In accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) has prepared a Proposed Resource Management Plan (RMP) Amendment and Final Supplemental Environmental Impact Statement (EIS) for the Roan Plateau planning area and by this notice announces its availability.

Federal Register, Volume 81 Issue 127 (Friday, July 1, 2016)
[Federal Register Volume 81, Number 127 (Friday, July 1, 2016)]
[Notices]
[Pages 43225-43226]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-15527]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

[LLCON04000 L16100000.DT0000-16X]


Notice of Availability of the Proposed Resource Management Plan 
Amendment and Final Supplemental Environmental Impact Statement for the 
Roan Plateau Planning Area, Colorado

AGENCY: Bureau of Land Management, Interior.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: In accordance with the National Environmental Policy Act 
(NEPA) of 1969, as amended, and the Federal Land Policy and Management 
Act of 1976, as amended, the Bureau of Land Management (BLM) has 
prepared a Proposed Resource Management Plan (RMP) Amendment and Final 
Supplemental Environmental Impact Statement (EIS) for the Roan Plateau 
planning area and by this notice announces its availability.

DATES: BLM planning regulations state that any person who meets the 
conditions identified in the regulations may protest the BLM's Proposed 
RMP Amendment/Final Supplemental EIS. A person who meets the conditions 
and files a protest must file the protest within 30 days of the date 
that the Environmental Protection Agency publishes its Notice of 
Availability in the Federal Register.

ADDRESSES: Copies of the Roan Plateau Proposed RMP Amendment/Final 
Supplemental EIS have been sent to affected Federal, State and local 
government agencies and to other stakeholders. Copies of the Proposed 
RMP Amendment/Final Supplemental EIS are also available for public 
inspection at the Colorado River Valley Field Office, 2300 River 
Frontage Road, Silt, CO 81652. Interested persons may also review the 
Proposed RMP Amendment/Final Supplemental EIS on the Internet at 
www.blm.gov/co/st/en/BLM_Programs/land_use_planning/rmp/roan_plateau.html.
    All protests must be in writing and mailed to one of the following 
addresses:
    Regular Mail: BLM Director (210), Attention: Protest Coordinator, 
P.O. Box 71383, Washington, DC 20024-1383.
    Overnight Delivery: BLM Director (210), Attention: Protest 
Coordinator, 20 M Street SE., Room 2134LM, Washington, DC 20003.

FOR FURTHER INFORMATION CONTACT: Greg Larson, Project Manager; 
telephone (970) 876-9048; see Colorado River Valley Field Office 
address above; email [email protected]. Persons who use a 
telecommunications device for the deaf (TDD) may call the Federal 
Information Relay Service (FIRS) at 1-800-877-8339 to contact the above 
individual during normal business hours. The FIRS is available 24 hours 
a day, seven days a week, to leave a message or question with the above 
individual. You will receive a reply during normal business hours.

SUPPLEMENTARY INFORMATION: The BLM prepared the Roan Plateau Proposed 
RMP Amendment/Final Supplemental EIS to evaluate a range of management 
decisions for resources, resource uses, and special designations in the 
planning area. The Proposed RMP/Final Supplemental EIS also responds to 
a June 22, 2012, ruling by the United States District Court for the 
District of Colorado remanding the 2007 Roan Plateau Record of 
Decision. The Court set aside the 2007 Roan Plateau RMP Amendment and 
remanded the matter to the BLM for further action in accordance with 
the Court's decision. In particular, the Court found that the Final EIS 
was deficient insofar as it failed to adequately address the: (i) 
``Community Alternative'' that various local governments, environmental 
organizations and individual members of the public recommended during 
the planning process leading up to the 2007 plan amendment; (ii) 
Cumulative air-quality impacts of the RMP Amendment decision in 
conjunction with anticipated oil and gas development on private lands 
outside the Roan Plateau planning area; and (iii) Issue of potential 
ozone impacts from proposed oil and gas development. Based on the 
Court's ruling and new information available since the BLM developed 
the Final EIS,

[[Page 43226]]

the BLM determined that a new RMP Amendment and supplemental analysis 
under NEPA were warranted. The parties involved in the litigation 
regarding the 2007 plan amendment reached a settlement in November 
2014. Based on that agreement, the Roan Plateau Proposed RMP Amendment/
Final Supplemental EIS includes an alternative that was identified in 
the November 2014 settlement. That ``Settlement Alternative'' was 
identified as the Proposed Alternative in the Draft Supplemental EIS.
    The planning area, which is in west-central Colorado, includes 
approximately 73,602 acres of BLM-managed land (Federal surface, 
Federal mineral estate, or both). It is located primarily in Garfield 
County with a small portion in southern Rio Blanco County. The Roan 
Plateau RMP Amendment proposes to amend the management decisions in the 
Glenwood Springs and White River RMPs as they relate to the planning 
area.
    The Roan Plateau RMP Amendment process began originally with 
scoping in 2000. The BLM published the Draft EIS in November 2004 and 
the Final EIS in August 2006. The BLM then issued two Records of 
Decision, one in June 2007 and a second, pertaining to Areas of 
Critical Environmental Concern, in March 2008. Following the District 
Court ruling in 2012, the BLM published a Notice of Intent to develop 
the Draft RMP Amendment/Supplemental EIS on January 28, 2013 (78 FR 
5834), which initiated a second scoping period. The Draft RMP 
Amendment/Supplemental EIS was published on November 20, 2015 (80 FR 
72732), and made available for public comment. The BLM held three 
public meetings to discuss the Draft RMP Amendment/Supplemental EIS and 
received approximately 50,000 comment submissions during the comment 
period. The BLM carefully considered those comments. The BLM made 
changes to the Proposed RMP Amendment/Final Supplemental EIS in 
response to comments received from the public and cooperating agencies, 
United States Fish and Wildlife Service consultation, and extensive 
internal BLM reviews. These changes included the addition of clarifying 
text and updated information, however, none of the changes constituted 
a substantial change in the proposed land use plan decisions or the 
analysis in the Draft Supplemental EIS that would require additional 
supplementation.
    Major issues considered in the Proposed RMP Amendment/Final 
Supplemental EIS include fluid minerals management; social and economic 
impacts; riparian habitat management; recreation; and air, water, and 
ecological resources. The RMP also addresses decisions regarding Wild 
and Scenic Rivers, Areas of Critical Environmental Concern, and lands 
with wilderness characteristics. Decisions related to Greater Sage-
Grouse management in the proposed Amendment are consistent with last 
year's Northwestern Colorado Greater Sage-Grouse Resource Management 
Plan Amendment Record of Decision.
    The Proposed RMP Amendment/Final Supplemental EIS focuses on 
evaluating new information and new issues raised since the BLM 
developed the 2006 Roan Plateau Final EIS. This includes an evaluation 
of four alternatives including the No Action Alternative (Alternative 
I). Alternative II is based on the Proposed Plan from the 2006 Roan RMP 
Amendment/Final EIS and includes updated decisions and analysis based 
on new information and issues raised during the scoping period for the 
Supplemental EIS. Alternative III is based on the ``Community 
Alternative'' raised during the original EIS process by Rock the Earth. 
Alternative III was augmented with input from other Supplemental EIS 
scoping comments. This alternative allows oil and gas leasing 
throughout the planning area, but limits surface disturbance on BLM 
lands above the rim. Wilderness characteristics would be managed for 
protection in this alternative, and all eligible river segments in the 
planning area would be determined to be suitable for designation as 
Wild and Scenic Rivers. Alternative III also analyzes two proposed sub-
alternatives for target shooting restrictions in an open Off-Highway 
Vehicle area. Alternative IV is the BLM's Proposed Alternative and is 
based on the terms of the 2014 Settlement Agreement. This alternative 
would allow for leasing at the base of the plateau (11,170 acres) and 
within several retained lease areas on the top of the plateau (1,830 
acres). Other resource management decisions in this alternative would 
be similar to Alternative II.
    Instructions for filing a protest with the Director of the BLM 
regarding the Proposed RMP Amendment/Final Supplemental EIS may be 
found in the ``Dear Reader'' Letter of the Roan Plateau Proposed RMP 
Amendment/Final Supplemental EIS and at 43 CFR 1610.5-2. All protests 
must be in writing and mailed to the appropriate address, as set forth 
in the ADDRESSES section above. Emailed protests will not be accepted 
as valid protests unless the protesting party also provides the 
original letter by either regular or overnight mail postmarked by the 
close of the protest period. Under these conditions, the BLM will 
consider the emailed protest as an advance copy, and it will receive 
full consideration. If you wish to provide the BLM with such advance 
notification, please direct emails to [email protected].
    Before including your address, phone number, email address, or 
other personal identifying information in your comment, you should be 
aware that your entire comment--including your personal identifying 
information--may be made publicly available at any time. While you can 
ask us in your comment to withhold your personal identifying 
information from public review, we cannot guarantee that we will be 
able to do so.

    Authority: 40 CFR 1506.6, 40 CFR 1506.10, 43 CFR 1610.2.

Ruth Welch,
BLM Colorado State Director.
[FR Doc. 2016-15527 Filed 6-30-16; 8:45 am]
 BILLING CODE 4310-JB-P



                                                                                      Federal Register / Vol. 81, No. 127 / Friday, July 1, 2016 / Notices                                            43225

                                                    II. Data                                                  Please note that the comments                        EIS are also available for public
                                                       OMB Control Number: 1028–0107.                       submitted in response to this notice are               inspection at the Colorado River Valley
                                                       Form Number: NA.                                     a matter of public record. Before                      Field Office, 2300 River Frontage Road,
                                                       Title: Economic Contribution of                      including your personal mailing                        Silt, CO 81652. Interested persons may
                                                    Federal Investments in Restoration of                   address, phone number, email address,                  also review the Proposed RMP
                                                    Degraded, Damaged, or Destroyed                         or other personally identifiable                       Amendment/Final Supplemental EIS on
                                                    Ecosystems.                                             information in your comment, you                       the Internet at www.blm.gov/co/st/en/
                                                       Type of Request: Renewal of existing                 should be aware that your entire                       BLM_Programs/land_use_planning/
                                                    information collection.                                 comment, including your personally                     rmp/roan_plateau.html.
                                                       Affected Public: DOI restoration                     identifiable information, may be made                     All protests must be in writing and
                                                    project managers and contractors                        publicly available at any time. While                  mailed to one of the following
                                                    working on selected case study                          you can ask us in your comment to                      addresses:
                                                    restoration projects.                                   withhold your personally identifiable                     Regular Mail: BLM Director (210),
                                                       Respondent’s Obligation: None.                       information from public view, we                       Attention: Protest Coordinator, P.O. Box
                                                    Participation is voluntary.                             cannot guarantee that we will be able to               71383, Washington, DC 20024–1383.
                                                       Frequency of Collection: One time                    do so.                                                    Overnight Delivery: BLM Director
                                                    only.                                                                                                          (210), Attention: Protest Coordinator, 20
                                                       Estimated Total Number of Annual                     William Lellis,                                        M Street SE., Room 2134LM,
                                                    Responses: We expect to do up to 10                     Acting Associate Director, Ecosystems.                 Washington, DC 20003.
                                                    case studies per year. This will result in              [FR Doc. 2016–15657 Filed 6–30–16; 8:45 am]            FOR FURTHER INFORMATION CONTACT: Greg
                                                    approximately 10 responses by project                   BILLING CODE 4338–11–P                                 Larson, Project Manager; telephone
                                                    managers and approximately 30                                                                                  (970) 876–9048; see Colorado River
                                                    responses by contractors, for a total of                                                                       Valley Field Office address above; email
                                                    40 responses per year. Most of the                      DEPARTMENT OF THE INTERIOR                             glarson@blm.gov. Persons who use a
                                                    project managers are expected to be                                                                            telecommunications device for the deaf
                                                    Federal employees.                                      Bureau of Land Management
                                                                                                                                                                   (TDD) may call the Federal Information
                                                       Estimated Time per Response:                         [LLCON04000 L16100000.DT0000–16X]                      Relay Service (FIRS) at 1–800–877–8339
                                                    Restoration project managers will                                                                              to contact the above individual during
                                                    complete a project summary survey and                   Notice of Availability of the Proposed                 normal business hours. The FIRS is
                                                    an expenditure survey, and will work                    Resource Management Plan                               available 24 hours a day, seven days a
                                                    with the USGS to coordinate contact                     Amendment and Final Supplemental                       week, to leave a message or question
                                                    with project contractors. It is expected                Environmental Impact Statement for                     with the above individual. You will
                                                    that it will take project managers up to                the Roan Plateau Planning Area,                        receive a reply during normal business
                                                    4 hours to complete this activity. Project              Colorado                                               hours.
                                                    contractors will complete an
                                                    expenditure survey. It is expected that                 AGENCY:   Bureau of Land Management,                   SUPPLEMENTARY INFORMATION: The BLM
                                                    it will take contractors no more than 1                 Interior.                                              prepared the Roan Plateau Proposed
                                                    hour to complete this activity.                         ACTION: Notice of availability.                        RMP Amendment/Final Supplemental
                                                       Estimated Annual Burden Hours:                                                                              EIS to evaluate a range of management
                                                                                                            SUMMARY:    In accordance with the                     decisions for resources, resource uses,
                                                    Total estimated annual burden for this                  National Environmental Policy Act
                                                    collection is no more than 70 hours per                                                                        and special designations in the planning
                                                                                                            (NEPA) of 1969, as amended, and the                    area. The Proposed RMP/Final
                                                    year.                                                   Federal Land Policy and Management
                                                       Estimated Reporting and                                                                                     Supplemental EIS also responds to a
                                                                                                            Act of 1976, as amended, the Bureau of                 June 22, 2012, ruling by the United
                                                    Recordkeeping ‘‘Non-Hour Cost’’
                                                                                                            Land Management (BLM) has prepared                     States District Court for the District of
                                                    Burden: There are no ‘‘non-hour cost’’
                                                                                                            a Proposed Resource Management Plan                    Colorado remanding the 2007 Roan
                                                    burdens associated with this IC.
                                                       Public Disclosure Statement: The PRA                 (RMP) Amendment and Final                              Plateau Record of Decision. The Court
                                                    (44 U.S.C. 3501, et seq.) provides that an              Supplemental Environmental Impact                      set aside the 2007 Roan Plateau RMP
                                                    agency may not conduct or sponsor and                   Statement (EIS) for the Roan Plateau                   Amendment and remanded the matter
                                                    you are not required to respond to a                    planning area and by this notice                       to the BLM for further action in
                                                    collection of information unless it                     announces its availability.                            accordance with the Court’s decision. In
                                                    displays a currently valid OMB control                  DATES: BLM planning regulations state                  particular, the Court found that the
                                                    number and current expiration date.                     that any person who meets the                          Final EIS was deficient insofar as it
                                                                                                            conditions identified in the regulations               failed to adequately address the: (i)
                                                    III. Request for Comments                               may protest the BLM’s Proposed RMP                     ‘‘Community Alternative’’ that various
                                                       We are soliciting comments as to: (a)                Amendment/Final Supplemental EIS. A                    local governments, environmental
                                                    Whether the proposed collection of                      person who meets the conditions and                    organizations and individual members
                                                    information is necessary for the agency                 files a protest must file the protest                  of the public recommended during the
                                                    to perform its duties, including whether                within 30 days of the date that the                    planning process leading up to the 2007
                                                    the information is useful; (b) the                      Environmental Protection Agency                        plan amendment; (ii) Cumulative air-
                                                    accuracy of the agency’s estimate of the                publishes its Notice of Availability in                quality impacts of the RMP Amendment
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    burden of the proposed collection of                    the Federal Register.                                  decision in conjunction with
                                                    information; (c) ways to enhance the                    ADDRESSES: Copies of the Roan Plateau                  anticipated oil and gas development on
                                                    quality, usefulness, and clarity of the                 Proposed RMP Amendment/Final                           private lands outside the Roan Plateau
                                                    information to be collected; and (d) how                Supplemental EIS have been sent to                     planning area; and (iii) Issue of potential
                                                    to minimize the burden on the                           affected Federal, State and local                      ozone impacts from proposed oil and
                                                    respondents, including the use of                       government agencies and to other                       gas development. Based on the Court’s
                                                    automated collection techniques or                      stakeholders. Copies of the Proposed                   ruling and new information available
                                                    other forms of information technology.                  RMP Amendment/Final Supplemental                       since the BLM developed the Final EIS,


                                               VerDate Sep<11>2014   19:05 Jun 30, 2016   Jkt 238001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\01JYN1.SGM   01JYN1


                                                    43226                             Federal Register / Vol. 81, No. 127 / Friday, July 1, 2016 / Notices

                                                    the BLM determined that a new RMP                       economic impacts; riparian habitat                     overnight mail postmarked by the close
                                                    Amendment and supplemental analysis                     management; recreation; and air, water,                of the protest period. Under these
                                                    under NEPA were warranted. The                          and ecological resources. The RMP also                 conditions, the BLM will consider the
                                                    parties involved in the litigation                      addresses decisions regarding Wild and                 emailed protest as an advance copy, and
                                                    regarding the 2007 plan amendment                       Scenic Rivers, Areas of Critical                       it will receive full consideration. If you
                                                    reached a settlement in November 2014.                  Environmental Concern, and lands with                  wish to provide the BLM with such
                                                    Based on that agreement, the Roan                       wilderness characteristics. Decisions                  advance notification, please direct
                                                    Plateau Proposed RMP Amendment/                         related to Greater Sage-Grouse                         emails to protest@blm.gov.
                                                    Final Supplemental EIS includes an                      management in the proposed                                Before including your address, phone
                                                    alternative that was identified in the                  Amendment are consistent with last                     number, email address, or other
                                                    November 2014 settlement. That                          year’s Northwestern Colorado Greater                   personal identifying information in your
                                                    ‘‘Settlement Alternative’’ was identified               Sage-Grouse Resource Management Plan                   comment, you should be aware that
                                                    as the Proposed Alternative in the Draft                Amendment Record of Decision.                          your entire comment—including your
                                                    Supplemental EIS.                                          The Proposed RMP Amendment/Final                    personal identifying information—may
                                                       The planning area, which is in west-                 Supplemental EIS focuses on evaluating                 be made publicly available at any time.
                                                    central Colorado, includes                              new information and new issues raised                  While you can ask us in your comment
                                                    approximately 73,602 acres of BLM-                      since the BLM developed the 2006 Roan                  to withhold your personal identifying
                                                    managed land (Federal surface, Federal                  Plateau Final EIS. This includes an                    information from public review, we
                                                    mineral estate, or both). It is located                 evaluation of four alternatives including              cannot guarantee that we will be able to
                                                    primarily in Garfield County with a                     the No Action Alternative (Alternative                 do so.
                                                    small portion in southern Rio Blanco                    I). Alternative II is based on the
                                                                                                                                                                     Authority: 40 CFR 1506.6, 40 CFR 1506.10,
                                                    County. The Roan Plateau RMP                            Proposed Plan from the 2006 Roan RMP
                                                                                                                                                                   43 CFR 1610.2.
                                                    Amendment proposes to amend the                         Amendment/Final EIS and includes
                                                    management decisions in the Glenwood                    updated decisions and analysis based                   Ruth Welch,
                                                    Springs and White River RMPs as they                    on new information and issues raised                   BLM Colorado State Director.
                                                    relate to the planning area.                            during the scoping period for the                      [FR Doc. 2016–15527 Filed 6–30–16; 8:45 am]
                                                       The Roan Plateau RMP Amendment                       Supplemental EIS. Alternative III is                   BILLING CODE 4310–JB–P
                                                    process began originally with scoping in                based on the ‘‘Community Alternative’’
                                                    2000. The BLM published the Draft EIS                   raised during the original EIS process by
                                                    in November 2004 and the Final EIS in                   Rock the Earth. Alternative III was                    DEPARTMENT OF THE INTERIOR
                                                    August 2006. The BLM then issued two                    augmented with input from other
                                                    Records of Decision, one in June 2007                   Supplemental EIS scoping comments.                     Bureau of Land Management
                                                    and a second, pertaining to Areas of                    This alternative allows oil and gas
                                                    Critical Environmental Concern, in                      leasing throughout the planning area,                  [LLCON06000 L16100000.DQ0000]
                                                    March 2008. Following the District                      but limits surface disturbance on BLM
                                                    Court ruling in 2012, the BLM                           lands above the rim. Wilderness                        Notice of Availability of the Proposed
                                                    published a Notice of Intent to develop                 characteristics would be managed for                   Resource Management Plan and Final
                                                    the Draft RMP Amendment/                                protection in this alternative, and all                Environmental Impact Statement for
                                                    Supplemental EIS on January 28, 2013                    eligible river segments in the planning                the Dominguez-Escalante National
                                                    (78 FR 5834), which initiated a second                  area would be determined to be suitable                Conservation Area, Colorado
                                                    scoping period. The Draft RMP                           for designation as Wild and Scenic                     AGENCY:   Bureau of Land Management,
                                                    Amendment/Supplemental EIS was                          Rivers. Alternative III also analyzes two              Interior.
                                                    published on November 20, 2015 (80 FR                   proposed sub-alternatives for target
                                                    72732), and made available for public                                                                          ACTION: Notice of availability.
                                                                                                            shooting restrictions in an open Off-
                                                    comment. The BLM held three public                      Highway Vehicle area. Alternative IV is                SUMMARY:   In accordance with the
                                                    meetings to discuss the Draft RMP                       the BLM’s Proposed Alternative and is                  National Environmental Policy Act of
                                                    Amendment/Supplemental EIS and                          based on the terms of the 2014                         1969, as amended, and the Federal Land
                                                    received approximately 50,000                           Settlement Agreement. This alternative                 Policy and Management Act of 1976, as
                                                    comment submissions during the                          would allow for leasing at the base of                 amended, the Bureau of Land
                                                    comment period. The BLM carefully                       the plateau (11,170 acres) and within                  Management (BLM) has prepared a
                                                    considered those comments. The BLM                      several retained lease areas on the top                Proposed Resource Management Plan
                                                    made changes to the Proposed RMP                        of the plateau (1,830 acres). Other                    (RMP)/Final Environmental Impact
                                                    Amendment/Final Supplemental EIS in                     resource management decisions in this                  Statement (EIS) for the Dominguez-
                                                    response to comments received from the                  alternative would be similar to                        Escalante National Conservation Area
                                                    public and cooperating agencies, United                 Alternative II.                                        (D–E NCA) located in Mesa, Delta and
                                                    States Fish and Wildlife Service                           Instructions for filing a protest with
                                                                                                                                                                   Montrose counties in Colorado and by
                                                    consultation, and extensive internal                    the Director of the BLM regarding the
                                                                                                                                                                   this notice is announcing its
                                                    BLM reviews. These changes included                     Proposed RMP Amendment/Final
                                                                                                                                                                   availability.
                                                    the addition of clarifying text and                     Supplemental EIS may be found in the
                                                    updated information, however, none of                   ‘‘Dear Reader’’ Letter of the Roan                     DATES:  The BLM planning regulations
                                                    the changes constituted a substantial                   Plateau Proposed RMP Amendment/                        state that any person who meets the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    change in the proposed land use plan                    Final Supplemental EIS and at 43 CFR                   conditions as described in the
                                                    decisions or the analysis in the Draft                  1610.5–2. All protests must be in                      regulations may protest the BLM’s
                                                    Supplemental EIS that would require                     writing and mailed to the appropriate                  Proposed RMP/Final EIS. A person who
                                                    additional supplementation.                             address, as set forth in the ADDRESSES                 meets the conditions and files a protest
                                                       Major issues considered in the                       section above. Emailed protests will not               must file the protest within 30 days of
                                                    Proposed RMP Amendment/Final                            be accepted as valid protests unless the               the date that the Environmental
                                                    Supplemental EIS include fluid                          protesting party also provides the                     Protection Agency publishes its notice
                                                    minerals management; social and                         original letter by either regular or                   of availability in the Federal Register.


                                               VerDate Sep<11>2014   19:05 Jun 30, 2016   Jkt 238001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\01JYN1.SGM   01JYN1



Document Created: 2016-07-14 11:37:16
Document Modified: 2016-07-14 11:37:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability.
DatesBLM planning regulations state that any person who meets the conditions identified in the regulations may protest the BLM's Proposed RMP Amendment/Final Supplemental EIS. A person who meets the conditions and files a protest must file the protest within 30 days of the date that the Environmental Protection Agency publishes its Notice of Availability in the Federal Register.
ContactGreg Larson, Project Manager; telephone (970) 876-9048; see Colorado River Valley Field Office
FR Citation81 FR 43225 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR