81_FR_47519 81 FR 47379 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

81 FR 47379 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 140 (July 21, 2016)

Page Range47379-47380
FR Document2016-17219

Federal Register, Volume 81 Issue 140 (Thursday, July 21, 2016)
[Federal Register Volume 81, Number 140 (Thursday, July 21, 2016)]
[Notices]
[Pages 47379-47380]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-17219]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-479-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on July 11, 2016, Columbia Gas Transmission, LLC 
(Columbia), pursuant to its blanket certificate authorization granted 
in Docket No. CP83-76-000,\1\ filed an application in accordance to 
sections 157.205 and 157.213(b) of the Commission's Regulations under 
the Natural Gas Act (NGA) as amended, requesting authority to modify 
certain natural gas storage facilities in the Pavonia Storage Field 
located in Ashland County, Ohio (Pavonia). The proposed construction is 
an effort to recovery the overall field deliverability at the Pavonia, 
all as more fully set forth in the application which is on file with 
the Commission and open to public inspection.
---------------------------------------------------------------------------

    \1\ 22 FERC ] 62,029 (1983).
---------------------------------------------------------------------------

    Currently, the Pavonia consists of 298 active wells and 2 
observation wells and is operated with a total storage capacity of 45.4 
Bcf, including 20.8 Bcf of base gas and 24.6 Bcf of working gas. Over 
time, the sub grade soil conditions around the reservoir degrade and 
cause restriction of gas flow through the existing vertical wells. 
Columbia proposes to construct a 540-foot horizontal well (Pavonia 
12595) within a geological-favorable area of the Pavonia peaking group, 
220 feet of 6-inch storage pipeline (SLW-12595), and appurtenances. The 
main purpose of the proposed facilities is to maintain field 
performance late in the withdrawal season when reservoir pressure is 
lowest. It is estimated that the new horizontal well will provide 25 
MMcf/day at the wellhead. Columbia's request seeks no change in the 
certificated physical parameters, including total inventory, reservoir 
pressure, and capacity. The construction of the proposed facilities 
will cost approximately $2,750,000.
    Any questions concerning this application may be directed to 
Matthew J. Agen, Senior Counsel, Columbia Gas Transmission, LLC, 5151 
San Felipe, Suite 2400, Houston, Texas 77056, or by phone at (713) 386-
3619; email [email protected].
    This filing is available for review at the Commission or may be 
viewed on the Commission's Web site at http://www.ferc.gov, using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number filed to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or call toll-free at (866) 208-3676, or, for 
TTY, contact (202) 502-8659. Comments, protests and interventions may 
be filed electronically via the Internet in lieu of paper. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
interveners to file electronically.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice, the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the

[[Page 47380]]

NGA (18 CFR 157.205), a protest to the request. If no protest is filed 
within the time allowed therefore, the proposed activity shall be 
deemed to be authorized effective the day after the time allowed for 
filing a protest. If a protest is filed and not withdrawn within 30 
days after the allowed time for filing a protest, the instant request 
shall be treated as an application for authorization pursuant to 
section 7 of the NGA.

    Dated: July 15, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-17219 Filed 7-20-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 81, No. 140 / Thursday, July 21, 2016 / Notices                                               47379

                                                    register on August 23, 2016 to make an                   this site, you can limit your search to                   season when reservoir pressure is
                                                    oral comment during NACIQI’s                             documents published by the                                lowest. It is estimated that the new
                                                    deliberations concerning a particular                    Department.                                               horizontal well will provide 25 MMcf/
                                                    agency or institution scheduled for                        Delegation of Authority: The Secretary                  day at the wellhead. Columbia’s request
                                                    review, by calling (202) 453–7615 from                   of Education has delegated authority to                   seeks no change in the certificated
                                                    7:30 a.m.–8:30 a.m. Eastern Time. The                    Lynn B. Mahaffie, Deputy Assistant                        physical parameters, including total
                                                    requestor must provide his or her name,                  Secretary for Planning, Policy, and                       inventory, reservoir pressure, and
                                                    title, organization/affiliation, mailing                 Innovation, to perform the duties of                      capacity. The construction of the
                                                    address, email address, and telephone                    Assistant Secretary for Postsecondary                     proposed facilities will cost
                                                    number. A total of up to fifteen minutes                 Education.                                                approximately $2,750,000.
                                                    during each agency review will be                             Authority: 20 U.S.C. 1011c.                             Any questions concerning this
                                                    allotted for oral commenters who                                                                                   application may be directed to Matthew
                                                    register on August 23, 2016 by 8:30 a.m.                 Lynn B. Mahaffie,                                         J. Agen, Senior Counsel, Columbia Gas
                                                    Eastern Time. Individuals will be                        Deputy Assistant Secretary for Planning,                  Transmission, LLC, 5151 San Felipe,
                                                    selected on a first-call, first-served basis.            Policy, and Innovation, delegated the duties              Suite 2400, Houston, Texas 77056, or by
                                                    If selected, each commenter may not                      of Assistant Secretary for Postsecondary                  phone at (713) 386–3619; email magen@
                                                    exceed three minutes. The oral                           Education.                                                cpg.com.
                                                    comments made will become part of the                    [FR Doc. 2016–17233 Filed 7–20–16; 8:45 am]                  This filing is available for review at
                                                    official record and will be considered by                BILLING CODE P                                            the Commission or may be viewed on
                                                    the Department and NACIQI in their                                                                                 the Commission’s Web site at http://
                                                    deliberations. No individual in                                                                                    www.ferc.gov, using the ‘‘eLibrary’’ link.
                                                    attendance or making oral presentations                  DEPARTMENT OF ENERGY                                      Enter the docket number excluding the
                                                    may distribute written materials at the                                                                            last three digits in the docket number
                                                    meeting.                                                 Federal Energy Regulatory                                 filed to access the document. For
                                                       Access to Records of the Meeting: The                 Commission                                                assistance, please contact FERC Online
                                                    Department will post the official report                 [Docket No. CP16–479–000]
                                                                                                                                                                       Support at FERCOnlineSupport@
                                                    of the meeting on the NACIQI Web site                                                                              ferc.gov or call toll-free at (866) 208–
                                                    90 calendar days after the meeting.                      Columbia Gas Transmission, LLC;                           3676, or, for TTY, contact (202) 502–
                                                    Pursuant to the FACA, the public may                     Notice of Request Under Blanket                           8659. Comments, protests and
                                                    also inspect the materials at 400                        Authorization                                             interventions may be filed electronically
                                                    Maryland Avenue SW., Washington,                                                                                   via the Internet in lieu of paper. See, 18
                                                    DC, by emailing aslrecordsmanager@                          Take notice that on July 11, 2016,                     CFR 385.2001(a)(1)(iii) and the
                                                    ed.gov or by calling (202) 453–7110 to                   Columbia Gas Transmission, LLC                            instructions on the Commission’s Web
                                                    schedule an appointment.                                 (Columbia), pursuant to its blanket                       site under the ‘‘e-Filing’’ link. The
                                                       Reasonable Accommodations: If you                     certificate authorization granted in                      Commission strongly encourages
                                                    will need an auxiliary aid or service to                 Docket No. CP83–76–000,1 filed an                         interveners to file electronically.
                                                    participate in the meeting (e.g.,                        application in accordance to sections                        Pursuant to section 157.9 of the
                                                    interpreting service, assistive listening                157.205 and 157.213(b) of the                             Commission’s rules, 18 CFR 157.9,
                                                    device, or materials in an alternate                     Commission’s Regulations under the                        within 90 days of this Notice, the
                                                    format), notify the contact person listed                Natural Gas Act (NGA) as amended,                         Commission staff will either: complete
                                                    in this notice at least two weeks before                 requesting authority to modify certain                    its environmental assessment (EA) and
                                                    the scheduled meeting date. Although                     natural gas storage facilities in the                     place it into the Commission’s public
                                                    we will attempt to meet a request                        Pavonia Storage Field located in                          record (eLibrary) for this proceeding; or
                                                    received after that date, we may not be                  Ashland County, Ohio (Pavonia). The                       issue a Notice of Schedule for
                                                    able to make available the requested                     proposed construction is an effort to                     Environmental Review. If a Notice of
                                                    auxiliary aid or service because of                      recovery the overall field deliverability                 Schedule for Environmental Review is
                                                    insufficient time to arrange it.                         at the Pavonia, all as more fully set forth               issued, it will indicate, among other
                                                                                                             in the application which is on file with                  milestones, the anticipated date for the
                                                    Electronic Access to This Document                       the Commission and open to public                         Commission staff’s issuance of the final
                                                       The official version of this document                 inspection.                                               environmental impact statement (FEIS)
                                                    is the document published in the                            Currently, the Pavonia consists of 298                 or EA for this proposal. The filing of the
                                                    Federal Register. Free Internet access to                active wells and 2 observation wells and                  EA in the Commission’s public record
                                                    the official edition of the Federal                      is operated with a total storage capacity                 for this proceeding or the issuance of a
                                                    Register and the Code of Federal                         of 45.4 Bcf, including 20.8 Bcf of base                   Notice of Schedule for Environmental
                                                    Regulations is available via the Federal                 gas and 24.6 Bcf of working gas. Over                     Review will serve to notify federal and
                                                    Digital System at: www.gpo.gov/fdsys.                    time, the sub grade soil conditions                       state agencies of the timing for the
                                                    At this site you can view this document,                 around the reservoir degrade and cause                    completion of all necessary reviews, and
                                                    as well as all other documents of this                   restriction of gas flow through the                       the subsequent need to complete all
                                                    Department published in the Federal                      existing vertical wells. Columbia                         federal authorizations within 90 days of
                                                    Register, in text or Adobe Portable                      proposes to construct a 540-foot                          the date of issuance of the Commission
                                                    Document Format (PDF). To use PDF,                       horizontal well (Pavonia 12595) within                    staff’s FEIS or EA.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    you must have Adobe Acrobat Reader,                      a geological-favorable area of the                           Any person or the Commission’s staff
                                                    which is available for free at the Adobe                 Pavonia peaking group, 220 feet of 6-                     may, within 60 days after issuance of
                                                    Web site. You may also access                            inch storage pipeline (SLW–12595), and                    the instant notice by the Commission,
                                                    documents of the Department published                    appurtenances. The main purpose of the                    file pursuant to Rule 214 of the
                                                    in the Federal Register by using the                     proposed facilities is to maintain field                  Commission’s Procedural Rules (18 CFR
                                                    article search feature at:                               performance late in the withdrawal                        385.214) a motion to intervene or notice
                                                    www.federalregister.gov. Specifically,                                                                             of intervention and pursuant to section
                                                    through the advanced search feature at                        1 22   FERC ¶ 62,029 (1983).                         157.205 of the regulations under the


                                               VerDate Sep<11>2014   17:15 Jul 20, 2016   Jkt 238001   PO 00000     Frm 00036     Fmt 4703   Sfmt 4703   E:\FR\FM\21JYN1.SGM   21JYN1


                                                    47380                          Federal Register / Vol. 81, No. 140 / Thursday, July 21, 2016 / Notices

                                                    NGA (18 CFR 157.205), a protest to the                      Deadline for filing comments, motions                 e. Name of Project: Potter Valley
                                                    request. If no protest is filed within the               to intervene, competing applications                  Project.
                                                    time allowed therefore, the proposed                     (without notices of intent), or notices of               f. Location: Eel River and East Fork
                                                    activity shall be deemed to be                           intent to file competing applications: 60             Russian River in Lake and Mendocino
                                                    authorized effective the day after the                   days from the issuance of this notice.                Counties, California.
                                                    time allowed for filing a protest. If a                  Competing applications and notices of                    g. Filed Pursuant to: Federal Power
                                                    protest is filed and not withdrawn                       intent must meet the requirements of 18               Act, 16 U.S.C. 791(a)–825(r).
                                                    within 30 days after the allowed time                    CFR 4.36. The Commission strongly                        h. Applicant Contact: Ms. Elizabeth
                                                    for filing a protest, the instant request                encourages electronic filing. Please file             Rossi, Senior License Coordinator,
                                                    shall be treated as an application for                   comments, motions to intervene, notices               Pacific Gas and Electric Company, Mail
                                                    authorization pursuant to section 7 of                   of intent, and competing applications                 Code: N13E, P.O. Box 770000, San
                                                    the NGA.                                                 using the Commission’s eFiling system                 Francisco, CA 94177, Phone: (415) 973–
                                                                                                             at http://www.ferc.gov/docs-filing/                   2032.
                                                      Dated: July 15, 2016.                                                                                           i. FERC Contact: Mr. John Aedo, (415)
                                                    Kimberly D. Bose,
                                                                                                             efiling.asp. Commenters can submit
                                                                                                             brief comments up to 6,000 characters,                369–3335, or john.aedo@ferc.gov.
                                                    Secretary.                                                                                                        j. Deadline for filing comments,
                                                                                                             without prior registration, using the
                                                    [FR Doc. 2016–17219 Filed 7–20–16; 8:45 am]                                                                    motions to intervene, protests, and
                                                                                                             eComment system at http://
                                                    BILLING CODE 6717–01–P                                                                                         recommendations is 30 days from the
                                                                                                             www.ferc.gov/docs-filing/
                                                                                                                                                                   issuance date of this notice by the
                                                                                                             ecomment.asp. You must include your
                                                                                                                                                                   Commission (August 15, 2016). The
                                                                                                             name and contact information at the end
                                                    DEPARTMENT OF ENERGY                                                                                           Commission strongly encourages
                                                                                                             of your comments. For assistance,                     electronic filing. Please file motions to
                                                    Federal Energy Regulatory                                please contact FERC Online Support at                 intervene, protests, comments, or
                                                    Commission                                               FERCOnlineSupport@ferc.gov, (866)                     recommendations using the
                                                                                                             208–3676 (toll free), or (202) 502–8659               Commission’s eFiling system at http://
                                                                                                             (TTY). In lieu of electronic filing, please           www.ferc.gov/docs-filing/efiling.asp.
                                                    [Project No. 14789–000]
                                                                                                             send a paper copy to: Secretary, Federal              Commenters can submit brief comments
                                                    Lock+ Hydro Friends Fund IV, LLC;                        Energy Regulatory Commission, 888                     up to 6,000 characters, without prior
                                                    Notice of Preliminary Permit                             First Street NE., Washington, DC 20426.               registration, using the eComment system
                                                    Application Accepted for Filing and                      The first page of any filing should                   at http://www.ferc.gov/docs-filing/
                                                    Soliciting Comments, Motions To                          include docket number P–14789–000.                    ecomment.asp. You must include your
                                                    Intervene, and Competing Applications                       More information about this project,               name and contact information at the end
                                                                                                             including a copy of the application, can              of your comments. For assistance,
                                                       On June 27, 2016, the Lock+ Hydro                     be viewed or printed on the ‘‘eLibrary’’              please contact FERC Online Support at
                                                    Friends Fund IV, LLC filed an                            link of Commission’s Web site at http://              FERCOnlineSupport@ferc.gov, (866)
                                                    application for a preliminary permit                     www.ferc.gov/docs-filing/elibrary.asp.                208–3676 (toll free), or (202) 502–8659
                                                    under section 4(f) of the Federal Power                  Enter the docket number (P–14789) in                  (TTY). In lieu of electronic filing, please
                                                    Act proposing to study the feasibility of                the docket number field to access the                 send a paper copy to: Secretary, Federal
                                                    the proposed Mississippi River Lock                      document. For assistance, contact FERC                Energy Regulatory Commission, 888
                                                    and Dam 26 Project No. 14789–000, to                     Online Support.                                       First Street NE., Washington, DC 20426.
                                                    be located at the existing Mississippi                     Dated: July 15, 2016.                               Please include the project number (P–
                                                    River Lock and Dam No. 26 on the                         Kimberly D. Bose,                                     77–282) on any comments, motions to
                                                    Mississippi River, near the City of West                 Secretary.                                            intervene, protests, or recommendations
                                                    Alston, in St. Charles County, Missouri                  [FR Doc. 2016–17221 Filed 7–20–16; 8:45 am]           filed.
                                                    and the City of Alton, in Madison                                                                                 k. Description of Request: The
                                                                                                             BILLING CODE 6717–01–P
                                                    County, Illinois. The Mississippi River                                                                        licensee requests a temporary variance
                                                    Lock and Dam No. 26 is owned by the                                                                            of the minimum flow requirements in
                                                    United States government and operated                    DEPARTMENT OF ENERGY                                  the Eel River below Scott Dam and the
                                                    by the U.S. Army Corps of Engineers.                                                                           East Branch of the Russian River. The
                                                       The proposed project would consist                    Federal Energy Regulatory                             licensee explains that Lake Pillsbury
                                                    of: (1) A new 750-foot-long by 22-foot-                  Commission                                            only filled to 80 percent this year due
                                                    wide by 66-foot-high steel frame                                                                               to: Dry spring conditions; the April 1,
                                                    modular hydropower system containing                     [Project No. 77–282]                                  2016 closure schedule of the spillway
                                                    fifty 1.5-megawatt (MW) hydropower                       Pacific Gas and Electric Company;                     gates for dam safety purposes; and
                                                    turbines for a total combined generating                 Notice of Application Accepted for                    minimum and supplemental flow
                                                    capacity of 75 MW; (2) a new 550-foot-                   Filing, Soliciting Comments, Motions                  releases. Therefore, in order to conserve
                                                    long by 750-foot-wide tailrace; (3) a new                To Intervene, and Protests                            water resources, ensure that adequate
                                                    50-foot by 100-foot switchyard; (4) a                                                                          water is available for minimum flow
                                                    new 5.2-mile-long, 69-kilovolt (kV) or                     Take notice that the following                      releases and regular water deliveries
                                                    115 kV transmission line; and (5)                        hydroelectric application has been filed              later in the year, and avoid Lake
                                                    appurtenant facilities. The project                      with the Commission and is available                  Pillsbury bank sloughing and water
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    would have an estimated annual                           for public inspection:                                turbidity, the licensee proposes to
                                                    generation of 427,050 megawatt-hours.                      a. Type of Application: Application                 reduce minimum flow releases at the
                                                       Applicant Contact: Mr. Wayne F.                       for Temporary Variance of Minimum                     project. Specifically, the licensee
                                                    Krouse, P.O. Box 43796, Birmingham,                      Flow Requirements.                                    proposes to reduce flows in the Eel
                                                    AL 35243; telephone (877) 556–6566,                        b. Project No.: 77–282.                             River below Scott Dam from the
                                                    extension 709.                                             c. Date Filed: July 6, 2016.                        required 60 cubic feet per second (cfs)
                                                       FERC Contact: Tyrone A. Williams,                       d. Applicant: Pacific Gas and Electric              normal year requirement to the 20 cfs
                                                    (202) 502–6331.                                          Company (licensee).                                   critical year requirement. The licensee


                                               VerDate Sep<11>2014   17:15 Jul 20, 2016   Jkt 238001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\21JYN1.SGM   21JYN1



Document Created: 2018-02-08 07:58:48
Document Modified: 2018-02-08 07:58:48
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 47379 

2025 Federal Register | Disclaimer | Privacy Policy