81 FR 47840 - Virgil C. Summer Nuclear Station, Units 2 and 3

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 141 (July 22, 2016)

Page Range47840-47841
FR Document2016-17386

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for multiple inspections, tests, analyses, and acceptance criteria (ITAAC) for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.

Federal Register, Volume 81 Issue 141 (Friday, July 22, 2016)
[Federal Register Volume 81, Number 141 (Friday, July 22, 2016)]
[Notices]
[Pages 47840-47841]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-17386]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2008-0441]


Virgil C. Summer Nuclear Station, Units 2 and 3

AGENCY: Nuclear Regulatory Commission.

ACTION: Determination of the successful completion of inspections, 
tests, and analyses.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has 
determined that the inspections, tests, and analyses have been 
successfully completed, and that the specified acceptance criteria are 
met for multiple inspections, tests, analyses, and acceptance criteria 
(ITAAC) for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 
3.

ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced in this document 
(if that document is available in ADAMS) is provided the first time 
that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Billy Gleaves, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-5848; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Licensee Notification of Completion of ITAAC

    South Carolina Electric & Gas (SCE&G), on behalf of itself and the 
South Carolina Public Service Authority, (both hereafter called the 
licensee) has submitted ITAAC closure notifications (ICNs) under Sec.  
52.99(c)(1) of title 10 of the Code of Federal Regulations (10 CFR), 
informing the NRC that the licensee has successfully performed the 
required inspections, tests, and analyses, and that the acceptance 
criteria are met for:

VCSNS Unit 2 ITAAC

2.1.02.08a.i (28), 2.1.02.08a.ii (29), 2.2.03.08c.vi.01 (189), 
2.2.03.08c.vi.02 (190), 2.5.02.13 (552), 3.1.00.01 (733), 
C.3.8.01.04.01 (848), C.3.8.01.05.01.01 (849), C.3.8.01.05.02.01 (857), 
and C.3.8.01.05.02.02 (858)

VCSNS Unit 3 ITAAC

2.1.02.08a.i (28), 2.1.02.08a.ii (29), 2.1.03.11 (86), 2.2.03.08c.vi.01 
(189), 2.2.03.08c.vi.02 (190), 2.5.02.13 (552), 3.1.00.01 (733), 
C.3.8.01.04.01 (848), C.3.8.01.05.01.01 (849), C.3.8.01.05.02.01 (857), 
and C.3.8.01.05.02.02 (858)

    The ITAAC for VCSNS Unit 2 are in Appendix C of the VCSNS Unit 2 
combined license (ADAMS Accession No. ML14100A092). The ITAAC for VCSNS 
Unit 3 are in Appendix C of VCSNS Unit 3 combined license (ADAMS 
Accession No. ML14100A101).

II. NRC Staff Determination of Completion of ITAAC

    The NRC staff has determined that the specified inspections, tests, 
and analyses have been successfully completed, and that the specified 
acceptance criteria are met. The documentation of the NRC staff's 
determination is in the ITAAC Closure Verification Evaluation Form 
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's 
structured process for reviewing ICNs. Each ICN presents a narrative 
description of how the ITAAC was completed. The NRC's ICN review 
process involves a determination on whether, among other things: (1) 
Each ICN provides sufficient information, including a summary of the 
methodology used to perform the ITAAC, to demonstrate that the 
inspections, tests, and analyses have been successfully completed; (2) 
each ICN provides sufficient information to demonstrate that the 
acceptance criteria of the ITAAC are met; and (3) any NRC inspections 
for the ITAAC have been completed and any ITAAC findings associated 
with that ITAAC have been closed.
    The NRC staff's determination of the successful completion of these 
ITAAC is based on information available at this time and is subject to 
the licensee's ability to maintain the condition that the acceptance 
criteria are met. If the staff receives new information that suggests 
the staff's determination on any of these ITAAC is incorrect, then the 
staff will determine whether to reopen

[[Page 47841]]

that ITAAC (including withdrawing the staff's determination on that 
ITAAC). The NRC staff's determination will be used to support a 
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of 
construction that all acceptance criteria in the combined license are 
met. The ITAAC closure process is not finalized for these ITAAC until 
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future 
updates to the status of these ITAAC will be reflected on the NRC's Web 
site at http://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
    This notice fulfills the staff's obligations under 10 CFR 
52.99(e)(1) to publish a notice in the Federal Register of the NRC 
staff's determination of the successful completion of inspections, 
tests and analyses.

Virgil C. Summer Nuclear Station Unit 2, Docket No. 5200027

    A complete list of the review status for VCSNS Unit 2 ITAAC, 
including the submission date and ADAMS accession number for each ICN 
received, the ADAMS accession number for each VEF, and the ADAMS 
accession numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum2-icnsr.pdf.

Virgil C. Summer Nuclear Station Unit 3, Docket No. 5200028

    A complete list of the review status for VCSNS Unit 3 ITAAC, 
including the submission date and ADAMS accession number for each ICN 
received, the ADAMS accession number for each VEF, and the ADAMS 
accession numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum3-icnsr.pdf.

    Dated at Rockville, Maryland, this 11th day of July 2016.

    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Acting Chief, Licensing Branch 4, Division of New Reactor Licensing, 
Office of New Reactors.
[FR Doc. 2016-17386 Filed 7-21-16; 8:45 am]
 BILLING CODE 7590-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDetermination of the successful completion of inspections, tests, and analyses.
ContactBilly Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-5848; email: [email protected]
FR Citation81 FR 47840 

2024 Federal Register | Disclaimer | Privacy Policy