81_FR_49792 81 FR 49647 - Brentwood Dam Ventures, LLC; Notice of Proposed Termination of Exemption by Implied Surrender and Soliciting Comments, Protests and Motions To Intervene

81 FR 49647 - Brentwood Dam Ventures, LLC; Notice of Proposed Termination of Exemption by Implied Surrender and Soliciting Comments, Protests and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 145 (July 28, 2016)

Page Range49647-49648
FR Document2016-17860

Federal Register, Volume 81 Issue 145 (Thursday, July 28, 2016)
[Federal Register Volume 81, Number 145 (Thursday, July 28, 2016)]
[Notices]
[Pages 49647-49648]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-17860]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 4254-011]


Brentwood Dam Ventures, LLC; Notice of Proposed Termination of 
Exemption by Implied Surrender and Soliciting Comments, Protests and 
Motions To Intervene

    Take notice that the following hydroelectric proceeding has been 
initiated by the Commission:

    a. Type of Proceeding: Proposed Termination of Exemption by Implied 
Surrender.
    b. Project No.: 4254-011.
    c. Date Initiated: July 20, 2016.
    d. Exemptee: Brentwood Dam Ventures, LLC.
    e. Name and Location of Project: Exeter River Hydro #1 Project 
located on the Exeter River, in Rockingham County, New Hampshire.
    f. Filed Pursuant to: 18 CFR 4.106.
    g. Exemptee Contact Information: Mr. Naoto Inoue, 25 Limerick Road, 
Arundel, Maine 04046, Phone: (207) 985-0088.
    h. FERC Contact: Mr. Ashish Desai, (202) 502-8370, 
[email protected].
    i. Deadline for filing comments, protests, and motions to intervene 
is 30 days from the issuance date of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file comments, 
protests, and motions to intervene using the Commission's eFiling 
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-4254-011.
    j. Description of Project Facilities: (1) An 110-foot-long, 15-
foot-high concrete dam; (2) a 24-acre reservoir; (3) an intake 
structure; (4) turbine-generator units with an installed capacity of 72 
kilowatts; and (5) appurtenant facilities.
    k. Description of Proceeding: The exemptee is in violation of 
Standard Article 1 of the exemption, issued on December 1, 1981 (17 
FERC ] 62,321), and the Commission's regulations at 18 CFR 4.106. 
Article 1 provides, among other things, that the Commission reserves 
the right to revoke an exemption if any term or condition of the 
exemption is violated.
    The exemptee's failure to operate and maintain the project as 
authorized by its exemption is a violation of Standard Article 1. 
Commission records indicate that the project has not been operated 
since 1998. The current exemptee acquired the project in February 2009 
and has been unable to restore project operation. On December 19, 2013, 
the exemptee filed a plan and schedule to restore project operation, 
which Commission staff approved with the requirement that the exemptee 
file quarterly progress reports starting October 1, 2014. The exemptee 
did not file the first progress report. By letter on December 19, 2014, 
Commission staff requested that the exemptee file the overdue progress 
report. In response, on January 9, 2015, the exemptee filed a

[[Page 49648]]

request for an extension of time stating it was unable to move forward 
with the approved plan and schedule and needed more time to reevaluate 
and formulate a plan of action. By telephone on March 12, 2015, 
Commission staff contacted the exemptee to inquire about the non-
operational status of the project. In response, the exemptee reiterated 
its need for additional time and stated it was looking for a buyer for 
the project. By letter on April 15, 2016, Commission staff again 
requested that the exemptee file a plan and schedule to restore project 
operation. In addition, Commission staff informed the exemptee that it 
was non-compliant with the exemption and that failure to maintain and 
operate the project as authorized would result in termination of the 
exemption by the Commission. On April 27, 2016, the exemptee filed a 
response stating the project was still for sale, but did not file a 
plan and schedule or any other information regarding its efforts to 
restore project operation.
    l. This notice is available for review and reproduction at the 
Commission in the Public Reference Room, Room 2A, 888 First Street NE., 
Washington, DC 20426. The notice and other project records may also be 
viewed on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the Docket number (P-4254-011) excluding the last 
three digits in the docket number field to access the notice. You may 
also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call toll-
free (866) 208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS,'' ``PROTEST,'' or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, protests, or motions to intervene should relate 
to project works which are the subject of the implied surrender. A copy 
of any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: July 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-17860 Filed 7-27-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                            Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Notices                                             49647

                                                Persons unable to file electronically                    The Commission encourages                             f. Filed Pursuant to: 18 CFR 4.106.
                                             should submit an original and 5 copies                   electronic submission of protests and                    g. Exemptee Contact Information: Mr.
                                             of the intervention or protest to the                    interventions in lieu of paper, using the             Naoto Inoue, 25 Limerick Road,
                                             Federal Energy Regulatory Commission,                    FERC Online links at http://                          Arundel, Maine 04046, Phone: (207)
                                             888 First Street NE., Washington, DC                     www.ferc.gov. To facilitate electronic                985–0088.
                                             20426.                                                   service, persons with Internet access                    h. FERC Contact: Mr. Ashish Desai,
                                                The filings in the above-referenced                   who will eFile a document and/or be                   (202) 502–8370, Ashish.Desai@ferc.gov.
                                             proceeding are accessible in the                         listed as a contact for an intervenor                    i. Deadline for filing comments,
                                             Commission’s eLibrary system by                          must create and validate an                           protests, and motions to intervene is 30
                                             clicking on the appropriate link in the                  eRegistration account using the                       days from the issuance date of this
                                             above list. They are also available for                  eRegistration link. Select the eFiling                notice by the Commission. The
                                             electronic review in the Commission’s                    link to log on and submit the                         Commission strongly encourages
                                             Public Reference Room in Washington,                     intervention or protests.                             electronic filing. Please file comments,
                                             DC. There is an eSubscription link on                       Persons unable to file electronically              protests, and motions to intervene using
                                             the Web site that enables subscribers to                 should submit an original and 5 copies                the Commission’s eFiling system at
                                             receive email notification when a                        of the intervention or protest to the                 http://www.ferc.gov/docs-filing/
                                             document is added to a subscribed                        Federal Energy Regulatory Commission,                 efiling.asp. Commenters can submit
                                             docket(s). For assistance with any FERC                  888 First Street NE., Washington, DC                  brief comments up to 6,000 characters,
                                             Online service, please email                             20426.                                                without prior registration, using the
                                             FERCOnlineSupport@ferc.gov or call                          The filings in the above-referenced                eComment system at http://
                                             (866) 208–3676 (toll free). For TTY, call                proceeding are accessible in the                      www.ferc.gov/docs-filing/
                                             (202) 502–8659.                                          Commission’s eLibrary system by                       ecomment.asp. You must include your
                                                                                                      clicking on the appropriate link in the               name and contact information at the end
                                               Dated: July 21, 2016.                                                                                        of your comments. For assistance,
                                                                                                      above list. They are also available for
                                             Nathaniel J. Davis, Sr.,                                                                                       please contact FERC Online Support at
                                                                                                      electronic review in the Commission’s
                                             Deputy Secretary.
                                                                                                      Public Reference Room in Washington,                  FERCOnlineSupport@ferc.gov, (866)
                                             [FR Doc. 2016–17837 Filed 7–27–16; 8:45 am]              DC. There is an eSubscription link on                 208–3676 (toll free), or (202) 502–8659
                                             BILLING CODE 6717–01–P                                   the Web site that enables subscribers to              (TTY). In lieu of electronic filing, please
                                                                                                      receive email notification when a                     send a paper copy to: Secretary, Federal
                                                                                                      document is added to a subscribed                     Energy Regulatory Commission, 888
                                             DEPARTMENT OF ENERGY                                                                                           First Street NE., Washington, DC 20426.
                                                                                                      docket(s). For assistance with any FERC
                                                                                                                                                            The first page of any filing should
                                             Federal Energy Regulatory                                Online service, please email
                                                                                                                                                            include docket number P–4254–011.
                                             Commission                                               FERCOnlineSupport@ferc.gov. or call                      j. Description of Project Facilities: (1)
                                                                                                      (866) 208–3676 (toll free). For TTY, call             An 110-foot-long, 15-foot-high concrete
                                             [Docket No. ER16–2241–000]                               (202) 502–8659.                                       dam; (2) a 24-acre reservoir; (3) an
                                             Ninnescah Wind Energy, LLC;                                Dated: July 21, 2016.                               intake structure; (4) turbine-generator
                                             Supplemental Notice That Initial                         Nathaniel J. Davis, Sr.,                              units with an installed capacity of 72
                                             Market-Based Rate Filing Includes                        Deputy Secretary.                                     kilowatts; and (5) appurtenant facilities.
                                             Request for Blanket Section 204                          [FR Doc. 2016–17838 Filed 7–27–16; 8:45 am]              k. Description of Proceeding: The
                                             Authorization                                            BILLING CODE 6717–01–P
                                                                                                                                                            exemptee is in violation of Standard
                                                                                                                                                            Article 1 of the exemption, issued on
                                               This is a supplemental notice in the                                                                         December 1, 1981 (17 FERC ¶ 62,321),
                                             above-referenced proceeding of                           DEPARTMENT OF ENERGY                                  and the Commission’s regulations at 18
                                             Ninnescah Wind Energy, LLC’s                                                                                   CFR 4.106. Article 1 provides, among
                                             application for market-based rate                        Federal Energy Regulatory                             other things, that the Commission
                                             authority, with an accompanying rate                     Commission                                            reserves the right to revoke an
                                             tariff, noting that such application                                                                           exemption if any term or condition of
                                                                                                      [Project No. 4254–011]
                                             includes a request for blanket                                                                                 the exemption is violated.
                                             authorization, under 18 CFR part 34, of                  Brentwood Dam Ventures, LLC; Notice                      The exemptee’s failure to operate and
                                             future issuances of securities and                       of Proposed Termination of Exemption                  maintain the project as authorized by its
                                             assumptions of liability.                                by Implied Surrender and Soliciting                   exemption is a violation of Standard
                                               Any person desiring to intervene or to                 Comments, Protests and Motions To                     Article 1. Commission records indicate
                                             protest should file with the Federal                     Intervene                                             that the project has not been operated
                                             Energy Regulatory Commission, 888                                                                              since 1998. The current exemptee
                                             First Street NE., Washington, DC 20426,                    Take notice that the following                      acquired the project in February 2009
                                             in accordance with Rules 211 and 214                     hydroelectric proceeding has been                     and has been unable to restore project
                                             of the Commission’s Rules of Practice                    initiated by the Commission:                          operation. On December 19, 2013, the
                                             and Procedure (18 CFR 385.211 and                          a. Type of Proceeding: Proposed                     exemptee filed a plan and schedule to
                                             385.214). Anyone filing a motion to                      Termination of Exemption by Implied                   restore project operation, which
                                             intervene or protest must serve a copy                   Surrender.                                            Commission staff approved with the
                                             of that document on the Applicant.                         b. Project No.: 4254–011.                           requirement that the exemptee file
Lhorne on DSK30JT082PROD with NOTICES




                                               Notice is hereby given that the                          c. Date Initiated: July 20, 2016.                   quarterly progress reports starting
                                             deadline for filing protests with regard                   d. Exemptee: Brentwood Dam                          October 1, 2014. The exemptee did not
                                             to the applicant’s request for blanket                   Ventures, LLC.                                        file the first progress report. By letter on
                                             authorization, under 18 CFR part 34, of                    e. Name and Location of Project:                    December 19, 2014, Commission staff
                                             future issuances of securities and                       Exeter River Hydro #1 Project located on              requested that the exemptee file the
                                             assumptions of liability, is August 10,                  the Exeter River, in Rockingham                       overdue progress report. In response, on
                                             2016.                                                    County, New Hampshire.                                January 9, 2015, the exemptee filed a


                                        VerDate Sep<11>2014   14:44 Jul 27, 2016   Jkt 238001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\28JYN1.SGM   28JYN1


                                             49648                          Federal Register / Vol. 81, No. 145 / Thursday, July 28, 2016 / Notices

                                             request for an extension of time stating                 all capital letters the title                            Docket Numbers: ER16–1443–000.
                                             it was unable to move forward with the                   ‘‘COMMENTS,’’ ‘‘PROTEST,’’ or                            Applicants: NRG Power Midwest LP.
                                             approved plan and schedule and needed                    ‘‘MOTION TO INTERVENE’’ as                               Description: Report Filing: Refund
                                             more time to reevaluate and formulate a                  applicable; (2) set forth in the heading              Report—Informational Filing to be
                                             plan of action. By telephone on March                    the name of the applicant and the                     effective N/A.
                                             12, 2015, Commission staff contacted                     project number of the application to                     Filed Date: 7/20/16.
                                             the exemptee to inquire about the non-                   which the filing responds; (3) furnish                   Accession Number: 20160720–5062.
                                             operational status of the project. In                    the name, address, and telephone                         Comments Due: 5 p.m. ET 8/10/16.
                                             response, the exemptee reiterated its                    number of the person protesting or                       Docket Numbers: ER16–1638–001.
                                             need for additional time and stated it                   intervening; and (4) otherwise comply                    Applicants: 4C Acquisition, LLC.
                                             was looking for a buyer for the project.                 with the requirements of 18 CFR                          Description: Tariff Amendment:
                                             By letter on April 15, 2016, Commission                  385.2001 through 385.2005. All                        Response to Request for Additional
                                             staff again requested that the exemptee                  comments, motions to intervene, or                    Information of 4CA to be effective 8/4/
                                             file a plan and schedule to restore                      protests must set forth their evidentiary             2016.
                                             project operation. In addition,                          basis and otherwise comply with the                      Filed Date: 7/20/16.
                                             Commission staff informed the                            requirements of 18 CFR 4.34(b). All                      Accession Number: 20160720–5131.
                                             exemptee that it was non-compliant                       comments, protests, or motions to                        Comments Due: 5 p.m. ET 8/10/16.
                                             with the exemption and that failure to                   intervene should relate to project works                 Docket Numbers: ER16–2252–000.
                                             maintain and operate the project as                      which are the subject of the implied                     Applicants: Antelope DSR 1, LLC.
                                             authorized would result in termination                   surrender. A copy of any protest or                      Description: Baseline eTariff Filing:
                                             of the exemption by the Commission.                      motion to intervene must be served                    Antelope DSR 1, LLC Co-Tenancy
                                             On April 27, 2016, the exemptee filed a                  upon each representative of the                       Agreement to be effective 8/1/2016.
                                             response stating the project was still for               applicant specified in the particular                    Filed Date: 7/20/16.
                                             sale, but did not file a plan and                        application. If an intervener files                      Accession Number: 20160720–5124.
                                             schedule or any other information                        comments or documents with the                           Comments Due: 5 p.m. ET 8/10/16.
                                             regarding its efforts to restore project                 Commission relating to the merits of an
                                             operation.                                                                                                        Docket Numbers: ER16–2253–000.
                                                                                                      issue that may affect the responsibilities               Applicants: Antelope DSR 2, LLC.
                                                l. This notice is available for review                of a particular resource agency, they
                                             and reproduction at the Commission in                                                                             Description: Baseline eTariff Filing:
                                                                                                      must also serve a copy of the document                Antelope DSR 2, LLC Co-Tenancy
                                             the Public Reference Room, Room 2A,                      on that resource agency. A copy of all
                                             888 First Street NE., Washington, DC                                                                           Agreement to be effective 8/1/2016.
                                                                                                      other filings in reference to this                       Filed Date: 7/20/16.
                                             20426. The notice and other project                      application must be accompanied by
                                             records may also be viewed on the                                                                                 Accession Number: 20160720–5126.
                                                                                                      proof of service on all persons listed in                Comments Due: 5 p.m. ET 8/10/16.
                                             Commission’s Web site at http://                         the service list prepared by the
                                             www.ferc.gov/docs-filing/elibrary.asp.                   Commission in this proceeding in                         Docket Numbers: ER16–2254–000.
                                             Enter the Docket number (P–4254–011)                     accordance with 18 CFR 4.34(b) and                       Applicants: Antelope DSR 3, LLC.
                                             excluding the last three digits in the                   385.2010.                                                Description: Baseline eTariff Filing:
                                             docket number field to access the                                                                              Antelope DSR 3, LLC Co-Tenancy
                                             notice. You may also register online at                    Dated: July 20, 2016.                               Agreement to be effective 8/1/2016.
                                             http://www.ferc.gov/docs-filing/                         Kimberly D. Bose,                                        Filed Date: 7/20/16.
                                             esubscription.asp to be notified via                     Secretary.                                               Accession Number: 20160720–5127.
                                             email of new filings and issuances                       [FR Doc. 2016–17860 Filed 7–27–16; 8:45 am]              Comments Due: 5 p.m. ET 8/10/16.
                                             related to this or other pending projects.               BILLING CODE 6717–01–P                                   Docket Numbers: ER16–2255–000.
                                             For assistance, call toll-free (866) 208–                                                                         Applicants: Elevation Solar C LLC.
                                             3676 or email FERCOnlineSupport@                                                                                  Description: Baseline eTariff Filing:
                                             ferc.gov. For TTY, call (202) 502–8659.                  DEPARTMENT OF ENERGY                                  Elevation Solar C LLC Co-Tenancy
                                                m. Individuals desiring to be included                                                                      Agreement to be effective 8/1/2016.
                                             on the Commission’s mailing list should                  Federal Energy Regulatory
                                                                                                                                                               Filed Date: 7/20/16.
                                             so indicate by writing to the Secretary                  Commission
                                                                                                                                                               Accession Number: 20160720–5128.
                                             of the Commission.                                                                                                Comments Due: 5 p.m. ET 8/10/16.
                                                n. Comments, Protests, or Motions to                  Combined Notice of Filings #1
                                             Intervene: Anyone may submit                                                                                      Docket Numbers: ER16–2256–000.
                                                                                                         Take notice that the Commission                       Applicants: Solverde 1, LLC.
                                             comments, a protest, or a motion to                      received the following electric rate
                                             intervene in accordance with the                                                                                  Description: Baseline eTariff Filing:
                                                                                                      filings:                                              Solverde 1, LLC Co-Tenancy Agreement
                                             requirements of Rules of Practice and                       Docket Numbers: ER10–2960–006;
                                             Procedure, 18 CFR 385.210, .211, and                                                                           to be effective 8/1/2016.
                                                                                                      ER10–1618–006; ER10–1616–006;                            Filed Date: 7/20/16.
                                             .214. In determining the appropriate                     ER10–1598–006; ER10–1595–006.
                                             action to take, the Commission will                                                                               Accession Number: 20160720–5129.
                                                                                                         Applicants: Astoria Generating
                                             consider all protests or other comments                                                                           Comments Due: 5 p.m. ET 8/10/16.
                                                                                                      Company, L.P., Crete Energy Venture,
                                             filed, but only those who file a motion                  LLC, Lincoln Generating Facility, LLC,                   Docket Numbers: ER16–2257–000.
                                             to intervene in accordance with the                      New Covert Generating Company, LLC,                      Applicants: Western Antelope Blue
                                             Commission’s Rules may become a                          Rolling Hills Generating, L.L.C.                      Sky Ranch B LLC.
Lhorne on DSK30JT082PROD with NOTICES




                                             party to the proceeding. Any comments,                      Description: Supplement to May 31,                    Description: Baseline eTariff Filing:
                                             protests, or motions to intervene must                   2016 Notice of Non-Material Change in                 Western Antelope Blue Sky Ranch B
                                             be received on or before the specified                   Status of Astoria Generating Company,                 LLC Co-Tenancy Agreement to be
                                             comment date for the particular                          L.P., et al.                                          effective 8/1/2016.
                                             application.                                                Filed Date: 7/20/16.                                  Filed Date: 7/20/16.
                                                o. Filing and Service of Responsive                      Accession Number: 20160720–5162.                      Accession Number: 20160720–5130.
                                             Documents: Any filing must (1) bear in                      Comments Due: 5 p.m. ET 8/10/16.                      Comments Due: 5 p.m. ET 8/10/16.


                                        VerDate Sep<11>2014   14:44 Jul 27, 2016   Jkt 238001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\28JYN1.SGM   28JYN1



Document Created: 2016-07-28 01:47:26
Document Modified: 2016-07-28 01:47:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 49647 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR