81_FR_40813 81 FR 40693 - Three Sisters Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 40693 - Three Sisters Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 120 (June 22, 2016)

Page Range40693-40694
FR Document2016-14762

Federal Register, Volume 81 Issue 120 (Wednesday, June 22, 2016)
[Federal Register Volume 81, Number 120 (Wednesday, June 22, 2016)]
[Notices]
[Pages 40693-40694]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-14762]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-13-000]


Three Sisters Irrigation District; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On June 2, 2016, as supplemented on June 13, 2016, Three Sisters 
Irrigation District filed a notice of intent to construct a qualifying 
conduit hydropower facility, pursuant to section 30 of the Federal 
Power Act (FPA), as amended by section 4 of the Hydropower Regulatory 
Efficiency Act of 2013 (HREA). The proposed Watson Net Meter/Micro 
Hydroelectric Demonstration Facility would have an installed capacity 
of 198.6 kilowatts (kW), and would be located along the outlet pipe for 
an existing irrigation pipeline, the Watson McKenzie Main Canal South 
Pipe. The project would be located in the town of Sisters, Deschutes 
County, Oregon.
    Applicant Contact: Marc Thalacker, P.O. Box 2230, Sisters, OR 
97759, Phone No. (541) 549-8815.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new powerhouse, approximately 20 feet 
by 40 feet, along the existing 24-inch-diameter outlet pipe of the 54-
inch-diameter Watson McKenzie Main Canal South Pipe; (2) four new 
turbine/generating units with a total installed capacity of 198.6 kW; 
(3) four new, short intake pipes of variable diameters; (4) four new, 
short discharge pipes of variable diameters; (5) a discharge pool 
structure, approximately 13.5 feet by 25 feet, with two 36-inch-
diameter outlet pipes to Watson Reservoir; and (6) appurtenant 
facilities.
    The proposed project would have a total installed capacity of 198.6 
kW.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit the                      Y
 HREA.                            facility uses is a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed addition of the 
hydroelectric project along the existing irrigation pipeline will not 
alter its primary purpose. Therefore, based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866)

[[Page 40694]]

208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. A 
copy of all other filings in reference to this application must be 
accompanied by proof of service on all persons listed in the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD16-13) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: June 16, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-14762 Filed 6-21-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 81, No. 120 / Wednesday, June 22, 2016 / Notices                                                 40693

                                                  385.214) on or before 5:00 p.m. Eastern                 DEPARTMENT OF ENERGY                                      Applicant Contact: Marc Thalacker,
                                                  time on the specified comment date.                                                                            P.O. Box 2230, Sisters, OR 97759, Phone
                                                  Protests may be considered, but                         Federal Energy Regulatory                              No. (541) 549–8815.
                                                  intervention is necessary to become a                   Commission                                                FERC Contact: Christopher Chaney,
                                                  party to the proceeding.                                [Docket No. CD16–13–000]                               Phone No. (202) 502–6778, email:
                                                     eFiling is encouraged. More detailed                                                                        Christopher.Chaney@ferc.gov.
                                                  information relating to filing                          Three Sisters Irrigation District; Notice                 Qualifying Conduit Hydropower
                                                                                                          of Preliminary Determination of a                      Facility Description: The proposed
                                                  requirements, interventions, protests,
                                                                                                          Qualifying Conduit Hydropower                          project would consist of: (1) A new
                                                  service, and qualifying facilities filings
                                                                                                          Facility and Soliciting Comments and                   powerhouse, approximately 20 feet by
                                                  can be found at: http://www.ferc.gov/                   Motions To Intervene
                                                  docs-filing/efiling/filing-req.pdf. For                                                                        40 feet, along the existing 24-inch-
                                                                                                            On June 2, 2016, as supplemented on                  diameter outlet pipe of the 54-inch-
                                                  other information, call (866) 208–3676
                                                                                                          June 13, 2016, Three Sisters Irrigation                diameter Watson McKenzie Main Canal
                                                  (toll free). For TTY, call (202) 502–8659.
                                                                                                          District filed a notice of intent to                   South Pipe; (2) four new turbine/
                                                    Dated: June 16, 2016.                                                                                        generating units with a total installed
                                                                                                          construct a qualifying conduit
                                                  Kimberly D. Bose,                                       hydropower facility, pursuant to section               capacity of 198.6 kW; (3) four new, short
                                                  Secretary.                                              30 of the Federal Power Act (FPA), as                  intake pipes of variable diameters; (4)
                                                  [FR Doc. 2016–14765 Filed 6–21–16; 8:45 am]             amended by section 4 of the                            four new, short discharge pipes of
                                                                                                          Hydropower Regulatory Efficiency Act                   variable diameters; (5) a discharge pool
                                                  BILLING CODE 6717–01–P
                                                                                                          of 2013 (HREA). The proposed Watson                    structure, approximately 13.5 feet by 25
                                                                                                          Net Meter/Micro Hydroelectric                          feet, with two 36-inch-diameter outlet
                                                                                                          Demonstration Facility would have an                   pipes to Watson Reservoir; and (6)
                                                                                                          installed capacity of 198.6 kilowatts                  appurtenant facilities.
                                                                                                          (kW), and would be located along the                      The proposed project would have a
                                                                                                          outlet pipe for an existing irrigation                 total installed capacity of 198.6 kW.
                                                                                                          pipeline, the Watson McKenzie Main                        A qualifying conduit hydropower
                                                                                                          Canal South Pipe. The project would be                 facility is one that is determined or
                                                                                                          located in the town of Sisters, Deschutes              deemed to meet all of the criteria shown
                                                                                                          County, Oregon.                                        in the table below.

                                                                                    TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                     Satisfies
                                                              Statutory provision                                                             Description                                             (Y/N)

                                                  FPA 30(a)(3)(A), as amended by HREA ..             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or             Y
                                                                                                       similar manmade water conveyance that is operated for the distribution of water
                                                                                                       for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                       eration of electricity.
                                                  FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                       power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                       erally owned conduit.
                                                  FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts ..................         Y
                                                    HREA.
                                                  FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-                Y
                                                    HREA.                                             censing requirements of Part I of the FPA.



                                                    Preliminary Determination: The                        the requirements of Rules of Practice                  Commission’s regulations.1 All
                                                  proposed addition of the hydroelectric                  and Procedure, 18 CFR 385.210 and                      comments contesting Commission staff’s
                                                  project along the existing irrigation                   385.214. Any motions to intervene must                 preliminary determination that the
                                                  pipeline will not alter its primary                     be received on or before the specified                 facility meets the qualifying criteria
                                                  purpose. Therefore, based upon the                      deadline date for the particular                       must set forth their evidentiary basis.
                                                  above criteria, Commission staff                        proceeding.                                               The Commission strongly encourages
                                                  preliminarily determines that the                                                                              electronic filing. Please file motions to
                                                                                                             Filing and Service of Responsive
                                                  proposal satisfies the requirements for a                                                                      intervene and comments using the
                                                  qualifying conduit hydropower facility,                 Documents: All filings must (1) bear in
                                                                                                                                                                 Commission’s eFiling system at http://
                                                  which is not required to be licensed or                 all capital letters the ‘‘COMMENTS
                                                                                                                                                                 www.ferc.gov/docs-filing/efiling.asp.
                                                  exempted from licensing.                                CONTESTING QUALIFICATION FOR A
                                                                                                                                                                 Commenters can submit brief comments
                                                    Comments and Motions to Intervene:                    CONDUIT HYDROPOWER FACILITY’’                          up to 6,000 characters, without prior
                                                  Deadline for filing comments contesting                 or ‘‘MOTION TO INTERVENE,’’ as                         registration, using the eComment system
                                                  whether the facility meets the qualifying               applicable; (2) state in the heading the               at http://www.ferc.gov/docs-filing/
mstockstill on DSK3G9T082PROD with NOTICES




                                                  criteria is 45 days from the issuance                   name of the applicant and the project                  ecomment.asp. You must include your
                                                  date of this notice.                                    number of the application to which the                 name and contact information at the end
                                                    Deadline for filing motions to                        filing responds; (3) state the name,                   of your comments. For assistance,
                                                  intervene is 30 days from the issuance                  address, and telephone number of the                   please contact FERC Online Support at
                                                  date of this notice.                                    person filing; and (4) otherwise comply                FERCOnlineSupport@ferc.gov, (866)
                                                    Anyone may submit comments or a                       with the requirements of sections
                                                  motion to intervene in accordance with                  385.2001 through 385.2005 of the                        1 18   CFR 385.2001–2005 (2015).



                                             VerDate Sep<11>2014   20:02 Jun 21, 2016   Jkt 238001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\22JNN1.SGM    22JNN1


                                                  40694                        Federal Register / Vol. 81, No. 120 / Wednesday, June 22, 2016 / Notices

                                                  208–3676 (toll free), or (202) 502–8659                 authorization, under 18 CFR part 34, of                   Take notice that the Commission
                                                  (TTY). In lieu of electronic filing, please             future issuances of securities and                     received the following electric rate
                                                  send a paper copy to: Secretary, Federal                assumptions of liability, is July 6, 2016.             filings:
                                                  Energy Regulatory Commission, 888                          The Commission encourages                              Docket Numbers: ER16–1254–002.
                                                  First Street NE., Washington, DC 20426.                 electronic submission of protests and                     Applicants: MMP SCO, LLC.
                                                  A copy of all other filings in reference                interventions in lieu of paper, using the                 Description: Tariff Amendment:
                                                  to this application must be accompanied                 FERC Online links at http://                           Second Amendment to Application for
                                                  by proof of service on all persons listed               www.ferc.gov. To facilitate electronic                 Market-Based Rate Authorization to be
                                                  in the service list prepared by the                     service, persons with Internet access                  effective 6/15/2016.
                                                  Commission in this proceeding, in                       who will eFile a document and/or be                       Filed Date: 6/15/16.
                                                  accordance with 18 CFR 4.34(b) and                      listed as a contact for an intervenor                     Accession Number: 20160615–5131.
                                                  385.2010.                                               must create and validate an                               Comments Due: 5 p.m. ET 6/27/16.
                                                    Locations of Notice of Intent: Copies                 eRegistration account using the                           Docket Numbers: ER16–1882–000.
                                                  of the notice of intent can be obtained                 eRegistration link. Select the eFiling                    Applicants: Boulder Solar Power,
                                                  directly from the applicant or such                     link to log on and submit the                          LLC.
                                                  copies can be viewed and reproduced at                  intervention or protests.                                 Description: Baseline eTariff Filing:
                                                  the Commission in its Public Reference                     Persons unable to file electronically               Market-Based Rate Tariff to be effective
                                                  Room, Room 2A, 888 First Street NE.,                    should submit an original and 5 copies                 7/1/2016.
                                                  Washington, DC 20426. The filing may                    of the intervention or protest to the                     Filed Date: 6/3/16.
                                                  also be viewed on the web at http://                    Federal Energy Regulatory Commission,                     Accession Number: 20160603–5296.
                                                  www.ferc.gov/docs-filing/elibrary.asp                   888 First Street NE., Washington, DC                      Comments Due: 5 p.m. ET 6/24/16.
                                                  using the ‘‘eLibrary’’ link. Enter the                  20426.                                                    Docket Numbers: ER16–1940–000.
                                                  docket number (i.e., CD16–13) in the                       The filings in the above-referenced                    Applicants: Idaho Power Company.
                                                  docket number field to access the                       proceeding are accessible in the                          Description: § 205(d) Rate Filing: SA
                                                  document. For assistance, call toll-free                Commission’s eLibrary system by                        358—Construction Agreement with PAC
                                                  1–866–208–3676 or email                                 clicking on the appropriate link in the                for Siphon Tap-Pingree Tap Line
                                                  FERCOnlineSupport@ferc.gov. For TTY,                    above list. They are also available for                Rebuild to be effective 6/1/2016.
                                                  call (202) 502–8659.                                    electronic review in the Commission’s                     Filed Date: 6/16/16.
                                                    Dated: June 16, 2016.                                 Public Reference Room in Washington,                      Accession Number: 20160616–5000.
                                                  Kimberly D. Bose,                                       DC. There is an eSubscription link on                     Comments Due: 5 p.m. ET 7/7/16.
                                                  Secretary.                                              the Web site that enables subscribers to                  Docket Numbers: ER16–1941–000.
                                                  [FR Doc. 2016–14762 Filed 6–21–16; 8:45 am]             receive email notification when a                         Applicants: Southern California
                                                  BILLING CODE 6717–01–P
                                                                                                          document is added to a subscribed                      Edison Company.
                                                                                                          docket(s). For assistance with any FERC                   Description: § 205(d) Rate Filing: 2016
                                                                                                          Online service, please email                           Revised Added Facilities Rate under
                                                  DEPARTMENT OF ENERGY                                    FERCOnlineSupport@ferc.gov. or call                    WDAT—Filing No. 14 to be effective
                                                                                                          (866) 208–3676 (toll free). For TTY, call              1/1/2016.
                                                  Federal Energy Regulatory                               (202) 502–8659.                                           Filed Date: 6/16/16.
                                                  Commission                                                Dated: June 16, 2016.                                   Accession Number: 20160616–5003.
                                                  [Docket No. ER16–1925–000]                              Kimberly D. Bose,                                         Comments Due: 5 p.m. ET 7/7/16.
                                                                                                          Secretary.                                                Docket Numbers: ER16–1942–000.
                                                  Pavant Solar II LLC; Supplemental                       [FR Doc. 2016–14756 Filed 6–21–16; 8:45 am]               Applicants: WM North Broward, Inc.
                                                  Notice That Initial Market-Based Rate                                                                             Description: Notice of Cancellation
                                                                                                          BILLING CODE 6717–01–P
                                                  Filing Includes Request for Blanket                                                                            market-based rate tariff of WM North
                                                  Section 204 Authorization                                                                                      Broward, Inc.
                                                                                                          DEPARTMENT OF ENERGY                                      Filed Date: 6/16/16.
                                                    This is a supplemental notice in the
                                                                                                                                                                    Accession Number: 20160616–5042.
                                                  above-referenced proceeding of Pavant
                                                                                                          Federal Energy Regulatory                                 Comments Due: 5 p.m. ET 7/7/16.
                                                  Solar II LLC’s application for market-
                                                                                                          Commission                                                Docket Numbers: ER16–1943–000.
                                                  based rate authority, with an
                                                  accompanying rate tariff, noting that                                                                             Applicants: Illinois Power Marketing
                                                                                                          Combined Notice of Filings #1                          Company.
                                                  such application includes a request for
                                                  blanket authorization, under 18 CFR                        Take notice that the Commission                        Description: Compliance filing: 2013
                                                  part 34, of future issuances of securities              received the following electric corporate              System Support Resource Agreement
                                                  and assumptions of liability.                           filings:                                               Compliance Filing to be effective
                                                    Any person desiring to intervene or to                                                                       1/1/2013.
                                                                                                             Docket Numbers: EC16–93–000.                           Filed Date: 6/16/16.
                                                  protest should file with the Federal
                                                                                                             Applicants: Atlas Power Finance,                       Accession Number: 20160616–5053.
                                                  Energy Regulatory Commission, 888
                                                                                                          LLC, Dynegy Inc., Energy Capital                          Comments Due: 5 p.m. ET 7/7/16.
                                                  First Street NE., Washington, DC 20426,
                                                                                                          Partners III, LLC, GDF Suez Energy                        Take notice that the Commission
                                                  in accordance with Rules 211 and 214
                                                                                                          North America, Inc.                                    received the following electric
                                                  of the Commission’s Rules of Practice
mstockstill on DSK3G9T082PROD with NOTICES




                                                  and Procedure (18 CFR 385.211 and                          Description: Supplement to March 25,                reliability filings:
                                                  385.214). Anyone filing a motion to                     2016 Joint Application for                                Docket Numbers: RR16–4–000.
                                                  intervene or protest must serve a copy                  Authorization under FPA Section 203 of                    Applicants: North American Electric
                                                  of that document on the Applicant.                      Atlas Power Finance, et al.                            Reliability Corp.
                                                    Notice is hereby given that the                          Filed Date: 6/15/16.                                   Description: North American Electric
                                                  deadline for filing protests with regard                   Accession Number: 20160615–5149.                    Reliability Corporation’s Revised Report
                                                  to the applicant’s request for blanket                     Comments Due: 5 p.m. ET 6/29/16.                    of Comparisons of Budgeted to Actual


                                             VerDate Sep<11>2014   20:02 Jun 21, 2016   Jkt 238001   PO 00000   Frm 00042   Fmt 4703   Sfmt 4703   E:\FR\FM\22JNN1.SGM   22JNN1



Document Created: 2016-06-22 01:06:13
Document Modified: 2016-06-22 01:06:13
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 40693 

2025 Federal Register | Disclaimer | Privacy Policy