 21, 2016)
[Federal Register Volume 81, Number 119 (Tuesday, June 21, 2016)]
[Notices]
[Pages 40293-40294]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-14595]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-467-000]


ANR Pipeline Company; Notice of Application

    Take notice that on June 3, 2016, ANR Pipeline Company (ANR), 700 
Louisiana Street, Suite 700, Houston, TX 77002-2700, filed an 
application pursuant to section 7(b) of the Natural Gas Act (NGA), and 
Part 157 of the Commission's regulations, requesting authorization to 
implement the permanent and temporary abandonment of certain 
facilities, horsepower, and design capacity at its Grand Chenier 
Compressor Station (CS), located in Cameron Parish, Louisiana, all as 
more fully set forth in the application which is on file with the 
Commission and open to public inspection.
    The filing may also be viewed on the web at http://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application should be directed to 
Linda Farquhar, Manager, Project Determinations and Regulatory 
Administration, ANR Pipeline Company, 700 Louisiana Street, Suite 700, 
Houston, Texas 77002-2700, by phone (832) 320-5685, or by email at 
[email protected].
    Specifically, ANR states that Grand Chenier CS is currently 
certificated at 16,200 horsepower (HP) and has two units, one rated at 
8,100 HP and the other ISO-rated at 9,700 HP. However, ANR has 
determined that it can continue to meet current transportation 
requirements without compression at the Grand Chenier CS. Thus, ANR 
proposes to permanently abandon 6,500 HP of certificated horsepower at 
its Grand Chenier CS. In order to effectuate this, ANR proposes to 
abandon in place its 8,100 HP compressor unit. In addition, ANR 
proposes to temporarily abandon the remaining certificated 9,700 HP and 
192 million cubic feet per day of design capacity for a period of up

[[Page 40294]]

to 36 months. ANR states that this proposed temporary action will allow 
ANR time to evaluate whether market demand predicates the need to 
retain this horsepower and to react quickly to any changing market 
conditions in the region. ANR states that the implementation of the 
Project will not impact ANR's ability to serve existing firm contracts.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and five copies of the protest or intervention to 
the Federal Energy regulatory Commission, 888 First Street NE., 
Washington, DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on July 6, 2016.

    Dated: June 15, 2016.
Kimberly Bose,
Secretary.
[FR Doc. 2016-14595 Filed 6-20-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 81, No. 119 / Tuesday, June 21, 2016 / Notices                                                  40293

                                                    Development, Los Angeles Department                     TTY, call (202) 502–8659. A copy is also                 Dated: June 15, 2016.
                                                    of Water and Power, 111 North Hope                      available for inspection and                           Kimberly D. Bose,
                                                    Street, Room 921, Los Angeles,                          reproduction at the address in item (h)                Secretary.
                                                    California 90012; (213) 367–0881.                       above.                                                 [FR Doc. 2016–14596 Filed 6–20–16; 8:45 am]
                                                       i. FERC Contact: Kim Carter, (202)
                                                                                                               m. Individuals desiring to be included              BILLING CODE 6717–01–P
                                                    502–6486, Kim.Carter@ferc.gov.
                                                       j. Deadline for filing comments,                     on the Commission’s mailing list should
                                                    motions to intervene, and protests is 30                so indicate by writing to the Secretary
                                                                                                            of the Commission.                                     DEPARTMENT OF ENERGY
                                                    days from the issuance of this notice by
                                                    the Commission. The Commission                             n. Comments, Motions to Intervene, or               Federal Energy Regulatory
                                                    strongly encourages electronic filing.                  Protests: Anyone may submit                            Commission
                                                    Please file comments, motions to                        comments, a motion to intervene, or a
                                                                                                                                                                   [Docket No. CP16–467–000]
                                                    intervene, and protests using the                       protest in accordance with the
                                                    Commission’s eFiling system at http://                  requirements of Rules of Practice and                  ANR Pipeline Company; Notice of
                                                    www.ferc.gov/docs-filing/efiling.asp.                   Procedure, 18 CFR 385.210, .211, .214.                 Application
                                                    Commenters can submit brief comments                    In determining the appropriate action to
                                                    up to 6,000 characters, without prior                   take, the Commission will consider all                    Take notice that on June 3, 2016, ANR
                                                    registration, using the eComment system                 protests or other comments filed, but                  Pipeline Company (ANR), 700 Louisiana
                                                    at http://www.ferc.gov/doc-sfiling/                     only those who file a motion to                        Street, Suite 700, Houston, TX 77002–
                                                    ecomment.asp. You must include your                     intervene in accordance with the                       2700, filed an application pursuant to
                                                    name and contact information at the end                                                                        section 7(b) of the Natural Gas Act
                                                                                                            Commission’s Rules may become a
                                                    of your comments. For assistance,                                                                              (NGA), and Part 157 of the
                                                                                                            party to the proceeding. Any comments,
                                                    please contact FERC Online Support at                                                                          Commission’s regulations, requesting
                                                                                                            motions to intervene, or protests must
                                                    FERCOnlineSupport@ferc.gov, (866)                                                                              authorization to implement the
                                                                                                            be received on or before the specified                 permanent and temporary abandonment
                                                    208–3676 (toll free), or (202) 502–8659                 comment date for the particular
                                                    (TTY). In lieu of electronic filing, please                                                                    of certain facilities, horsepower, and
                                                                                                            application.                                           design capacity at its Grand Chenier
                                                    send a paper copy to: Secretary, Federal
                                                    Energy Regulatory Commission, 888                          o. Filing and Service of Responsive                 Compressor Station (CS), located in
                                                    First Street NE., Washington, DC 20426.                 Documents: Any filing must (1) bear in                 Cameron Parish, Louisiana, all as more
                                                    The first page of any filing should                     all capital letters the title                          fully set forth in the application which
                                                    include docket number P–2426–225,                       ‘‘COMMENTS’’, ‘‘MOTION TO                              is on file with the Commission and open
                                                    -226.                                                   INTERVENE’’, or ‘‘PROTEST’’ as                         to public inspection.
                                                       k. Description of Request: The                       applicable; (2) set forth in the heading                  The filing may also be viewed on the
                                                    applicant proposes to: (1) Amend the                    the name of the applicant and the                      web at http://www.ferc.gov using the
                                                    South SWP Hydropower Project license                    project number of the application to                   ‘‘eLibrary’’ link. Enter the docket
                                                    to remove a 640-foot-long, 115-kV                       which the filing responds; (3) furnish                 number excluding the last three digits in
                                                    transmission line and a 1.0-mile-long,                  the name, address, and telephone                       the docket number field to access the
                                                    115-kV transmission line at the Devil                   number of the person protesting or                     document. For assistance, please contact
                                                    Canyon Power Drop Development. The                      intervening; and (4) otherwise comply                  FERC Online Support at
                                                    licensee states that the lines are part of              with the requirements of 18 CFR                        FERCOnlineSupport@ferc.gov or toll
                                                    Southern California Edison’s                            385.2001 through 385.2005. All                         free at (866) 208–3676, or TTY, contact
                                                    distribution lines; and (2) add a new                   comments, motions to intervene, or                     (202) 502–8659.
                                                    230-kV transmission line at the Castaic                 protests must set forth their evidentiary                 Any questions concerning this
                                                    Power Drop along the existing                           basis and otherwise comply with the                    application should be directed to Linda
                                                    transmission tower bay from the Castaic                 requirements of 18 CFR 4.34(b). All                    Farquhar, Manager, Project
                                                    to Haskell substations, including all                                                                          Determinations and Regulatory
                                                                                                            comments, motions to intervene, or
                                                    necessary appurtenant components (i.e.,                                                                        Administration, ANR Pipeline
                                                                                                            protests should relate to project works
                                                    circuit breaker, transformer, relays,                                                                          Company, 700 Louisiana Street, Suite
                                                                                                            which are the subject of the license
                                                    controls, metering, and                                                                                        700, Houston, Texas 77002–2700, by
                                                                                                            amendments. Agencies may obtain
                                                    telecommunications equipment).                                                                                 phone (832) 320–5685, or by email at
                                                       l. Locations of the Applications: A                  copies of the application directly from
                                                                                                                                                                   linda_farquhar@transcanada.com.
                                                    copy of the applications are available for              the applicant. A copy of any protest or                   Specifically, ANR states that Grand
                                                    inspection and reproduction at the                      motion to intervene must be served                     Chenier CS is currently certificated at
                                                    Commission’s Public Reference Room,                     upon each representative of the                        16,200 horsepower (HP) and has two
                                                    located at 888 First Street NE., Room                   applicant specified in the particular                  units, one rated at 8,100 HP and the
                                                    2A, Washington, DC 20426, or by calling                 application. If an intervener files                    other ISO-rated at 9,700 HP. However,
                                                    (202) 502–8371. The filings may also be                 comments or documents with the                         ANR has determined that it can
                                                    viewed on the Commission’s Web site at                  Commission relating to the merits of an                continue to meet current transportation
                                                    http://www.ferc.gov/docs-filing/                        issue that may affect the responsibilities             requirements without compression at
                                                    elibrary.asp. Enter the docket number                   of a particular resource agency, they                  the Grand Chenier CS. Thus, ANR
                                                    excluding the last three digits in the                  must also serve a copy of the document                 proposes to permanently abandon 6,500
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    docket number field to access the                       on that resource agency. A copy of all                 HP of certificated horsepower at its
                                                    document. You may also register online                  other filings in reference to this                     Grand Chenier CS. In order to effectuate
                                                    at http://www.ferc.gov/docs-filing/                     application must be accompanied by                     this, ANR proposes to abandon in place
                                                    esubscription.asp to be notified via                    proof of service on all persons listed in              its 8,100 HP compressor unit. In
                                                    email of new filings and issuances                      the service list prepared by the                       addition, ANR proposes to temporarily
                                                    related to this or other pending projects.              Commission in this proceeding, in                      abandon the remaining certificated
                                                    For assistance, call 1–866–208–3676 or                  accordance with 18 CFR 4.34(b) and                     9,700 HP and 192 million cubic feet per
                                                    email FERCOnlineSupport@ferc.gov, for                   385.2010.                                              day of design capacity for a period of up


                                               VerDate Sep<11>2014   18:37 Jun 20, 2016   Jkt 238001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\21JNN1.SGM   21JNN1


                                                    40294                          Federal Register / Vol. 81, No. 119 / Tuesday, June 21, 2016 / Notices

                                                    to 36 months. ANR states that this                      determining the appropriate action to be               discuss the environmental impacts of
                                                    proposed temporary action will allow                    taken, but the filing of a comment alone               the Shidler Line Segment Abandonment
                                                    ANR time to evaluate whether market                     will not serve to make the filer a party               Project proposed by Southern Star
                                                    demand predicates the need to retain                    to the proceeding. The Commission’s                    Central Gas Pipeline, Inc. (Southern
                                                    this horsepower and to react quickly to                 rules require that persons filing                      Star). The project involves abandonment
                                                    any changing market conditions in the                   comments in opposition to the project                  of about 31.2 miles of 16-inch-diameter
                                                    region. ANR states that the                             provide copies of their protests only to               natural gas pipeline and removal of
                                                    implementation of the Project will not                  the party or parties directly involved in              certain pipeline and aboveground
                                                    impact ANR’s ability to serve existing                  the protest.                                           facilities in Osage County, Oklahoma.
                                                    firm contracts.                                            Persons who wish to comment only                    The Commission will use this EA in its
                                                       Pursuant to section 157.9 of the                     on the environmental review of this                    decision-making process to determine
                                                    Commission’s rules (18 CFR 157.9),                      project should submit an original and                  whether to authorize the project.
                                                    within 90 days of this Notice, the                      two copies of their comments to the                       This notice announces the opening of
                                                    Commission staff will either: complete                  Secretary of the Commission.                           the scoping process the Commission
                                                    its environmental assessment (EA) and                   Environmental commenters will be                       will use to gather input from the public
                                                    place it into the Commission’s public                   placed on the Commission’s                             and interested agencies on the project.
                                                    record (eLibrary) for this proceeding or                environmental mailing list, will receive               You can make a difference by providing
                                                    issue a Notice of Schedule for                          copies of the environmental documents,                 us with your specific comments or
                                                    Environmental Review. If a Notice of                    and will be notified of meetings                       concerns about the project. Your
                                                    Schedule for Environmental Review is                    associated with the Commission’s                       comments should focus on the potential
                                                    issued, it will indicate, among other                   environmental review process.                          environmental effects, reasonable
                                                    milestones, the anticipated date for the                Environmental commenters will not be                   alternatives, and measures to avoid or
                                                    Commission staff’s issuance of the final                required to serve copies of filed                      lessen environmental impacts. Your
                                                    environmental impact statement (FEIS)                   documents on all other parties.                        input will help the Commission staff
                                                    or EA for this proposal. The filing of the              However, the non-party commenters                      determine what issues they need to
                                                    EA in the Commission’s public record                    will not receive copies of all documents               evaluate in the EA. To ensure that your
                                                    for this proceeding or the issuance of a                filed by other parties or issued by the                comments are timely and properly
                                                    Notice of Schedule will serve to notify                 Commission (except for the mailing of                  recorded, please send your comments so
                                                    federal and state agencies of the timing                environmental documents issued by the                  that the Commission receives them in
                                                    for the completion of all necessary                     Commission) and will not have the right                Washington, DC on or before July 9,
                                                    reviews, and the subsequent need to                     to seek court review of the                            2016.
                                                    complete all federal authorizations                     Commission’s final order.                                 If you sent comments on this project
                                                    within 90 days of the date of issuance                                                                         to the Commission before the opening of
                                                                                                               The Commission strongly encourages
                                                    of the Commission staff’s FEIS or EA.                                                                          this docket on May 6, 2016, you will
                                                                                                            electronic filings of comments, protests
                                                       There are two ways to become                                                                                need to file those comments in Docket
                                                                                                            and interventions in lieu of paper using
                                                    involved in the Commission’s review of                                                                         No. CP16–456–000 to ensure they are
                                                                                                            the ‘‘eFiling’’ link at http://
                                                    this project. First, any person wishing to                                                                     considered as part of this proceeding.
                                                                                                            www.ferc.gov. Persons unable to file                      This notice is being sent to the
                                                    obtain legal status by becoming a party
                                                                                                            electronically should submit an original               Commission’s current environmental
                                                    to the proceedings for this project
                                                                                                            and five copies of the protest or                      mailing list for this project. State and
                                                    should, on or before the comment date
                                                                                                            intervention to the Federal Energy                     local government representatives should
                                                    stated below, file with the Federal
                                                                                                            regulatory Commission, 888 First Street                notify their constituents of this
                                                    Energy Regulatory Commission, 888
                                                    First Street, NE., Washington, DC 20426,                NE., Washington, DC 20426.                             proposed project and encourage them to
                                                    a motion to intervene in accordance                        Comment Date: 5:00 p.m. Eastern                     comment on their areas of concern.
                                                    with the requirements of the                            Time on July 6, 2016.                                     If you are a landowner receiving this
                                                    Commission’s Rules of Practice and                        Dated: June 15, 2016.                                notice, a pipeline company
                                                    Procedure (18 CFR 385.214 or 385.211)                   Kimberly Bose,                                         representative may contact you about
                                                    and the Regulations under the NGA (18                   Secretary.                                             the acquisition of an easement for
                                                    CFR 157.10). A person obtaining party                   [FR Doc. 2016–14595 Filed 6–20–16; 8:45 am]            temporary workspace or access roads to
                                                    status will be placed on the service list               BILLING CODE 6717–01–P
                                                                                                                                                                   abandon the facilities. The company
                                                    maintained by the Secretary of the                                                                             would seek to negotiate a mutually
                                                    Commission and will receive copies of                                                                          acceptable agreement. However, if the
                                                    all documents filed by the applicant and                DEPARTMENT OF ENERGY                                   Commission approves the project, that
                                                    by all other parties. A party must submit                                                                      approval conveys with it the right of
                                                    5 copies of filings made with the                       Federal Energy Regulatory                              eminent domain. Therefore, if easement
                                                    Commission and must mail a copy to                      Commission                                             negotiations fail to produce an
                                                    the applicant and to every other party in                                                                      agreement, the pipeline company could
                                                                                                            [Docket No. CP16–456–000]
                                                    the proceeding. Only parties to the                                                                            initiate condemnation proceedings
                                                    proceeding can ask for court review of                  Southern Star Central Gas Pipeline,                    where compensation would be
                                                    Commission orders in the proceeding.                    Inc.; Notice of Intent To Prepare an                   determined in accordance with state
                                                       However, a person does not have to                                                                          law.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            Environmental Assessment for the
                                                    intervene in order to have comments                     Proposed Shidler Line Segment                             A fact sheet prepared by the FERC
                                                    considered. The second way to                           Abandonment Project and Request for                    entitled ‘‘An Interstate Natural Gas
                                                    participate is by filing with the                       Comments on Environmental Issues                       Facility On My Land? What Do I Need
                                                    Secretary of the Commission, as soon as                                                                        To Know?’’ is available for viewing on
                                                    possible, an original and two copies of                   The staff of the Federal Energy                      the FERC Web site (www.ferc.gov). This
                                                    comments in support of or in opposition                 Regulatory Commission (FERC or                         fact sheet addresses a number of
                                                    to this project. The Commission will                    Commission) will prepare an                            typically asked questions, including the
                                                    consider these comments in                              environmental assessment (EA) that will                use of eminent domain and how to


                                               VerDate Sep<11>2014   18:37 Jun 20, 2016   Jkt 238001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\21JNN1.SGM   21JNN1



Document Created: 2016-06-21 01:30:21
Document Modified: 2016-06-21 01:30:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on July 6, 2016.
FR Citation81 FR 40293 