81_FR_49725 81 FR 49580 - Standards for Business Practices and Communication Protocols for Public Utilities

81 FR 49580 - Standards for Business Practices and Communication Protocols for Public Utilities

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 145 (July 28, 2016)

Page Range49580-49590
FR Document2016-17841

The Federal Energy Regulatory Commission (Commission) proposes to incorporate by reference the latest version (Version 003.1) of certain Standards for Business Practices and Communication Protocols for Public Utilities adopted by the Wholesale Electric Quadrant (WEQ) of the North American Energy Standards Board (NAESB). These standards mainly modify and update NAESB's WEQ Version 003 Standards. The Commission also proposes to revise its regulations to incorporate NAESB's updated Smart Grid Business Practice Standards in the Commission's General Policy and Interpretations.

Federal Register, Volume 81 Issue 145 (Thursday, July 28, 2016)
[Federal Register Volume 81, Number 145 (Thursday, July 28, 2016)]
[Proposed Rules]
[Pages 49580-49590]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-17841]



[[Page 49580]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Parts 2 and 38

[Docket No. RM05-5-025]


Standards for Business Practices and Communication Protocols for 
Public Utilities

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission (Commission) proposes 
to incorporate by reference the latest version (Version 003.1) of 
certain Standards for Business Practices and Communication Protocols 
for Public Utilities adopted by the Wholesale Electric Quadrant (WEQ) 
of the North American Energy Standards Board (NAESB). These standards 
mainly modify and update NAESB's WEQ Version 003 Standards. The 
Commission also proposes to revise its regulations to incorporate 
NAESB's updated Smart Grid Business Practice Standards in the 
Commission's General Policy and Interpretations.

DATES: Comments are due September 26, 2016.

ADDRESSES: Comments, identified by Docket No. RM05-5-025, may be filed 
in the following ways:
     Electronic Filing through http://www.ferc.gov. Documents 
created electronically using word processing software should be filed 
in native applications or print-to-PDF format and not in a scanned 
format.
     Mail/Hand Delivery: Those unable to file electronically 
may mail or hand-deliver comments to: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: For detailed instructions on submitting comments and 
additional information on the rulemaking process, see the Comment 
Procedures Section of this document.

FOR FURTHER INFORMATION CONTACT: 
Michael P. Lee (technical issues), Office of Energy Policy and 
Innovation, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426, (202) 502-6548.

Gary D. Cohen (legal issues), Office of the General Counsel, Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426, (202) 502-8321.

SUPPLEMENTARY INFORMATION: 

Table of Contents

------------------------------------------------------------------------
                                                             Paragraph
                                                              numbers
------------------------------------------------------------------------
I. Background...........................................               6
II. Discussion..........................................              17
  A. Revisions to WEQ OASIS Business Practice Standards               18
   in Light of Commission Policies......................
  1. Overview...........................................              18
  2. Redirects from Conditional Parent Reservations.....              19
  3. Requirement to Post ATC Narrative within One Day...              26
  4. SAMTS Point-to-Point Treatment.....................              28
  5. Clarification of Discretion of Transmission                      30
   Providers to Deny Service Requests under Standard WEQ-
   001-106.2.5..........................................
  6. Modifications to Allow a Transmission Provider to                32
   Extend the Time to Perform its Biennial Reassessment.
  7. Industry-Wide Mechanism for Consistent Posting of                34
   AFC-Related Data.....................................
  8. Use of DUNS Numbers................................              36
  B. Revised and New Standards Designed to Complement                 38
   NERC Reliability Standards and Developments..........
  1. NERC Compliance Registry...........................              38
  2. Electric Industry Registry Standards...............              39
  3. WEQ-023 Modeling Business Practice Standards.......              41
  C. Revisions to WEQ Business Practice Standards Not                 43
   Requested by Commission or Developed to Comply with a
   Commission Directive.................................
  1. Proper Method to Post Off-OASIS Resale Transactions              44
  2. Unmasking of Final State Source and Sink Requests..              46
  3. Modifications to Smart Grid Standards..............              48
  4. Modification to Standards on Abbreviations,                      51
   Acronyms and Definitions of Terms....................
  5. Public Key Infrastructure-Related Standards........              53
  D. Implementation.....................................              56
III. Notice of Use of Voluntary Consensus Standards.....              57
IV. Incorporation By Reference..........................              59
V. Information Collection Statement.....................              62
VI. Environmental Analysis..............................              69
VII. Regulatory Flexibility Act Certification...........              70
VIII. Comment Procedures................................              74
IX. Document Availability...............................              78
------------------------------------------------------------------------

    1. In this notice of proposed rulemaking (NOPR), the Federal Energy 
Regulatory Commission (Commission) proposes to amend its regulations 
under the Federal Power Act \1\ to incorporate by reference the latest 
version of certain Standards for Business Practices and Communication 
Protocols for Public Utilities (Version 003.1) adopted by the Wholesale 
Electric Quadrant (WEQ) of the North American Energy Standards Board 
(NAESB) and filed with the Commission on October 26, 2015 (October 26 
Filing). We also propose to list informationally, as guidance, NAESB's 
updated Smart Grid Business Practice Standards in Standard WEQ-019. In 
addition, as explained further below, there are several NAESB standards 
included in the WEQ Version 003.1 package of standards that we are not 
proposing in this NOPR to incorporate by reference.
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 791a, et seq.
---------------------------------------------------------------------------

    2. These revised NAESB standards update earlier versions of these 
standards that the Commission previously incorporated by reference into 
its regulations at 18 CFR 38.1 in

[[Page 49581]]

Order Nos. 676-E,\2\ 676-H,\3\ 764,\4\ and 890.\5\ In addition, NAESB 
developed two new suites of standards in coordination with the North 
American Electric Reliability Corporation (NERC) (the Commission-
certified ``electric reliability organization'' responsible for 
developing and enforcing mandatory Reliability Standards).\6\ These two 
NAESB proposals would establish: (1) NAESB Electric Industry Registry 
(EIR) business practice standards that replace the NERC Transmission 
System Information Networks (TSIN) as the tool to be used by wholesale 
electric markets to conduct electronic transactions via electronic 
tagging (e-Tags); and (2) Modeling Business Practice Standards to 
support and complement NERC's proposed retirement of its ``MOD A'' 
Reliability Standards.\7\
---------------------------------------------------------------------------

    \2\ Standards for Business Practices and Communication Protocols 
for Public Utilities, Order No. 676-E, 74 FR 63288 (Dec. 3, 2009), 
FERC Stats. & Regs. ] 31,299 (2009).
    \3\ Standards for Business Practices and Communication Protocols 
for Public Utilities, Order No. 676-H, 79 FR 56939 (Sept. 24, 2014), 
FERC Stats. & Regs. ] 31,359, at n.81 (2014), corrected, 149 FERC ] 
61,014 (2014).
    \4\ Integration of Variable Energy Resources, Order No. 764, 77 
FR 41,482 (July 13, 2012), FERC Stats. & Regs. ] 31,331 (2012).
    \5\ Preventing Undue Discrimination and Preference in 
Transmission Service, Order No. 890, 72 FR 12266 (Mar. 15, 2007), 
FERC Stats. & Regs. ] 31,241 (2007).
    \6\ NERC is the Commission-certified ``electric reliability 
organization'' responsible for developing and enforcing mandatory 
Reliability Standards. See section 215 of the Federal Power Act, 16 
U.S.C. 824o (2012).
    \7\ In a February 19, 2014 petition, NERC proposed to retire 
Reliability Standards MOD-001-1a, MOD-004-1, MOD-008-1, MOD-028-2, 
MOD-029-1a, and MOD-030-2 and requested approval of new Reliability 
Standard MOD-001-2. Generally, the ``MOD'' series of NERC 
Reliability Standards pertain to transmission system modeling. The 
Commission issued a NOPR in Docket No. RM14-7-000 that addressed 
NERC's proposal, and the matter is currently pending before the 
Commission. Modeling, Data, and Analysis Reliability Standards, 
Notice of Proposed Rulemaking, 79 FR 36269 (June 26, 2014), 147 FERC 
] 61,208 (2014) (MOD NOPR).
---------------------------------------------------------------------------

    3. NAESB's WEQ Version 003.1 Business Practice Standards include 
modifications to the following set of existing standards: \8\
---------------------------------------------------------------------------

    \8\ On October 26, 2015, NAESB filed a report with the 
Commission (previously referenced as the October 26 Filing) 
presenting all the modifications it has made to the WEQ Version 003 
Business Practice Standards since those standards were incorporated 
by reference by the Commission in 2014 in Order No. 676-H, as well 
as two new suites of standards that it has developed, which are 
further described below in P 12.

------------------------------------------------------------------------
                  WEQ                      Business practice standards
------------------------------------------------------------------------
000....................................  Abbreviations, Acronyms, and
                                          Definition of Terms.
001....................................  Open Access Same-Time
                                          Information System (OASIS).
002....................................  OASIS Standards and
                                          Communication Protocols
                                          (S&CP).
003....................................  OASIS S&CP Data Dictionaries.
004....................................  Coordinate Interchange.
006....................................  Manual Time Error Corrections.
012....................................  Public Key Infrastructure
                                          (PKI).
013....................................  OASIS Implementation Guide.
019....................................  Customer Energy Usage
                                          Information Communication.
------------------------------------------------------------------------

    4. Additionally, the Version 003.1 standards include two new suites 
of standards:

------------------------------------------------------------------------
             WEQ                      Business practice standards
------------------------------------------------------------------------
022..........................  Electric Industry Registry (EIR).
023..........................  Modeling.
------------------------------------------------------------------------

    5. These NAESB standards, developed through the NAESB standards 
development process or the NAESB minor correction process, build upon 
the Version 003 WEQ Business Practice Standards that NAESB filed with 
the Commission on September 18, 2012 and that the Commission 
incorporated by reference into its regulations in Order No. 676-H, a 
final rule issued by the Commission on September 18, 2014.\9\
---------------------------------------------------------------------------

    \9\ See supra n.3.
---------------------------------------------------------------------------

I. Background

    6. NAESB is a non-profit standards development organization 
established in late 2001 (as the successor to the Gas Industry 
Standards Board (GISB), which was established in 1994) and serves as an 
industry forum for the development of business practice standards and 
communication protocols for the wholesale and retail natural gas and 
electricity industry sectors. Since 1995, NAESB and its predecessor, 
the GISB, have been accredited members of the American National 
Standards Institute (ANSI), complying with ANSI's requirements that its 
standards reflect a consensus of the affected industries.\10\
---------------------------------------------------------------------------

    \10\ Prior to the establishment of NAESB in 2001, the 
Commission's development of business practice standards for the 
wholesale electric industry was aided by two ad hoc industry working 
groups established during the rulemaking proceeding that resulted in 
issuance of Order No. 889 and the creation of the OASIS, while 
GISB's efforts involved the development of business practice 
standards for the wholesale natural gas industry. Once formally 
established, NAESB took over the standards development previously 
handled by GISB and by the electric working groups.
---------------------------------------------------------------------------

    7. NAESB's standards include business practices intended to 
standardize and streamline the transactional processes of the natural 
gas and electric industries, as well as communication protocols and 
related standards designed to improve the efficiency of communication 
within each industry. NAESB supports all three quadrants of the gas and 
electric industries--wholesale gas, wholesale electric, and retail 
markets quadrant.\11\ All participants in the gas and electric 
industries are eligible to join NAESB and participate in standards 
development.
---------------------------------------------------------------------------

    \11\ The retail gas quadrant and the retail electric quadrant 
were combined into the retail markets quadrant. NAESB continues to 
refer to these working groups as ``quadrants'' even though there are 
now only three quadrants.
---------------------------------------------------------------------------

    8. NAESB develops its standards under a consensus process so that 
the standards draw support from a wide range of industry members. 
NAESB's procedures are designed to ensure that all persons choosing to 
participate can have input into the development of a standard, 
regardless of whether they are members of NAESB, and each standard 
NAESB adopts is supported by a consensus of the relevant industry 
segments. Standards that fail to gain consensus support are not 
adopted. NAESB's consistent practice has been to submit a report to the 
Commission after it has made revisions to existing business practice 
standards or has developed and adopted new business practice standards. 
NAESB's standards are voluntary standards, which become mandatory for 
public utilities upon incorporation by reference by the Commission.
    9. In Order No. 676,\12\ the Commission not only incorporated by 
reference into its regulations business practice standards and 
communication protocols

[[Page 49582]]

for the wholesale electric industry, it also established a formal 
ongoing process for reviewing and upgrading the Commission's OASIS 
standards and other wholesale electric industry business practice 
standards. In later orders in this series, the Commission incorporated 
by reference revisions to these standards.\13\
---------------------------------------------------------------------------

    \12\ Standards for Business Practices and Communication 
Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ] 
31,216 (2006).
    \13\ Standards for Business Practices and Communication 
Protocols for Public Utilities, Order No. 676-C, FERC Stats. & Regs. 
] 31,274, reh'g denied, Order No. 676-D, 124 FERC ] 61,317 (2008); 
See supra n.2; Standards for Business Practices and Communication 
Protocols for Public Utilities, Order No. 676-F, FERC Stats. & Regs. 
] 31,309 (2010); Standards for Business Practices and Communication 
Protocols for Public Utilities, Order No. 676-G, 78 FR 14654 (Mar. 
7, 2013), FERC Stats. & Regs. ] 31,343 (2013); See supra n.3.
---------------------------------------------------------------------------

    10. The WEQ Version 003.1 Business Practice Standards include six 
OASIS-related standards \14\ that NAESB modified in response to 
directives and guidance provided in Order Nos. 676-E, 676-H, and 890. 
Specifically, in response to the Commission's guidance in Order No. 
676-E, NAESB modified its OASIS standards to explicitly permit a 
transmission provider to extend the performance of the biennial 
assessment. In response to the Commission's guidance in Order No. 676-
H, NAESB made four modifications to the OASIS suite of standards 
regarding: (1) The treatment of redirects for transmission service from 
conditional parent reservations; (2) the one-day requirement for the 
posting of Available Transfer Capability (ATC) Narratives; (3) the 
treatment of point-to-point reservations under Service Across Multiple 
Transmission Systems (SAMTS); and (4) the clarification of the 
requirements under which a transmission provider may deny a request to 
terminate service. To implement Commission guidance in Order No. 890, 
NAESB modified standards to allow for the consistent posting of 
Available Flowgate Capability (AFC) related data on OASIS sites.
---------------------------------------------------------------------------

    \14\ The OASIS suite of standards is used collectively by NAESB 
to reference four business practice standards: WEQ-001 Open Access 
Same-Time Information System (OASIS); WEQ-002 OASIS Standards and 
Communication Protocols (S&CP); WEQ-003 OASIS S&CP Data 
Dictionaries; and WEQ-013 OASIS Implementation Guide.
---------------------------------------------------------------------------

    11. In addition, as part of the standards development process, 
NAESB made two additional revisions to the OASIS suite of standards 
that were not made in response to Commission orders. First, NAESB 
modified WEQ-001 and WEQ-013 to require resellers to enter off-OASIS 
resale transactions into OASIS sites in the ``accepted'' status to 
provide the assignee of the resale the opportunity to confirm the 
transaction on the OASIS. Second, NAESB revised WEQ-002-4.3.6.2 to 
allow for the unmasking of the source and sink of a request for 
transmission when that request is moved to any final state.
    12. NAESB has adopted certain new and revised WEQ Version 003.1 
Business Practice Standards based on developments involving NERC. 
First, NAESB developed the WEQ-022 Electric Industry Registry (EIR) 
Business Practice Standards to complement the transfer of registry 
functions from the NERC TSIN to the NAESB EIR. The EIR database serves 
as a central repository of information required for commercial 
interactions, including electronic transactions via e-Tags. Second, 
NAESB developed the WEQ-023 Modeling Business Practice Standards in 
response to a NERC petition to delete and retire the six ``MOD A'' 
Reliability Standards. As mentioned above, NERC filed a petition with 
the Commission on February 10, 2014 proposing to retire NERC's six MOD 
A Reliability Standards and replace them with Reliability Standard MOD-
001-2, which NERC states will focus exclusively on the reliability 
aspects of ATC and AFC.\15\ On February 7, 2014, NERC submitted a 
request to NAESB (Standards Request 14002) \16\ asking NAESB to 
consider adopting standards that address the commercial and business 
aspects of the MOD standards proposed for retirement. NAESB 
subsequently developed the WEQ-023 Business Practice Standards to 
support and complement the proposed retirement of the MOD A Reliability 
Standards. The WEQ-023 Business Practice Standard specifies the 
requirements for calculating ATC and AFC and supports the task of 
reporting on the commercial aspects of these calculations.\17\
---------------------------------------------------------------------------

    \15\ As mentioned above, NERC proposes to retire Reliability 
Standards MOD-001-1a, MOD-004-1, MOD-008-1, MOD-028-2, MOD-029-1a, 
and MOD-030-2.
    \16\ https://www.naesb.org/pdf4/r140.
    \17\ These terms are defined in WEQ-000-1.
---------------------------------------------------------------------------

    13. Third, NAESB has adopted revisions to NAESB standards that need 
to match up with NERC's Interchange Scheduling and Coordination (INT) 
Reliability Standards. In this regard, NAESB modified certain WEQ-000 
and WEQ-004 Business Practice Standards to complement NERC's proposal 
to modify the INT Reliability Standards, including removal of the Load 
Serving Entity (LSE) category as one of the functional registration 
categories in the NERC Compliance Registry.\18\
---------------------------------------------------------------------------

    \18\ NAESB October 26 Filing at 3.
---------------------------------------------------------------------------

    14. NAESB also includes as part of its Version 003.1 Business 
Practice Standards additional non-OASIS standards modifications to WEQ 
Version 003.1 that it made in the course of normal standards 
development. In Order No. 764, the Commission required transmission 
providers to provide for the scheduling of interchange in 15-minute 
intervals. In response, NAESB made two changes to the WEQ-004 
Coordinate Interchange Business Practice Standards. NAESB also modified 
WEQ-019 to ensure consistency between WEQ Business Practice Standards 
and other standards organizations' standards. Additionally, NAESB 
modified WEQ-000 to harmonize definitions with NAESB Retail Market 
Quadrant efforts.
    15. In Order 676-H, the Commission incorporated by reference WEQ 
Business Practice Standards to support Public Key Infrastructure (PKI). 
The WEQ Version 003.1 Business Practice Standards include additional 
PKI modifications to WEQ-002, WEQ-004, and WEQ-012 to support the NAESB 
Authorized Certification Authority (Certification Authority) 
Certification Program and to account for technological advances.
    16. NAESB also has in place a process to make necessary minor 
corrections to its standards, when needed. The WEQ Version 003.1 
Business Practice Standards include seven new minor corrections made by 
NAESB.\19\
---------------------------------------------------------------------------

    \19\ These corrections are identified and explained in the 
October 26 Filing.
---------------------------------------------------------------------------

II. Discussion

    17. As discussed below, with certain enumerated exceptions, we 
propose to incorporate by reference (into the Commission's regulations 
at 18 CFR 38.1(b)) the NAESB WEQ Version 003.1 Business Practice 
Standards.\20\ The Version 003.1 standards will replace the Version 003 
standards currently incorporated by reference into the Commission's 
regulations. Where we have proposed in this NOPR to incorporate a NAESB 
Business Practice

[[Page 49583]]

Standard by reference into the Commission's regulations, this has been 
based on a preliminary determination that the standard at issue is 
consistent with the Commission's findings in Order No. 676-H and does 
not appear inconsistent with any Commission directives or findings in 
other orders.
---------------------------------------------------------------------------

    \20\ Consistent with our past practice, we do not propose to 
incorporate by reference into the Commission's regulations the 
following standards: Standards of Conduct for Electric Transmission 
Providers (WEQ-009); Contracts Related Standards (WEQ-010); and WEQ/
WGQ eTariff Related Standards (WEQ-014). We also do not propose to 
incorporate by reference at this time the WEQ-023 Modeling Business 
Practice Standards. We do not propose to incorporate by reference 
standard WEQ-009 because it contains no substantive standards and 
merely serves as a placeholder for future standards. We do not 
propose to incorporate by reference standard WEQ-010 because this 
standard contains an optional NAESB contract regarding funds 
transfers and the Commission does not require utilities to use such 
contracts. Moreover, as discussed more specifically in the section 
below on Redirects from Conditional Parent Reservations, we do not 
propose in this NOPR to incorporate by reference certain portions of 
WEQ-001.
---------------------------------------------------------------------------

A. Revisions to WEQ OASIS Business Practice Standards in Light of 
Commission Policies

1. Overview
    18. The NAESB WEQ Version 003.1 Business Practice Standards contain 
six modifications to the OASIS suite of standards that NAESB developed 
to ensure consistency with certain policies articulated by the 
Commission in Order Nos. 676-H, 676-E, and 890. NAESB states that four 
of the six modifications align the OASIS suite of standards with 
guidance provided by the Commission in Order No. 676-H concerning the 
treatment of redirects for transmission service from conditional parent 
reservations, the one-day requirement for the posting of ATC 
Narratives, the treatment of point-to-point reservations under SAMTS, 
and new clarification of the requirements under which a transmission 
provider may deny a request to terminate service. In response to a 
directive in Order No. 676-E, NAESB also modified standards to 
explicitly permit a transmission provider to extend the performance of 
the biennial reassessment. Additionally, to implement the Commission's 
guidance provided in Order No. 890, NAESB modified pertinent standards 
to allow for the consistent posting of AFC-related data on OASIS sites.
2. Redirects From Conditional Parent Reservations
    19. In Order No. 676-H, the Commission declined to incorporate by 
reference NAESB Standards WEQ-001-9.5 and WEQ-001-10.5. The Version 
003.0 WEQ-001-9.5 stated that, ``upon confirmation of the request to 
Redirect on a firm basis, the Capacity Available to Redirect shall be 
reduced by the amount of the redirected capacity granted for the time 
period of that Redirect.'' The Version 003.0 WEQ-001-10.5 contained 
nearly identical language relating to the confirmation of requests to 
redirect on a non-firm basis. The Commission explained that it found 
both of these standards inconsistent with the Commission's precedent in 
Dynegy Power Marketing, Inc.\21\ and Entergy Services, Inc.\22\ With 
regard to Standard WEQ-001-9.5, the Commission explained that, ``as we 
found in these orders, reducing the capacity available to redirect 
prior to the passage of the conditional reservation deadline could lead 
to a customer paying firm transmission charges and losing capacity on 
both its original path and its redirect path.'' \23\ The Commission 
further explained that the Dynegy policy ``effects a reasonable 
balancing of interests between the customer and the transmission owner 
by ensuring that the customer does not potentially lose rights to 
capacity, while at the same time still permitting the transmission 
owner to sell available capacity on a short term basis until the 
redirect becomes unconditional.'' The Commission also found that 
Standard WEQ-001-10.5 raised similar concerns regarding the 
confirmation of requests to redirect on a non-firm basis and also 
declined to incorporate by reference Standard WEQ-001-10.5 and 
requested that NAESB, likewise, give consideration to reworking this 
standard.
---------------------------------------------------------------------------

    \21\ 99 FERC ] 61,054, at P 9 (2002) (Dynegy).
    \22\ 143 FERC ] 61,143, at P 25 & n.68 (2013) (Entergy).
    \23\ Id. P 47.
---------------------------------------------------------------------------

    20. As the Commission stated in Entergy,\24\ our guiding precedent 
on the issue of when a customer requesting redirect loses rights on the 
original path was set in Dynegy.\25\ In Dynegy, the Commission found 
that a transmission customer receiving firm transmission service does 
not lose its rights to its original path until the redirect request 
satisfies all of the following criteria: (1) It is accepted by the 
transmission provider; (2) it is confirmed by the transmission 
customer; and (3) it passes the conditional reservation deadline under 
section 13.2 of its Open Access Transmission Tariff.
---------------------------------------------------------------------------

    \24\ Id. P 25 & n.68.
    \25\ Dynegy, 99 FERC ] 61,054 at P 9.
---------------------------------------------------------------------------

    21. Having NAESB revise its standards to accommodate the 
Commission's policy in this area will help avoid confusion by public 
utilities as to their responsibilities under the Commission's policy 
and under the NAESB standards. The Commission's concern in Dynegy and 
Entergy was that a redirecting customer would lose its rights to the 
unconditional parent path and be left with no transmission service 
during the redirect period if the requested redirect was preempted by a 
competing service request.
    22. We appreciate the extensive work that NAESB and its stakeholder 
have undertaken in response to our directive in Order 676-H. NAESB has 
reached consensus on standards relating to redirects related to 
unconditional parent reservations, and we propose to incorporate those 
standards by reference into our regulations.
    23. NAESB reports, however, that it was unsure whether and to what 
extent the Dynegy policy applies to conditional parent reservations and 
non-firm service, and no consensus could be reached with respect to 
such standards. It therefore adopted a standard (WEQ-001-9.5) that 
allows individual transmission providers to craft provisions in their 
individual tariffs for how they will address redirects of requests for 
firm transmission service, rather than having an industry-wide business 
practice for such transactions. Because it could not reach consensus on 
these issues, the standards also do not prescribe when a public utility 
must reduce uncommitted capacity to account for redirects. NAESB also 
adopted a similar rewrite of the standard (WEQ-001-10.5) on redirects 
on a non-firm basis.
    24. The concern about the negative effects of the potential loss of 
the customer's parent path when the parent reservation is conditional 
and subject to competition arguably is much less compelling than when 
the parent reservation is unconditional. While Dynegy carved out an 
exception for unconditional parent reservations, the Commission has not 
explicitly ruled on whether Dynegy applies to conditional parent 
reservations, and such an extension may go beyond the policy concern 
with losing firm service articulated in Entergy.
    25. We, therefore, invite comment on whether the Commission should 
apply the Dynegy policy to conditional and non-firm redirects. Parties 
also should address the four redirect-related issues on which 
stakeholders have been unable to reach consensus. These are: (1) The 
treatment of a firm redirect for transmission service following the 
preemption of the conditional parent reservation; (2) the circumstances 
under which a firm redirect for transmission service may return to the 
conditional parent reservation; (3) the number of subsequent firm 
redirects for transmission service that can stem from the original firm 
redirect for transmission service; and (4) the proper treatment of 
requests to redirect requests for non-firm transmission service. Based 
on these responses, the Commission will consider whether it will adopt 
regulations regarding redirects from conditional parent reservations 
and non-firm service.
3. Requirement To Post ATC Narrative Within One Day
    26. NAESB developed Standard WEQ-001-14 to meet the requirement

[[Page 49584]]

in Order No. 890 for transmission providers to post a narrative in 
instances when ATC remains unchanged at a value of zero for six months 
or longer. In addition, Standard WEQ-001-15 requires transmission 
providers to post a brief narrative that explains the reason for a 
change in monthly or yearly ATC values on a constrained path when a 
monthly or yearly ATC value changes as a result of a 10 percent change 
in total transfer capability. In Order No. 676-H, the Commission 
declined to incorporate by reference Standards WEQ-001-14.1.3 and WEQ-
011-15.1.2 after determining that these standards did not meet the 
Commission's requirement to post the ATC narrative as soon as 
feasible.\26\ The Commission requested that NAESB ``revise these 
standards to provide for a one-day posting requirement.'' \27\ In 
response, NAESB modified Standards WEQ-001-14.1.3 and WEQ-011-15.1.2 
and adopted business practice standards to support the one-day posting 
requirement.
---------------------------------------------------------------------------

    \26\ Order No. 676-E, FERC Stats. & Regs. ] 31,299 at P 39.
    \27\ Id. P 29.
---------------------------------------------------------------------------

    27. NAESB's revised standards appear consistent with our findings 
in Order No. 676-H and do not appear inconsistent with any Commission 
directives or findings in other orders. Moreover, as we explained 
above,\28\ below,\29\ and in previous orders, the NAESB standards are 
developed in an open consensus process that assures that the standards 
draw support from a wide range of industry members before being 
developed and adopted. Accordingly, we propose to incorporate by 
reference, into the Commission's regulations at 18 CFR 38.1, NAESB's 
revised standards on the timing of the required posting of ATC 
narratives, as set forth in NAESB's WEQ Version 003.1 Business Practice 
Standards.
---------------------------------------------------------------------------

    \28\ See supra P 8.
    \29\ See infra P 57.
---------------------------------------------------------------------------

4. SAMTS Point-to-Point Treatment
    28. The NAESB SAMTS business practice standards that the Commission 
incorporated by reference in Order No. 676-H were developed in response 
to a Commission finding in Order No. 890 requesting that NAESB develop 
business practice standards in this area.\30\ In Order No. 676-H, the 
Commission found reasonable a NAESB request to treat a conditional 
point-to-point reservation included in a coordinated group displaced 
through preemption as comparable to a reservation being superseded as a 
result of preemption.\31\ NAESB therefore includes in the Version 003.1 
standards modifications to the SAMTS-related standards to permit a 
customer with preempted transmission capacity from a reservation 
associated with a coordinated group to alter (reduce or terminate) the 
capacity of coordinate requests in the coordinated group.
---------------------------------------------------------------------------

    \30\ Order No. 890, FERC Stats. & Regs. ] 31,241 at P 1377.
    \31\ Order No. 676-H, FERC Stats. & Regs. ] 31,359 at P 65.
---------------------------------------------------------------------------

    29. The Commission finds that NAESB's revised standards are 
consistent with our findings in Order No. 676-H and do not appear 
inconsistent with any Commission directives or findings in other 
orders. Accordingly, we propose to incorporate by reference, into the 
Commission's regulations at 18 CFR 38.1, NAESB's revised standards on 
SAMTS-Related standards as set forth in the WEQ Version 003.1 Business 
Practice Standards.
5. Clarification of Discretion of Transmission Providers To Deny 
Service Requests Under Standard WEQ-001-106.2.5
    30. In Order No. 676-H, the Commission declined to incorporate by 
reference Standard WEQ-001-106.2.5, explaining that the standard was 
``unclear in its application and could be read to allow Transmission 
Providers discretion to deny requests to terminate service in 
situations where this might not be warranted.'' \32\ In response, NAESB 
modified Standard WEQ-001-106.2.1, added Standard WEQ-001-106.2.1.1, 
and deleted Standard WEQ-001-106.2.5. Together, these revised standards 
clarify that a transmission customer should submit an accurate 
termination request and, if the transmission customer fails to do so, 
the transmission provider may deny the request.
---------------------------------------------------------------------------

    \32\ Id. P 58.
---------------------------------------------------------------------------

    31. NAESB's revised standards appear consistent with our findings 
in Order No. 676-H and do not appear inconsistent with any Commission 
directives or findings in other orders. Accordingly, we propose to 
incorporate by reference, into the Commission's regulations at 18 CFR 
38.1, NAESB's revised Standards WEQ-WEQ-001-106.2.21, WEQ-001-
106.2.1.1, and WEQ-001-106.2.5, as set forth in the WEQ Version 003.1 
Business Practice Standards.
6. Modifications To Allow a Transmission Provider To Extend the Time To 
Perform Its Biennial Reassessment
    32. In Order No. 676-E, the Commission stated ``we reiterate here 
the Commission's finding in Order No. 890 that a transmission provider 
is permitted to extend the timeframe to reassess the availability of 
conditional firm service. Since the Version 002.1 Standards do not 
specifically address this issue, we would ask the industry, working 
through NAESB, to continue to look at additional business practice 
standards facilitating a transmission provider's extension of its right 
to perform a reassessment.'' \33\ In response to this request, NAESB, 
in its Version 003.1 Standards, adopted modifications to five standards 
in the WEQ-001 OASIS Business Practice Standards and one standard in 
the WEQ-013 OASIS Implementation Guide Business Practice Standards that 
explicitly allow a transmission provider to extend the deadline by 
which it must perform its biennial reassessment of the availability on 
its system of conditional firm service.
---------------------------------------------------------------------------

    \33\ Order No. 676-E, FERC Stats. & Regs. ] 31,299 at P 72.
---------------------------------------------------------------------------

    33. NAESB's revised standards appear consistent with our findings 
in Order No. 676-E and do not appear inconsistent with any Commission 
directives or findings in other orders. Accordingly, we propose to 
incorporate by reference, into the Commission's regulations at 18 CFR 
38.1, NAESB's revisions to five standards to extend the deadline by 
which a transmission provider must perform its biennial reassessment of 
the availability on its system of conditional firm service, as set 
forth in the WEQ Version 003.1 Business Practice Standards.
7. Industry-Wide Mechanism for Consistent Posting of AFC-Related Data
    34. In Order No. 890-A, the Commission explained that ``[t]o the 
extent MidAmerican or its customers find it beneficial also to post 
AFC, MidAmerican is free to post both ATC and AFC values.'' \34\ In the 
WEQ Version 003.1 Business Practice Standards, NAESB includes revisions 
to provide an industry-wide mechanism for posting of AFC-related data. 
NAESB adds three new data elements to the list of valid data element 
values for SYSTEM_ATTRIBUTE and SYSTEM_ELEMENT_TYPE in WEQ-003 OASIS 
Data Dictionary and to the system data OASIS template in WEQ-013 OASIS

[[Page 49585]]

Implementation Guide Business Practice Standards.
---------------------------------------------------------------------------

    \34\ Order No. 890-A, FERC Stats. & Regs. ] 31,261 at P 51.
---------------------------------------------------------------------------

    35. NAESB's revised standards appear consistent with our findings 
in Order No. 890-A and do not appear inconsistent with any Commission 
directives or findings in other orders. Accordingly, we propose to 
incorporate by reference, into the Commission's regulations at 18 CFR 
38.1, NAESB's revisions to the data elements in the OASIS Data 
Dictionary and to the data OASIS Template in Standard WEQ-013 to 
provide an industry-wide mechanism for posting of AFC-related data, as 
set forth in the WEQ Version 003.1 Business Practice Standards.
8. Use of DUNS Numbers
    36. In Order No. 768, the Commission eliminated the requirement to 
use DUNS numbers \35\ in Electronic Quarterly Report filings and stated 
that ``DUNS numbers have proven to be imprecise identification systems, 
as entities may have multiple DUNS numbers, only one DUNS number, or no 
DUNS number at all.'' \36\ NAESB has adopted revisions to Standard WEQ-
001-3.1 to eliminate the use of a DUNS number to identify an 
organization in OASIS postings. For consistency, NAESB also adopted 
changes or modifications to the Standard WEQ-000 Abbreviations, 
Acronyms, and Definition of Terms Business Practice Standards, WEQ-001 
OASIS Business Practice Standards, WEQ-003 OASIS Data Dictionary 
Business Practice Standards, and WEQ-013 OASIS Implementation Guide 
Business Practice Standards.
---------------------------------------------------------------------------

    \35\ The Data Universal Numbering System, abbreviated as DUNS or 
D-U-N-S, is a proprietary system developed and regulated by Dun & 
Bradstreet that assigns a unique numeric identifier, referred to as 
a ``DUNS number'' to a single business entity.
    \36\ Electricity Market Transparency Provisions of Section 220 
of the Federal Power Act, Order No. 768, 77 FR 61896, FERC Stats. & 
Regs. ] 31,336, at P 171 (2012).
---------------------------------------------------------------------------

    37. NAESB's revised standards appear consistent with the 
Commission's findings in Order No. 768 and do not appear inconsistent 
with any Commission directives or findings in other orders. 
Accordingly, we propose to incorporate by reference, into the 
Commission's regulations at 18 CFR 38.1, NAESB's revisions to Standard 
WEQ-002-4.3.6.2.

B. Revised and New Standards Designed To Complement NERC Reliability 
Standards and Developments

1. NERC Compliance Registry
    38. The WEQ Version 003.1 standards include modifications to the 
WEQ-004 Coordinate Interchange Business Practice Standards to include 
in the EIR items eliminated by NERC, in Docket No. RR15-4-000, from the 
NERC Compliance Registry including the elimination of the LSE, the 
Purchase Selling Entity, and the Interchange Authority roles. This 
proposal was accepted by the Commission in orders issued on March 19, 
2015 \37\ and on October 15, 2015.\38\ Because the Commission has 
accepted the elimination of the LSE function from the NERC Compliance 
Registry, we propose to incorporate by reference, into the Commission's 
regulations at 18 CFR 38.1, the NAESB modifications of WEQ-004 
pertaining to Coordinate Interchange Business Practices.
---------------------------------------------------------------------------

    \37\ North American Electric Reliability Corporation, 150 FERC ] 
61,213 (2015).
    \38\ North American Electric Reliability Corporation, 153 FERC ] 
61,024, at P 20 (2015).
---------------------------------------------------------------------------

2. Electric Industry Registry Standards
    39. On November 13, 2012, the NAESB EIR replaced the NERC TSIN as 
the industry registry, a tool previously used by wholesale electric 
markets to help them develop e-Tags for electronic scheduling. Thus, 
the NAESB EIR is now the tool the industry uses to support OASIS users 
in the electronic scheduling of transactions by acting as the central 
repository for information used by the wholesale electric industry in 
the creation of e-Tags. The WEQ-004 Coordinate Interchange Business 
Practice Standards and e-Tag Functional Specifications and Schema 
provide the commercial framework for e-Tagging. The new WEQ-022 EIR 
Business Practice Standards establish business practices for the NAESB 
EIR and provide guidance for registry users.
    40. NAESB's revised Standard WEQ-004 appears reasonable and does 
not appear inconsistent with any Commission directives or findings in 
other orders. Accordingly, we propose to incorporate by reference, into 
the Commission's regulations at 18 CFR 38.1, NAESB's revised Standard 
WEQ-004 as set forth in the WEQ Version 003.1 Business Practice 
Standards.
3. WEQ-023 Modeling Business Practice Standards
    41. WEQ's Version 003.1 Business Practice Standards includes a new 
suite of standards, the WEQ-023 Modeling Business Practice Standards, 
which address technical issues affecting the calculation of ATC for 
wholesale electric transmission services. NAESB developed these 
Modeling standards after NERC proposed to retire the bulk of its MOD A 
Reliability Standards, which address ATC calculation, and NERC 
requested that NAESB consider developing replacement Business Practice 
Standards for requirements that NERC identified as being potentially 
relevant for commercial purposes.\39\ WEQ-023 includes two new 
requirements not previously included in the NERC Reliability Standards 
related to contract path management. These two standards, WEQ-023-1.4 
and WEQ-023-1.4.1, limit the amount of firm transmission service across 
a path between balancing authorities to the contract path limit for 
that given path.
---------------------------------------------------------------------------

    \39\ NERC's proposal is currently pending before the Commission 
in the rulemaking proceeding in Docket No. RM14-7-000, see supra 
n.7.
---------------------------------------------------------------------------

    42. The Commission is considering NERC's proposed retirement of its 
ATC-related Reliability Standards in Docket No. RM14-7-000. In 
addition, the Commission has established a proceeding in Docket No. 
AD15-5-000 to consider proposed changes to the calculation of ATC, and 
has conducted a technical conference and received comments regarding 
such changes.\40\ As a result, we are not proposing to incorporate by 
reference the WEQ-023 Modeling Business Practice Standards in this 
NOPR, but will consider these standards as part of the overall inquiry 
into ATC calculation.
---------------------------------------------------------------------------

    \40\ See, e.g., the December 18, 2014 status report filed by 
NAESB in Docket Nos. RM05-5-000 and RM14-7-000, and the Commission's 
April 21, 2015 workshop, Available Transfer Capability Standards for 
Wholesale Electric Transmission Services, Docket No. RM15-5-000.
---------------------------------------------------------------------------

C. Revisions to WEQ Business Practice Standards Not Requested by 
Commission or Developed To Comply With a Commission Directive

    43. In addition to the standards revisions that NAESB made to 
comply with various Commission directives and requests, NAESB also 
developed and adopted five revisions to the Business Practice Standards 
at its own initiative. These revisions: (1) Introduce a requirement for 
resellers to post off-OASIS resale transactions on the OASIS in the 
``accepted'' status to provide the assignee of the resale the 
opportunity to confirm the transaction on the OASIS; (2) allow for the 
unmasking of the source and sink of a request for transmission service, 
once that request is moved to any final state; (3) modify the 
Commission's existing non-mandatory guidance on Smart Grid standards; 
(4) modify the WEQ Abbreviations, Acronyms, and Definition of Terms in 
Standard WEQ-000 to maintain consistency between the defined terms used 
in the NAESB standards, including revisions to the

[[Page 49586]]

terms ``Demand Reduction Value'' and ``Energy Efficiency'' to mirror 
definitions proposed by the Retail Market Quadrant and prevent industry 
confusion; and (5) modify the Commission's PKI-related standards. We 
will now separately discuss each of these revisions.
1. Proper Method To Post Off-OASIS Resale Transactions
    44. NAESB's WEQ Version 003.1 Business Practice Standards include a 
revision to the WEQ-013 OASIS Implementation Guide Business Practice 
Standards to allow off-OASIS resale transactions to be posted directly 
to the OASIS under an ``accepted'' status. Prior to the modification to 
WEQ-013-2.6.7.2, these transactions were posted only as confirmed 
transactions. NAESB has also adopted a revision to the WEQ-001 OASIS 
Business Practice Standards (WEQ-013-2.6.7.2) as a conforming change 
requiring a service agreement between an assignee and a transmission 
provider to be executed once the assignee has confirmed the resale 
transaction on the OASIS.
    45. NAESB's revised standards on this subject appear reasonable and 
do not appear inconsistent with any directives or findings in any 
Commission orders. Accordingly, we propose to incorporate by reference, 
into the Commission's regulations at 18 CFR 38.1, NAESB's revisions to 
Standard WEQ-013-2.6.7.2 and to the WEQ-013 OASIS Implementation Guide 
Standards.
2. Unmasking of Final State Source and Sink Requests
    46. NAESB's WEQ Version 003.1 Business Practice Standards modify 
Standard WEQ-002-4.3.6.2 to unmask the source and sink for a request 
for transmission service for all instances where the request for 
transmission service is moved to any final state. Prior to this 
modification, masking of the source and sink of a request for 
transmission service was permitted until the status of that request was 
confirmed.
    47. NAESB's revised standards appear reasonable and do not appear 
inconsistent with any directives or findings in any Commission order. 
Accordingly, we propose to incorporate by reference, into the 
Commission's regulations at 18 CFR 38.1, NAESB's revisions to Standard 
WEQ-002-4.3.6.2.
3. Modifications to Smart Grid Standards
    48. In Order 676-H, the Commission recognized the values of the 
Smart Grid standards and encouraged ``further developments in 
interoperability, technological innovation and standardization in this 
area.'' In Order No. 676-H, the Commission adopted in its regulations 
as non-mandatory guidance five Smart Grid related standards: (1) WEQ-
016 Specifications for Common Electricity Product and Pricing 
Definition Business Practice Standards; (2) WEQ-017 Specifications for 
Common Schedule Communication Mechanism for Energy Transactions; (3) 
WEQ-018 Specifications for Wholesale Standard Demand Response Signals 
Business Practice Standards; (4) WEQ-019 Customer Energy Usage 
Information Communication Business Practice Standards; and (5) WEQ-020 
Smart Grid Standards Data Elements Table Business Practice Standards. 
This guidance is published in the Federal Register at 18 CFR 2.27.
    49. In its Version 003.1 Business Practice Standards, NAESB has 
modified the Standard WEQ-019 Customer Energy Usage Information 
Communication Business Practice Standards. NAESB made this modification 
so that the revised standard will operate in harmony with other smart 
grid standards, including the Smart Energy Profile 2.0, the 
International Electrotechnical Commission Information Model, the NAESB 
REQ.21 Energy Service Providers Interface, and standards developed by 
the American Society of Heating, Refrigerating, and Air-Conditioning 
Engineers.
    50. Standard WEQ-019 provides for energy usage information and this 
revision allows consumers access to their energy usage information. 
These standards will not only be used by the wholesale electric 
industry, but also are important initiatives for use in ongoing utility 
programs for consumer data access. We, therefore, propose to revise our 
non-mandatory guidance that we listed in 18 CFR 2.27(d) to reference 
NAESB's updated Standard WEQ-019 as set out in the Version 003.1 
package of WEQ Business Practice Standards, replacing the existing 
reference in 18 CFR 2.27(d) to Standard WEQ-019 as set out in the 
Version 003 WEQ Business Practice Standards.
4. Modification to Standards on Abbreviations, Acronyms and Definitions 
of Terms
    51. Also included in Version 003.1 is a modification to WEQ 
Abbreviations, Acronyms, and Definition of Terms in Standard WEQ-000 to 
maintain consistency between the defined terms used in the NAESB 
standards, and modified the terms ``Demand Reduction Value'' and 
``Energy Efficiency'' to mirror definitions proposed by the Retail 
Market Quadrant and prevent industry confusion.
    52. NAESB's revised standards appear reasonable and do not appear 
inconsistent with any directives or findings in any Commission orders. 
Accordingly, we propose to incorporate by reference, into the 
Commission's regulations at 18 CFR 38.1, NAESB's revisions to Standard 
WEQ-000.
5. Public Key Infrastructure-Related Standards
    53. NAESB includes three modifications to support the WEQ-012 PKI 
Business Practice Standards previously incorporated by reference by the 
Commission in Order No. 676-H.\41\ The three PKI-related modifications 
made in the Version 003.1 Standards were to the WEQ-012 PKI Business 
Practice Standards, the WEQ-002 OASIS Standards and Communication 
Protocols Business Practice Standards, and the WEQ-004 Coordinate 
Interchange Business Practice Standards. NAESB modified WEQ-012 to 
accommodate technology changes and security advances as well as to 
remove standards specifying criteria a certificate authority must meet. 
NAESB moved the standards specifying criteria that must be met out of 
the Version 003.1 Business Practice Standards and into a second 
document that outlines the prerequisites a certificate authority must 
meet to become a NAESB Certification Authority.\42\
---------------------------------------------------------------------------

    \41\ These three modifications were not included in the Version 
003 filing NAESB made on September 18, 2012 but rather were filed 
separately by NAESB on January 29, 2013 following the conclusion of 
standards development. See Submittal of Modifications to the NAESB 
Public Key Infrastructure Standards and Other Standards to support 
the Public Key Infrastructure, Docket Nos. RM05-5-000 and RM05-5-
022, January 29, 2013.
    \42\ The specifications document was created in recognition that 
certificate authorities may not be subject to the Commission's 
jurisdictional authority under the Federal Power Act and that 
specification requirements can be modified through an accelerated 
process versus standards development.
---------------------------------------------------------------------------

    54. NAESB modified five standards and added three standards WEQ-
002, which require the use of a certificate issued by a NAESB 
Certification Authority to access an OASIS site and include 
requirements related to support the implementation of PKI on OASIS 
sites as well as revisions to reflect the transmission of the registry 
from the NERC TSI to the NAESB EIR. NAESB includes one new standard, 
WEQ-004-2.3, which requires all e-Tagging communication to be secured 
by certifications issued by a NAESB Certification Authority. NAESB also 
includes modifications to WEQ-000 for consistency purposes.

[[Page 49587]]

    55. In Order No. 676-H, the Commission incorporated by reference 
the WEQ-012 PKI Business Practice Standards. In Version 003.1, NAESB 
has filed three modifications to support these standards, requesting 
that the Commission also incorporate by reference these modifications. 
We propose to incorporate these revised standards by reference into the 
Commission's regulations. These revised standards will require public 
utilities to conduct transactions securely when using the internet and 
will eliminate confusion over which transactions involving public 
utilities must follow the approved PKI procedures to secure their 
transactions. The revisions support the NAESB Authorized Certification 
Authority (ACA) Certification Program and account for technological 
advances following the original adoption of the standards by NAESB.\43\
---------------------------------------------------------------------------

    \43\ We note the NAESB ACA Certification Program is solely a 
service offered by NAESB, and is not include in WEQ-012.
---------------------------------------------------------------------------

D. Implementation

    56. Consistent with the policy that we introduced in Order No. 676-
H,\44\ we propose upon issuance of a final rule, to establish a 
specific date by which all public utilities must file compliance 
filings revising their tariffs to acknowledge their responsibility to 
comply with the revised standards. In Order No. 676-H, we permitted 
public utilities that wish to incorporate the complete set of NAESB 
standards into their tariffs without modification to avoid having to 
make future compliance filings by specifying in their compliance filing 
that they are incorporating into their tariff all of the standards 
incorporated by reference by the Commission as specified in Part 38 of 
the Commission's Rules of Practice and Procedure as updated and 
revised. Those public utilities that followed this approach after the 
issuance of Order No. 676-H will not need to make a compliance filing 
revising their tariff after issuance of a final rule in this proceeding 
as long as they continue to incorporate all of the standards without 
modification. Public utilities that have not availed themselves of this 
option in complying with Order No. 676-H would be free to do so in 
complying with a final rule in this proceeding.
---------------------------------------------------------------------------

    \44\ Order No. 676-H, FERC Stats. & Regs. ] 31,359 at P 71.
---------------------------------------------------------------------------

III. Notice of Use of Voluntary Consensus Standards

    57. The NAESB WEQ Version 003.1 Business Practice Standards were 
adopted by NAESB under NAESB's consensus procedures.\45\ As the 
Commission found in Order No. 676, adoption of consensus standards is 
appropriate because the consensus process helps ensure the 
reasonableness of the standards by requiring that the standards draw 
support from a broad spectrum of all segments of the industry. 
Moreover, since the industry itself has to conduct business under these 
standards, the Commission's regulations should reflect those standards 
that have the widest possible support. In section 12(d) of the National 
Technology Transfer and Advancement Act of 1995, Congress affirmatively 
requires federal agencies to use technical standards developed by 
voluntary consensus standards organizations, like NAESB, as a means to 
carry out policy objectives or activities unless use of such standards 
would be inconsistent with applicable law or otherwise impractical.\46\
---------------------------------------------------------------------------

    \45\ Under this process, to be approved a standard must receive 
a super-majority vote of 67 percent of the members of the WEQ's 
Executive Committee with support from at least 40 percent from each 
of the five industry segments--transmission, generation, marketer/
brokers, distribution/load serving entities, and end users. For 
final approval, 67 percent of the WEQ's general membership must 
ratify the standards.
    \46\ Public Law 104-113, 12(d), 110 Stat. 775 (1996), 15 U.S.C. 
272 note (1997).
---------------------------------------------------------------------------

    58. Office of Management and Budget Circular A-119 (section 11) 
(February 10, 1998) provides that Federal Agencies should publish a 
request for comment in a NOPR when the agency is seeking to issue or 
revise a regulation proposing to adopt a voluntary consensus standard 
or a government-unique standard. In this NOPR, the Commission is 
proposing to incorporate by reference voluntary consensus standards 
developed by the WEQ of NAESB.

IV. Incorporation by Reference

    59. The Office of the Federal Register requires agencies 
incorporating material by reference in final rules to discuss, in the 
preamble of the final rule, the ways that the materials it incorporates 
by reference are reasonably available to interested parties and how 
interested parties can obtain the materials.\47\ The regulations also 
require agencies to summarize, in the preamble of the final rule, the 
material it incorporates by reference. The NAESB standards we are 
proposing to incorporate by reference in this Final Rule can be 
summarized as follows:
---------------------------------------------------------------------------

    \47\ 1 CFR 51.5. See Incorporation by Reference, 79 FR 66267 
(Nov. 7, 2014).
---------------------------------------------------------------------------

     Revisions to OASIS Standards. The Version 003.1 standards 
include revisions to six OASIS-related standards made to conform to 
directives and guidance provided by the Commission in Order Nos. 676-E, 
676-H, and 890. In addition, NAESB modified WEQ-001 and WEQ-013 to 
require resellers to enter off-OASIS resale transactions into OASIS 
sites in the ``accepted'' status to provide the assignee of the resale 
the opportunity to confirm the transaction on the OASIS and revised 
WEQ-002-4.3.6.2 to allow for the unmasking of the source and sink of a 
request for transmission when that request is moved to any final state. 
Finally, NAESB modified WEQ-001, WEQ-003, and WEQ-013 to be consistent 
with the Commission's treatment of Data Universal Numbering System 
(DUNS) numbers.
     Revisions to NERC-Related Standards. NAESB modified 
existing standards and developed new standards based on developments 
involving NERC. In addition, NAESB has adopted revisions to NAESB 
standards that need to match up with NERC's Interchange Scheduling and 
Coordination (INT) Reliability Standards. The Commission is proposing 
to incorporate by reference the WEQ-022 standards and the standards 
relating to NERC's INT standards.\48\
---------------------------------------------------------------------------

    \48\ As discussed above, NAESB has also adopted modifications to 
NERC-related standards, such as WEQ-023, that we do not propose in 
this NOPR to incorporate by reference.
---------------------------------------------------------------------------

     Standards Development. NAESB also modified four additional 
standards in the course of normal standards development. In response to 
Order No. 764, NAESB modified WEQ-004 to provide for the scheduling of 
interchange in 15-minute intervals and modified WEQ-019 to ensure 
consistency between WEQ Business Practice Standards and other standards 
organizations' standards. Additionally, NAESB modified WEQ-000 to 
harmonize definitions with NAESB Retail Market Quadrant efforts.
     PKI Modifications. The standards include additional PKI 
modifications to WEQ-002, WEQ-004, and WEQ-012 to support the NAESB 
Authorized Certification Authority (Certification Authority) 
Certification Program and to account for technological advances.
     Minor Corrections. Under its process to make necessary 
minor corrections to its standards, when needed, the WEQ Version 003.1 
Business Practice Standards include seven new minor corrections made by 
NAESB.
    60. Our regulations provide that copies of the NAESB standards 
incorporated by reference may be obtained from the North American

[[Page 49588]]

Energy Standards Board, 801 Travis Street, Suite 1675, Houston, TX 
77002, Phone: (713) 356-0060. NAESB's Web site is located at http://www.naesb.org/ org/. Copies of the standards may be inspected at the 
Federal Energy Regulatory Commission, Public Reference and Files 
Maintenance Branch, 888 First Street NE., Washington, DC 20426, Phone: 
(202) 502-8371, http://www.ferc.gov.\49\
---------------------------------------------------------------------------

    \49\ 18 CFR 284.12.
---------------------------------------------------------------------------

    61. NAESB is a private consensus standards developer that develops 
voluntary wholesale and retail standards related to the energy 
industry. The procedures used by NAESB make its standards reasonably 
available to those affected by the Commission regulations, which 
generally is comprised of entities that have the means to acquire the 
information they need to effectively participate in Commission 
proceedings.\50\ NAESB provides a free electronic read-only version of 
the standards for a three business day period or, in the case of a 
regulatory comment period, through the end of the comment period.\51\ 
Participants can join NAESB, for an annual membership cost of $7,000, 
which entitles them to full participation in NAESB and enables them to 
obtain these standards at no additional cost.\52\ Non-members may 
obtain a complete set of Standards Manuals, Booklets, and Contracts on 
CD for $2,000 and the Individual Standards Manual or Booklets for each 
standard by email for $250 per manual or booklet.\53\ In addition, 
NAESB considers requests for waivers of the charges on a case by case 
basis based on need.
---------------------------------------------------------------------------

    \50\ As a private, consensus standards developer, NAESB needs 
the funds obtained from its membership fees and sales of its 
standards to finance the organization. The parties affected by these 
Commission regulations generally are highly sophisticated and have 
the means to acquire the information they need to effectively 
participate in Commission proceedings.
    \51\ Procedures for non-members to evaluate work products before 
purchasing are available at https://www.naesb.org/misc/NAESB_Nonmember_Evaluation.pdf. See Incorporation by Reference, 79 
FR at 66271, n.51 & 53 (Nov. 7, 2014) (citing to NAESB's procedure 
of providing ``no-cost, no-print electronic access,'' NAESB Comment 
at 1, http://www.regulations.gov/#!documentDetail;D=OFR-2013-0001-
0023).
    \52\ North American Energy Standards Board Membership 
Application, https://www.naesb.org/pdf4/naesbapp.pdf.
    \53\ NAESB Materials Order Form, https://www.naesb.org//pdf/ordrform.pdf.
---------------------------------------------------------------------------

V. Information Collection Statement

    62. The following collection of information contained in this 
proposed rule is subject to review by the Office of Management and 
Budget (OMB) under section 3507(d) of the Paperwork Reduction Act of 
1995, 44 U.S.C. 3507(d).\54\ OMB's regulations require approval of 
certain information collection requirements imposed by agency 
rules.\55\ Upon approval of a collection(s) of information, OMB will 
assign an OMB control number and an expiration date. Respondents 
subject to the filing requirements of this rule will not be penalized 
for failing to respond to these collections of information unless the 
collections of information display a valid OMB control number.
---------------------------------------------------------------------------

    \54\ 44 U.S.C. 3507(d).
    \55\ 5 CFR 1320.11.
---------------------------------------------------------------------------

    63. The Commission solicits comments on the Commission's need for 
this information, whether the information will have practical utility, 
the accuracy of the provided burden estimates, ways to enhance the 
quality, utility, and clarity of the information to be collected, and 
any suggested methods for minimizing respondents' burden, including the 
use of automated information techniques.
    64. The following burden estimate is based on the projected costs 
for the industry to implement the new and revised business practice 
standards adopted by NAESB and proposed to be incorporated by reference 
in this NOPR.\56\
---------------------------------------------------------------------------

    \56\ Commission staff estimates that industry is similarly 
situated in terms of hourly cost (wages plus benefits). Based on the 
Commission average cost (wages plus benefits) for 2016, $74.50/hour 
is used.

                                                             Revisions in NOPR in RM05-5-025
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                          Annual number
                                            Number of     of responses    Total number    Average burden (hours) & cost     Total annual burden hours &
                                           respondents   per respondent   of responses           ($) per response              total annual cost ($)
                                                    (1)             (2)     (1)*(2)=(3)  (4)............................  (3)*(4)=(5)
--------------------------------------------------------------------------------------------------------------------------------------------------------
FERC-516E 57 58 (tariff filing)........             132               1             132  6..............................  792 hours.
                                                                                         $447...........................  $59,004.
FERC-717 (compliance with standards) 59             132               1             132  30 \60\........................  3,960 hours.
                                                                                         $2,235.........................  $295,020.
                                        ----------------------------------------------------------------------------------------------------------------
    Total..............................  ..............  ..............             264  36 hours.......................  4,752 hours.
                                                                                         $2,682.........................  $354,024.
--------------------------------------------------------------------------------------------------------------------------------------------------------

Costs To Comply With Paperwork Requirements

    The estimated annual costs are as follows:
---------------------------------------------------------------------------

    \57\ This burden category is intended for ``FERC-516,'' the 
Commission's identifier that corresponds to OMB Control No. 1902-
0096 (Electric Rate Schedules and Tariff Filings). However, another 
unrelated item is pending OMB review using this OMB Control No. and 
only one item per OMB Control No. may be pending at a time. 
Therefore, to ensure timely submission, Commission staff is using 
FERC-516E (OMB Control No. TBD), a temporary collection number.
    \58\ These information collection requirements are one-time 
burden estimates. After implementation in Year 1, the revision 
proposed in this NOPR would be complete.
    \59\ ``FERC-717'' is the Commission's identifier that 
corresponds to OMB control no. 1902-0173 that identifies the 
information collection associated with Standards for Business 
Practices and Communication Protocols for Public Utilities.
    \60\ The 30-hour estimate was developed in Docket No. RM05-5-
013, when the Commission prepared its estimate of the scope of work 
involved in transitioning to the NAESB Version 002.1 Business 
Practice Standards. See Order No. 676-E, FERC Stats. & Regs. ] 
31,299 at P 134. We have retained the same estimate here, because 
the scope of the tasks involved in the transition to Version 003.1 
of the Business Practice Standards is very similar to that for the 
transition to the Version 003 Standards.
---------------------------------------------------------------------------

     FERC-516E: 132 entities * 1 response/entity * (6 hours/
response * $74.50/hour) = $57,024.
     FERC-717: 132 entities * 1 response/entity * (30 hours/
response * $74.50/hour) = $285,120.
    Titles: Electric Rate Schedule Filing (FERC-516E); Open Access Same 
Time Information System and Standards for Business Practices and 
Communication Protocols for Public Utilities (FERC-717).

[[Page 49589]]

    Action: Proposed collection.
    OMB Control Nos.: TBD (FERC-516E); 1902-0173 (FERC-717).
    Respondents: Business or other for profit (Public Utilities--
Generally not applicable to small businesses).\61\
---------------------------------------------------------------------------

    \61\ See infra PP 72-73.
---------------------------------------------------------------------------

    Frequency of Responses: One-time implementation (business 
procedures, capital/start-up).
    65. Necessity of the Information: This proposed rule, if 
implemented would upgrade the Commission's current business practice 
and communication standards and protocols modifications to support 
compliance with requirements established by the Commission in Order 
Nos. 890, 890-A, 890-B, and 890-C, as well as modifications to the 
OASIS-related standards to support Order Nos. 676, 676-A, 676-E, and 
717.
    66. Internal Review: The Commission has reviewed the revised 
business practice standards and has made a preliminary determination 
that the proposed revisions that we propose here to incorporate by 
reference are both necessary and useful. In addition, the Commission 
has assured itself, by means of its internal review, that there is 
specific, objective support for the burden estimate associated with the 
information requirements.
    67. Interested persons may obtain information on the reporting 
requirements by contacting the Federal Energy Regulatory Commission, 
Office of the Executive Director, 888 First Street NE., Washington, DC 
20426 [Attn: Ellen Brown, email: [email protected], phone: (202) 
502-8663, fax: (202) 273-0873].
    68. Comments concerning the information collections proposed in 
this NOPR and the associated burden estimates should be sent to the 
Commission at this docket and by email to the Office of Management and 
Budget, Office of Information and Regulatory Affairs [Attention: Desk 
Officer for the Federal Energy Regulatory Commission]. For security 
reasons, comments should be sent by email to OMB at the following email 
address: [email protected]. Please reference the docket 
number of this Notice of Proposed Rulemaking (Docket No. RM05-5-25) and 
OMB Control Nos. TBD (FERC-516E) and 1902-0173 (FERC-717) in your 
submission.

VI. Environmental Analysis

    69. The Commission is required to prepare an Environmental 
Assessment or an Environmental Impact Statement for any action that may 
have a significant adverse effect on the human environment.\62\ The 
Commission has categorically excluded certain actions from these 
requirements as not having a significant effect on the human 
environment.\63\ The actions proposed here fall within categorical 
exclusions in the Commission's regulations for rules that are 
clarifying, corrective, or procedural, for information gathering, 
analysis, and dissemination, and for sales, exchange, and 
transportation of electric power that requires no construction of 
facilities.\64\ Therefore, an environmental assessment is unnecessary 
and has not been prepared in this NOPR.
---------------------------------------------------------------------------

    \62\ Regulations Implementing the National Environmental Policy 
Act of 1969, Order No. 486, 52 FR 47897 (Dec. 17, 1987), FERC Stats. 
& Regs., Regulations Preambles 1986-1990 ] 30,783 (1987).
    \63\ 18 CFR 380.4.
    \64\ See 18 CFR 380.4(a)(2)(ii), 380.4(a)(5), 380.4(a)(27).
---------------------------------------------------------------------------

VII. Regulatory Flexibility Act Certification

    70. The Regulatory Flexibility Act of 1980 (RFA) \65\ generally 
requires a description and analysis of proposed rules that will have 
significant economic impact on a substantial number of small entities. 
The RFA does not mandate any particular outcome in a rulemaking. It 
only requires consideration of alternatives that are less burdensome to 
small entities and an agency explanation of why alternatives were 
rejected.
---------------------------------------------------------------------------

    \65\ 5 U.S.C. 601-612.
---------------------------------------------------------------------------

    71. The Small Business Administration (SBA) revised its size 
standards (effective January 22, 2014) for electric utilities from a 
standard based on megawatt hours to a standard based on the number of 
employees, including affiliates. Under SBA's standards, some 
transmission owners will fall under the following category and 
associated size threshold: Electric bulk power transmission and 
control, at 500 employees.\66\
---------------------------------------------------------------------------

    \66\ 13 CFR 121.201, Sector 22 (Utilities), NAICS code 221121 
(Electric Bulk Power Transmission and Control).
---------------------------------------------------------------------------

    72. The Commission estimates that 5 of the 132 respondents are 
small. The Commission estimates that the impact on these entities is 
consistent with the paperwork burden of $2,682 per entity used 
above.\67\ The Commission does not consider $2,682 to be a significant 
economic impact.
---------------------------------------------------------------------------

    \67\ 36 hours at $74.50/hour = $2,682.
---------------------------------------------------------------------------

    73. Based on the above, the Commission certifies that 
implementation of the proposed Business Practice Standards will not 
have a significant impact on a substantial number of small entities. 
Accordingly, no initial regulatory flexibility analysis is required.

VIII. Comment Procedures

    74. The Commission invites interested persons to submit comments on 
the matters and issues proposed in this notice to be adopted, including 
any related matters or alternative proposals that commenters may wish 
to discuss. Comments are due September 26, 2016. Comments must refer to 
Docket No. RM05-5-025 and must include the commenter's name, the 
organization they represent, if applicable, and their address in their 
comments.
    75. The Commission encourages comments to be filed electronically 
via the eFiling link on the Commission's Web site at http://www.ferc.gov. The Commission accepts most standard word processing 
formats. Documents created electronically using word processing 
software should be filed in native applications or print-to-PDF format 
and not in a scanned format. Commenters filing electronically do not 
need to make a paper filing.
    76. Commenters that are not able to file comments electronically 
must send an original of their comments to: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    77. All comments will be placed in the Commission's public files 
and may be viewed, printed, or downloaded remotely as described in the 
Document Availability section below. Commenters on this proposal are 
not required to serve copies of their comments on other commenters.

IX. Document Availability

    78. In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
Internet through the Commission's Home Page (http://www.ferc.gov) and 
in the Commission's Public Reference Room during normal business hours 
(8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE., Room 2A, 
Washington, DC 20426.
    79. From the Commission's Home Page on the Internet, this 
information is available on eLibrary. The full text of this document is 
available on eLibrary in PDF and Microsoft Word format for viewing, 
printing, and/or downloading. To access this document in eLibrary, type 
the docket number excluding the last three digits of this document in 
the docket number field.
    80. User assistance is available for eLibrary and the Commission's 
Web site during normal business hours from the

[[Page 49590]]

Commission's Online Support at (202) 502-6652 (toll free at 1-866-208-
3676) or email at [email protected], or the Public Reference 
Room at (202) 502-8371, TTY (202) 502-8659. Email the Public Reference 
Room at [email protected].

List of Subjects

18 CFR Part 2

    Electric utilities, Guidance and policy statements.

18 CFR Part 38

    Conflict of interests, Electric power plants, Electric utilities, 
Incorporation by reference, Reporting and recordkeeping requirements.

    By direction of the Commission.

    Dated: July 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
    In consideration of the foregoing, the Commission proposes to amend 
parts 2 and 38, chapter I, title 18, Code of Federal Regulations, as 
follows:

PART 2--GENERAL POLICY AND INTERPRETATIONS

0
1. The authority citation for part 2 continues to read as follows:

    Authority: 5 U.S.C. 601; 15 U.S.C. 717-717z, 3301-3432, 16 
U.S.C. 792-828c, 2601-2645; 42 U.S.C. 4321-4370h, 7101-7352.

0
2. Amend Sec.  2.27 by revising paragraph (d) to read as follows:


Sec.  2.27  Availability of North American Energy Standards Board 
(NAESB) Smart Grid Standards as non-mandatory guidance.

* * * * *
    (d) WEQ-019, Customer Energy Usage Information Communication (WEQ 
Version 003.1, Sep. 30, 2015); and
* * * * *

PART 38--STANDARDS FOR PUBLIC UTILITY BUSINESS OPERATIONS AND 
COMMUNICATIONS

0
3. The authority citation for part 38 continues to read as follows:

    Authority: 16 U.S.C. 791-825r, 2601-2645; 31 U.S.C. 9701; 42 
U.S.C. 7101-7352.

0
4. Amend Sec.  38.1, by revising paragraph (b) to read as follows:


Sec.  38.1  Incorporation by reference of North American Energy 
Standards Board Wholesale Electric Quadrant standards.

* * * * *
    (b) The business practice and electronic communication standards 
the Commission incorporates by reference are as follows:
    (1) WEQ-000, Abbreviations, Acronyms, and Definition of Terms 
(Version 003.1, Sep., 30, 2015);
    (2) WEQ-001, Open Access Same-Time Information System (OASIS), 
OASIS Version 2.1 (WEQ Version 003.1, Sep. 30, 2015) with the exception 
of Standards 001-9.5, 001-10.5, 001-14.1.3, 001-15.1.2 and 001-
106.2.5);
    (3) WEQ-002, Open Access Same-Time Information System (OASIS) 
Business Practice Standards and Communication Protocols (S&CP), OASIS 
Version 2.1 (WEQ Version 003.1, Sep. 30, 2015);
    (4) WEQ-003, Open Access Same-Time Information System (OASIS) Data 
Dictionary Business Practice Standards, OASIS Version 2.1 (WEQ Version 
003.1, Sep. 30, 2015);
    (5) WEQ-004, Coordinate Interchange (WEQ Version 003.1, Sep. 30, 
2015);
    (6) WEQ-005, Area Control Error (ACE) Equation Special Cases (WEQ 
Version 003.1, Sep. 30, 2015);
    (7) WEQ-006, Manual Time Error Correction (WEQ Version 003, Sep. 
30, 2015);
    (8) WEQ-007, Inadvertent Interchange Payback (WEQ Version 003.1, 
Sep. 30, 2015);
    (9) WEQ-008, Transmission Loading Relief (TLR)--Eastern 
Interconnection (WEQ Version 003.1, Sep. 30, 2015);
    (10) WEQ-011, Gas/Electric Coordination (WEQ Version 003.1, Sep. 
30, 2015);
    (11) WEQ-012, Public Key Infrastructure (PKI) (WEQ Version 003.1, 
Sep. 30, 2015);
    (12) WEQ-013, Open Access Same-Time Information System (OASIS) 
Implementation Guide, OASIS Version 2.1 (WEQ Version 003.1, Sep. 30, 
2015);
    (13) WEQ-015, Measurement and Verification of Wholesale Electricity 
Demand Response (WEQ Version 003.1, Sep. 30, 2015);
    (14) WEQ-021, Measurement and Verification of Energy Efficiency 
Products (WEQ Version 003.1, Sep. 30, 2015).
    (15) WEQ-022, Electric Industry Registry Business Practice 
Standards (WEQ Version 003.1, Sep. 30, 2015); and
    (16) WEQ-023, Modeling Business Practice Standards (WEQ Version 
003.1, Sep. 30, 2015).

[FR Doc. 2016-17841 Filed 7-27-16; 8:45 am]
BILLING CODE 6717-01-P



                                               49580                             Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules

                                               DEPARTMENT OF ENERGY                                                        American Energy Standards Board                                             Regulatory Commission, Secretary of the
                                                                                                                           (NAESB). These standards mainly                                             Commission, 888 First Street NE.,
                                               Federal Energy Regulatory                                                   modify and update NAESB’s WEQ                                               Washington, DC 20426.
                                               Commission                                                                  Version 003 Standards. The                                                    Instructions: For detailed instructions
                                                                                                                           Commission also proposes to revise its                                      on submitting comments and additional
                                               18 CFR Parts 2 and 38                                                       regulations to incorporate NAESB’s                                          information on the rulemaking process,
                                               [Docket No. RM05–5–025]                                                     updated Smart Grid Business Practice                                        see the Comment Procedures Section of
                                                                                                                           Standards in the Commission’s General                                       this document.
                                               Standards for Business Practices and                                        Policy and Interpretations.                                                 FOR FURTHER INFORMATION CONTACT:
                                               Communication Protocols for Public                                          DATES: Comments are due September                                           Michael P. Lee (technical issues), Office
                                               Utilities                                                                   26, 2016.                                                                     of Energy Policy and Innovation,
                                               AGENCY: Federal Energy Regulatory                                           ADDRESSES: Comments, identified by                                            Federal Energy Regulatory
                                               Commission, Department of Energy.                                           Docket No. RM05–5–025, may be filed                                           Commission, 888 First Street NE.,
                                               ACTION: Notice of proposed rulemaking.                                      in the following ways:                                                        Washington, DC 20426, (202) 502–
                                                                                                                             • Electronic Filing through http://                                         6548.
                                               SUMMARY:   The Federal Energy                                               www.ferc.gov. Documents created                                             Gary D. Cohen (legal issues), Office of
                                               Regulatory Commission (Commission)                                          electronically using word processing                                          the General Counsel, Federal Energy
                                               proposes to incorporate by reference the                                    software should be filed in native                                            Regulatory Commission, 888 First
                                               latest version (Version 003.1) of certain                                   applications or print-to-PDF format and                                       Street NE., Washington, DC 20426,
                                               Standards for Business Practices and                                        not in a scanned format.                                                      (202) 502–8321.
                                               Communication Protocols for Public                                            • Mail/Hand Delivery: Those unable
                                                                                                                                                                                                       SUPPLEMENTARY INFORMATION:
                                               Utilities adopted by the Wholesale                                          to file electronically may mail or hand-
                                               Electric Quadrant (WEQ) of the North                                        deliver comments to: Federal Energy                                         Table of Contents

                                                                                                                                                                                                                                                        Paragraph
                                                                                                                                                                                                                                                         numbers

                                               I. Background .......................................................................................................................................................................................             6
                                               II. Discussion .......................................................................................................................................................................................           17
                                                   A. Revisions to WEQ OASIS Business Practice Standards in Light of Commission Policies ........................................................                                                               18
                                                   1. Overview ......................................................................................................................................................................................           18
                                                   2. Redirects from Conditional Parent Reservations ........................................................................................................................                                   19
                                                   3. Requirement to Post ATC Narrative within One Day ..................................................................................................................                                       26
                                                   4. SAMTS Point-to-Point Treatment ................................................................................................................................................                           28
                                                   5. Clarification of Discretion of Transmission Providers to Deny Service Requests under Standard WEQ–001–106.2.5 ............                                                                                30
                                                   6. Modifications to Allow a Transmission Provider to Extend the Time to Perform its Biennial Reassessment ............................                                                                       32
                                                   7. Industry-Wide Mechanism for Consistent Posting of AFC-Related Data ....................................................................................                                                   34
                                                   8. Use of DUNS Numbers ...............................................................................................................................................................                       36
                                                   B. Revised and New Standards Designed to Complement NERC Reliability Standards and Developments ...............................                                                                              38
                                                   1. NERC Compliance Registry ........................................................................................................................................................                         38
                                                   2. Electric Industry Registry Standards ...........................................................................................................................................                          39
                                                   3. WEQ–023 Modeling Business Practice Standards .....................................................................................................................                                        41
                                                   C. Revisions to WEQ Business Practice Standards Not Requested by Commission or Developed to Comply with a Commis-
                                                     sion Directive ................................................................................................................................................................................            43
                                                   1. Proper Method to Post Off-OASIS Resale Transactions ............................................................................................................                                          44
                                                   2. Unmasking of Final State Source and Sink Requests ................................................................................................................                                        46
                                                   3. Modifications to Smart Grid Standards ........................................................................................................................................                            48
                                                   4. Modification to Standards on Abbreviations, Acronyms and Definitions of Terms .....................................................................                                                       51
                                                   5. Public Key Infrastructure-Related Standards ..............................................................................................................................                                53
                                                   D. Implementation ............................................................................................................................................................................               56
                                               III. Notice of Use of Voluntary Consensus Standards ........................................................................................................................                                     57
                                               IV. Incorporation By Reference ...........................................................................................................................................................                       59
                                               V. Information Collection Statement ....................................................................................................................................................                         62
                                               VI. Environmental Analysis ..................................................................................................................................................................                    69
                                               VII. Regulatory Flexibility Act Certification ..........................................................................................................................................                         70
                                               VIII. Comment Procedures ..................................................................................................................................................................                      74
                                               IX. Document Availability .....................................................................................................................................................................                  78



                                                 1. In this notice of proposed                                             the North American Energy Standards                                         not proposing in this NOPR to
                                               rulemaking (NOPR), the Federal Energy                                       Board (NAESB) and filed with the                                            incorporate by reference.
                                               Regulatory Commission (Commission)                                          Commission on October 26, 2015                                                2. These revised NAESB standards
                                               proposes to amend its regulations under                                     (October 26 Filing). We also propose to                                     update earlier versions of these
                                               the Federal Power Act 1 to incorporate                                      list informationally, as guidance,
Lhorne on DSK30JT082PROD with PROPOSALS




                                                                                                                                                                                                       standards that the Commission
                                               by reference the latest version of certain                                  NAESB’s updated Smart Grid Business                                         previously incorporated by reference
                                               Standards for Business Practices and                                        Practice Standards in Standard WEQ–                                         into its regulations at 18 CFR 38.1 in
                                               Communication Protocols for Public                                          019. In addition, as explained further
                                               Utilities (Version 003.1) adopted by the                                    below, there are several NAESB
                                               Wholesale Electric Quadrant (WEQ) of                                        standards included in the WEQ Version
                                                                                                                           003.1 package of standards that we are
                                                 1 16   U.S.C. 791a, et seq.



                                          VerDate Sep<11>2014         14:42 Jul 27, 2016        Jkt 238001       PO 00000        Frm 00025       Fmt 4702       Sfmt 4702       E:\FR\FM\28JYP1.SGM              28JYP1


                                                                                Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules                                                                  49581

                                               Order Nos. 676–E,2 676–H,3 764,4 and                                         NAESB proposals would establish: (1)                      to support and complement NERC’s
                                               890.5 In addition, NAESB developed                                           NAESB Electric Industry Registry (EIR)                    proposed retirement of its ‘‘MOD A’’
                                               two new suites of standards in                                               business practice standards that replace                  Reliability Standards.7
                                               coordination with the North American                                         the NERC Transmission System                                3. NAESB’s WEQ Version 003.1
                                               Electric Reliability Corporation (NERC)                                      Information Networks (TSIN) as the tool                   Business Practice Standards include
                                               (the Commission-certified ‘‘electric                                         to be used by wholesale electric markets
                                                                                                                                                                                      modifications to the following set of
                                               reliability organization’’ responsible for                                   to conduct electronic transactions via
                                                                                                                                                                                      existing standards: 8
                                               developing and enforcing mandatory                                           electronic tagging (e-Tags); and (2)
                                               Reliability Standards).6 These two                                           Modeling Business Practice Standards

                                                                                        WEQ                                                                                  Business practice standards

                                               000   ........................................................................................   Abbreviations, Acronyms, and Definition of Terms.
                                               001   ........................................................................................   Open Access Same-Time Information System (OASIS).
                                               002   ........................................................................................   OASIS Standards and Communication Protocols (S&CP).
                                               003   ........................................................................................   OASIS S&CP Data Dictionaries.
                                               004   ........................................................................................   Coordinate Interchange.
                                               006   ........................................................................................   Manual Time Error Corrections.
                                               012   ........................................................................................   Public Key Infrastructure (PKI).
                                               013   ........................................................................................   OASIS Implementation Guide.
                                               019   ........................................................................................   Customer Energy Usage Information Communication.



                                                 4. Additionally, the Version 003.1                                         of business practice standards and                           8. NAESB develops its standards
                                               standards include two new suites of                                          communication protocols for the                           under a consensus process so that the
                                               standards:                                                                   wholesale and retail natural gas and                      standards draw support from a wide
                                                                                                                            electricity industry sectors. Since 1995,                 range of industry members. NAESB’s
                                                WEQ                 Business practice standards                             NAESB and its predecessor, the GISB,                      procedures are designed to ensure that
                                                                                                                            have been accredited members of the                       all persons choosing to participate can
                                               022 ....      Electric Industry Registry (EIR).
                                                                                                                            American National Standards Institute                     have input into the development of a
                                               023 ....      Modeling.
                                                                                                                            (ANSI), complying with ANSI’s                             standard, regardless of whether they are
                                                 5. These NAESB standards, developed                                        requirements that its standards reflect a                 members of NAESB, and each standard
                                               through the NAESB standards                                                  consensus of the affected industries.10                   NAESB adopts is supported by a
                                               development process or the NAESB                                                                                                       consensus of the relevant industry
                                                                                                                               7. NAESB’s standards include                           segments. Standards that fail to gain
                                               minor correction process, build upon                                         business practices intended to
                                               the Version 003 WEQ Business Practice                                                                                                  consensus support are not adopted.
                                                                                                                            standardize and streamline the                            NAESB’s consistent practice has been to
                                               Standards that NAESB filed with the                                          transactional processes of the natural
                                               Commission on September 18, 2012 and                                                                                                   submit a report to the Commission after
                                                                                                                            gas and electric industries, as well as                   it has made revisions to existing
                                               that the Commission incorporated by                                          communication protocols and related
                                               reference into its regulations in Order                                                                                                business practice standards or has
                                                                                                                            standards designed to improve the                         developed and adopted new business
                                               No. 676–H, a final rule issued by the
                                                                                                                            efficiency of communication within                        practice standards. NAESB’s standards
                                               Commission on September 18, 2014.9
                                                                                                                            each industry. NAESB supports all three                   are voluntary standards, which become
                                               I. Background                                                                quadrants of the gas and electric                         mandatory for public utilities upon
                                                  6. NAESB is a non-profit standards                                        industries—wholesale gas, wholesale                       incorporation by reference by the
                                               development organization established in                                      electric, and retail markets quadrant.11                  Commission.
                                               late 2001 (as the successor to the Gas                                       All participants in the gas and electric                     9. In Order No. 676,12 the Commission
                                               Industry Standards Board (GISB), which                                       industries are eligible to join NAESB                     not only incorporated by reference into
                                               was established in 1994) and serves as                                       and participate in standards                              its regulations business practice
                                               an industry forum for the development                                        development.                                              standards and communication protocols
                                                 2 Standards for Business Practices and                                        7 In a February 19, 2014 petition, NERC proposed         9 See supra n.3.
                                               Communication Protocols for Public Utilities, Order                          to retire Reliability Standards MOD–001–1a, MOD–            10 Prior to the establishment of NAESB in 2001,
                                               No. 676–E, 74 FR 63288 (Dec. 3, 2009), FERC Stats.                           004–1, MOD–008–1, MOD–028–2, MOD–029–1a,                  the Commission’s development of business practice
                                               & Regs. ¶ 31,299 (2009).                                                     and MOD–030–2 and requested approval of new               standards for the wholesale electric industry was
                                                 3 Standards for Business Practices and                                     Reliability Standard MOD–001–2. Generally, the            aided by two ad hoc industry working groups
                                               Communication Protocols for Public Utilities, Order                          ‘‘MOD’’ series of NERC Reliability Standards              established during the rulemaking proceeding that
                                               No. 676–H, 79 FR 56939 (Sept. 24, 2014), FERC                                pertain to transmission system modeling. The              resulted in issuance of Order No. 889 and the
                                               Stats. & Regs. ¶ 31,359, at n.81 (2014), corrected,                          Commission issued a NOPR in Docket No. RM14–
                                                                                                                                                                                      creation of the OASIS, while GISB’s efforts involved
                                               149 FERC ¶ 61,014 (2014).                                                    7–000 that addressed NERC’s proposal, and the
                                                                                                                                                                                      the development of business practice standards for
                                                                                                                            matter is currently pending before the Commission.
                                                 4 Integration of Variable Energy Resources, Order                                                                                    the wholesale natural gas industry. Once formally
                                                                                                                            Modeling, Data, and Analysis Reliability Standards,
                                               No. 764, 77 FR 41,482 (July 13, 2012), FERC Stats.                           Notice of Proposed Rulemaking, 79 FR 36269 (June          established, NAESB took over the standards
                                               & Regs. ¶ 31,331 (2012).                                                     26, 2014), 147 FERC ¶ 61,208 (2014) (MOD NOPR).           development previously handled by GISB and by
Lhorne on DSK30JT082PROD with PROPOSALS




                                                 5 Preventing Undue Discrimination and
                                                                                                                               8 On October 26, 2015, NAESB filed a report with       the electric working groups.
                                               Preference in Transmission Service, Order No. 890,                                                                                       11 The retail gas quadrant and the retail electric
                                                                                                                            the Commission (previously referenced as the
                                               72 FR 12266 (Mar. 15, 2007), FERC Stats. & Regs.                             October 26 Filing) presenting all the modifications       quadrant were combined into the retail markets
                                               ¶ 31,241 (2007).                                                             it has made to the WEQ Version 003 Business               quadrant. NAESB continues to refer to these
                                                 6 NERC is the Commission-certified ‘‘electric                              Practice Standards since those standards were             working groups as ‘‘quadrants’’ even though there
                                               reliability organization’’ responsible for developing                        incorporated by reference by the Commission in            are now only three quadrants.
                                               and enforcing mandatory Reliability Standards. See                           2014 in Order No. 676–H, as well as two new suites          12 Standards for Business Practices and

                                               section 215 of the Federal Power Act, 16 U.S.C.                              of standards that it has developed, which are             Communication Protocols for Public Utilities, Order
                                               824o (2012).                                                                 further described below in P 12.                          No. 676, FERC Stats. & Regs. ¶ 31,216 (2006).



                                          VerDate Sep<11>2014         14:42 Jul 27, 2016         Jkt 238001       PO 00000        Frm 00026      Fmt 4702   Sfmt 4702   E:\FR\FM\28JYP1.SGM   28JYP1


                                               49582                    Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules

                                               for the wholesale electric industry, it                  WEQ–002–4.3.6.2 to allow for the                      standards modifications to WEQ
                                               also established a formal ongoing                        unmasking of the source and sink of a                 Version 003.1 that it made in the course
                                               process for reviewing and upgrading the                  request for transmission when that                    of normal standards development. In
                                               Commission’s OASIS standards and                         request is moved to any final state.                  Order No. 764, the Commission required
                                               other wholesale electric industry                           12. NAESB has adopted certain new                  transmission providers to provide for
                                               business practice standards. In later                    and revised WEQ Version 003.1                         the scheduling of interchange in 15-
                                               orders in this series, the Commission                    Business Practice Standards based on                  minute intervals. In response, NAESB
                                               incorporated by reference revisions to                   developments involving NERC. First,                   made two changes to the WEQ–004
                                               these standards.13                                       NAESB developed the WEQ–022                           Coordinate Interchange Business
                                                  10. The WEQ Version 003.1 Business                    Electric Industry Registry (EIR) Business             Practice Standards. NAESB also
                                               Practice Standards include six OASIS-                    Practice Standards to complement the                  modified WEQ–019 to ensure
                                               related standards 14 that NAESB                          transfer of registry functions from the               consistency between WEQ Business
                                               modified in response to directives and                   NERC TSIN to the NAESB EIR. The EIR                   Practice Standards and other standards
                                               guidance provided in Order Nos. 676–                     database serves as a central repository of            organizations’ standards. Additionally,
                                               E, 676–H, and 890. Specifically, in                      information required for commercial                   NAESB modified WEQ–000 to
                                               response to the Commission’s guidance                    interactions, including electronic                    harmonize definitions with NAESB
                                               in Order No. 676–E, NAESB modified                       transactions via e-Tags. Second, NAESB                Retail Market Quadrant efforts.
                                               its OASIS standards to explicitly permit                 developed the WEQ–023 Modeling                           15. In Order 676–H, the Commission
                                               a transmission provider to extend the                    Business Practice Standards in response               incorporated by reference WEQ
                                               performance of the biennial assessment.                  to a NERC petition to delete and retire               Business Practice Standards to support
                                               In response to the Commission’s                          the six ‘‘MOD A’’ Reliability Standards.              Public Key Infrastructure (PKI). The
                                               guidance in Order No. 676–H, NAESB                       As mentioned above, NERC filed a                      WEQ Version 003.1 Business Practice
                                               made four modifications to the OASIS                     petition with the Commission on                       Standards include additional PKI
                                               suite of standards regarding: (1) The                    February 10, 2014 proposing to retire                 modifications to WEQ–002, WEQ–004,
                                               treatment of redirects for transmission                  NERC’s six MOD A Reliability                          and WEQ–012 to support the NAESB
                                               service from conditional parent                          Standards and replace them with                       Authorized Certification Authority
                                               reservations; (2) the one-day                            Reliability Standard MOD–001–2,                       (Certification Authority) Certification
                                               requirement for the posting of Available                 which NERC states will focus                          Program and to account for
                                               Transfer Capability (ATC) Narratives; (3)                exclusively on the reliability aspects of             technological advances.
                                               the treatment of point-to-point                          ATC and AFC.15 On February 7, 2014,                      16. NAESB also has in place a process
                                               reservations under Service Across                        NERC submitted a request to NAESB                     to make necessary minor corrections to
                                               Multiple Transmission Systems                            (Standards Request 14002) 16 asking                   its standards, when needed. The WEQ
                                               (SAMTS); and (4) the clarification of the                NAESB to consider adopting standards                  Version 003.1 Business Practice
                                               requirements under which a                               that address the commercial and                       Standards include seven new minor
                                               transmission provider may deny a                         business aspects of the MOD standards                 corrections made by NAESB.19
                                               request to terminate service. To                         proposed for retirement. NAESB
                                               implement Commission guidance in                         subsequently developed the WEQ–023                    II. Discussion
                                               Order No. 890, NAESB modified                            Business Practice Standards to support                   17. As discussed below, with certain
                                               standards to allow for the consistent                    and complement the proposed                           enumerated exceptions, we propose to
                                               posting of Available Flowgate Capability                 retirement of the MOD A Reliability                   incorporate by reference (into the
                                               (AFC) related data on OASIS sites.                       Standards. The WEQ–023 Business                       Commission’s regulations at 18 CFR
                                                  11. In addition, as part of the                       Practice Standard specifies the                       38.1(b)) the NAESB WEQ Version 003.1
                                               standards development process, NAESB                     requirements for calculating ATC and                  Business Practice Standards.20 The
                                               made two additional revisions to the                     AFC and supports the task of reporting                Version 003.1 standards will replace the
                                               OASIS suite of standards that were not                   on the commercial aspects of these                    Version 003 standards currently
                                               made in response to Commission orders.                   calculations.17                                       incorporated by reference into the
                                               First, NAESB modified WEQ–001 and                           13. Third, NAESB has adopted                       Commission’s regulations. Where we
                                               WEQ–013 to require resellers to enter                    revisions to NAESB standards that need                have proposed in this NOPR to
                                               off-OASIS resale transactions into                       to match up with NERC’s Interchange                   incorporate a NAESB Business Practice
                                               OASIS sites in the ‘‘accepted’’ status to                Scheduling and Coordination (INT)
                                               provide the assignee of the resale the                   Reliability Standards. In this regard,                  19 These corrections are identified and explained

                                               opportunity to confirm the transaction                   NAESB modified certain WEQ–000 and                    in the October 26 Filing.
                                               on the OASIS. Second, NAESB revised                      WEQ–004 Business Practice Standards                     20 Consistent with our past practice, we do not

                                                                                                        to complement NERC’s proposal to                      propose to incorporate by reference into the
                                                                                                                                                              Commission’s regulations the following standards:
                                                 13 Standards for Business Practices and                modify the INT Reliability Standards,                 Standards of Conduct for Electric Transmission
                                               Communication Protocols for Public Utilities, Order      including removal of the Load Serving                 Providers (WEQ–009); Contracts Related Standards
                                               No. 676–C, FERC Stats. & Regs. ¶ 31,274, reh’g           Entity (LSE) category as one of the                   (WEQ–010); and WEQ/WGQ eTariff Related
                                               denied, Order No. 676–D, 124 FERC ¶ 61,317                                                                     Standards (WEQ–014). We also do not propose to
                                               (2008); See supra n.2; Standards for Business
                                                                                                        functional registration categories in the
                                                                                                                                                              incorporate by reference at this time the WEQ–023
                                               Practices and Communication Protocols for Public         NERC Compliance Registry.18                           Modeling Business Practice Standards. We do not
                                               Utilities, Order No. 676–F, FERC Stats. & Regs.             14. NAESB also includes as part of its             propose to incorporate by reference standard WEQ–
                                               ¶ 31,309 (2010); Standards for Business Practices        Version 003.1 Business Practice                       009 because it contains no substantive standards
                                               and Communication Protocols for Public Utilities,        Standards additional non-OASIS                        and merely serves as a placeholder for future
Lhorne on DSK30JT082PROD with PROPOSALS




                                               Order No. 676–G, 78 FR 14654 (Mar. 7, 2013), FERC                                                              standards. We do not propose to incorporate by
                                               Stats. & Regs. ¶ 31,343 (2013); See supra n.3.                                                                 reference standard WEQ–010 because this standard
                                                                                                          15 As mentioned above, NERC proposes to retire
                                                 14 The OASIS suite of standards is used                                                                      contains an optional NAESB contract regarding
                                               collectively by NAESB to reference four business         Reliability Standards MOD–001–1a, MOD–004–1,          funds transfers and the Commission does not
                                               practice standards: WEQ–001 Open Access Same-            MOD–008–1, MOD–028–2, MOD–029–1a, and                 require utilities to use such contracts. Moreover, as
                                               Time Information System (OASIS); WEQ–002                 MOD–030–2.                                            discussed more specifically in the section below on
                                                                                                          16 https://www.naesb.org/pdf4/r140.
                                               OASIS Standards and Communication Protocols                                                                    Redirects from Conditional Parent Reservations, we
                                                                                                          17 These terms are defined in WEQ–000–1.
                                               (S&CP); WEQ–003 OASIS S&CP Data Dictionaries;                                                                  do not propose in this NOPR to incorporate by
                                               and WEQ–013 OASIS Implementation Guide.                    18 NAESB October 26 Filing at 3.                    reference certain portions of WEQ–001.



                                          VerDate Sep<11>2014   14:42 Jul 27, 2016   Jkt 238001   PO 00000   Frm 00027   Fmt 4702   Sfmt 4702   E:\FR\FM\28JYP1.SGM   28JYP1


                                                                        Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules                                             49583

                                               Standard by reference into the                           Standard WEQ–001–9.5, the                                incorporate those standards by reference
                                               Commission’s regulations, this has been                  Commission explained that, ‘‘as we                       into our regulations.
                                               based on a preliminary determination                     found in these orders, reducing the                         23. NAESB reports, however, that it
                                               that the standard at issue is consistent                 capacity available to redirect prior to the              was unsure whether and to what extent
                                               with the Commission’s findings in                        passage of the conditional reservation                   the Dynegy policy applies to conditional
                                               Order No. 676–H and does not appear                      deadline could lead to a customer                        parent reservations and non-firm
                                               inconsistent with any Commission                         paying firm transmission charges and                     service, and no consensus could be
                                               directives or findings in other orders.                  losing capacity on both its original path                reached with respect to such standards.
                                                                                                        and its redirect path.’’ 23 The                          It therefore adopted a standard (WEQ–
                                               A. Revisions to WEQ OASIS Business                                                                                001–9.5) that allows individual
                                                                                                        Commission further explained that the
                                               Practice Standards in Light of                                                                                    transmission providers to craft
                                                                                                        Dynegy policy ‘‘effects a reasonable
                                               Commission Policies                                                                                               provisions in their individual tariffs for
                                                                                                        balancing of interests between the
                                               1. Overview                                              customer and the transmission owner by                   how they will address redirects of
                                                  18. The NAESB WEQ Version 003.1                       ensuring that the customer does not                      requests for firm transmission service,
                                               Business Practice Standards contain six                  potentially lose rights to capacity, while               rather than having an industry-wide
                                               modifications to the OASIS suite of                      at the same time still permitting the                    business practice for such transactions.
                                               standards that NAESB developed to                        transmission owner to sell available                     Because it could not reach consensus on
                                               ensure consistency with certain policies                 capacity on a short term basis until the                 these issues, the standards also do not
                                               articulated by the Commission in Order                   redirect becomes unconditional.’’ The                    prescribe when a public utility must
                                               Nos. 676–H, 676–E, and 890. NAESB                        Commission also found that Standard                      reduce uncommitted capacity to
                                               states that four of the six modifications                WEQ–001–10.5 raised similar concerns                     account for redirects. NAESB also
                                               align the OASIS suite of standards with                  regarding the confirmation of requests to                adopted a similar rewrite of the
                                               guidance provided by the Commission                      redirect on a non-firm basis and also                    standard (WEQ–001–10.5) on redirects
                                               in Order No. 676–H concerning the                        declined to incorporate by reference                     on a non-firm basis.
                                                                                                        Standard WEQ–001–10.5 and requested                         24. The concern about the negative
                                               treatment of redirects for transmission
                                                                                                        that NAESB, likewise, give                               effects of the potential loss of the
                                               service from conditional parent
                                                                                                        consideration to reworking this                          customer’s parent path when the parent
                                               reservations, the one-day requirement
                                                                                                        standard.                                                reservation is conditional and subject to
                                               for the posting of ATC Narratives, the
                                                                                                           20. As the Commission stated in                       competition arguably is much less
                                               treatment of point-to-point reservations
                                                                                                        Entergy,24 our guiding precedent on the                  compelling than when the parent
                                               under SAMTS, and new clarification of
                                                                                                        issue of when a customer requesting                      reservation is unconditional. While
                                               the requirements under which a
                                                                                                        redirect loses rights on the original path               Dynegy carved out an exception for
                                               transmission provider may deny a
                                                                                                        was set in Dynegy.25 In Dynegy, the                      unconditional parent reservations, the
                                               request to terminate service. In response
                                                                                                        Commission found that a transmission                     Commission has not explicitly ruled on
                                               to a directive in Order No. 676–E,
                                                                                                        customer receiving firm transmission                     whether Dynegy applies to conditional
                                               NAESB also modified standards to
                                                                                                        service does not lose its rights to its                  parent reservations, and such an
                                               explicitly permit a transmission
                                                                                                        original path until the redirect request                 extension may go beyond the policy
                                               provider to extend the performance of
                                                                                                        satisfies all of the following criteria: (1)             concern with losing firm service
                                               the biennial reassessment. Additionally,
                                                                                                        It is accepted by the transmission                       articulated in Entergy.
                                               to implement the Commission’s
                                                                                                        provider; (2) it is confirmed by the                        25. We, therefore, invite comment on
                                               guidance provided in Order No. 890,
                                                                                                        transmission customer; and (3) it passes                 whether the Commission should apply
                                               NAESB modified pertinent standards to
                                                                                                        the conditional reservation deadline                     the Dynegy policy to conditional and
                                               allow for the consistent posting of AFC-
                                                                                                        under section 13.2 of its Open Access                    non-firm redirects. Parties also should
                                               related data on OASIS sites.
                                                                                                        Transmission Tariff.                                     address the four redirect-related issues
                                               2. Redirects From Conditional Parent                        21. Having NAESB revise its                           on which stakeholders have been unable
                                               Reservations                                             standards to accommodate the                             to reach consensus. These are: (1) The
                                                  19. In Order No. 676–H, the                           Commission’s policy in this area will                    treatment of a firm redirect for
                                               Commission declined to incorporate by                    help avoid confusion by public utilities                 transmission service following the
                                               reference NAESB Standards WEQ–001–                       as to their responsibilities under the                   preemption of the conditional parent
                                               9.5 and WEQ–001–10.5. The Version                        Commission’s policy and under the                        reservation; (2) the circumstances under
                                               003.0 WEQ–001–9.5 stated that, ‘‘upon                    NAESB standards. The Commission’s                        which a firm redirect for transmission
                                               confirmation of the request to Redirect                  concern in Dynegy and Entergy was that                   service may return to the conditional
                                               on a firm basis, the Capacity Available                  a redirecting customer would lose its                    parent reservation; (3) the number of
                                               to Redirect shall be reduced by the                      rights to the unconditional parent path                  subsequent firm redirects for
                                               amount of the redirected capacity                        and be left with no transmission service                 transmission service that can stem from
                                               granted for the time period of that                      during the redirect period if the                        the original firm redirect for
                                               Redirect.’’ The Version 003.0 WEQ–                       requested redirect was preempted by a                    transmission service; and (4) the proper
                                               001–10.5 contained nearly identical                      competing service request.                               treatment of requests to redirect requests
                                               language relating to the confirmation of                    22. We appreciate the extensive work                  for non-firm transmission service. Based
                                               requests to redirect on a non-firm basis.                that NAESB and its stakeholder have                      on these responses, the Commission
                                               The Commission explained that it found                   undertaken in response to our directive                  will consider whether it will adopt
Lhorne on DSK30JT082PROD with PROPOSALS




                                               both of these standards inconsistent                     in Order 676–H. NAESB has reached                        regulations regarding redirects from
                                               with the Commission’s precedent in                       consensus on standards relating to                       conditional parent reservations and
                                               Dynegy Power Marketing, Inc.21 and                       redirects related to unconditional parent                non-firm service.
                                               Entergy Services, Inc.22 With regard to                  reservations, and we propose to                          3. Requirement To Post ATC Narrative
                                                                                                             23 Id.
                                                                                                                                                                 Within One Day
                                                 21 99FERC ¶ 61,054, at P 9 (2002) (Dynegy).                      P 47.
                                                 22 143 FERC ¶ 61,143, at P 25 & n.68 (2013)                 24 Id.
                                                                                                                  P 25 & n.68.                                      26. NAESB developed Standard
                                               (Entergy).                                                    25 Dynegy, 99 FERC ¶ 61,054 at P 9.                 WEQ–001–14 to meet the requirement


                                          VerDate Sep<11>2014   14:42 Jul 27, 2016   Jkt 238001   PO 00000     Frm 00028   Fmt 4702   Sfmt 4702    E:\FR\FM\28JYP1.SGM   28JYP1


                                               49584                    Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules

                                               in Order No. 890 for transmission                        of preemption.31 NAESB therefore                          6. Modifications To Allow a
                                               providers to post a narrative in                         includes in the Version 003.1 standards                   Transmission Provider To Extend the
                                               instances when ATC remains                               modifications to the SAMTS-related                        Time To Perform Its Biennial
                                               unchanged at a value of zero for six                     standards to permit a customer with                       Reassessment
                                               months or longer. In addition, Standard                  preempted transmission capacity from a                       32. In Order No. 676–E, the
                                               WEQ–001–15 requires transmission                         reservation associated with a                             Commission stated ‘‘we reiterate here
                                               providers to post a brief narrative that                 coordinated group to alter (reduce or                     the Commission’s finding in Order No.
                                               explains the reason for a change in                      terminate) the capacity of coordinate                     890 that a transmission provider is
                                               monthly or yearly ATC values on a                        requests in the coordinated group.                        permitted to extend the timeframe to
                                               constrained path when a monthly or                                                                                 reassess the availability of conditional
                                               yearly ATC value changes as a result of                    29. The Commission finds that
                                                                                                        NAESB’s revised standards are                             firm service. Since the Version 002.1
                                               a 10 percent change in total transfer                                                                              Standards do not specifically address
                                               capability. In Order No. 676–H, the                      consistent with our findings in Order
                                                                                                                                                                  this issue, we would ask the industry,
                                               Commission declined to incorporate by                    No. 676–H and do not appear                               working through NAESB, to continue to
                                               reference Standards WEQ–001–14.1.3                       inconsistent with any Commission                          look at additional business practice
                                               and WEQ–011–15.1.2 after determining                     directives or findings in other orders.                   standards facilitating a transmission
                                               that these standards did not meet the                    Accordingly, we propose to incorporate                    provider’s extension of its right to
                                               Commission’s requirement to post the                     by reference, into the Commission’s                       perform a reassessment.’’ 33 In response
                                               ATC narrative as soon as feasible.26 The                 regulations at 18 CFR 38.1, NAESB’s                       to this request, NAESB, in its Version
                                               Commission requested that NAESB                          revised standards on SAMTS-Related                        003.1 Standards, adopted modifications
                                               ‘‘revise these standards to provide for a                standards as set forth in the WEQ                         to five standards in the WEQ–001
                                               one-day posting requirement.’’ 27 In                     Version 003.1 Business Practice                           OASIS Business Practice Standards and
                                               response, NAESB modified Standards                       Standards.                                                one standard in the WEQ–013 OASIS
                                               WEQ–001–14.1.3 and WEQ–011–15.1.2                                                                                  Implementation Guide Business Practice
                                               and adopted business practice standards                  5. Clarification of Discretion of                         Standards that explicitly allow a
                                               to support the one-day posting                           Transmission Providers To Deny                            transmission provider to extend the
                                               requirement.                                             Service Requests Under Standard WEQ–                      deadline by which it must perform its
                                                  27. NAESB’s revised standards appear                  001–106.2.5                                               biennial reassessment of the availability
                                               consistent with our findings in Order                                                                              on its system of conditional firm
                                               No. 676–H and do not appear                                 30. In Order No. 676–H, the
                                                                                                                                                                  service.
                                               inconsistent with any Commission                         Commission declined to incorporate by                        33. NAESB’s revised standards appear
                                               directives or findings in other orders.                  reference Standard WEQ–001–106.2.5,                       consistent with our findings in Order
                                               Moreover, as we explained above,28                       explaining that the standard was                          No. 676–E and do not appear
                                               below,29 and in previous orders, the                     ‘‘unclear in its application and could be                 inconsistent with any Commission
                                               NAESB standards are developed in an                      read to allow Transmission Providers                      directives or findings in other orders.
                                               open consensus process that assures                      discretion to deny requests to terminate                  Accordingly, we propose to incorporate
                                               that the standards draw support from a                   service in situations where this might                    by reference, into the Commission’s
                                               wide range of industry members before                    not be warranted.’’ 32 In response,                       regulations at 18 CFR 38.1, NAESB’s
                                               being developed and adopted.                             NAESB modified Standard WEQ–001–                          revisions to five standards to extend the
                                               Accordingly, we propose to incorporate                   106.2.1, added Standard WEQ–001–                          deadline by which a transmission
                                               by reference, into the Commission’s                                                                                provider must perform its biennial
                                                                                                        106.2.1.1, and deleted Standard WEQ–
                                               regulations at 18 CFR 38.1, NAESB’s                                                                                reassessment of the availability on its
                                                                                                        001–106.2.5. Together, these revised
                                               revised standards on the timing of the                                                                             system of conditional firm service, as set
                                               required posting of ATC narratives, as                   standards clarify that a transmission
                                                                                                        customer should submit an accurate                        forth in the WEQ Version 003.1
                                               set forth in NAESB’s WEQ Version
                                                                                                        termination request and, if the                           Business Practice Standards.
                                               003.1 Business Practice Standards.
                                                                                                        transmission customer fails to do so, the                 7. Industry-Wide Mechanism for
                                               4. SAMTS Point-to-Point Treatment                        transmission provider may deny the                        Consistent Posting of AFC-Related Data
                                                  28. The NAESB SAMTS business                          request.
                                                                                                                                                                     34. In Order No. 890–A, the
                                               practice standards that the Commission                      31. NAESB’s revised standards appear                   Commission explained that ‘‘[t]o the
                                               incorporated by reference in Order No.                   consistent with our findings in Order                     extent MidAmerican or its customers
                                               676–H were developed in response to a                    No. 676–H and do not appear                               find it beneficial also to post AFC,
                                               Commission finding in Order No. 890
                                                                                                        inconsistent with any Commission                          MidAmerican is free to post both ATC
                                               requesting that NAESB develop
                                                                                                        directives or findings in other orders.                   and AFC values.’’ 34 In the WEQ Version
                                               business practice standards in this
                                                                                                        Accordingly, we propose to incorporate                    003.1 Business Practice Standards,
                                               area.30 In Order No. 676–H, the
                                                                                                        by reference, into the Commission’s                       NAESB includes revisions to provide an
                                               Commission found reasonable a NAESB
                                               request to treat a conditional point-to-                 regulations at 18 CFR 38.1, NAESB’s                       industry-wide mechanism for posting of
                                               point reservation included in a                          revised Standards WEQ–WEQ–001–                            AFC-related data. NAESB adds three
                                               coordinated group displaced through                      106.2.21, WEQ–001–106.2.1.1, and                          new data elements to the list of valid
                                               preemption as comparable to a                            WEQ–001–106.2.5, as set forth in the                      data element values for SYSTEM_
                                               reservation being superseded as a result                 WEQ Version 003.1 Business Practice                       ATTRIBUTE and SYSTEM_ELEMENT_
Lhorne on DSK30JT082PROD with PROPOSALS




                                                                                                        Standards.                                                TYPE in WEQ–003 OASIS Data
                                                  26 Order No. 676–E, FERC Stats. & Regs. ¶ 31,299                                                                Dictionary and to the system data
                                               at P 39.                                                                                                           OASIS template in WEQ–013 OASIS
                                                  27 Id. P 29.
                                                  28 See supra P 8.                                                                                                  33 Order No. 676–E, FERC Stats. & Regs. ¶ 31,299
                                                                                                             31 Order   No. 676–H, FERC Stats. & Regs. ¶ 31,359
                                                  29 See infra P 57.                                                                                              at P 72.
                                                  30 Order No. 890, FERC Stats. & Regs. ¶ 31,241 at     at P 65.                                                     34 Order No. 890–A, FERC Stats. & Regs. ¶ 31,261

                                               P 1377.                                                     32 Id. P 58.                                           at P 51.



                                          VerDate Sep<11>2014   14:42 Jul 27, 2016   Jkt 238001   PO 00000     Frm 00029     Fmt 4702   Sfmt 4702   E:\FR\FM\28JYP1.SGM   28JYP1


                                                                        Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules                                                   49585

                                               Implementation Guide Business Practice                   Coordinate Interchange Business                       which address ATC calculation, and
                                               Standards.                                               Practice Standards to include in the EIR              NERC requested that NAESB consider
                                                 35. NAESB’s revised standards appear                   items eliminated by NERC, in Docket                   developing replacement Business
                                               consistent with our findings in Order                    No. RR15–4–000, from the NERC                         Practice Standards for requirements that
                                               No. 890–A and do not appear                              Compliance Registry including the                     NERC identified as being potentially
                                               inconsistent with any Commission                         elimination of the LSE, the Purchase                  relevant for commercial purposes.39
                                               directives or findings in other orders.                  Selling Entity, and the Interchange                   WEQ–023 includes two new
                                               Accordingly, we propose to incorporate                   Authority roles. This proposal was                    requirements not previously included in
                                               by reference, into the Commission’s                      accepted by the Commission in orders                  the NERC Reliability Standards related
                                               regulations at 18 CFR 38.1, NAESB’s                      issued on March 19, 2015 37 and on                    to contract path management. These two
                                               revisions to the data elements in the                    October 15, 2015.38 Because the                       standards, WEQ–023–1.4 and WEQ–
                                               OASIS Data Dictionary and to the data                    Commission has accepted the                           023–1.4.1, limit the amount of firm
                                               OASIS Template in Standard WEQ–013                       elimination of the LSE function from the              transmission service across a path
                                               to provide an industry-wide mechanism                    NERC Compliance Registry, we propose                  between balancing authorities to the
                                               for posting of AFC-related data, as set                  to incorporate by reference, into the                 contract path limit for that given path.
                                               forth in the WEQ Version 003.1                           Commission’s regulations at 18 CFR                       42. The Commission is considering
                                               Business Practice Standards.                             38.1, the NAESB modifications of WEQ–                 NERC’s proposed retirement of its ATC-
                                                                                                        004 pertaining to Coordinate                          related Reliability Standards in Docket
                                               8. Use of DUNS Numbers
                                                                                                        Interchange Business Practices.                       No. RM14–7–000. In addition, the
                                                  36. In Order No. 768, the Commission                                                                        Commission has established a
                                               eliminated the requirement to use                        2. Electric Industry Registry Standards               proceeding in Docket No. AD15–5–000
                                               DUNS numbers 35 in Electronic                              39. On November 13, 2012, the                       to consider proposed changes to the
                                               Quarterly Report filings and stated that                 NAESB EIR replaced the NERC TSIN as                   calculation of ATC, and has conducted
                                               ‘‘DUNS numbers have proven to be                         the industry registry, a tool previously              a technical conference and received
                                               imprecise identification systems, as                     used by wholesale electric markets to                 comments regarding such changes.40 As
                                               entities may have multiple DUNS                          help them develop e-Tags for electronic               a result, we are not proposing to
                                               numbers, only one DUNS number, or no                     scheduling. Thus, the NAESB EIR is                    incorporate by reference the WEQ–023
                                               DUNS number at all.’’ 36 NAESB has                       now the tool the industry uses to                     Modeling Business Practice Standards
                                               adopted revisions to Standard WEQ–                       support OASIS users in the electronic                 in this NOPR, but will consider these
                                               001–3.1 to eliminate the use of a DUNS                   scheduling of transactions by acting as               standards as part of the overall inquiry
                                               number to identify an organization in                    the central repository for information                into ATC calculation.
                                               OASIS postings. For consistency,                         used by the wholesale electric industry
                                               NAESB also adopted changes or                                                                                  C. Revisions to WEQ Business Practice
                                                                                                        in the creation of e-Tags. The WEQ–004
                                               modifications to the Standard WEQ–000                                                                          Standards Not Requested by
                                                                                                        Coordinate Interchange Business
                                               Abbreviations, Acronyms, and                                                                                   Commission or Developed To Comply
                                                                                                        Practice Standards and e-Tag Functional
                                               Definition of Terms Business Practice                                                                          With a Commission Directive
                                                                                                        Specifications and Schema provide the
                                               Standards, WEQ–001 OASIS Business                        commercial framework for e-Tagging.                      43. In addition to the standards
                                               Practice Standards, WEQ–003 OASIS                        The new WEQ–022 EIR Business                          revisions that NAESB made to comply
                                               Data Dictionary Business Practice                        Practice Standards establish business                 with various Commission directives and
                                               Standards, and WEQ–013 OASIS                             practices for the NAESB EIR and                       requests, NAESB also developed and
                                               Implementation Guide Business Practice                   provide guidance for registry users.                  adopted five revisions to the Business
                                               Standards.                                                 40. NAESB’s revised Standard WEQ–                   Practice Standards at its own initiative.
                                                  37. NAESB’s revised standards appear                  004 appears reasonable and does not                   These revisions: (1) Introduce a
                                               consistent with the Commission’s                         appear inconsistent with any                          requirement for resellers to post off-
                                               findings in Order No. 768 and do not                     Commission directives or findings in                  OASIS resale transactions on the OASIS
                                               appear inconsistent with any                             other orders. Accordingly, we propose                 in the ‘‘accepted’’ status to provide the
                                               Commission directives or findings in                     to incorporate by reference, into the                 assignee of the resale the opportunity to
                                               other orders. Accordingly, we propose                    Commission’s regulations at 18 CFR                    confirm the transaction on the OASIS;
                                               to incorporate by reference, into the                    38.1, NAESB’s revised Standard WEQ–                   (2) allow for the unmasking of the
                                               Commission’s regulations at 18 CFR                       004 as set forth in the WEQ Version                   source and sink of a request for
                                               38.1, NAESB’s revisions to Standard                      003.1 Business Practice Standards.                    transmission service, once that request
                                               WEQ–002–4.3.6.2.                                                                                               is moved to any final state; (3) modify
                                                                                                        3. WEQ–023 Modeling Business Practice                 the Commission’s existing non-
                                               B. Revised and New Standards Designed                    Standards
                                               To Complement NERC Reliability                                                                                 mandatory guidance on Smart Grid
                                               Standards and Developments                                  41. WEQ’s Version 003.1 Business                   standards; (4) modify the WEQ
                                                                                                        Practice Standards includes a new suite               Abbreviations, Acronyms, and
                                               1. NERC Compliance Registry                              of standards, the WEQ–023 Modeling                    Definition of Terms in Standard WEQ–
                                                  38. The WEQ Version 003.1 standards                   Business Practice Standards, which                    000 to maintain consistency between
                                               include modifications to the WEQ–004                     address technical issues affecting the                the defined terms used in the NAESB
                                                                                                        calculation of ATC for wholesale                      standards, including revisions to the
                                                 35 The Data Universal Numbering System,                electric transmission services. NAESB
Lhorne on DSK30JT082PROD with PROPOSALS




                                               abbreviated as DUNS or D–U–N–S, is a proprietary         developed these Modeling standards                       39 NERC’s proposal is currently pending before

                                               system developed and regulated by Dun &                  after NERC proposed to retire the bulk                the Commission in the rulemaking proceeding in
                                               Bradstreet that assigns a unique numeric identifier,                                                           Docket No. RM14–7–000, see supra n.7.
                                               referred to as a ‘‘DUNS number’’ to a single             of its MOD A Reliability Standards,                      40 See, e.g., the December 18, 2014 status report
                                               business entity.                                                                                               filed by NAESB in Docket Nos. RM05–5–000 and
                                                 36 Electricity Market Transparency Provisions of         37 North American Electric Reliability
                                                                                                                                                              RM14–7–000, and the Commission’s April 21, 2015
                                               Section 220 of the Federal Power Act, Order No.          Corporation, 150 FERC ¶ 61,213 (2015).                workshop, Available Transfer Capability Standards
                                               768, 77 FR 61896, FERC Stats. & Regs. ¶ 31,336, at         38 North American Electric Reliability              for Wholesale Electric Transmission Services,
                                               P 171 (2012).                                            Corporation, 153 FERC ¶ 61,024, at P 20 (2015).       Docket No. RM15–5–000.



                                          VerDate Sep<11>2014   14:42 Jul 27, 2016   Jkt 238001   PO 00000   Frm 00030   Fmt 4702   Sfmt 4702   E:\FR\FM\28JYP1.SGM   28JYP1


                                               49586                    Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules

                                               terms ‘‘Demand Reduction Value’’ and                     technological innovation and                          Retail Market Quadrant and prevent
                                               ‘‘Energy Efficiency’’ to mirror                          standardization in this area.’’ In Order              industry confusion.
                                               definitions proposed by the Retail                       No. 676–H, the Commission adopted in                     52. NAESB’s revised standards appear
                                               Market Quadrant and prevent industry                     its regulations as non-mandatory                      reasonable and do not appear
                                               confusion; and (5) modify the                            guidance five Smart Grid related                      inconsistent with any directives or
                                               Commission’s PKI-related standards. We                   standards: (1) WEQ–016 Specifications                 findings in any Commission orders.
                                               will now separately discuss each of                      for Common Electricity Product and                    Accordingly, we propose to incorporate
                                               these revisions.                                         Pricing Definition Business Practice                  by reference, into the Commission’s
                                                                                                        Standards; (2) WEQ–017 Specifications                 regulations at 18 CFR 38.1, NAESB’s
                                               1. Proper Method To Post Off-OASIS
                                                                                                        for Common Schedule Communication                     revisions to Standard WEQ–000.
                                               Resale Transactions
                                                                                                        Mechanism for Energy Transactions; (3)
                                                  44. NAESB’s WEQ Version 003.1                         WEQ–018 Specifications for Wholesale                  5. Public Key Infrastructure-Related
                                               Business Practice Standards include a                    Standard Demand Response Signals                      Standards
                                               revision to the WEQ–013 OASIS                            Business Practice Standards; (4) WEQ–                    53. NAESB includes three
                                               Implementation Guide Business Practice                   019 Customer Energy Usage Information                 modifications to support the WEQ–012
                                               Standards to allow off-OASIS resale                      Communication Business Practice                       PKI Business Practice Standards
                                               transactions to be posted directly to the                Standards; and (5) WEQ–020 Smart Grid                 previously incorporated by reference by
                                               OASIS under an ‘‘accepted’’ status.                      Standards Data Elements Table Business                the Commission in Order No. 676–H.41
                                               Prior to the modification to WEQ–013–                    Practice Standards. This guidance is                  The three PKI-related modifications
                                               2.6.7.2, these transactions were posted                  published in the Federal Register at 18               made in the Version 003.1 Standards
                                               only as confirmed transactions. NAESB                    CFR 2.27.                                             were to the WEQ–012 PKI Business
                                               has also adopted a revision to the WEQ–                     49. In its Version 003.1 Business                  Practice Standards, the WEQ–002
                                               001 OASIS Business Practice Standards                    Practice Standards, NAESB has                         OASIS Standards and Communication
                                               (WEQ–013–2.6.7.2) as a conforming                        modified the Standard WEQ–019                         Protocols Business Practice Standards,
                                               change requiring a service agreement                     Customer Energy Usage Information                     and the WEQ–004 Coordinate
                                               between an assignee and a transmission                   Communication Business Practice                       Interchange Business Practice
                                               provider to be executed once the                         Standards. NAESB made this                            Standards. NAESB modified WEQ–012
                                               assignee has confirmed the resale                        modification so that the revised                      to accommodate technology changes
                                               transaction on the OASIS.                                standard will operate in harmony with                 and security advances as well as to
                                                  45. NAESB’s revised standards on this                 other smart grid standards, including                 remove standards specifying criteria a
                                               subject appear reasonable and do not                     the Smart Energy Profile 2.0, the                     certificate authority must meet. NAESB
                                               appear inconsistent with any directives                  International Electrotechnical                        moved the standards specifying criteria
                                               or findings in any Commission orders.                    Commission Information Model, the                     that must be met out of the Version
                                               Accordingly, we propose to incorporate                   NAESB REQ.21 Energy Service                           003.1 Business Practice Standards and
                                               by reference, into the Commission’s                      Providers Interface, and standards                    into a second document that outlines
                                               regulations at 18 CFR 38.1, NAESB’s                      developed by the American Society of                  the prerequisites a certificate authority
                                               revisions to Standard WEQ–013–2.6.7.2                    Heating, Refrigerating, and Air-                      must meet to become a NAESB
                                               and to the WEQ–013 OASIS                                 Conditioning Engineers.                               Certification Authority.42
                                               Implementation Guide Standards.                             50. Standard WEQ–019 provides for                     54. NAESB modified five standards
                                                                                                        energy usage information and this                     and added three standards WEQ–002,
                                               2. Unmasking of Final State Source and                   revision allows consumers access to
                                               Sink Requests                                                                                                  which require the use of a certificate
                                                                                                        their energy usage information. These
                                                                                                                                                              issued by a NAESB Certification
                                                  46. NAESB’s WEQ Version 003.1                         standards will not only be used by the
                                                                                                                                                              Authority to access an OASIS site and
                                               Business Practice Standards modify                       wholesale electric industry, but also are
                                                                                                                                                              include requirements related to support
                                               Standard WEQ–002–4.3.6.2 to unmask                       important initiatives for use in ongoing
                                                                                                                                                              the implementation of PKI on OASIS
                                               the source and sink for a request for                    utility programs for consumer data
                                                                                                                                                              sites as well as revisions to reflect the
                                               transmission service for all instances                   access. We, therefore, propose to revise
                                                                                                                                                              transmission of the registry from the
                                               where the request for transmission                       our non-mandatory guidance that we
                                                                                                                                                              NERC TSI to the NAESB EIR. NAESB
                                               service is moved to any final state. Prior               listed in 18 CFR 2.27(d) to reference
                                                                                                                                                              includes one new standard, WEQ–004–
                                               to this modification, masking of the                     NAESB’s updated Standard WEQ–019
                                                                                                                                                              2.3, which requires all e-Tagging
                                               source and sink of a request for                         as set out in the Version 003.1 package
                                                                                                                                                              communication to be secured by
                                               transmission service was permitted                       of WEQ Business Practice Standards,
                                                                                                                                                              certifications issued by a NAESB
                                               until the status of that request was                     replacing the existing reference in 18
                                                                                                                                                              Certification Authority. NAESB also
                                               confirmed.                                               CFR 2.27(d) to Standard WEQ–019 as
                                                                                                                                                              includes modifications to WEQ–000 for
                                                  47. NAESB’s revised standards appear                  set out in the Version 003 WEQ
                                                                                                                                                              consistency purposes.
                                               reasonable and do not appear                             Business Practice Standards.
                                               inconsistent with any directives or
                                                                                                        4. Modification to Standards on                         41 These three modifications were not included in
                                               findings in any Commission order.                                                                              the Version 003 filing NAESB made on September
                                                                                                        Abbreviations, Acronyms and
                                               Accordingly, we propose to incorporate                                                                         18, 2012 but rather were filed separately by NAESB
                                                                                                        Definitions of Terms
                                               by reference, into the Commission’s                                                                            on January 29, 2013 following the conclusion of
                                               regulations at 18 CFR 38.1, NAESB’s                         51. Also included in Version 003.1 is              standards development. See Submittal of
                                                                                                        a modification to WEQ Abbreviations,                  Modifications to the NAESB Public Key
Lhorne on DSK30JT082PROD with PROPOSALS




                                               revisions to Standard WEQ–002–4.3.6.2.                                                                         Infrastructure Standards and Other Standards to
                                                                                                        Acronyms, and Definition of Terms in                  support the Public Key Infrastructure, Docket Nos.
                                               3. Modifications to Smart Grid                           Standard WEQ–000 to maintain                          RM05–5–000 and RM05–5–022, January 29, 2013.
                                               Standards                                                consistency between the defined terms                   42 The specifications document was created in

                                                  48. In Order 676–H, the Commission                    used in the NAESB standards, and                      recognition that certificate authorities may not be
                                                                                                                                                              subject to the Commission’s jurisdictional authority
                                               recognized the values of the Smart Grid                  modified the terms ‘‘Demand Reduction                 under the Federal Power Act and that specification
                                               standards and encouraged ‘‘further                       Value’’ and ‘‘Energy Efficiency’’ to                  requirements can be modified through an
                                               developments in interoperability,                        mirror definitions proposed by the                    accelerated process versus standards development.



                                          VerDate Sep<11>2014   14:42 Jul 27, 2016   Jkt 238001   PO 00000   Frm 00031   Fmt 4702   Sfmt 4702   E:\FR\FM\28JYP1.SGM   28JYP1


                                                                        Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules                                                 49587

                                                  55. In Order No. 676–H, the                           consensus procedures.45 As the                         made to conform to directives and
                                               Commission incorporated by reference                     Commission found in Order No. 676,                     guidance provided by the Commission
                                               the WEQ–012 PKI Business Practice                        adoption of consensus standards is                     in Order Nos. 676–E, 676–H, and 890.
                                               Standards. In Version 003.1, NAESB has                   appropriate because the consensus                      In addition, NAESB modified WEQ–001
                                               filed three modifications to support                     process helps ensure the reasonableness                and WEQ–013 to require resellers to
                                               these standards, requesting that the                     of the standards by requiring that the                 enter off-OASIS resale transactions into
                                               Commission also incorporate by                           standards draw support from a broad                    OASIS sites in the ‘‘accepted’’ status to
                                               reference these modifications. We                        spectrum of all segments of the                        provide the assignee of the resale the
                                               propose to incorporate these revised                     industry. Moreover, since the industry                 opportunity to confirm the transaction
                                               standards by reference into the                          itself has to conduct business under                   on the OASIS and revised WEQ–002–
                                               Commission’s regulations. These                          these standards, the Commission’s                      4.3.6.2 to allow for the unmasking of the
                                               revised standards will require public                    regulations should reflect those                       source and sink of a request for
                                               utilities to conduct transactions securely               standards that have the widest possible                transmission when that request is
                                               when using the internet and will                         support. In section 12(d) of the National              moved to any final state. Finally,
                                               eliminate confusion over which                           Technology Transfer and Advancement                    NAESB modified WEQ–001, WEQ–003,
                                               transactions involving public utilities                  Act of 1995, Congress affirmatively                    and WEQ–013 to be consistent with the
                                               must follow the approved PKI                             requires federal agencies to use                       Commission’s treatment of Data
                                               procedures to secure their transactions.                 technical standards developed by                       Universal Numbering System (DUNS)
                                               The revisions support the NAESB                          voluntary consensus standards                          numbers.
                                               Authorized Certification Authority                       organizations, like NAESB, as a means                     • Revisions to NERC-Related
                                               (ACA) Certification Program and                          to carry out policy objectives or                      Standards. NAESB modified existing
                                               account for technological advances                       activities unless use of such standards                standards and developed new standards
                                               following the original adoption of the                   would be inconsistent with applicable                  based on developments involving
                                               standards by NAESB.43                                    law or otherwise impractical.46                        NERC. In addition, NAESB has adopted
                                                                                                           58. Office of Management and Budget                 revisions to NAESB standards that need
                                               D. Implementation
                                                                                                        Circular A–119 (section 11) (February                  to match up with NERC’s Interchange
                                                  56. Consistent with the policy that we                10, 1998) provides that Federal                        Scheduling and Coordination (INT)
                                               introduced in Order No. 676–H,44 we                      Agencies should publish a request for                  Reliability Standards. The Commission
                                               propose upon issuance of a final rule, to                comment in a NOPR when the agency                      is proposing to incorporate by reference
                                               establish a specific date by which all                   is seeking to issue or revise a regulation             the WEQ–022 standards and the
                                               public utilities must file compliance                    proposing to adopt a voluntary                         standards relating to NERC’s INT
                                               filings revising their tariffs to                        consensus standard or a government-                    standards.48
                                               acknowledge their responsibility to                      unique standard. In this NOPR, the                        • Standards Development. NAESB
                                               comply with the revised standards. In                    Commission is proposing to incorporate                 also modified four additional standards
                                               Order No. 676–H, we permitted public                     by reference voluntary consensus                       in the course of normal standards
                                               utilities that wish to incorporate the                   standards developed by the WEQ of                      development. In response to Order No.
                                               complete set of NAESB standards into                     NAESB.                                                 764, NAESB modified WEQ–004 to
                                               their tariffs without modification to
                                                                                                        IV. Incorporation by Reference                         provide for the scheduling of
                                               avoid having to make future compliance
                                                                                                                                                               interchange in 15-minute intervals and
                                               filings by specifying in their compliance                  59. The Office of the Federal Register               modified WEQ–019 to ensure
                                               filing that they are incorporating into                  requires agencies incorporating material               consistency between WEQ Business
                                               their tariff all of the standards                        by reference in final rules to discuss, in             Practice Standards and other standards
                                               incorporated by reference by the                         the preamble of the final rule, the ways               organizations’ standards. Additionally,
                                               Commission as specified in Part 38 of                    that the materials it incorporates by                  NAESB modified WEQ–000 to
                                               the Commission’s Rules of Practice and                   reference are reasonably available to
                                               Procedure as updated and revised.                                                                               harmonize definitions with NAESB
                                                                                                        interested parties and how interested                  Retail Market Quadrant efforts.
                                               Those public utilities that followed this                parties can obtain the materials.47 The                   • PKI Modifications. The standards
                                               approach after the issuance of Order No.                 regulations also require agencies to
                                               676–H will not need to make a                                                                                   include additional PKI modifications to
                                                                                                        summarize, in the preamble of the final                WEQ–002, WEQ–004, and WEQ–012 to
                                               compliance filing revising their tariff                  rule, the material it incorporates by
                                               after issuance of a final rule in this                                                                          support the NAESB Authorized
                                                                                                        reference. The NAESB standards we are                  Certification Authority (Certification
                                               proceeding as long as they continue to                   proposing to incorporate by reference in
                                               incorporate all of the standards without                                                                        Authority) Certification Program and to
                                                                                                        this Final Rule can be summarized as                   account for technological advances.
                                               modification. Public utilities that have                 follows:                                                  • Minor Corrections. Under its
                                               not availed themselves of this option in                   • Revisions to OASIS Standards. The                  process to make necessary minor
                                               complying with Order No. 676–H would                     Version 003.1 standards include
                                               be free to do so in complying with a                                                                            corrections to its standards, when
                                                                                                        revisions to six OASIS-related standards               needed, the WEQ Version 003.1
                                               final rule in this proceeding.
                                                                                                          45 Under this process, to be approved a standard
                                                                                                                                                               Business Practice Standards include
                                               III. Notice of Use of Voluntary                                                                                 seven new minor corrections made by
                                                                                                        must receive a super-majority vote of 67 percent of
                                               Consensus Standards                                      the members of the WEQ’s Executive Committee           NAESB.
                                                  57. The NAESB WEQ Version 003.1                       with support from at least 40 percent from each of        60. Our regulations provide that
Lhorne on DSK30JT082PROD with PROPOSALS




                                                                                                        the five industry segments—transmission,               copies of the NAESB standards
                                               Business Practice Standards were                         generation, marketer/brokers, distribution/load
                                               adopted by NAESB under NAESB’s                           serving entities, and end users. For final approval,   incorporated by reference may be
                                                                                                        67 percent of the WEQ’s general membership must        obtained from the North American
                                                  43 We note the NAESB ACA Certification Program        ratify the standards.
                                                                                                          46 Public Law 104–113, 12(d), 110 Stat. 775
                                               is solely a service offered by NAESB, and is not                                                                  48 As discussed above, NAESB has also adopted

                                               include in WEQ–012.                                      (1996), 15 U.S.C. 272 note (1997).                     modifications to NERC-related standards, such as
                                                  44 Order No. 676–H, FERC Stats. & Regs. ¶ 31,359        47 1 CFR 51.5. See Incorporation by Reference, 79    WEQ–023, that we do not propose in this NOPR to
                                               at P 71.                                                 FR 66267 (Nov. 7, 2014).                               incorporate by reference.



                                          VerDate Sep<11>2014   14:42 Jul 27, 2016   Jkt 238001   PO 00000   Frm 00032   Fmt 4702   Sfmt 4702   E:\FR\FM\28JYP1.SGM   28JYP1


                                               49588                           Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules

                                               Energy Standards Board, 801 Travis                                        end of the comment period.51                                            collection(s) of information, OMB will
                                               Street, Suite 1675, Houston, TX 77002,                                    Participants can join NAESB, for an                                     assign an OMB control number and an
                                               Phone: (713) 356–0060. NAESB’s Web                                        annual membership cost of $7,000,                                       expiration date. Respondents subject to
                                               site is located at http://www.naesb.                                      which entitles them to full participation                               the filing requirements of this rule will
                                               org/. Copies of the standards may be                                      in NAESB and enables them to obtain                                     not be penalized for failing to respond
                                               inspected at the Federal Energy                                           these standards at no additional cost.52                                to these collections of information
                                               Regulatory Commission, Public                                             Non-members may obtain a complete set                                   unless the collections of information
                                               Reference and Files Maintenance                                           of Standards Manuals, Booklets, and                                     display a valid OMB control number.
                                               Branch, 888 First Street NE.,                                             Contracts on CD for $2,000 and the                                        63. The Commission solicits
                                               Washington, DC 20426, Phone: (202)                                        Individual Standards Manual or                                          comments on the Commission’s need for
                                               502–8371, http://www.ferc.gov.49                                          Booklets for each standard by email for
                                                  61. NAESB is a private consensus                                                                                                               this information, whether the
                                                                                                                         $250 per manual or booklet.53 In
                                               standards developer that develops                                                                                                                 information will have practical utility,
                                                                                                                         addition, NAESB considers requests for
                                               voluntary wholesale and retail                                                                                                                    the accuracy of the provided burden
                                                                                                                         waivers of the charges on a case by case
                                               standards related to the energy industry.                                                                                                         estimates, ways to enhance the quality,
                                                                                                                         basis based on need.
                                               The procedures used by NAESB make                                                                                                                 utility, and clarity of the information to
                                               its standards reasonably available to                                     V. Information Collection Statement                                     be collected, and any suggested methods
                                               those affected by the Commission                                            62. The following collection of                                       for minimizing respondents’ burden,
                                               regulations, which generally is                                           information contained in this proposed                                  including the use of automated
                                               comprised of entities that have the                                       rule is subject to review by the Office of                              information techniques.
                                               means to acquire the information they                                     Management and Budget (OMB) under                                         64. The following burden estimate is
                                               need to effectively participate in                                        section 3507(d) of the Paperwork                                        based on the projected costs for the
                                               Commission proceedings.50 NAESB                                           Reduction Act of 1995, 44 U.S.C.                                        industry to implement the new and
                                               provides a free electronic read-only                                      3507(d).54 OMB’s regulations require                                    revised business practice standards
                                               version of the standards for a three                                      approval of certain information                                         adopted by NAESB and proposed to be
                                               business day period or, in the case of a                                  collection requirements imposed by                                      incorporated by reference in this
                                               regulatory comment period, through the                                    agency rules.55 Upon approval of a                                      NOPR.56

                                                                                                                          REVISIONS IN NOPR IN RM05–5–025
                                                                                                                                                                     Annual                                                                  Total annual
                                                                                                                                                                                                               Average burden
                                                                                                                                       Number of                    number of               Total number                                    burden hours &
                                                                                                                                                                                                                (hours) & cost
                                                                                                                                      respondents                responses per              of responses                                   total annual cost
                                                                                                                                                                                                               ($) per response
                                                                                                                                                                   respondent                                                                      ($)

                                                                                                                                              (1)                         (2)                (1)*(2)=(3)                 (4)                  (3)*(4)=(5)

                                               FERC–516E 57 58 (tariff filing) ........................................                                132                            1               132      6 .......................   792 hours.
                                                                                                                                                                                                               $447 .................      $59,004.
                                               FERC–717 (compliance with standards) 59 ...................                                             132                            1               132      30 60 ..................    3,960 hours.
                                                                                                                                                                                                               $2,235 ..............       $295,020.

                                                    Total ........................................................................   ........................    ........................             264      36 hours ...........        4,752 hours.
                                                                                                                                                                                                               $2,682 ..............       $354,024.



                                               Costs To Comply With Paperwork                                              • FERC–516E: 132 entities * 1                                           Titles: Electric Rate Schedule Filing
                                               Requirements                                                              response/entity * (6 hours/response *                                   (FERC–516E); Open Access Same Time
                                                                                                                         $74.50/hour) = $57,024.                                                 Information System and Standards for
                                                 The estimated annual costs are as                                                                                                               Business Practices and Communication
                                               follows:                                                                    • FERC–717: 132 entities * 1
                                                                                                                         response/entity * (30 hours/response *                                  Protocols for Public Utilities (FERC–
                                                                                                                         $74.50/hour) = $285,120.                                                717).

                                                 49 18  CFR 284.12.                                                        53 NAESB Materials Order Form, https://                                  58 These information collection requirements are
                                                 50 As  a private, consensus standards developer,                        www.naesb.org//pdf/ordrform.pdf.                                        one-time burden estimates. After implementation in
                                               NAESB needs the funds obtained from its                                     54 44 U.S.C. 3507(d).                                                 Year 1, the revision proposed in this NOPR would
                                               membership fees and sales of its standards to                               55 5 CFR 1320.11.                                                     be complete.
                                               finance the organization. The parties affected by                                                                                                    59 ‘‘FERC–717’’ is the Commission’s identifier
                                                                                                                           56 Commission staff estimates that industry is
                                               these Commission regulations generally are highly
                                               sophisticated and have the means to acquire the                           similarly situated in terms of hourly cost (wages                       that corresponds to OMB control no. 1902–0173
                                               information they need to effectively participate in                       plus benefits). Based on the Commission average                         that identifies the information collection associated
                                               Commission proceedings.                                                   cost (wages plus benefits) for 2016, $74.50/hour is                     with Standards for Business Practices and
                                                  51 Procedures for non-members to evaluate work                         used.                                                                   Communication Protocols for Public Utilities.
                                               products before purchasing are available at https://                        57 This burden category is intended for ‘‘FERC–                          60 The 30-hour estimate was developed in Docket
                                               www.naesb.org/misc/NAESB_Nonmember_
Lhorne on DSK30JT082PROD with PROPOSALS




                                                                                                                         516,’’ the Commission’s identifier that corresponds                     No. RM05–5–013, when the Commission prepared
                                               Evaluation.pdf. See Incorporation by Reference, 79                                                                                                its estimate of the scope of work involved in
                                                                                                                         to OMB Control No. 1902–0096 (Electric Rate
                                               FR at 66271, n.51 & 53 (Nov. 7, 2014) (citing to
                                                                                                                         Schedules and Tariff Filings). However, another                         transitioning to the NAESB Version 002.1 Business
                                               NAESB’s procedure of providing ‘‘no-cost, no-print
                                               electronic access,’’ NAESB Comment at 1, http://                          unrelated item is pending OMB review using this                         Practice Standards. See Order No. 676–E, FERC
                                               www.regulations.gov/#!documentDetail;D=OFR-                               OMB Control No. and only one item per OMB                               Stats. & Regs. ¶ 31,299 at P 134. We have retained
                                               2013-0001-0023).                                                          Control No. may be pending at a time. Therefore,                        the same estimate here, because the scope of the
                                                  52 North American Energy Standards Board                               to ensure timely submission, Commission staff is                        tasks involved in the transition to Version 003.1 of
                                               Membership Application, https://www.naesb.org/                            using FERC–516E (OMB Control No. TBD), a                                the Business Practice Standards is very similar to
                                               pdf4/naesbapp.pdf.                                                        temporary collection number.                                            that for the transition to the Version 003 Standards.



                                          VerDate Sep<11>2014       19:18 Jul 27, 2016        Jkt 238001       PO 00000       Frm 00033        Fmt 4702         Sfmt 4702       E:\FR\FM\28JYP1.SGM        28JYP1


                                                                            Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules                                       49589

                                                  Action: Proposed collection.                            significant adverse effect on the human               Accordingly, no initial regulatory
                                                  OMB Control Nos.: TBD (FERC–516E);                      environment.62 The Commission has                     flexibility analysis is required.
                                               1902–0173 (FERC–717).                                      categorically excluded certain actions
                                                  Respondents: Business or other for                                                                            VIII. Comment Procedures
                                                                                                          from these requirements as not having a
                                               profit (Public Utilities—Generally not                     significant effect on the human                          74. The Commission invites interested
                                               applicable to small businesses).61                         environment.63 The actions proposed                   persons to submit comments on the
                                                  Frequency of Responses: One-time                        here fall within categorical exclusions               matters and issues proposed in this
                                               implementation (business procedures,                       in the Commission’s regulations for                   notice to be adopted, including any
                                               capital/start-up).                                         rules that are clarifying, corrective, or             related matters or alternative proposals
                                                  65. Necessity of the Information: This                  procedural, for information gathering,                that commenters may wish to discuss.
                                               proposed rule, if implemented would                        analysis, and dissemination, and for                  Comments are due September 26, 2016.
                                               upgrade the Commission’s current                           sales, exchange, and transportation of                Comments must refer to Docket No.
                                               business practice and communication                        electric power that requires no                       RM05–5–025 and must include the
                                               standards and protocols modifications                      construction of facilities.64 Therefore,              commenter’s name, the organization
                                               to support compliance with                                 an environmental assessment is                        they represent, if applicable, and their
                                               requirements established by the                            unnecessary and has not been prepared                 address in their comments.
                                               Commission in Order Nos. 890, 890–A,                       in this NOPR.                                            75. The Commission encourages
                                               890–B, and 890–C, as well as                                                                                     comments to be filed electronically via
                                               modifications to the OASIS-related                         VII. Regulatory Flexibility Act                       the eFiling link on the Commission’s
                                               standards to support Order Nos. 676,                       Certification                                         Web site at http://www.ferc.gov. The
                                               676–A, 676–E, and 717.                                        70. The Regulatory Flexibility Act of              Commission accepts most standard
                                                  66. Internal Review: The Commission                     1980 (RFA) 65 generally requires a                    word processing formats. Documents
                                               has reviewed the revised business                          description and analysis of proposed                  created electronically using word
                                               practice standards and has made a                          rules that will have significant                      processing software should be filed in
                                               preliminary determination that the                         economic impact on a substantial                      native applications or print-to-PDF
                                               proposed revisions that we propose here                    number of small entities. The RFA does                format and not in a scanned format.
                                               to incorporate by reference are both                       not mandate any particular outcome in                 Commenters filing electronically do not
                                               necessary and useful. In addition, the                     a rulemaking. It only requires                        need to make a paper filing.
                                               Commission has assured itself, by                          consideration of alternatives that are                   76. Commenters that are not able to
                                               means of its internal review, that there                   less burdensome to small entities and an              file comments electronically must send
                                               is specific, objective support for the                     agency explanation of why alternatives                an original of their comments to:
                                               burden estimate associated with the                        were rejected.                                        Federal Energy Regulatory Commission,
                                               information requirements.                                     71. The Small Business                             Secretary of the Commission, 888 First
                                                  67. Interested persons may obtain                       Administration (SBA) revised its size                 Street NE., Washington, DC 20426.
                                               information on the reporting                               standards (effective January 22, 2014)                   77. All comments will be placed in
                                               requirements by contacting the Federal                     for electric utilities from a standard                the Commission’s public files and may
                                               Energy Regulatory Commission, Office                       based on megawatt hours to a standard                 be viewed, printed, or downloaded
                                               of the Executive Director, 888 First                       based on the number of employees,                     remotely as described in the Document
                                               Street NE., Washington, DC 20426 [Attn:                    including affiliates. Under SBA’s                     Availability section below. Commenters
                                               Ellen Brown, email: DataClearance@                         standards, some transmission owners                   on this proposal are not required to
                                               ferc.gov, phone: (202) 502–8663, fax:                      will fall under the following category                serve copies of their comments on other
                                               (202) 273–0873].                                           and associated size threshold: Electric               commenters.
                                                  68. Comments concerning the                             bulk power transmission and control, at
                                               information collections proposed in this                   500 employees.66                                      IX. Document Availability
                                               NOPR and the associated burden                                72. The Commission estimates that 5                  78. In addition to publishing the full
                                               estimates should be sent to the                            of the 132 respondents are small. The                 text of this document in the Federal
                                               Commission at this docket and by email                     Commission estimates that the impact                  Register, the Commission provides all
                                               to the Office of Management and                            on these entities is consistent with the              interested persons an opportunity to
                                               Budget, Office of Information and                          paperwork burden of $2,682 per entity                 view and/or print the contents of this
                                               Regulatory Affairs [Attention: Desk                        used above.67 The Commission does not                 document via the Internet through the
                                               Officer for the Federal Energy                             consider $2,682 to be a significant                   Commission’s Home Page (http://
                                               Regulatory Commission]. For security                       economic impact.                                      www.ferc.gov) and in the Commission’s
                                               reasons, comments should be sent by                           73. Based on the above, the                        Public Reference Room during normal
                                               email to OMB at the following email                        Commission certifies that                             business hours (8:30 a.m. to 5:00 p.m.
                                               address: oira_submission@omb.eop.gov.                      implementation of the proposed                        Eastern time) at 888 First Street NE.,
                                               Please reference the docket number of                      Business Practice Standards will not                  Room 2A, Washington, DC 20426.
                                               this Notice of Proposed Rulemaking                         have a significant impact on a                          79. From the Commission’s Home
                                               (Docket No. RM05–5–25) and OMB                             substantial number of small entities.                 Page on the Internet, this information is
                                               Control Nos. TBD (FERC–516E) and                                                                                 available on eLibrary. The full text of
                                                                                                            62 Regulations Implementing the National
                                               1902–0173 (FERC–717) in your                                                                                     this document is available on eLibrary
                                                                                                          Environmental Policy Act of 1969, Order No. 486,
                                               submission.                                                52 FR 47897 (Dec. 17, 1987), FERC Stats. & Regs.,     in PDF and Microsoft Word format for
                                                                                                                                                                viewing, printing, and/or downloading.
Lhorne on DSK30JT082PROD with PROPOSALS




                                                                                                          Regulations Preambles 1986–1990 ¶ 30,783 (1987).
                                               VI. Environmental Analysis                                   63 18 CFR 380.4.                                    To access this document in eLibrary,
                                                 69. The Commission is required to                          64 See 18 CFR 380.4(a)(2)(ii), 380.4(a)(5),
                                                                                                                                                                type the docket number excluding the
                                               prepare an Environmental Assessment                        380.4(a)(27).                                         last three digits of this document in the
                                                                                                            65 5 U.S.C. 601–612.
                                               or an Environmental Impact Statement                         66 13 CFR 121.201, Sector 22 (Utilities), NAICS
                                                                                                                                                                docket number field.
                                               for any action that may have a                             code 221121 (Electric Bulk Power Transmission and       80. User assistance is available for
                                                                                                          Control).                                             eLibrary and the Commission’s Web site
                                                 61 See   infra PP 72–73.                                   67 36 hours at $74.50/hour = $2,682.                during normal business hours from the


                                          VerDate Sep<11>2014     14:42 Jul 27, 2016   Jkt 238001   PO 00000   Frm 00034   Fmt 4702   Sfmt 4702   E:\FR\FM\28JYP1.SGM   28JYP1


                                               49590                    Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Proposed Rules

                                               Commission’s Online Support at (202)                       (1) WEQ–000, Abbreviations,                         DEPARTMENT OF ENERGY
                                               502–6652 (toll free at 1–866–208–3676)                   Acronyms, and Definition of Terms
                                               or email at ferconlinesupport@ferc.gov,                  (Version 003.1, Sep., 30, 2015);                      Federal Energy Regulatory
                                               or the Public Reference Room at (202)                                                                          Commission
                                                                                                          (2) WEQ–001, Open Access Same-
                                               502–8371, TTY (202) 502–8659. Email                      Time Information System (OASIS),
                                               the Public Reference Room at                                                                                   18 CFR Part 35
                                                                                                        OASIS Version 2.1 (WEQ Version 003.1,
                                               public.referenceroom@ferc.gov.                                                                                 [Docket No. RM15–23–000]
                                                                                                        Sep. 30, 2015) with the exception of
                                               List of Subjects                                         Standards 001–9.5, 001–10.5, 001–
                                                                                                                                                              Collection of Connected Entity Data
                                               18 CFR Part 2                                            14.1.3, 001–15.1.2 and 001–106.2.5);
                                                                                                                                                              From Regional Transmission
                                                                                                          (3) WEQ–002, Open Access Same-                      Organizations and Independent
                                                 Electric utilities, Guidance and policy                Time Information System (OASIS)
                                               statements.                                                                                                    System Operators; Withdrawal
                                                                                                        Business Practice Standards and
                                               18 CFR Part 38                                           Communication Protocols (S&CP),                       AGENCY: Federal Energy Regulatory
                                                                                                        OASIS Version 2.1 (WEQ Version 003.1,                 Commission, Department of Energy.
                                                 Conflict of interests, Electric power                                                                        ACTION: Withdrawal of notice of
                                               plants, Electric utilities, Incorporation                Sep. 30, 2015);
                                                                                                                                                              proposed rulemaking and termination of
                                               by reference, Reporting and                                (4) WEQ–003, Open Access Same-                      rulemaking proceeding.
                                               recordkeeping requirements.                              Time Information System (OASIS) Data
                                                 By direction of the Commission.                        Dictionary Business Practice Standards,               SUMMARY:   The Federal Energy
                                                 Dated: July 21, 2016.                                  OASIS Version 2.1 (WEQ Version 003.1,                 Regulatory Commission (Commission) is
                                                                                                        Sep. 30, 2015);                                       withdrawing its proposal to amend its
                                               Nathaniel J. Davis, Sr.,
                                                                                                          (5) WEQ–004, Coordinate Interchange                 regulations to require each regional
                                               Deputy Secretary.                                                                                              transmission organization and
                                                 In consideration of the foregoing, the                 (WEQ Version 003.1, Sep. 30, 2015);
                                                                                                                                                              independent system operator to
                                               Commission proposes to amend parts 2                       (6) WEQ–005, Area Control Error                     electronically deliver to the
                                               and 38, chapter I, title 18, Code of                     (ACE) Equation Special Cases (WEQ                     Commission, on an ongoing basis, data
                                               Federal Regulations, as follows:                         Version 003.1, Sep. 30, 2015);                        required from its market participants
                                                                                                          (7) WEQ–006, Manual Time Error                      that would: Identify the market
                                               PART 2—GENERAL POLICY AND                                                                                      participants by means of a common
                                               INTERPRETATIONS                                          Correction (WEQ Version 003, Sep. 30,
                                                                                                        2015);                                                alpha-numeric identifier; list their
                                                                                                                                                              ‘‘Connected Entities;’’ and describe in
                                               ■ 1. The authority citation for part 2                     (8) WEQ–007, Inadvertent Interchange                brief the nature of the relationship of
                                               continues to read as follows:                            Payback (WEQ Version 003.1, Sep. 30,                  each Connected Entity. The Commission
                                                 Authority: 5 U.S.C. 601; 15 U.S.C. 717–                2015);                                                is also concurrently issuing a Notice of
                                               717z, 3301–3432, 16 U.S.C. 792–828c, 2601–                 (9) WEQ–008, Transmission Loading                   Proposed Rulemaking in Docket No.
                                               2645; 42 U.S.C. 4321–4370h, 7101–7352.                   Relief (TLR)—Eastern Interconnection                  RM16–17–000, which supersedes this
                                               ■ 2. Amend § 2.27 by revising paragraph                  (WEQ Version 003.1, Sep. 30, 2015);                   proposal.
                                               (d) to read as follows:                                    (10) WEQ–011, Gas/Electric                          DATES:  The notice of proposed
                                               § 2.27 Availability of North American                    Coordination (WEQ Version 003.1, Sep.                 rulemaking published on September 29,
                                               Energy Standards Board (NAESB) Smart                     30, 2015);                                            2015, at 80 FR 58382, is withdrawn as
                                               Grid Standards as non-mandatory
                                                                                                          (11) WEQ–012, Public Key                            of July 28, 2016.
                                               guidance.                                                                                                      FOR FURTHER INFORMATION CONTACT:
                                                                                                        Infrastructure (PKI) (WEQ Version
                                               *     *   *     *     *                                  003.1, Sep. 30, 2015);                                Jamie Marcos, Office of Enforcement,
                                                 (d) WEQ–019, Customer Energy Usage                                                                           Federal Energy Regulatory Commission,
                                               Information Communication (WEQ                             (12) WEQ–013, Open Access Same-                     888 First Street NE., Washington, DC
                                               Version 003.1, Sep. 30, 2015); and                       Time Information System (OASIS)                       20426, (202) 502–6628, Jamie.marcos@
                                                                                                        Implementation Guide, OASIS Version                   ferc.gov.
                                               *     *   *     *     *
                                                                                                        2.1 (WEQ Version 003.1, Sep. 30, 2015);
                                                                                                                                                              SUPPLEMENTARY INFORMATION:
                                               PART 38—STANDARDS FOR PUBLIC                               (13) WEQ–015, Measurement and                          1. On September 17, 2015, the
                                               UTILITY BUSINESS OPERATIONS AND                          Verification of Wholesale Electricity                 Commission issued a Notice of
                                               COMMUNICATIONS                                           Demand Response (WEQ Version 003.1,                   Proposed Rulemaking (NOPR) in this
                                                                                                        Sep. 30, 2015);                                       proceeding.1 For the reasons set forth
                                               ■ 3. The authority citation for part 38
                                               continues to read as follows:                              (14) WEQ–021, Measurement and                       below, we are exercising our discretion
                                                                                                        Verification of Energy Efficiency                     to withdraw the NOPR and terminate
                                                 Authority: 16 U.S.C. 791–825r, 2601–2645;                                                                    this rulemaking proceeding. The NOPR
                                               31 U.S.C. 9701; 42 U.S.C. 7101–7352.                     Products (WEQ Version 003.1, Sep. 30,
                                                                                                        2015).                                                is superseded by the new proposal
                                               ■ 4. Amend § 38.1, by revising                                                                                 reflected in the concurrently issued
                                                                                                          (15) WEQ–022, Electric Industry                     NOPR on Data Collection for Analytics
                                               paragraph (b) to read as follows:
                                                                                                        Registry Business Practice Standards                  and Surveillance and Market-Based Rate
                                               § 38.1 Incorporation by reference of North               (WEQ Version 003.1, Sep. 30, 2015); and
Lhorne on DSK30JT082PROD with PROPOSALS




                                                                                                                                                              Purposes (Data Collection NOPR).2
                                               American Energy Standards Board
                                                                                                          (16) WEQ–023, Modeling Business
                                               Wholesale Electric Quadrant standards.                                                                           1 Collection of Connected Entity Data from
                                                                                                        Practice Standards (WEQ Version 003.1,
                                               *     *     *   *     *                                  Sep. 30, 2015).                                       Regional Transmission Organizations and
                                                 (b) The business practice and                                                                                Independent System Operators, FERC Stats. & Regs.
                                                                                                        [FR Doc. 2016–17841 Filed 7–27–16; 8:45 am]           ¶ 32,711 (2015).
                                               electronic communication standards the                                                                           2 Data Collection for Analytics and Surveillance
                                                                                                        BILLING CODE 6717–01–P
                                               Commission incorporates by reference                                                                           and Market-Based Rate Purposes, 156 FERC
                                               are as follows:                                                                                                ¶ 61,045 (2016).



                                          VerDate Sep<11>2014   14:42 Jul 27, 2016   Jkt 238001   PO 00000   Frm 00035   Fmt 4702   Sfmt 4702   E:\FR\FM\28JYP1.SGM   28JYP1



Document Created: 2016-07-28 01:47:52
Document Modified: 2016-07-28 01:47:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionProposed Rules
ActionNotice of proposed rulemaking.
DatesComments are due September 26, 2016.
ContactMichael P. Lee (technical issues), Office of Energy Policy and Innovation, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-6548.
FR Citation81 FR 49580 
CFR Citation18 CFR 2
18 CFR 38
CFR AssociatedElectric Utilities; Guidance and Policy Statements; Conflict of Interests; Electric Power Plants; Incorporation by Reference and Reporting and Recordkeeping Requirements

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR