81_FR_40812 81 FR 40692 - Combined Notice of Filings #2

81 FR 40692 - Combined Notice of Filings #2

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 120 (June 22, 2016)

Page Range40692-40693
FR Document2016-14765

Federal Register, Volume 81 Issue 120 (Wednesday, June 22, 2016)
[Federal Register Volume 81, Number 120 (Wednesday, June 22, 2016)]
[Notices]
[Pages 40692-40693]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-14765]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER12-2275-001; EC14-129-001.
    Applicants: Lexington Power & Light, LLC.
    Description: Notice of Material Change in Status of Lexington Power 
& Light, LLC.
    Filed Date: 6/15/16.
    Accession Number: 20160615-5163.
    Comments Due: 5 p.m. ET 7/6/16.

    Docket Numbers: ER14-2952-005.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Report Filing: 2016-06-15_SSR Cost Allocation Refund 
Report Supplement to be effective N/A.
    Filed Date: 6/15/16.
    Accession Number: 20160615-5028.
    Comments Due: 5 p.m. ET 7/6/16.

    Docket Numbers: ER16-425-003.
    Applicants: New York Independent System Operator, Inc.
    Description: Compliance filing: Compliance re: effective date 
scarcity pricing spplmntl rvsns to be effective 6/30/2016.
    Filed Date: 6/16/16.
    Accession Number: 20160616-5132.
    Comments Due: 5 p.m. ET 6/28/16.

    Docket Numbers: ER16-1944-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Section 205(d) Rate Filing: Amendment to WMPA SA No. 
3236, Queue No. W4-064 to be effective 3/6/2015.
    Filed Date: 6/16/16.
    Accession Number: 20160616-5096.
    Comments Due: 5 p.m. ET 7/7/16

    Docket Numbers: ER16-1945-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Section 205(d) Rate Filing: 3211 NIMECA NITSA NOA; 
Cancellation of 3124 Basin NITSA NOA to be effective 6/1/2016.
    Filed Date: 6/16/16.
    Accession Number: 20160616-5098.
    Comments Due: 5 p.m. ET 7/7/16.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and

[[Page 40693]]

385.214) on or before 5:00 p.m. Eastern time on the specified comment 
date. Protests may be considered, but intervention is necessary to 
become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 16, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-14765 Filed 6-21-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  40692                        Federal Register / Vol. 81, No. 120 / Wednesday, June 22, 2016 / Notices

                                                  of your comments. For assistance,                       intervene in accordance with the                       DEPARTMENT OF ENERGY
                                                  please contact FERC Online Support at                   requirements of Rules of Practice and
                                                  FERCOnlineSupport@ferc.gov, (866)                       Procedure, 18 CFR 385.210, .211, .214,                 Federal Energy Regulatory
                                                  208–3676 (toll free), or (202) 502–8659                 respectively. In determining the                       Commission
                                                  (TTY). In lieu of electronic filing, please             appropriate action to take, the
                                                  send a paper copy to: Secretary, Federal                                                                       Combined Notice of Filings #2
                                                                                                          Commission will consider all protests or
                                                  Energy Regulatory Commission, 888                       other comments filed, but only those                      Take notice that the Commission
                                                  First Street NE., Washington, DC 20426.                 who file a motion to intervene in                      received the following electric rate
                                                  The first page of any filing should                     accordance with the Commission’s                       filings:
                                                  include docket number P–2146–199.
                                                                                                          Rules may become a party to the                           Docket Numbers: ER12–2275–001;
                                                     k. Description of Request: Alabama
                                                  Power requests approval to modify Unit                  proceeding. Any comments, protests, or                 EC14–129–001.
                                                  1 at the Jordan Development to address                  motions to intervene must be received                     Applicants: Lexington Power & Light,
                                                  significant maintenance needs and to                    on or before the specified comment date                LLC.
                                                  improve power and efficiency. The                       for the particular application.                           Description: Notice of Material
                                                  proposed scope of work for Unit 1                          o. Filing and Service of Documents:                 Change in Status of Lexington Power &
                                                  includes complete turbine replacement,                  Any filing must (1) bear in all capital                Light, LLC.
                                                  wicket gate replacement, governor and                                                                             Filed Date: 6/15/16.
                                                                                                          letters the title ‘‘COMMENTS’’,
                                                  servomotor system replacement, turbine                                                                            Accession Number: 20160615–5163.
                                                                                                          ‘‘PROTEST’’, or ‘‘MOTION TO
                                                  and thrust bearing refurbishment, and                                                                             Comments Due: 5 p.m. ET 7/6/16.
                                                                                                          INTERVENE’’ as applicable; (2) set forth
                                                  related component replacement.                          in the heading the name of the applicant                  Docket Numbers: ER14–2952–005.
                                                  Alabama Power also proposes to extend                                                                             Applicants: Midcontinent
                                                                                                          and the project number of the
                                                  of vacuum breaker piping to enhance                                                                            Independent System Operator, Inc.
                                                                                                          application to which the filing
                                                  Unit 1’s aerating capability through a                                                                            Description: Report Filing: 2016–06–
                                                                                                          responds; (3) furnish the name, address,               15_SSR Cost Allocation Refund Report
                                                  draft tube aeration system that will be
                                                                                                          and telephone number of the person                     Supplement to be effective N/A.
                                                  operated in a similar manner as Units 2,
                                                  3, and 4. Alabama Power states the                      commenting, protesting or intervening;                    Filed Date: 6/15/16.
                                                  turbine replacement is not expected to                  and (4) otherwise comply with the                         Accession Number: 20160615–5028.
                                                  result in an increase to the total rated                requirements of 18 CFR 385.2001                           Comments Due: 5 p.m. ET 7/6/16.
                                                  capacity or the maximum discharge of                    through 385.2005. All comments,                           Docket Numbers: ER16–425–003.
                                                  the unit at rated conditions. Alabama                   motions to intervene, or protests must                    Applicants: New York Independent
                                                  Power notes that project operations will                set forth their evidentiary basis and                  System Operator, Inc.
                                                  not change, refurbishment will not                      otherwise comply with the requirements                    Description: Compliance filing:
                                                  include any structural changes to the                   of 18 CFR 4.34(b). All comments,                       Compliance re: effective date scarcity
                                                  project facilities, and no changes will be              motions to intervene, or protests should               pricing spplmntl rvsns to be effective 6/
                                                  made to the project boundary.                           relate to project works that are the                   30/2016.
                                                     l. Locations of the Application: A                   subject of the license amendment.                         Filed Date: 6/16/16.
                                                  copy of the application is available for                Agencies may obtain copies of the                         Accession Number: 20160616–5132.
                                                  inspection and reproduction at the                      application directly from the applicant.                  Comments Due: 5 p.m. ET 6/28/16.
                                                  Commission’s Public Reference Room,                     A copy of any protest or motion to                        Docket Numbers: ER16–1944–000.
                                                  located at 888 First Street NE., Room                   intervene must be served upon each                        Applicants: PJM Interconnection,
                                                  2A, Washington, DC 20426, or by calling                 representative of the applicant specified              L.L.C.
                                                  (202) 502–8371. This filing may also be                                                                           Description: Section 205(d) Rate
                                                                                                          in the particular application. If an
                                                  viewed on the Commission’s Web site at                                                                         Filing: Amendment to WMPA SA No.
                                                                                                          intervener files comments or documents
                                                  http://www.ferc.gov using the
                                                                                                          with the Commission relating to the                    3236, Queue No. W4–064 to be effective
                                                  ‘‘eLibrary’’ link. Enter the docket
                                                                                                          merits of an issue that may affect the                 3/6/2015.
                                                  number excluding the last three digits
                                                                                                          responsibilities of a particular resource                 Filed Date: 6/16/16.
                                                  (P–2146) in the docket number field to
                                                                                                          agency, they must also serve a copy of                    Accession Number: 20160616–5096.
                                                  access the document. You may also
                                                                                                          the document on that resource agency.                     Comments Due: 5 p.m. ET 7/7/16
                                                  register online at http://www.ferc.gov/
                                                  docs-filing/esubscription.asp to be                     A copy of all other filings in reference                  Docket Numbers: ER16–1945–000.
                                                  notified via email of new filings and                   to this application must be accompanied                   Applicants: Southwest Power Pool,
                                                  issuances related to this or other                      by proof of service on all persons listed              Inc.
                                                  pending projects. For assistance, call 1–               in the service list prepared by the                       Description: Section 205(d) Rate
                                                  866–208–3676 or email                                   Commission in this proceeding, in                      Filing: 3211 NIMECA NITSA NOA;
                                                  FERCOnlineSupport@ferc.gov, for TTY,                    accordance with 18 CFR 4.34(b) and                     Cancellation of 3124 Basin NITSA NOA
                                                  call (202) 502–8659. A copy is also                     385.2010.                                              to be effective 6/1/2016.
                                                  available for inspection and                                                                                      Filed Date: 6/16/16.
                                                                                                            Dated: June 16, 2016.                                   Accession Number: 20160616–5098.
                                                  reproduction at the address in item (h)
                                                  above. Agencies may obtain copies of                    Kimberly D. Bose,                                         Comments Due: 5 p.m. ET 7/7/16.
                                                  the application directly from the                       Secretary.                                                The filings are accessible in the
                                                                                                                                                                 Commission’s eLibrary system by
mstockstill on DSK3G9T082PROD with NOTICES




                                                  applicant.                                              [FR Doc. 2016–14758 Filed 6–21–16; 8:45 am]
                                                     m. Individuals desiring to be included               BILLING CODE 6717–01–P                                 clicking on the links or querying the
                                                  on the Commission’s mailing list should                                                                        docket number.
                                                  so indicate by writing to the Secretary                                                                           Any person desiring to intervene or
                                                  of the Commission.                                                                                             protest in any of the above proceedings
                                                     n. Comments, Protests, or Motions to                                                                        must file in accordance with Rules 211
                                                  Intervene: Anyone may submit                                                                                   and 214 of the Commission’s
                                                  comments, a protest, or a motion to                                                                            Regulations (18 CFR 385.211 and


                                             VerDate Sep<11>2014   20:02 Jun 21, 2016   Jkt 238001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\22JNN1.SGM   22JNN1


                                                                               Federal Register / Vol. 81, No. 120 / Wednesday, June 22, 2016 / Notices                                                 40693

                                                  385.214) on or before 5:00 p.m. Eastern                 DEPARTMENT OF ENERGY                                      Applicant Contact: Marc Thalacker,
                                                  time on the specified comment date.                                                                            P.O. Box 2230, Sisters, OR 97759, Phone
                                                  Protests may be considered, but                         Federal Energy Regulatory                              No. (541) 549–8815.
                                                  intervention is necessary to become a                   Commission                                                FERC Contact: Christopher Chaney,
                                                  party to the proceeding.                                [Docket No. CD16–13–000]                               Phone No. (202) 502–6778, email:
                                                     eFiling is encouraged. More detailed                                                                        Christopher.Chaney@ferc.gov.
                                                  information relating to filing                          Three Sisters Irrigation District; Notice                 Qualifying Conduit Hydropower
                                                                                                          of Preliminary Determination of a                      Facility Description: The proposed
                                                  requirements, interventions, protests,
                                                                                                          Qualifying Conduit Hydropower                          project would consist of: (1) A new
                                                  service, and qualifying facilities filings
                                                                                                          Facility and Soliciting Comments and                   powerhouse, approximately 20 feet by
                                                  can be found at: http://www.ferc.gov/                   Motions To Intervene
                                                  docs-filing/efiling/filing-req.pdf. For                                                                        40 feet, along the existing 24-inch-
                                                                                                            On June 2, 2016, as supplemented on                  diameter outlet pipe of the 54-inch-
                                                  other information, call (866) 208–3676
                                                                                                          June 13, 2016, Three Sisters Irrigation                diameter Watson McKenzie Main Canal
                                                  (toll free). For TTY, call (202) 502–8659.
                                                                                                          District filed a notice of intent to                   South Pipe; (2) four new turbine/
                                                    Dated: June 16, 2016.                                                                                        generating units with a total installed
                                                                                                          construct a qualifying conduit
                                                  Kimberly D. Bose,                                       hydropower facility, pursuant to section               capacity of 198.6 kW; (3) four new, short
                                                  Secretary.                                              30 of the Federal Power Act (FPA), as                  intake pipes of variable diameters; (4)
                                                  [FR Doc. 2016–14765 Filed 6–21–16; 8:45 am]             amended by section 4 of the                            four new, short discharge pipes of
                                                                                                          Hydropower Regulatory Efficiency Act                   variable diameters; (5) a discharge pool
                                                  BILLING CODE 6717–01–P
                                                                                                          of 2013 (HREA). The proposed Watson                    structure, approximately 13.5 feet by 25
                                                                                                          Net Meter/Micro Hydroelectric                          feet, with two 36-inch-diameter outlet
                                                                                                          Demonstration Facility would have an                   pipes to Watson Reservoir; and (6)
                                                                                                          installed capacity of 198.6 kilowatts                  appurtenant facilities.
                                                                                                          (kW), and would be located along the                      The proposed project would have a
                                                                                                          outlet pipe for an existing irrigation                 total installed capacity of 198.6 kW.
                                                                                                          pipeline, the Watson McKenzie Main                        A qualifying conduit hydropower
                                                                                                          Canal South Pipe. The project would be                 facility is one that is determined or
                                                                                                          located in the town of Sisters, Deschutes              deemed to meet all of the criteria shown
                                                                                                          County, Oregon.                                        in the table below.

                                                                                    TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                     Satisfies
                                                              Statutory provision                                                             Description                                             (Y/N)

                                                  FPA 30(a)(3)(A), as amended by HREA ..             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or             Y
                                                                                                       similar manmade water conveyance that is operated for the distribution of water
                                                                                                       for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                       eration of electricity.
                                                  FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                       power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                       erally owned conduit.
                                                  FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts ..................         Y
                                                    HREA.
                                                  FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-                Y
                                                    HREA.                                             censing requirements of Part I of the FPA.



                                                    Preliminary Determination: The                        the requirements of Rules of Practice                  Commission’s regulations.1 All
                                                  proposed addition of the hydroelectric                  and Procedure, 18 CFR 385.210 and                      comments contesting Commission staff’s
                                                  project along the existing irrigation                   385.214. Any motions to intervene must                 preliminary determination that the
                                                  pipeline will not alter its primary                     be received on or before the specified                 facility meets the qualifying criteria
                                                  purpose. Therefore, based upon the                      deadline date for the particular                       must set forth their evidentiary basis.
                                                  above criteria, Commission staff                        proceeding.                                               The Commission strongly encourages
                                                  preliminarily determines that the                                                                              electronic filing. Please file motions to
                                                                                                             Filing and Service of Responsive
                                                  proposal satisfies the requirements for a                                                                      intervene and comments using the
                                                  qualifying conduit hydropower facility,                 Documents: All filings must (1) bear in
                                                                                                                                                                 Commission’s eFiling system at http://
                                                  which is not required to be licensed or                 all capital letters the ‘‘COMMENTS
                                                                                                                                                                 www.ferc.gov/docs-filing/efiling.asp.
                                                  exempted from licensing.                                CONTESTING QUALIFICATION FOR A
                                                                                                                                                                 Commenters can submit brief comments
                                                    Comments and Motions to Intervene:                    CONDUIT HYDROPOWER FACILITY’’                          up to 6,000 characters, without prior
                                                  Deadline for filing comments contesting                 or ‘‘MOTION TO INTERVENE,’’ as                         registration, using the eComment system
                                                  whether the facility meets the qualifying               applicable; (2) state in the heading the               at http://www.ferc.gov/docs-filing/
mstockstill on DSK3G9T082PROD with NOTICES




                                                  criteria is 45 days from the issuance                   name of the applicant and the project                  ecomment.asp. You must include your
                                                  date of this notice.                                    number of the application to which the                 name and contact information at the end
                                                    Deadline for filing motions to                        filing responds; (3) state the name,                   of your comments. For assistance,
                                                  intervene is 30 days from the issuance                  address, and telephone number of the                   please contact FERC Online Support at
                                                  date of this notice.                                    person filing; and (4) otherwise comply                FERCOnlineSupport@ferc.gov, (866)
                                                    Anyone may submit comments or a                       with the requirements of sections
                                                  motion to intervene in accordance with                  385.2001 through 385.2005 of the                        1 18   CFR 385.2001–2005 (2015).



                                             VerDate Sep<11>2014   20:02 Jun 21, 2016   Jkt 238001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\22JNN1.SGM    22JNN1



Document Created: 2016-06-22 01:06:09
Document Modified: 2016-06-22 01:06:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates6/15/16.
FR Citation81 FR 40692 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR