81_FR_40413 81 FR 40294 - Southern Star Central Gas Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Shidler Line Segment Abandonment Project and Request for Comments on Environmental Issues

81 FR 40294 - Southern Star Central Gas Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Shidler Line Segment Abandonment Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 119 (June 21, 2016)

Page Range40294-40296
FR Document2016-14147

Federal Register, Volume 81 Issue 119 (Tuesday, June 21, 2016)
[Federal Register Volume 81, Number 119 (Tuesday, June 21, 2016)]
[Notices]
[Pages 40294-40296]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-14147]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-456-000]


Southern Star Central Gas Pipeline, Inc.; Notice of Intent To 
Prepare an Environmental Assessment for the Proposed Shidler Line 
Segment Abandonment Project and Request for Comments on Environmental 
Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Shidler Line Segment 
Abandonment Project proposed by Southern Star Central Gas Pipeline, 
Inc. (Southern Star). The project involves abandonment of about 31.2 
miles of 16-inch-diameter natural gas pipeline and removal of certain 
pipeline and aboveground facilities in Osage County, Oklahoma. The 
Commission will use this EA in its decision-making process to determine 
whether to authorize the project.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before July 9, 2016.
    If you sent comments on this project to the Commission before the 
opening of this docket on May 6, 2016, you will need to file those 
comments in Docket No. CP16-456-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement for 
temporary workspace or access roads to abandon the facilities. The 
company would seek to negotiate a mutually acceptable agreement. 
However, if the Commission approves the project, that approval conveys 
with it the right of eminent domain. Therefore, if easement 
negotiations fail to produce an agreement, the pipeline company could 
initiate condemnation proceedings where compensation would be 
determined in accordance with state law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses 
a number of typically asked questions, including the use of eminent 
domain and how to

[[Page 40295]]

participate in the Commission's proceedings.

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP16-456-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Southern Star proposes to abandon about 31.2 miles of 16-inch-
diameter pipeline and appurtenant facilities of the Shidler Line (also 
referred to as ``Line ME'' or the ``Blackwell-Cotton Valley Line''), in 
Osage County, Oklahoma. The abandonment will require cutting and 
capping of the pipeline just east of the Shidler Town Border and 
slightly west of the Bowring Meter Station. Exposed pipeline would be 
removed at three stream crossings and would be cut, capped, and filled 
with grout at two improved road crossings. All associated aboveground 
facilities would be removed, including two mainline valve settings, 
three domestic taps, four rectifiers, 14 cathodic protection test 
stations, and the pipeline markers. The remainder of facilities would 
be abandoned in place.
    According to Southern Star, the abandonment is proposed due to 
corrosion on the Shidler Line that would require costly maintenance and 
integrity analysis to maintain service, and the pipeline is not 
necessary to support current or future service obligations.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    The project would affect about 61.1 total acres during abandonment 
activities including 14.5 acres of existing pipeline right-of-way and 
aboveground facility sites; 5.0 acres of temporary extra workspace; and 
41.7 acres for temporary access roads. Following construction, Southern 
Star would restore construction workspaces to pre-construction land use 
and the associated right-of-way would revert back to the landowner.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers authorizing an applicant's 
proposal. NEPA also requires us \2\ to discover and address concerns 
the public may have about proposals. This process is referred to as 
``scoping.'' The main goal of the scoping process is to focus the 
analysis in the EA on the important environmental issues. By this 
notice, the Commission requests public comments on the scope of the 
issues to address in the EA. We will consider all filed comments during 
the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the proposed project under these general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit its views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest

[[Page 40296]]

groups; Native American Tribes; other interested parties; and local 
libraries and newspapers. This list also includes all affected 
landowners (as defined in the Commission's regulations) who are 
potential right-of-way grantors, whose property may be used temporarily 
for project purposes, or who own homes within certain distances of 
aboveground facilities, and anyone who submits comments on the project. 
We will update the environmental mailing list as the analysis proceeds 
to ensure that we send the information related to this environmental 
review to all individuals, organizations, and government entities 
interested in and/or potentially affected by the proposed project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site. Motions to intervene are more fully 
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP16-
456). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: June 9, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-14147 Filed 6-20-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    40294                          Federal Register / Vol. 81, No. 119 / Tuesday, June 21, 2016 / Notices

                                                    to 36 months. ANR states that this                      determining the appropriate action to be               discuss the environmental impacts of
                                                    proposed temporary action will allow                    taken, but the filing of a comment alone               the Shidler Line Segment Abandonment
                                                    ANR time to evaluate whether market                     will not serve to make the filer a party               Project proposed by Southern Star
                                                    demand predicates the need to retain                    to the proceeding. The Commission’s                    Central Gas Pipeline, Inc. (Southern
                                                    this horsepower and to react quickly to                 rules require that persons filing                      Star). The project involves abandonment
                                                    any changing market conditions in the                   comments in opposition to the project                  of about 31.2 miles of 16-inch-diameter
                                                    region. ANR states that the                             provide copies of their protests only to               natural gas pipeline and removal of
                                                    implementation of the Project will not                  the party or parties directly involved in              certain pipeline and aboveground
                                                    impact ANR’s ability to serve existing                  the protest.                                           facilities in Osage County, Oklahoma.
                                                    firm contracts.                                            Persons who wish to comment only                    The Commission will use this EA in its
                                                       Pursuant to section 157.9 of the                     on the environmental review of this                    decision-making process to determine
                                                    Commission’s rules (18 CFR 157.9),                      project should submit an original and                  whether to authorize the project.
                                                    within 90 days of this Notice, the                      two copies of their comments to the                       This notice announces the opening of
                                                    Commission staff will either: complete                  Secretary of the Commission.                           the scoping process the Commission
                                                    its environmental assessment (EA) and                   Environmental commenters will be                       will use to gather input from the public
                                                    place it into the Commission’s public                   placed on the Commission’s                             and interested agencies on the project.
                                                    record (eLibrary) for this proceeding or                environmental mailing list, will receive               You can make a difference by providing
                                                    issue a Notice of Schedule for                          copies of the environmental documents,                 us with your specific comments or
                                                    Environmental Review. If a Notice of                    and will be notified of meetings                       concerns about the project. Your
                                                    Schedule for Environmental Review is                    associated with the Commission’s                       comments should focus on the potential
                                                    issued, it will indicate, among other                   environmental review process.                          environmental effects, reasonable
                                                    milestones, the anticipated date for the                Environmental commenters will not be                   alternatives, and measures to avoid or
                                                    Commission staff’s issuance of the final                required to serve copies of filed                      lessen environmental impacts. Your
                                                    environmental impact statement (FEIS)                   documents on all other parties.                        input will help the Commission staff
                                                    or EA for this proposal. The filing of the              However, the non-party commenters                      determine what issues they need to
                                                    EA in the Commission’s public record                    will not receive copies of all documents               evaluate in the EA. To ensure that your
                                                    for this proceeding or the issuance of a                filed by other parties or issued by the                comments are timely and properly
                                                    Notice of Schedule will serve to notify                 Commission (except for the mailing of                  recorded, please send your comments so
                                                    federal and state agencies of the timing                environmental documents issued by the                  that the Commission receives them in
                                                    for the completion of all necessary                     Commission) and will not have the right                Washington, DC on or before July 9,
                                                    reviews, and the subsequent need to                     to seek court review of the                            2016.
                                                    complete all federal authorizations                     Commission’s final order.                                 If you sent comments on this project
                                                    within 90 days of the date of issuance                                                                         to the Commission before the opening of
                                                                                                               The Commission strongly encourages
                                                    of the Commission staff’s FEIS or EA.                                                                          this docket on May 6, 2016, you will
                                                                                                            electronic filings of comments, protests
                                                       There are two ways to become                                                                                need to file those comments in Docket
                                                                                                            and interventions in lieu of paper using
                                                    involved in the Commission’s review of                                                                         No. CP16–456–000 to ensure they are
                                                                                                            the ‘‘eFiling’’ link at http://
                                                    this project. First, any person wishing to                                                                     considered as part of this proceeding.
                                                                                                            www.ferc.gov. Persons unable to file                      This notice is being sent to the
                                                    obtain legal status by becoming a party
                                                                                                            electronically should submit an original               Commission’s current environmental
                                                    to the proceedings for this project
                                                                                                            and five copies of the protest or                      mailing list for this project. State and
                                                    should, on or before the comment date
                                                                                                            intervention to the Federal Energy                     local government representatives should
                                                    stated below, file with the Federal
                                                                                                            regulatory Commission, 888 First Street                notify their constituents of this
                                                    Energy Regulatory Commission, 888
                                                    First Street, NE., Washington, DC 20426,                NE., Washington, DC 20426.                             proposed project and encourage them to
                                                    a motion to intervene in accordance                        Comment Date: 5:00 p.m. Eastern                     comment on their areas of concern.
                                                    with the requirements of the                            Time on July 6, 2016.                                     If you are a landowner receiving this
                                                    Commission’s Rules of Practice and                        Dated: June 15, 2016.                                notice, a pipeline company
                                                    Procedure (18 CFR 385.214 or 385.211)                   Kimberly Bose,                                         representative may contact you about
                                                    and the Regulations under the NGA (18                   Secretary.                                             the acquisition of an easement for
                                                    CFR 157.10). A person obtaining party                   [FR Doc. 2016–14595 Filed 6–20–16; 8:45 am]            temporary workspace or access roads to
                                                    status will be placed on the service list               BILLING CODE 6717–01–P
                                                                                                                                                                   abandon the facilities. The company
                                                    maintained by the Secretary of the                                                                             would seek to negotiate a mutually
                                                    Commission and will receive copies of                                                                          acceptable agreement. However, if the
                                                    all documents filed by the applicant and                DEPARTMENT OF ENERGY                                   Commission approves the project, that
                                                    by all other parties. A party must submit                                                                      approval conveys with it the right of
                                                    5 copies of filings made with the                       Federal Energy Regulatory                              eminent domain. Therefore, if easement
                                                    Commission and must mail a copy to                      Commission                                             negotiations fail to produce an
                                                    the applicant and to every other party in                                                                      agreement, the pipeline company could
                                                                                                            [Docket No. CP16–456–000]
                                                    the proceeding. Only parties to the                                                                            initiate condemnation proceedings
                                                    proceeding can ask for court review of                  Southern Star Central Gas Pipeline,                    where compensation would be
                                                    Commission orders in the proceeding.                    Inc.; Notice of Intent To Prepare an                   determined in accordance with state
                                                       However, a person does not have to                                                                          law.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            Environmental Assessment for the
                                                    intervene in order to have comments                     Proposed Shidler Line Segment                             A fact sheet prepared by the FERC
                                                    considered. The second way to                           Abandonment Project and Request for                    entitled ‘‘An Interstate Natural Gas
                                                    participate is by filing with the                       Comments on Environmental Issues                       Facility On My Land? What Do I Need
                                                    Secretary of the Commission, as soon as                                                                        To Know?’’ is available for viewing on
                                                    possible, an original and two copies of                   The staff of the Federal Energy                      the FERC Web site (www.ferc.gov). This
                                                    comments in support of or in opposition                 Regulatory Commission (FERC or                         fact sheet addresses a number of
                                                    to this project. The Commission will                    Commission) will prepare an                            typically asked questions, including the
                                                    consider these comments in                              environmental assessment (EA) that will                use of eminent domain and how to


                                               VerDate Sep<11>2014   18:37 Jun 20, 2016   Jkt 238001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\21JNN1.SGM   21JNN1


                                                                                   Federal Register / Vol. 81, No. 119 / Tuesday, June 21, 2016 / Notices                                                       40295

                                                    participate in the Commission’s                         and the pipeline is not necessary to                   available in the public record through
                                                    proceedings.                                            support current or future service                      eLibrary. Depending on the comments
                                                                                                            obligations.                                           received during the scoping process, we
                                                    Public Participation                                      The general location of the project                  may also publish and distribute the EA
                                                      For your convenience, there are three                 facilities is shown in appendix 1.1                    to the public for an allotted comment
                                                    methods you can use to submit your                                                                             period. We will consider all comments
                                                    comments to the Commission. The                         Land Requirements for Construction
                                                                                                                                                                   on the EA before making our
                                                    Commission encourages electronic filing                   The project would affect about 61.1                  recommendations to the Commission.
                                                    of comments and has expert staff                        total acres during abandonment                         To ensure we have the opportunity to
                                                    available to assist you at (202) 502–8258               activities including 14.5 acres of                     consider and address your comments,
                                                    or efiling@ferc.gov. Please carefully                   existing pipeline right-of-way and                     please carefully follow the instructions
                                                    follow these instructions so that your                  aboveground facility sites; 5.0 acres of               in the Public Participation section,
                                                    comments are properly recorded.                         temporary extra workspace; and 41.7                    beginning on page 2.
                                                       (1) You can file your comments                       acres for temporary access roads.                        With this notice, we are asking
                                                    electronically using the eComment                       Following construction, Southern Star                  agencies with jurisdiction by law and/
                                                    feature on the Commission’s Web site                    would restore construction workspaces                  or special expertise with respect to the
                                                    (www.ferc.gov) under the link to                        to pre-construction land use and the                   environmental issues of this project to
                                                    Documents and Filings. This is an easy                  associated right-of-way would revert                   formally cooperate with us in the
                                                    method for submitting brief, text-only                  back to the landowner.                                 preparation of the EA.3 Agencies that
                                                    comments on a project;                                  The EA Process                                         would like to request cooperating
                                                       (2) You can file your comments                                                                              agency status should follow the
                                                    electronically by using the eFiling                        The National Environmental Policy                   instructions for filing comments
                                                    feature on the Commission’s Web site                    Act (NEPA) requires the Commission to                  provided under the Public Participation
                                                    (www.ferc.gov) under the link to                        take into account the environmental                    section of this notice.
                                                    Documents and Filings. With eFiling,                    impacts that could result from an action
                                                    you can provide comments in a variety                   whenever it considers authorizing an                   Consultations Under Section 106 of the
                                                    of formats by attaching them as a file                  applicant’s proposal. NEPA also                        National Historic Preservation Act
                                                    with your submission. New eFiling                       requires us 2 to discover and address                    In accordance with the Advisory
                                                    users must first create an account by                   concerns the public may have about                     Council on Historic Preservation’s
                                                    clicking on ‘‘eRegister.’’ If you are filing            proposals. This process is referred to as              implementing regulations for section
                                                    a comment on a particular project,                      ‘‘scoping.’’ The main goal of the scoping              106 of the National Historic
                                                    please select ‘‘Comment on a Filing’’ as                process is to focus the analysis in the                Preservation Act, we are using this
                                                    the filing type; or                                     EA on the important environmental                      notice to initiate consultation with the
                                                       (3) You can file a paper copy of your                issues. By this notice, the Commission                 applicable State Historic Preservation
                                                    comments by mailing them to the                         requests public comments on the scope                  Office (SHPO), and to solicit its views
                                                    following address. Be sure to reference                 of the issues to address in the EA. We                 and those of other government agencies,
                                                    the project docket number (CP16–456–                    will consider all filed comments during                interested Indian tribes, and the public
                                                    000) with your submission: Kimberly D.                  the preparation of the EA.                             on the project’s potential effects on
                                                    Bose, Secretary, Federal Energy                            In the EA we will discuss impacts that              historic properties.4 We will define the
                                                    Regulatory Commission, 888 First Street                 could occur as a result of the proposed                project-specific Area of Potential Effects
                                                    NE., Room 1A, Washington, DC 20426.                     project under these general headings:                  (APE) in consultation with the SHPO as
                                                                                                               • Geology and soils;                                the project develops. On natural gas
                                                    Summary of the Proposed Project                            • land use;                                         facility projects, the APE at a minimum
                                                       Southern Star proposes to abandon                       • water resources, fisheries, and                   encompasses all areas subject to ground
                                                    about 31.2 miles of 16-inch-diameter                    wetlands;                                              disturbance (examples include
                                                    pipeline and appurtenant facilities of                     • cultural resources;                               construction right-of-way, contractor/
                                                    the Shidler Line (also referred to as                      • vegetation and wildlife;
                                                                                                               • air quality and noise;                            pipe storage yards, compressor stations,
                                                    ‘‘Line ME’’ or the ‘‘Blackwell-Cotton                      • endangered and threatened species;                and access roads). Our EA for this
                                                    Valley Line’’), in Osage County,                           • public safety; and                                project will document our findings on
                                                    Oklahoma. The abandonment will                             • cumulative impacts.                               the impacts on historic properties and
                                                    require cutting and capping of the                         We will also evaluate reasonable                    summarize the status of consultations
                                                    pipeline just east of the Shidler Town                  alternatives to the proposed project or                under section 106.
                                                    Border and slightly west of the Bowring                 portions of the project, and make
                                                    Meter Station. Exposed pipeline would                                                                          Environmental Mailing List
                                                                                                            recommendations on how to lessen or
                                                    be removed at three stream crossings                    avoid impacts on the various resource                    The environmental mailing list
                                                    and would be cut, capped, and filled                    areas.                                                 includes federal, state, and local
                                                    with grout at two improved road                            The EA will present our independent                 government representatives and
                                                    crossings. All associated aboveground                   analysis of the issues. The EA will be                 agencies; elected officials;
                                                    facilities would be removed, including                                                                         environmental and public interest
                                                    two mainline valve settings, three                        1 The appendices referenced in this notice will

                                                    domestic taps, four rectifiers, 14                      not appear in the Federal Register. Copies of            3 The Council on Environmental Quality
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            appendices were sent to all those receiving this       regulations addressing cooperating agency
                                                    cathodic protection test stations, and the              notice in the mail and are available at www.ferc.gov   responsibilities are at Title 40, Code of Federal
                                                    pipeline markers. The remainder of                      using the link called ‘‘eLibrary’’ or from the         Regulations, Part 1501.6.
                                                    facilities would be abandoned in place.                 Commission’s Public Reference Room, 888 First            4 The Advisory Council on Historic Preservation’s

                                                       According to Southern Star, the                      Street NE., Washington, DC 20426, or call (202)        regulations are at Title 36, Code of Federal
                                                    abandonment is proposed due to                          502–8371. For instructions on connecting to            Regulations, Part 800. Those regulations define
                                                                                                            eLibrary, refer to the last page of this notice.       historic properties as any prehistoric or historic
                                                    corrosion on the Shidler Line that                        2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the           district, site, building, structure, or object included
                                                    would require costly maintenance and                    environmental staff of the Commission’s Office of      in or eligible for inclusion in the National Register
                                                    integrity analysis to maintain service,                 Energy Projects.                                       of Historic Places.



                                               VerDate Sep<11>2014   18:37 Jun 20, 2016   Jkt 238001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\21JNN1.SGM   21JNN1


                                                    40296                          Federal Register / Vol. 81, No. 119 / Tuesday, June 21, 2016 / Notices

                                                    groups; Native American Tribes; other                      In addition, the Commission offers a                elevation between 6,800 and 7,500 feet
                                                    interested parties; and local libraries                 free service called eSubscription which                above mean sea level; (7) a transmission
                                                    and newspapers. This list also includes                 allows you to keep track of all formal                 line from the powerhouse to the nearest
                                                    all affected landowners (as defined in                  issuances and submittals in specific                   major transmission interconnection; and
                                                    the Commission’s regulations) who are                   dockets. This can reduce the amount of                 (10) appurtenant facilities. The
                                                    potential right-of-way grantors, whose                  time you spend researching proceedings                 estimated annual generation of the Ute
                                                    property may be used temporarily for                    by automatically providing you with                    Project would be between 400 and 850
                                                    project purposes, or who own homes                      notification of these filings, document                gigawatt-hours.
                                                    within certain distances of aboveground                 summaries, and direct links to the
                                                    facilities, and anyone who submits                      documents. Go to www.ferc.gov/docs-                       Applicant Contact: Shaun Chapoose,
                                                    comments on the project. We will                        filing/esubscription.asp.                              Chairman, Ute Tribal Business
                                                    update the environmental mailing list as                   Finally, public meetings or site visits             Committee, Ute Indian Tribe, P.O. Box
                                                    the analysis proceeds to ensure that we                 will be posted on the Commission’s                     190, Fort Duchesne, Utah 84026; phone:
                                                    send the information related to this                    calendar located at www.ferc.gov/                      (435) 722–5141.
                                                    environmental review to all individuals,                EventCalendar/EventsList.aspx along                       FERC Contact: Joseph Hassell; phone:
                                                    organizations, and government entities                  with other related information.                        (202) 502–8079.
                                                    interested in and/or potentially affected                 Dated: June 9, 2016.                                    Deadline for filing comments, motions
                                                    by the proposed project.                                Nathaniel J. Davis, Sr.,                               to intervene, competing applications
                                                       If we publish and distribute the EA,                 Deputy Secretary.                                      (without notices of intent), or notices of
                                                    copies will be sent to the environmental                                                                       intent to file competing applications: 60
                                                                                                            [FR Doc. 2016–14147 Filed 6–20–16; 8:45 am]
                                                    mailing list for public review and
                                                                                                            BILLING CODE 6717–01–P                                 days from the issuance of this notice.
                                                    comment. If you would prefer to receive
                                                                                                                                                                   Competing applications and notices of
                                                    a paper copy of the document instead of
                                                                                                                                                                   intent must meet the requirements of 18
                                                    the CD version or would like to remove                  DEPARTMENT OF ENERGY
                                                    your name from the mailing list, please                                                                        CFR 4.36.
                                                    return the attached Information Request                 Federal Energy Regulatory                                 The Commission strongly encourages
                                                    (appendix 2).                                           Commission                                             electronic filing. Please file comments,
                                                                                                                                                                   motions to intervene, notices of intent,
                                                    Becoming an Intervenor                                  [Project No. 14742–000]                                and competing applications using the
                                                       In addition to involvement in the EA                 Ute Indian Tribe; Notice of Preliminary                Commission’s eFiling system at http://
                                                    scoping process, you may want to                        Permit Application Accepted for Filing                 www.ferc.gov/docs-filing/efiling.asp.
                                                    become an ‘‘intervenor’’ which is an                    and Soliciting Comments, Motions To                    Commenters can submit brief comments
                                                    official party to the Commission’s                      Intervene, and Competing Applications                  up to 6,000 characters, without prior
                                                    proceeding. Intervenors play a more                                                                            registration, using the eComment system
                                                    formal role in the process and are able                    On December 12, 2015, the Ute Indian                at http://www.ferc.gov/docs-filing/
                                                    to file briefs, appear at hearings, and be              Tribe, filed an application for a                      ecomment.asp. You must include your
                                                    heard by the courts if they choose to                   preliminary permit, pursuant to section                name and contact information at the end
                                                    appeal the Commission’s final ruling.                   4(f) of the Federal Power Act (FPA),                   of your comments. For assistance,
                                                    An intervenor formally participates in                  proposing to study the feasibility of the              please contact FERC Online Support at
                                                    the proceeding by filing a request to                   Ute Pumped Storage Project (Ute Project                FERCOnlineSupport@ferc.gov, (866)
                                                    intervene. Instructions for becoming an                 or project) adjacent to the Bureau of
                                                                                                                                                                   208–3676 (toll free), or (202) 502–8659
                                                    intervenor are in the ‘‘Document-less                   Reclamation’s Flaming Gorge Reservoir,
                                                                                                                                                                   (TTY). In lieu of electronic filing, please
                                                    Intervention Guide’’ under the ‘‘e-filing’’             in Daggett County, Utah. The sole
                                                    link on the Commission’s Web site.                                                                             send a paper copy to: Secretary, Federal
                                                                                                            purpose of a preliminary permit, if
                                                    Motions to intervene are more fully                     issued, is to grant the permit holder                  Energy Regulatory Commission, 888
                                                    described at http://www.ferc.gov/                       priority to file a license application                 First Street NE., Washington, DC 20426.
                                                    resources/guides/how-to/intervene.asp.                  during the permit term. A preliminary                  The first page of any filing should
                                                                                                            permit does not authorize the permit                   include docket number P–14742–000.
                                                    Additional Information
                                                                                                            holder to perform any land-disturbing                     More information about this project,
                                                       Additional information about the                     activities or otherwise enter upon lands               including a copy of the application, can
                                                    project is available from the                           or waters owned by others without the                  be viewed or printed on the ‘‘eLibrary’’
                                                    Commission’s Office of External Affairs,                owners’ express permission.                            link of Commission’s Web site at http://
                                                    at (866) 208–FERC, or on the FERC Web                      The proposed pumped storage project                 www.ferc.gov/docs-filing/
                                                    site at www.ferc.gov using the                          would consist of the following: (1) An                 ecomment.asp. Enter the docket number
                                                    ‘‘eLibrary’’ link. Click on the eLibrary                intake and discharge structure at one of               (P–14742) in the docket number field to
                                                    link, click on ‘‘General Search’’ and                   seven locations in Flaming Gorge                       access the document. For assistance,
                                                    enter the docket number, excluding the                  Reservoir; (2) an underground tailrace                 contact FERC Online Support.
                                                    last three digits in the Docket Number                  between the reservoir intake/outlet
                                                    field (i.e., CP16–456). Be sure you have                structure and the powerhouse; (3)                        Dated: June 15, 2016.
                                                    selected an appropriate date range. For                 pump-turbine units in an underground                   Kimberly D. Bose,
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    assistance, please contact FERC Online                  powerhouse with generation capacity of                 Secretary.
                                                    Support at FercOnlineSupport@ferc.gov                   between 500 to 1,000 megawatts; (4) a                  [FR Doc. 2016–14602 Filed 6–20–16; 8:45 am]
                                                    or toll free at (866) 208–3676, or for                  penstock between the powerhouse and                    BILLING CODE 6717–01–P
                                                    TTY, contact (202) 502–8659. The                        the upper reservoir; (5) a dam at one of
                                                    eLibrary link also provides access to the               seven locations forming the upper
                                                    texts of formal documents issued by the                 reservoir; (6) an upper reservoir at one
                                                    Commission, such as orders, notices,                    of seven locations with a capacity
                                                    and rulemakings.                                        between 5,000 and 10,000 acre-feet at an


                                               VerDate Sep<11>2014   18:37 Jun 20, 2016   Jkt 238001   PO 00000   Frm 00038   Fmt 4703   Sfmt 9990   E:\FR\FM\21JNN1.SGM   21JNN1



Document Created: 2016-06-21 01:30:52
Document Modified: 2016-06-21 01:30:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 40294 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR