81_FR_48926 81 FR 48783 - Gulf South Pipeline Company, LP; Notice of Application

81 FR 48783 - Gulf South Pipeline Company, LP; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 143 (July 26, 2016)

Page Range48783-48784
FR Document2016-17522

Federal Register, Volume 81 Issue 143 (Tuesday, July 26, 2016)
[Federal Register Volume 81, Number 143 (Tuesday, July 26, 2016)]
[Notices]
[Pages 48783-48784]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-17522]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. Cp16-478-000]


Gulf South Pipeline Company, LP; Notice of Application

    Take notice that on July 11, 2016, Gulf South Pipeline Company, LP 
(Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed 
an application pursuant to section 7(c) of the Natural Gas Act (NGA) 
requesting authorization to construct and operate its St. Charles 
Parish Expansion Project to provide 133,333 dekatherms per day to serve 
Entergy Louisiana, LLC. Specifically, Gulf South proposes to construct: 
(i) A new 5,000 horsepower compressor station near Montz, Louisiana 
(Montz Compressor Station); and (ii) approximately 900 ft of new 16-
inch-diameter pipeline, all facilities located in St. Charles and St. 
John the Baptist Parishes, Louisiana. Gulf South estimates the cost of 
the St. Charles Parish Expansion Project to be $29,721,360, all as more 
fully set forth in the application which is on file with the Commission 
and open to public inspection. The filing is available for review at 
the Commission in the Public Reference Room or may be viewed on the 
Commission's Web site web at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at [email protected] or call toll-free, (886) 208-3676 or 
TYY, (202) 502-8659.
    Any questions regarding this application may be directed to J. Kyle 
Stephens, Vice President of Regulatory Affairs, Gulf South Pipeline 
Company, LP, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, by 
telephone at (713) 479-8252, by facsimile at (713) 479-1745 or by email 
to [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice, the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record

[[Page 48784]]

for this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit five copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and five copies of the protest or intervention to 
the Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on August 8, 2016.

    Dated: July 18, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-17522 Filed 7-25-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                Federal Register / Vol. 81, No. 143 / Tuesday, July 26, 2016 / Notices                                           48783

                                                   Accession Number: 20160718–5074.                      DEPARTMENT OF ENERGY                                  DEPARTMENT OF ENERGY
                                                   Comments Due: 5 p.m. ET 8/8/16.
                                                   Docket Numbers: ER16–2225–000.                        Federal Energy Regulatory                             Federal Energy Regulatory
                                                   Applicants: Midcontinent                              Commission                                            Commission
                                                Independent System Operator, Inc.                                                                              [Docket No. Cp16–478–000]
                                                   Description: Compliance filing: 2016–                 [Project No. 9842–006]
                                                07–18 RSG Rhg Compliance Filing to be                                                                          Gulf South Pipeline Company, LP;
                                                effective 4/1/2011.                                      Mr. Ray F. Ward; Notice Of Availability               Notice of Application
                                                   Filed Date: 7/18/16.                                  Of Draft Environmental Assessment
                                                   Accession Number: 20160718–5093.                                                                               Take notice that on July 11, 2016, Gulf
                                                   Comments Due: 5 p.m. ET 8/8/16.                                                                             South Pipeline Company, LP (Gulf
                                                                                                            In accordance with the National
                                                   Docket Numbers: ER16–2226–000.                                                                              South), 9 Greenway Plaza, Suite 2800,
                                                                                                         Environmental Policy Act of 1969 and                  Houston, Texas 77046, filed an
                                                   Applicants: McHenry Battery Storage,                  the Federal Energy Regulatory
                                                LLC.                                                                                                           application pursuant to section 7(c) of
                                                                                                         Commission’s (Commission)                             the Natural Gas Act (NGA) requesting
                                                   Description: Baseline eTariff Filing:
                                                                                                         regulations, 18 CFR part 380 (Order No.               authorization to construct and operate
                                                McHenry Battery Storage Initial
                                                                                                         486, 52 FR 47879), the Office of Energy               its St. Charles Parish Expansion Project
                                                Baseline MBR Application & Notice
                                                                                                         Projects has reviewed the application                 to provide 133,333 dekatherms per day
                                                Waiver Request to be effective 7/19/
                                                2016.                                                    for a new license for the Ward Mill                   to serve Entergy Louisiana, LLC.
                                                   Filed Date: 7/18/16.                                  Hydroelectric Project, located on the                 Specifically, Gulf South proposes to
                                                   Accession Number: 20160718–5097.                      Watauga River near Boone, Watauga                     construct: (i) A new 5,000 horsepower
                                                   Comments Due: 5 p.m. ET 8/8/16.                       County, North Carolina, and has                       compressor station near Montz,
                                                   Docket Numbers: ER16–2227–000.                        prepared a draft Environmental                        Louisiana (Montz Compressor Station);
                                                   Applicants: Kelly Creek Wind, LLC.                    Assessment (draft EA) for the project.                and (ii) approximately 900 ft of new 16-
                                                   Description: Baseline eTariff Filing:                 The project would not occupy federal                  inch-diameter pipeline, all facilities
                                                Kelly Creek Wind Initial Baseline MBR                    land.                                                 located in St. Charles and St. John the
                                                Application Filing to be effective 9/17/                                                                       Baptist Parishes, Louisiana. Gulf South
                                                                                                            In the draft EA, Commission staff                  estimates the cost of the St. Charles
                                                2016.                                                    analyze the potential environmental
                                                   Filed Date: 7/18/16.                                                                                        Parish Expansion Project to be
                                                                                                         effects of relicensing the project and                $29,721,360, all as more fully set forth
                                                   Accession Number: 20160718–5132.
                                                   Comments Due: 5 p.m. ET 8/8/16.                       conclude that continued project                       in the application which is on file with
                                                                                                         operation under a new license, with                   the Commission and open to public
                                                   Docket Numbers: ER16–2228–000.
                                                                                                         appropriate measures, would not                       inspection. The filing is available for
                                                   Applicants: PJM Interconnection,
                                                L.L.C.                                                   constitute a major federal action                     review at the Commission in the Public
                                                   Description: Tariff Cancellation:                     significantly affecting the quality of the            Reference Room or may be viewed on
                                                Notice of Cancellation of WMPA SA No.                    human environment.                                    the Commission’s Web site web at
                                                3354, Queue No. X2–054 to be effective                      A copy of the draft EA is available for            http://www.ferc.gov using the
                                                9/13/2016.                                               review at the Commission in the Public                ‘‘eLibrary’’ link. Enter the docket
                                                   Filed Date: 7/18/16.                                  Reference Room or may be viewed on                    number excluding the last three digits in
                                                   Accession Number: 20160718–5140.                      the Commission’s Web site at                          the docket number field to access the
                                                   Comments Due: 5 p.m. ET 8/8/16.                       www.ferc.gov using the ‘‘eLibrary’’ link.             document. For assistance, contact FERC
                                                   The filings are accessible in the                                                                           at FERCOnlineSupport@ferc.gov or call
                                                                                                         Enter the docket number, excluding the
                                                Commission’s eLibrary system by                                                                                toll-free, (886) 208–3676 or TYY, (202)
                                                                                                         last three digits, in the docket number
                                                clicking on the links or querying the                                                                          502–8659.
                                                                                                         field to access the document. For                        Any questions regarding this
                                                docket number.                                           assistance, contact FERC Online
                                                   Any person desiring to intervene or                                                                         application may be directed to J. Kyle
                                                                                                         Support at FERCOnlineSupport@                         Stephens, Vice President of Regulatory
                                                protest in any of the above proceedings
                                                                                                         ferc.gov or toll-free number at 1–866–                Affairs, Gulf South Pipeline Company,
                                                must file in accordance with Rules 211
                                                                                                         208–3676, or for TTY, 202–502–8659.                   LP, 9 Greenway Plaza, Suite 2800,
                                                and 214 of the Commission’s
                                                Regulations (18 CFR 385.211 and                             You may also register online at                    Houston, Texas 77046, by telephone at
                                                385.214) on or before 5:00 p.m. Eastern                  www.ferc.gov/docs-filing/                             (713) 479–8252, by facsimile at (713)
                                                time on the specified comment date.                      esubscription.asp to be notified via                  479–1745 or by email to kyle.stephens@
                                                Protests may be considered, but                          email of new filings and issuances                    bwpmlp.com.
                                                intervention is necessary to become a                    related to this or other pending projects.               Pursuant to section 157.9 of the
                                                party to the proceeding.                                 For assistance, contact FERC Online                   Commission’s rules, 18 CFR 157.9,
                                                   eFiling is encouraged. More detailed                  Support.                                              within 90 days of this Notice, the
                                                information relating to filing                                                                                 Commission staff will either: complete
                                                                                                            For further information, please                    its environmental assessment (EA) and
                                                requirements, interventions, protests,
                                                                                                         contact Adam Peer by telephone at (202)               place it into the Commission’s public
                                                service, and qualifying facilities filings
                                                                                                         502–8449 or by email at Adam.Peer@                    record (eLibrary) for this proceeding; or
                                                can be found at: http://www.ferc.gov/
                                                docs-filing/efiling/filing-req.pdf. For                  ferc.gov.                                             issue a Notice of Schedule for
                                                                                                                                                               Environmental Review. If a Notice of
srobinson on DSK5SPTVN1PROD with NOTICES




                                                other information, call (866) 208–3676                     Dated: July 18, 2016.
                                                (toll free). For TTY, call (202) 502–8659.               Kimberly D. Bose,
                                                                                                                                                               Schedule for Environmental Review is
                                                                                                                                                               issued, it will indicate, among other
                                                  Dated: July 18, 2016.                                  Secretary.                                            milestones, the anticipated date for the
                                                Nathaniel J. Davis, Sr.,                                 [FR Doc. 2016–17520 Filed 7–25–16; 8:45 am]           Commission staff’s issuance of the final
                                                Deputy Secretary.                                        BILLING CODE 6717–01–P                                environmental impact statement (FEIS)
                                                [FR Doc. 2016–17526 Filed 7–25–16; 8:45 am]                                                                    or EA for this proposal. The filing of the
                                                BILLING CODE 6717–01–P                                                                                         EA in the Commission’s public record


                                           VerDate Sep<11>2014   20:28 Jul 25, 2016   Jkt 238001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\26JYN1.SGM   26JYN1


                                                48784                           Federal Register / Vol. 81, No. 143 / Tuesday, July 26, 2016 / Notices

                                                for this proceeding or the issuance of a                 will not receive copies of all documents    LLC, Essential Power Rock Springs,
                                                Notice of Schedule for Environmental                     filed by other parties or issued by the     LLC, James River Genco, LLC,
                                                Review will serve to notify federal and                  Commission (except for the mailing of       Lakewood Cogeneration, L.P.,
                                                state agencies of the timing for the                     environmental documents issued by the       Portsmouth Genco, LLC, Red Oak
                                                completion of all necessary reviews, and                 Commission) and will not have the right     Power, LLC, Rhode Island State Energy
                                                the subsequent need to complete all                      to seek court review of the                 Center, LP, SEPG Energy Marketing
                                                federal authorizations within 90 days of                 Commission’s final order.                   Services, LLC.
                                                the date of issuance of the Commission                      The Commission strongly encourages          Description: Notice of Non-Material
                                                staff’s FEIS or EA.                                      electronic filings of comments, protests    Change in Status of Cogentrix Virginia
                                                   There are two ways to become                          and interventions in lieu of paper using    Financing Holding Company, LLC, et al.
                                                involved in the Commission’s review of                   the ‘‘eFiling’’ link at http://                Filed Date: 7/18/16.
                                                this project. First, any person wishing to               www.ferc.gov. Persons unable to file           Accession Number: 20160718–5201.
                                                obtain legal status by becoming a party                  electronically should submit an original       Comments Due: 5 p.m. ET 8/8/16.
                                                to the proceedings for this project                      and five copies of the protest or              Docket Numbers: ER16–1483–001.
                                                should, on or before the comment date                    intervention to the Federal Energy             Applicants: California Independent
                                                stated below file with the Federal                       Regulatory Commission, 888 First Street     System Operator Corporation.
                                                Energy Regulatory Commission, 888                        NE., Washington, DC 20426.                     Description: Tariff Amendment:
                                                First Street NE., Washington, DC 20426,                     Comment Date: 5:00 p.m. Eastern          2016–07–18 Frequency Response
                                                a motion to intervene in accordance                      Time on August 8, 2016.                     Deficiency Letter Response to be
                                                with the requirements of the                                                                         effective 8/15/2016.
                                                                                                            Dated: July 18, 2016.
                                                Commission’s Rules of Practice and                                                                      Filed Date: 7/18/16.
                                                Procedure (18 CFR 385.214 or 385.211)                    Kimberly D. Bose,
                                                                                                                                                        Accession Number: 20160718–5169.
                                                and the Regulations under the NGA (18                    Secretary.
                                                                                                                                                        Comments Due: 5 p.m. ET 8/8/16.
                                                CFR 157.10). A person obtaining party                    [FR Doc. 2016–17522 Filed 7–25–16; 8:45 am]
                                                                                                                                                        Docket Numbers: ER16–1791–001.
                                                status will be placed on the service list                BILLING CODE 6717–01–P
                                                                                                                                                        Applicants: PJM Interconnection,
                                                maintained by the Secretary of the                                                                   L.L.C.
                                                Commission and will receive copies of                                                                   Description: Tariff Amendment:
                                                all documents filed by the applicant and                 DEPARTMENT OF ENERGY
                                                                                                                                                     Amendment to 5/26/16 Filing of
                                                by all other parties. A party must submit                                                            Revisions to MISO/PJM JOA re CMP–
                                                five copies of filings made in the                       Federal Energy Regulatory
                                                                                                         Commission                                  ICP Baseline to be effective 7/25/2016.
                                                proceeding with the Commission and                                                                      Filed Date: 7/19/16.
                                                must mail a copy to the applicant and                                                                   Accession Number: 20160719–5029.
                                                                                                         Combined Notice of Filings #1
                                                to every other party. Only parties to the                                                               Comments Due: 5 p.m. ET 8/9/16.
                                                proceeding can ask for court review of                      Take notice that the Commission             Docket Numbers: ER16–2229–000.
                                                Commission orders in the proceeding.                     received the following electric rate           Applicants: NorthWestern
                                                   However, a person does not have to                    filings:
                                                intervene in order to have comments                                                                  Corporation.
                                                                                                            Docket Numbers: ER10–1257–006;              Description: § 205(d) Rate Filing: SA
                                                considered. The second way to                            ER10–1258–006; ER11–3117–002.               642 3rd Rev—NITSA with General Mills
                                                participate is by filing with the                           Applicants: Wabash Valley Power
                                                Secretary of the Commission, as soon as                                                              Operations, LLC to be effective 9/1/
                                                                                                         Association, Inc., Wabash Valley Energy 2016.
                                                possible, an original and two copies of                  Marketing, Inc., Lively Grove Energy           Filed Date: 7/18/16.
                                                comments in support of or in opposition                  Partners, LLC.                                 Accession Number: 20160718–5160.
                                                to this project. The Commission will                        Description: Notice of Change of            Comments Due: 5 p.m. ET 8/8/16.
                                                consider these comments in                               Status of Wabash Valley Power
                                                determining the appropriate action to be                                                                Docket Numbers: ER16–2230–000.
                                                                                                         Association, et al.                            Applicants: PJM Interconnection,
                                                taken, but the filing of a comment alone                    Filed Date: 7/18/16.
                                                will not serve to make the filer a party                                                             L.L.C.
                                                                                                            Accession Number: 20160718–5219.            Description: § 205(d) Rate Filing:
                                                to the proceeding. The Commission’s                         Comments Due: 5 p.m. ET 8/8/16.
                                                rules require that persons filing                                                                    Amendment to ISA No. 3388 and ICSA
                                                comments in opposition to the project                       Docket Numbers: ER10–2575–008.           No. 3409 Queue Position #T107, X3–004
                                                provide copies of their protests only to                    Applicants: Watson Cogeneration          & Y2–01 to be effective 11/20/2012.
                                                the party or parties directly involved in                Company.                                       Filed Date: 7/19/16.
                                                the protest.                                                Description: Updated Market Power           Accession Number: 20160719–5023.
                                                   Persons who wish to comment only                      Analysis of Watson Cogeneration                Comments Due: 5 p.m. ET 8/9/16.
                                                on the environmental review of this                      Company.                                       Docket Numbers: ER16–2231–000.
                                                project should submit an original and                       Filed Date: 7/18/16.                        Applicants: NorthWestern
                                                two copies of their comments to the                         Accession Number: 20160718–5197.         Corporation.
                                                Secretary of the Commission.                                Comments Due: 5 p.m. ET 9/16/16.            Description: § 205(d) Rate Filing:
                                                Environmental commenters will be                            Docket Numbers: ER16–328–002;            Revisions to Market-Based Rate Tariff to
                                                placed on the Commission’s                               ER12–952–003; ER13–1141–002; ER13– be effective 9/18/2016.
                                                environmental mailing list, will receive                 1142–002; ER13–1143–003; ER13–1144–            Filed Date: 7/19/16.
                                                copies of the environmental documents,                   003; ER11–4027–007; ER10–2196–002;             Accession Number: 20160719–5024.
srobinson on DSK5SPTVN1PROD with NOTICES




                                                and will be notified of meetings                         ER11–4028–007; ER12–1275–002;                  Comments Due: 5 p.m. ET 8/9/16.
                                                associated with the Commission’s                         ER16–918–001; ER15–1657–003.                   Docket Numbers: ER16–2232–000.
                                                environmental review process.                               Applicants: Cogentrix Virginia              Applicants: Public Service Company
                                                Environmental commenters will not be                     Financing Holding Company, LLC,             of Colorado.
                                                required to serve copies of filed                        Essential Power, LLC, Essential Power          Description: § 205(d) Rate Filing:
                                                documents on all other parties.                          Massachusetts, LLC, Essential Power         20160719_Production Wind Credit to be
                                                However, the non-party commenters                        Newington, LLC, Essential Power OPP,        effective 9/16/2016.


                                           VerDate Sep<11>2014   20:28 Jul 25, 2016   Jkt 238001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\26JYN1.SGM   26JYN1



Document Created: 2018-02-08 08:01:14
Document Modified: 2018-02-08 08:01:14
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on August 8, 2016.
FR Citation81 FR 48783 