81_FR_42374 81 FR 42249 - Drawbridge Operation Regulation; Lewis and Clark River, Astoria, OR

81 FR 42249 - Drawbridge Operation Regulation; Lewis and Clark River, Astoria, OR

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 81, Issue 125 (June 29, 2016)

Page Range42249-42249
FR Document2016-15348

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Oregon State (Lewis and Clark River) highway bridge across the Lewis and Clark River, mile 1.0, at Astoria, Oregon. The deviation is necessary to accommodate bridge maintenance activities during the effective time period. The deviation allows the bridge to remain in the closed-to-navigation position such that it need not open to maritime traffic.

Federal Register, Volume 81 Issue 125 (Wednesday, June 29, 2016)
[Federal Register Volume 81, Number 125 (Wednesday, June 29, 2016)]
[Rules and Regulations]
[Page 42249]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-15348]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-0605]


Drawbridge Operation Regulation; Lewis and Clark River, Astoria, 
OR

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Oregon State (Lewis and Clark 
River) highway bridge across the Lewis and Clark River, mile 1.0, at 
Astoria, Oregon. The deviation is necessary to accommodate bridge 
maintenance activities during the effective time period. The deviation 
allows the bridge to remain in the closed-to-navigation position such 
that it need not open to maritime traffic.

DATES: This deviation is effective from 7 a.m. on July 15, 2016 to 5 
p.m. on October 31, 2016.

ADDRESSES: The docket for this deviation, [USCG-2016-0605] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Steven Fischer, Bridge 
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, 
email [email protected].

SUPPLEMENTARY INFORMATION: The Oregon Department of Transportation 
(ODOT) has requested that the Lewis and Clark River Bridge, mile 1.0, 
be allowed to remain in the closed-to-navigation position such that it 
need not open to vessel traffic from 7 a.m. on July 15, 2016 until 5 
p.m. on October 31, 2016. The deviation is necessary to facilitate 
bridge maintenance activities to include repairing and preserving the 
bascule drawbridge structural steel. The Lewis and Clark River Bridge 
provides a vertical clearance of 17 feet above mean high water when in 
the closed-to-navigation position. However, during the bridge 
maintenance activities, the bascule span of the bridge will have a 
containment system installed which will reduce the vertical clearance 
by 5 feet to 12 feet above mean high water. The normal operating 
schedule of this bridge is detailed at 33 CFR 117.899(c).
    This deviation allows the bascule span of the Lewis and Clark River 
Bridge to remain in the closed-to-navigation position such that it such 
that it need not open to maritime traffic from 7 a.m. on July 15, 2016 
until 5 p.m. on October 31, 2016. However, the bascule span will be 
available to open on Wednesdays and Sundays with at least three-hour 
advanced notice. The bascule span will also open at any time for 
emergency situations with at least three-hour advanced notice. Vessels 
able to pass through the bridge in the closed position may do so at 
anytime.
    Waterway usage on the Lewis and Clark River is primarily small 
recreational boaters and fishing vessels transiting to and from Fred 
Wahl Marine Construction Inc. ODOT has coordinated with Fred Wahl 
Marine Construction Inc. in this regard. No immediate alternate route 
is available for vessels to pass. The Coast Guard will also inform the 
users of the waterways through our Local and Broadcast Notices to 
Mariners of the change in operating schedule for the bridge so that 
vessels can arrange their transits to minimize any impact caused by the 
temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: June 23, 2016.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2016-15348 Filed 6-28-16; 8:45 am]
 BILLING CODE 9110-04-P



                                                                 Federal Register / Vol. 81, No. 125 / Wednesday, June 29, 2016 / Rules and Regulations                                                42249

                                                on demand from 7 p.m. to 6 a.m. The                       Dated: June 23, 2016.                                the bridge maintenance activities, the
                                                north and south spans of the bridge will                Hal R. Pitts.                                          bascule span of the bridge will have a
                                                open to navigation concurrently, with                   Bridge Program Manager, Fifth Coast Guard              containment system installed which
                                                the south span only opening partially                   District.                                              will reduce the vertical clearance by 5
                                                due to damage, upon request, for: (1)                   [FR Doc. 2016–15295 Filed 6–28–16; 8:45 am]            feet to 12 feet above mean high water.
                                                Scheduled openings at 9:30 a.m. for                     BILLING CODE 9110–04–P                                 The normal operating schedule of this
                                                vessels transiting southeast, (2) 10:30                                                                        bridge is detailed at 33 CFR 117.899(c).
                                                a.m. for vessels transiting northwest,                                                                            This deviation allows the bascule
                                                and (3) at noon and 2 p.m. for two-way                  DEPARTMENT OF HOMELAND                                 span of the Lewis and Clark River
                                                                                                        SECURITY                                               Bridge to remain in the closed-to-
                                                vessel traffic through the bridge,
                                                                                                                                                               navigation position such that it such
                                                Monday through Friday. The north and                    Coast Guard                                            that it need not open to maritime traffic
                                                south spans of the bridge will open to
                                                                                                                                                               from 7 a.m. on July 15, 2016 until 5 p.m.
                                                navigation concurrently, with the south                 33 CFR Part 117                                        on October 31, 2016. However, the
                                                span only opening partially due to                                                                             bascule span will be available to open
                                                damage, upon request, for: (1)                          [Docket No. USCG–2016–0605]
                                                                                                                                                               on Wednesdays and Sundays with at
                                                Scheduled openings at 9:30 a.m. for                                                                            least three-hour advanced notice. The
                                                                                                        Drawbridge Operation Regulation;
                                                vessels transiting southeast and (2)                    Lewis and Clark River, Astoria, OR                     bascule span will also open at any time
                                                10:30 a.m. for vessels transiting                                                                              for emergency situations with at least
                                                northwest, Saturday and Sunday. The                     AGENCY: Coast Guard, DHS.                              three-hour advanced notice. Vessels
                                                horizontal clearance of the bridge with                 ACTION:Notice of deviation from                        able to pass through the bridge in the
                                                the south span closed-to-navigation is                  drawbridge regulation.                                 closed position may do so at anytime.
                                                38 feet and the horizontal clearance of                                                                           Waterway usage on the Lewis and
                                                the bridge with the south span partially                SUMMARY:    The Coast Guard has issued a               Clark River is primarily small
                                                open-to-navigation is 70 feet. The                      temporary deviation from the operating                 recreational boaters and fishing vessels
                                                                                                        schedule that governs the Oregon State                 transiting to and from Fred Wahl Marine
                                                modified temporary deviation is
                                                                                                        (Lewis and Clark River) highway bridge                 Construction Inc. ODOT has
                                                necessary to relieve vessel congestion
                                                                                                        across the Lewis and Clark River, mile                 coordinated with Fred Wahl Marine
                                                and provide for safe navigation on the
                                                                                                        1.0, at Astoria, Oregon. The deviation is              Construction Inc. in this regard. No
                                                waterway. The bridge is a double swing                  necessary to accommodate bridge
                                                draw bridge and has a vertical clearance                                                                       immediate alternate route is available
                                                                                                        maintenance activities during the                      for vessels to pass. The Coast Guard will
                                                in the closed position of 6 feet above                  effective time period. The deviation
                                                mean high water.                                                                                               also inform the users of the waterways
                                                                                                        allows the bridge to remain in the                     through our Local and Broadcast
                                                   The North Landing River is used by                   closed-to-navigation position such that                Notices to Mariners of the change in
                                                a variety of vessels including small U.S.               it need not open to maritime traffic.                  operating schedule for the bridge so that
                                                government and public vessels, small                    DATES: This deviation is effective from                vessels can arrange their transits to
                                                commercial vessels, tug and barge, and                  7 a.m. on July 15, 2016 to 5 p.m. on                   minimize any impact caused by the
                                                recreational vessels. The Coast Guard                   October 31, 2016.                                      temporary deviation.
                                                has carefully considered the nature and                 ADDRESSES: The docket for this                            In accordance with 33 CFR 117.35(e),
                                                volume of vessel traffic on the waterway                deviation, [USCG–2016–0605] is                         the drawbridge must return to its regular
                                                in publishing this temporary deviation.                 available at http://www.regulations.gov.               operating schedule immediately at the
                                                   During the closure times there will be               Type the docket number in the                          end of the effective period of this
                                                limited opportunity for vessels which                   ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                   temporary deviation. This deviation
                                                                                                        Click on Open Docket Folder on the line                from the operating regulations is
                                                are able to safely pass through the
                                                                                                        associated with this deviation.                        authorized under 33 CFR 117.35.
                                                bridge in the closed position to do so.
                                                Vessels able to safely pass through the                 FOR FURTHER INFORMATION CONTACT: If                      Dated: June 23, 2016.
                                                bridge in the closed position may do so,                you have questions on this temporary                   Steven M. Fischer,
                                                after receiving confirmation from the                   deviation, call or email Mr. Steven                    Bridge Administrator, Thirteenth Coast Guard
                                                bridge tender that it is safe to transit                Fischer, Bridge Administrator,                         District.
                                                through the bridge. The north span of                   Thirteenth Coast Guard District;                       [FR Doc. 2016–15348 Filed 6–28–16; 8:45 am]
                                                                                                        telephone 206–220–7282, email d13-pf-
                                                the bridge will be able to open for                                                                            BILLING CODE 9110–04–P
                                                                                                        d13bridges@uscg.mil.
                                                emergencies. The Coast Guard will also
                                                                                                        SUPPLEMENTARY INFORMATION: The
                                                inform the users of the waterways
                                                                                                        Oregon Department of Transportation                    DEPARTMENT OF HOMELAND
                                                through our Local and Broadcast                                                                                SECURITY
                                                                                                        (ODOT) has requested that the Lewis
                                                Notices to Mariners of the change in
                                                                                                        and Clark River Bridge, mile 1.0, be
                                                operating schedule for the bridge so that                                                                      Coast Guard
                                                                                                        allowed to remain in the closed-to-
                                                vessel operators can arrange their transit
                                                                                                        navigation position such that it need not
                                                to minimize any impact caused by the                    open to vessel traffic from 7 a.m. on July             33 CFR Part 117
                                                modified temporary deviation.                           15, 2016 until 5 p.m. on October 31,                   [Docket No. USCG–2016–0539]
                                                   In accordance with 33 CFR 117.35(e),                 2016. The deviation is necessary to
mstockstill on DSK3G9T082PROD with RULES




                                                the drawbridge must return to its regular               facilitate bridge maintenance activities               Drawbridge Operation Regulation; Isle
                                                operating schedule immediately at the                   to include repairing and preserving the                of Wight (Sinepuxent) Bay, Ocean City,
                                                end of the effective period of this                     bascule drawbridge structural steel. The               MD
                                                temporary deviation. This deviation                     Lewis and Clark River Bridge provides                  AGENCY: Coast Guard, DHS.
                                                from the operating regulations is                       a vertical clearance of 17 feet above
                                                                                                                                                               ACTION:Notice of deviation from
                                                authorized under 33 CFR 117.35.                         mean high water when in the closed-to-
                                                                                                                                                               drawbridge regulations.
                                                                                                        navigation position. However, during


                                           VerDate Sep<11>2014   16:45 Jun 28, 2016   Jkt 238001   PO 00000   Frm 00025   Fmt 4700   Sfmt 4700   E:\FR\FM\29JNR1.SGM   29JNR1



Document Created: 2018-02-08 07:42:44
Document Modified: 2018-02-08 07:42:44
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 7 a.m. on July 15, 2016 to 5 p.m. on October 31, 2016.
ContactIf you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email [email protected]
FR Citation81 FR 42249 