81_FR_4628 81 FR 4611 - Submission for OMB Review; Comment Request

81 FR 4611 - Submission for OMB Review; Comment Request

DEPARTMENT OF AGRICULTURE
Rural Utility Service

Federal Register Volume 81, Issue 17 (January 27, 2016)

Page Range4611-4612
FR Document2016-01611

Federal Register, Volume 81 Issue 17 (Wednesday, January 27, 2016)
[Federal Register Volume 81, Number 17 (Wednesday, January 27, 2016)]
[Notices]
[Pages 4611-4612]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-01611]



[[Page 4611]]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Rural Utility Service


Submission for OMB Review; Comment Request

January 21, 2016.
    The Department of Agriculture has submitted the following 
information collection requirement(s) to Office of Management and 
Budget (OMB) for review and clearance under the Paperwork Reduction Act 
of 1995, Public Law 104-13. Comments are requested regarding (1) 
whether the collection of information is necessary for the proper 
performance of the functions of the agency, including whether the 
information will have practical utility; (2) the accuracy of the 
agency's estimate of burden including the validity of the methodology 
and assumptions used; (3) ways to enhance the quality, utility and 
clarity of the information to be collected; (4) ways to minimize the 
burden of the collection of information on those who are to respond, 
including through the use of appropriate automated, electronic, 
mechanical, or other technological collection techniques or other forms 
of information technology.
    Comments regarding this information collection received by February 
26, 2016 will be considered. Written comments should be addressed to: 
Desk Officer for Agriculture, Office of Information and Regulatory 
Affairs, Office of Management and Budget (OMB), New Executive Office 
Building, 725 17th Street NW., Washington, DC 20502. Commenters are 
encouraged to submit their comments to OMB via email to: 
[email protected] or fax (202) 395-5806 and to Departmental 
Clearance Office, USDA, OCIO, Mail Stop 7602, Washington, DC 20250-
7602. Copies of the submission(s) may be obtained by calling (202) 720-
8958.
    An agency may not conduct or sponsor a collection of information 
unless the collection of information displays a currently valid OMB 
control number and the agency informs potential persons who are to 
respond to the collection of information that such persons are not 
required to respond to the collection of information unless it displays 
a currently valid OMB control number.

Rural Utilities Service

    Title: 7 CFR 1717 Subpart Y, Settlement of Debt Owed by Electric 
Borrowers.
    OMB Control Number: 0572-0116.
    Summary of Collection: The Rural Utilities Service (RUS) makes 
mortgage loans and loan guarantees to electric systems to provide and 
improve electric service in rural areas pursuant to the Rural 
Electrification Act of 1936, as amended (7 U.S.C. 901 et. seq.) (RE 
Act). This information collection requirement stems from passage of 
Public Law 104-127, which amended section 331(b) of the Consolidated 
Farm and Rural Development Act (7 U.S.C. 1921 et seq.,) to extend to 
the RUS' loans and loan guarantees the Secretary authority to 
compromise, adjust, reduce, or charge-off debts or claims owed to the 
government (collectively, debt settlement) with respect to loans made 
or guaranteed by RUS. Only those electric borrowers that are unable to 
fully repay their debts to the government and who apply to RUS for 
relief will be affected by this collection of information. The 
information collected will be similar to that which any prudent lender 
would need to determine whether debt settlement is required and the 
amount of relief that is needed.
    Need and Use of the Information: RUS will collect information to 
determine the need for debt settlement; the amount of debt the borrower 
can repay; the future scheduling of debt repayment; and, the range of 
opportunities for enhancing the amount of debt that can be recovered.
    Description of Respondents: Non-for-profit institutions; Business 
or other for-profit.
    Number of Respondents: 1.
    Frequency of Responses: Reporting: On occasion.
    Total Burden Hours: 1,000.

Rural Utilities Service

    Title: 7 CFR part 1721, Extensions of Payments of Principal and 
Interest.
    OMB Control Number: 0572-0123.
    Summary of Collection: The Rural Utilities Service (RUS) electric 
program provides loans and loan guarantees to borrowers at interest 
rates and on terms that are more favorable than those generally 
available from the private sector. Procedures and conditions which 
borrowers may request extensions of the payment of principal and 
interest are authorized, as amended, in section 12 of the Rural 
Electrification Act of 1936, and section 236 of the ``Disaster Relief 
Act of 1970 (Public Law 91-606), as amended by the Department of 
Agriculture Reorganization Act of 1994 (Public Law 103-354). As a 
result of obtaining federal financing, RUS borrowers receive economic 
benefits that exceed any direct economic costs associated with 
complying with (RUS) regulations and requirements.
    Need and Use of the Information: The collection of information 
occurs only when the borrower requests an extension of principal and 
interest. Eligible purposes include financial hardship, energy resource 
conservation loans, renewable energy project, and contributions-in-aid 
of construction. These procedures are codified at 7 CFR part 1721, 
subpart B. The collections are made to provide needed benefits to 
borrowers while also maintaining the integrity of RUS loans and their 
repayment of taxpayer's monies.
    Description of Respondents: Not for-profit institutions.
    Number of Respondents: 29.
    Frequency of Responses: Reporting: On occasion.
    Total Burden Hours: 296.

Rural Utilities Service

    Title: 7 CFR part 1738, Rural Broadband Loan and Loan Guarantee.
    OMB Control Number: 0572-0130.
    Summary of Collection: Title VI, Rural Broadband Access, of the 
Rural Electrification Act of 1936, as amended (RE Act), provides loans 
and loan guarantees to fund the cost of construction, improvement, or 
acquisition of facilities and equipment for the provision of broadband 
service in eligible rural communities in State and territories of the 
United States. The regulation prescribes the types of loans available, 
facilities financed and eligible applicants, as well as minimum credit 
support requirements considered for a loan. In addition, Title VI of 
the RE Act requires that Rural Utilities Service (RUS) make or 
guarantee a loan only if there is reasonable assurance that the loan, 
together with all outstanding loans and obligations of the borrower, 
will be repaid in full within the time agreed.
    Need and Use of the Information: The information in the program 
application guide--RUS Bulletin 1738-1 provides applicants with needed 
information, definitions and details for completing and submitting an 
application. Information will be used to determine an applicant's 
eligibility, availability of broadband service for priority 
consideration, technical and economic feasibility of the proposed 
project (that the funds requested are adequate to complete the project 
taking into consideration any additional funding provided by the 
applicant and that the loan can be repaid within the allowable time 
frame), and the applicant complies with statutory, regulatory and 
administrative eligibility requirements for loan assistance.
    Description of Respondents: Business or other for-profit; Not-for-
profit institutions.

[[Page 4612]]

    Number of Respondents: 5.
    Frequency of Responses: Reporting: On occasion.
    Total Burden Hours: 2,095.

Charlene Parker,
Departmental Information Collection Clearance Officer.
[FR Doc. 2016-01611 Filed 1-26-16; 8:45 am]
BILLING CODE 3410-15-P



                                                                               Federal Register / Vol. 81, No. 17 / Wednesday, January 27, 2016 / Notices                                              4611

                                                    DEPARTMENT OF AGRICULTURE                               loans and loan guarantees to electric                    Need and Use of the Information: The
                                                                                                            systems to provide and improve electric                collection of information occurs only
                                                    Rural Utility Service                                   service in rural areas pursuant to the                 when the borrower requests an
                                                                                                            Rural Electrification Act of 1936, as                  extension of principal and interest.
                                                    Submission for OMB Review;                              amended (7 U.S.C. 901 et. seq.) (RE Act).              Eligible purposes include financial
                                                    Comment Request                                         This information collection requirement                hardship, energy resource conservation
                                                    January 21, 2016.                                       stems from passage of Public Law 104–                  loans, renewable energy project, and
                                                      The Department of Agriculture has                     127, which amended section 331(b) of                   contributions-in-aid of construction.
                                                    submitted the following information                     the Consolidated Farm and Rural                        These procedures are codified at 7 CFR
                                                    collection requirement(s) to Office of                  Development Act (7 U.S.C. 1921 et seq.,)               part 1721, subpart B. The collections are
                                                    Management and Budget (OMB) for                         to extend to the RUS’ loans and loan                   made to provide needed benefits to
                                                    review and clearance under the                          guarantees the Secretary authority to                  borrowers while also maintaining the
                                                    Paperwork Reduction Act of 1995,                        compromise, adjust, reduce, or charge-                 integrity of RUS loans and their
                                                    Public Law 104–13. Comments are                         off debts or claims owed to the                        repayment of taxpayer’s monies.
                                                                                                            government (collectively, debt                           Description of Respondents: Not for-
                                                    requested regarding (1) whether the
                                                                                                            settlement) with respect to loans made                 profit institutions.
                                                    collection of information is necessary                                                                           Number of Respondents: 29.
                                                    for the proper performance of the                       or guaranteed by RUS. Only those
                                                                                                            electric borrowers that are unable to                    Frequency of Responses: Reporting:
                                                    functions of the agency, including                                                                             On occasion.
                                                    whether the information will have                       fully repay their debts to the
                                                                                                            government and who apply to RUS for                      Total Burden Hours: 296.
                                                    practical utility; (2) the accuracy of the
                                                    agency’s estimate of burden including                   relief will be affected by this collection             Rural Utilities Service
                                                    the validity of the methodology and                     of information. The information
                                                                                                                                                                     Title: 7 CFR part 1738, Rural
                                                    assumptions used; (3) ways to enhance                   collected will be similar to that which
                                                                                                                                                                   Broadband Loan and Loan Guarantee.
                                                    the quality, utility and clarity of the                 any prudent lender would need to                         OMB Control Number: 0572–0130.
                                                    information to be collected; (4) ways to                determine whether debt settlement is                     Summary of Collection: Title VI, Rural
                                                    minimize the burden of the collection of                required and the amount of relief that is              Broadband Access, of the Rural
                                                    information on those who are to                         needed.                                                Electrification Act of 1936, as amended
                                                    respond, including through the use of                     Need and Use of the Information:                     (RE Act), provides loans and loan
                                                    appropriate automated, electronic,                      RUS will collect information to                        guarantees to fund the cost of
                                                    mechanical, or other technological                      determine the need for debt settlement;                construction, improvement, or
                                                    collection techniques or other forms of                 the amount of debt the borrower can                    acquisition of facilities and equipment
                                                    information technology.                                 repay; the future scheduling of debt                   for the provision of broadband service
                                                      Comments regarding this information                   repayment; and, the range of                           in eligible rural communities in State
                                                    collection received by February 26, 2016                opportunities for enhancing the amount                 and territories of the United States. The
                                                    will be considered. Written comments                    of debt that can be recovered.                         regulation prescribes the types of loans
                                                    should be addressed to: Desk Officer for                  Description of Respondents: Non-for-                 available, facilities financed and eligible
                                                    Agriculture, Office of Information and                  profit institutions; Business or other for-            applicants, as well as minimum credit
                                                    Regulatory Affairs, Office of                           profit.                                                support requirements considered for a
                                                    Management and Budget (OMB), New                          Number of Respondents: 1.                            loan. In addition, Title VI of the RE Act
                                                    Executive Office Building, 725 17th                       Frequency of Responses: Reporting:                   requires that Rural Utilities Service
                                                    Street NW., Washington, DC 20502.                       On occasion.                                           (RUS) make or guarantee a loan only if
                                                    Commenters are encouraged to submit                       Total Burden Hours: 1,000.                           there is reasonable assurance that the
                                                    their comments to OMB via email to:                     Rural Utilities Service                                loan, together with all outstanding loans
                                                    OIRA_Submission@OMB.EOP.GOV or                                                                                 and obligations of the borrower, will be
                                                    fax (202) 395–5806 and to Departmental                     Title: 7 CFR part 1721, Extensions of               repaid in full within the time agreed.
                                                    Clearance Office, USDA, OCIO, Mail                      Payments of Principal and Interest.                      Need and Use of the Information: The
                                                    Stop 7602, Washington, DC 20250–                           OMB Control Number: 0572–0123.                      information in the program application
                                                    7602. Copies of the submission(s) may                      Summary of Collection: The Rural                    guide—RUS Bulletin 1738–1 provides
                                                    be obtained by calling (202) 720–8958.                  Utilities Service (RUS) electric program               applicants with needed information,
                                                      An agency may not conduct or                          provides loans and loan guarantees to                  definitions and details for completing
                                                    sponsor a collection of information                     borrowers at interest rates and on terms               and submitting an application.
                                                    unless the collection of information                    that are more favorable than those                     Information will be used to determine
                                                    displays a currently valid OMB control                  generally available from the private                   an applicant’s eligibility, availability of
                                                    number and the agency informs                           sector. Procedures and conditions                      broadband service for priority
                                                    potential persons who are to respond to                 which borrowers may request                            consideration, technical and economic
                                                    the collection of information that such                 extensions of the payment of principal                 feasibility of the proposed project (that
                                                    persons are not required to respond to                  and interest are authorized, as amended,               the funds requested are adequate to
                                                    the collection of information unless it                 in section 12 of the Rural Electrification             complete the project taking into
                                                    displays a currently valid OMB control                  Act of 1936, and section 236 of the                    consideration any additional funding
                                                                                                            ‘‘Disaster Relief Act of 1970 (Public Law              provided by the applicant and that the
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    number.
                                                                                                            91–606), as amended by the Department                  loan can be repaid within the allowable
                                                    Rural Utilities Service                                 of Agriculture Reorganization Act of                   time frame), and the applicant complies
                                                      Title: 7 CFR 1717 Subpart Y,                          1994 (Public Law 103–354). As a result                 with statutory, regulatory and
                                                    Settlement of Debt Owed by Electric                     of obtaining federal financing, RUS                    administrative eligibility requirements
                                                    Borrowers.                                              borrowers receive economic benefits                    for loan assistance.
                                                      OMB Control Number: 0572–0116.                        that exceed any direct economic costs                    Description of Respondents: Business
                                                      Summary of Collection: The Rural                      associated with complying with (RUS)                   or other for-profit; Not-for-profit
                                                    Utilities Service (RUS) makes mortgage                  regulations and requirements.                          institutions.


                                               VerDate Sep<11>2014   19:41 Jan 26, 2016   Jkt 238001   PO 00000   Frm 00004   Fmt 4703   Sfmt 4703   E:\FR\FM\27JAN1.SGM   27JAN1


                                                    4612                       Federal Register / Vol. 81, No. 17 / Wednesday, January 27, 2016 / Notices

                                                     Number of Respondents: 5.                              proposed operation and its economic                    PRC on December 8, 2011.1 On
                                                     Frequency of Responses: Reporting:                     effects because the Act and Regulations                December 31, 2015, the Department
                                                    On occasion.                                            authorize the Board to restrict or                     received timely new shipper review
                                                     Total Burden Hours: 2,095.                             prohibit operations that are detrimental               requests from Keri Wood and Simite
                                                                                                            to the public interest.                                Wooden, respectively, in accordance
                                                    Charlene Parker,
                                                                                                               Affected Public: State, local or tribal             with section 751(a)(2)(B)(i) of the Tariff
                                                    Departmental Information Collection                     governments or not-for-profit                          Act of 1930, as amended (‘‘the Act’’),
                                                    Clearance Officer.
                                                                                                            institutions that are FTZ grantees, as                 and 19 CFR 351.214(c).2
                                                    [FR Doc. 2016–01611 Filed 1–26–16; 8:45 am]             well as private companies.                                In their submissions, Keri Wood and
                                                    BILLING CODE 3410–15–P                                     Frequency: As necessary to receive                  Simite Wooden stated that they are both
                                                                                                            FTZ benefits.                                          the producers and exporters of the
                                                                                                               Respondent’s Obligation: Mandatory.                 subject merchandise upon which their
                                                    DEPARTMENT OF COMMERCE                                     This information collection request                 respective review requests were based.3
                                                                                                            may be viewed at reginfo.gov. Follow                   Pursuant to section 751(a)(2)(B)(i)(I) of
                                                    Submission for OMB Review;                              the instructions to view Department of                 the Act and 19 CFR 351.214(b)(2)(i),
                                                    Comment Request                                         Commerce collections currently under                   Keri Wood and Simite Wooden certified
                                                                                                            review by OMB.                                         that they did not export multilayered
                                                       The Department of Commerce will
                                                                                                               Written comments and                                wood flooring to the United States
                                                    submit to the Office of Management and
                                                                                                            recommendations for the proposed                       during the period of investigation
                                                    Budget (OMB) for clearance the
                                                                                                            information collection should be sent                  (‘‘POI’’).4 In addition, pursuant to
                                                    following proposal for collection of
                                                                                                            within 30 days of publication of this                  section 751(a)(2)(B)(i)(II) of the Act and
                                                    information under the provisions of the
                                                                                                            notice to OIRA_Submission@                             19 CFR 351.214(b)(2)(iii)(A), Keri Wood
                                                    Paperwork Reduction Act (44 U.S.C.
                                                                                                            omb.eop.gov or fax to (202) 395–5806.                  and Simite Wooden certified that, since
                                                    chapter 35).
                                                                                                                                                                   the initiation of the investigation, they
                                                       Agency: International Trade                          Sheleen Dumas,
                                                                                                                                                                   have never been affiliated with any
                                                    Administration.                                         Departmental PRA Lead, Office of the Chief             producer or exporter that exported
                                                       Title: Foreign-Trade Zone                            Information Officer.
                                                                                                                                                                   multilayered wood flooring to the
                                                    Applications.                                           [FR Doc. 2016–01607 Filed 1–26–16; 8:45 am]
                                                                                                                                                                   United States during the POI, including
                                                       OMB Control Number: 0625–0139.                       BILLING CODE 3510–DS–P                                 those not individually examined during
                                                       Form Number(s): N/A.                                                                                        the investigation.5 As required by 19
                                                       Type of Request: Regular Submission.                                                                        CFR 351.214(b)(2)(iii)(B), Keri Wood
                                                       Number of Respondents: 248.                          DEPARTMENT OF COMMERCE                                 and Simite Wooden also certified that
                                                       Average Hours per Response: New                                                                             their export activities were not
                                                    Zone Application, 131 hours; Subzone                    International Trade Administration
                                                                                                                                                                   controlled by the central government of
                                                    Application, 4.5 hours; Reorganization/                 [A–570–970]                                            the PRC.6
                                                    Expansion Application, 99 hours;                                                                                  In addition to the certifications
                                                    Production Notification, 5.5 hours;                     Multilayered Wood Flooring From the                    described above, pursuant to 19 CFR
                                                    Production Application, 34 hours;                       People’s Republic of China: Initiation                 351.214(b)(2)(iv), Keri Wood and Simite
                                                    Minor Boundary Modifications, 3.5                       of Antidumping Duty New Shipper                        Wooden submitted documentation
                                                    hours; Waivers, 9 hours.                                Reviews; 2014–2015                                     establishing the following: (1) The date
                                                       Burden Hours: 3,128.                                                                                        on which each company first shipped
                                                       Needs and Uses: The Foreign-Trade                    AGENCY:    Enforcement and Compliance,
                                                                                                            International Trade Administration,                    multilayered wood flooring for export to
                                                    Zone Application is the vehicle by                                                                             the United States and the date on which
                                                    which individual firms or organizations                 Department of Commerce.
                                                    apply for foreign-trade zone (FTZ)                      SUMMARY: The Department of Commerce                       1 See Multilayered Wood Flooring from the
                                                    status, for subzone status, production                  is initiating new shipper reviews of the               People’s Republic of China: Amended Final
                                                    authority, or for expansion/                            antidumping duty order on multilayered                 Determination of Sales at Less Than Fair Value and
                                                    reorganization of an existing zone. The                 wood flooring from the People’s                        Antidumping Duty Order, 76 FR 76690 (December
                                                                                                            Republic of China for Jiangsu Keri Wood                8, 2011) (‘‘Order’’), as amended Multilayered Wood
                                                    FTZ Act and Regulations require that an                                                                        Flooring from the People’s Republic of China:
                                                    application with a description of the                   Co., Ltd. (‘‘Keri Wood’’) and Zhejiang                 Amended Antidumping and Countervailing Duty
                                                    proposed project be made to the FTZ                     Simite Wooden Co., Ltd. (‘‘Simite                      Orders, 77 FR 5484 (February 3, 2012).
                                                    Board (19 U.S.C. 81b and 81f; 15 CFR                    Wooden’’). The period of review                           2 See Letter from Keri Wood to the Secretary of


                                                    400.24–26) before a license can be                      (‘‘POR’’) is December 1, 2014, through                 Commerce ‘‘Multilayered Wood Flooring from the
                                                                                                            November 30, 2015.                                     People’s Republic of China: New Shipper Review,’’
                                                    issued or a zone can be expanded. The                                                                          dated December 31, 2015 (‘‘Keri Wood Initiation
                                                    Act and Regulations require that                        DATES: Effective Date: January 27, 2016.               Request’’); see also Simite Wooden to the Secretary
                                                    applications contain detailed                           FOR FURTHER INFORMATION CONTACT:                       of Commerce ‘‘Multilayered Wood Flooring from
                                                                                                                                                                   the People’s Republic of China; A–570–970;
                                                    information on facilities, financing,                   Maisha Cryor, AD/CVD Operations,                       Request for Antidumping Duty New Shipper
                                                    operational plans, proposed production                  Office 4, Enforcement and Compliance,                  Review,’’ dated December 31, 2015 (‘‘Simite
                                                    operations, need, and economic impact.                  International Trade Administration,                    Wooden Initiation Request’’).
                                                    Production activity in zones or                         U.S. Department of Commerce, 14th                         3 See Keri Wood Initiation Request at 2 and

                                                    subzones, can involve issues related to                 Street and Constitution Avenue NW.,                    Exhibit 2; see also Simite Wooden Initiation
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                                                                                   Request at 1–2.
                                                    domestic industry and trade policy                      Washington, DC 20230; telephone: 202–                     4 See Keri Wood Initiation Request at 2 and
                                                    impact. Such applications must include                  482–5831.                                              Exhibit 2; see also Simite Wooden Initiation
                                                    specific information on the customs                     SUPPLEMENTARY INFORMATION:                             Request at 2 and Exhibit Req-3.
                                                    tariff-related savings that result from                                                                           5 See Keri Wood Initiation Request at Exhibit 2;

                                                    zone procedures and the economic                        Background                                             see also Simite Wooden Initiation Request at 2–3
                                                                                                                                                                   and Exhibit Req-3.
                                                    consequences of permitting such                            The Department of Commerce                             6 See Keri Wood Initiation Request at Exhibit 2;
                                                    savings. The FTZ Board needs complete                   (‘‘Department’’) published the AD order                see also Simite Wooden Initiation Request at 3 and
                                                    and accurate information on the                         on multilayered wood flooring from the                 Exhibit Req-3.



                                               VerDate Sep<11>2014   19:41 Jan 26, 2016   Jkt 238001   PO 00000   Frm 00005   Fmt 4703   Sfmt 4703   E:\FR\FM\27JAN1.SGM   27JAN1



Document Created: 2018-02-02 12:40:17
Document Modified: 2018-02-02 12:40:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 4611 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR