81_FR_50117 81 FR 49971 - PennEast Pipeline Company, LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Penneast Pipeline Project

81 FR 49971 - PennEast Pipeline Company, LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Penneast Pipeline Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 146 (July 29, 2016)

Page Range49971-49973
FR Document2016-18038

Federal Register, Volume 81 Issue 146 (Friday, July 29, 2016)
[Federal Register Volume 81, Number 146 (Friday, July 29, 2016)]
[Notices]
[Pages 49971-49973]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-18038]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-558-000]


PennEast Pipeline Company, LLC; Notice of Availability of the 
Draft Environmental Impact Statement for the Proposed Penneast Pipeline 
Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared a draft environmental impact statement (EIS) 
for the PennEast Pipeline Project, proposed by PennEast Pipeline 
Company, LLC (PennEast) in the above-referenced docket. PennEast 
requests authorization to construct and operate a 118.8-mile-long 
pipeline to provide 1.1 million dekatherms per day (MMDth/d) of year-
round natural gas transportation service from northern Pennsylvania to 
markets in eastern Pennsylvania, New Jersey, and surrounding states.
    The draft EIS assesses the potential environmental effects of the 
construction and operation of the PennEast Pipeline Project in 
accordance with the requirements of the National Environmental Policy 
Act (NEPA). The FERC staff concludes that approval of the proposed 
project, with the mitigation measures recommended in the EIS, would 
result in some adverse environmental impacts, but impacts would be 
reduced to less-than-significant levels with the implementation of 
PennEast's proposed and FERC staff recommended mitigation measures. 
This determination is based on a review of the information provided by 
PennEast and further developed from data requests; field 
investigations; scoping; literature research; alternatives analysis; 
and contacts with federal, state, and local agencies as well as Indian 
tribes and individual members of the public.
    The U.S. Environmental Protection Agency, U.S. Army Corps of 
Engineers, U.S. Fish and Wildlife Service, U.S. Department of 
Agriculture, Natural Resource Conservation Service, and U.S. Department 
of Transportation's Pipeline and Hazardous Materials Safety 
Administration participated as cooperating agencies in the preparation 
of the EIS. Cooperating agencies have jurisdiction by law or special 
expertise with respect to resources potentially affected by the 
proposal and participate in the NEPA analysis. Although these agencies 
provided input to the conclusions and recommendations presented in the 
draft EIS, the agencies will present their own conclusions and

[[Page 49972]]

recommendations in any respective record of decision or determination 
for the Project.
    The draft EIS addresses the potential environmental effects of the 
construction and operation of the following project facilities:
     115.1 miles of new, 36-inch-diameter pipeline extending 
from Luzerne County, Pennsylvania to Mercer County, New Jersey (77 
miles in Pennsylvania and 38 miles in New Jersey);
     the 2.1-mile Hellertown Lateral consisting of 24-inch-
diameter pipe in Northampton County, Pennsylvania;
     the 0.1-mile Gilbert Lateral consisting of 12-inch-
diameter pipe in Hunterdon County, New Jersey;
     the 1.5-mile Lambertville Lateral consisting of 36-inch-
diameter pipe in Hunterdon County, New Jersey;
     new, 47,700 total hp Kidder Compressor Station in Kidder 
Township, Carbon County, Pennsylvania; and
     associated aboveground facilities including eight metering 
and regulating stations for interconnections, 11 main line valve sites, 
and four pig launcher/receiver sites.
    The FERC staff mailed copies of the draft EIS to federal, state, 
and local government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; and newspapers and libraries in the project area. Paper copy 
versions of this EIS (Volume I in paper copy, Volumes II and III on CD) 
were mailed to those specifically requesting them; all others received 
a CD version of the entire document. In addition, the draft EIS is 
available for public viewing on the FERC's Web site (www.ferc.gov) 
using the eLibrary link. A limited number of copies are available for 
distribution and public inspection at: Federal Energy Regulatory 
Commission, Public Reference Room, 888 First Street NE., Room 2A, 
Washington, DC 20426, (202) 502-8371.
    Any person wishing to comment on the draft EIS may do so. To ensure 
consideration of your comments on the proposal in the final EIS, it is 
important that the Commission receive your comments on or before 
September 12, 2016.
    For your convenience, there are four methods you can use to submit 
your comments to the Commission. The Commission will provide equal 
consideration to all comments received, whether filed in written form 
or provided verbally. The Commission encourages electronic filing of 
comments and has expert staff available to assist you at (202) 502-8258 
or [email protected]. Please carefully follow these instructions so that 
your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP15-558-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426;
    (4) In lieu of sending written or electronic comments, the 
Commission invites you to attend one of the public comment meetings its 
staff will conduct in the project area to receive comments on the draft 
EIS. To ensure interested parties have ample opportunity to attend a 
public comment meeting six meetings are scheduled as follows:

----------------------------------------------------------------------------------------------------------------
                              Date and time                                               Location
----------------------------------------------------------------------------------------------------------------
Monday, August 15, 2016 6-10 p.m.........................................  Best Western Lehigh Valley &
                                                                            Conference Center, 300 Gateway
                                                                            Drive, Bethlehem, PA 18017, Phone:
                                                                            610-866-5800.
Monday, August 15, 2016 6-10 p.m.........................................  Penn's Peak, 325 Maury Road, Jim
                                                                            Thorpe, PA 18229, Phone: 610-826-
                                                                            9000.
Tuesday, August 16, 2016 6-10 p.m........................................  Grand Colonial, 86 Route 173 West,
                                                                            Hampton, NJ 08827, Phone: 908-735-
                                                                            7889.
Tuesday, August 16, 2016 6-10 p.m........................................  Peddler's Village, (Lahaska and
                                                                            Neshaminy Rooms), Routes 202 & 263,
                                                                            Lahaska, PA 19831, Phone: 215-794-
                                                                            4000.
Wednesday, August 17, 2016 6-10 p.m......................................  Best Western Genetti Hotel &
                                                                            Conference Center, 77 E Market
                                                                            Street, Wilkes-Barre, PA 18701,
                                                                            Phone: 570-823-6152.
Wednesday, August 17, 2016 6-10 p.m......................................  Clifford B. Memorial Hall, 1666
                                                                            Pennington Road, Ewing, NJ 08618,
                                                                            Phone: 609-882-3221.
----------------------------------------------------------------------------------------------------------------

    The meetings will be scheduled from 6:00 p.m. to 10:00 p.m. There 
will not be a formal presentation by Commission staff. The primary goal 
will be to have your verbal environmental comments on the draft EIS 
documented in the public record. Verbal comments will be recorded by 
stenographers in one-on-one settings, and transcriptions will be placed 
into the docket for the project and made available for public viewing 
on FERC's eLibrary system (see below for instructions on using 
eLibrary). If a significant number of people are interested in 
providing verbal comments in the one-on-one settings, a time limit of 3 
to 5 minutes may be implemented for each commenter. It is important to 
note that verbal comments hold the same weight as written or 
electronically submitted comments. Although there will not be a formal 
presentation, Commission staff will be available throughout the 
meetings to answer your questions about the environmental review 
process.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR part 385.214).\1\ Only intervenors have 
the right to seek rehearing of the Commission's decision. The 
Commission grants affected landowners and others with environmental 
concerns intervenor status upon showing good cause by stating that they 
have a clear and direct interest in this proceeding which no other 
party can adequately represent. Simply filing environmental comments 
will not give you intervenor status, but you do not need intervenor 
status to have your comments considered.
---------------------------------------------------------------------------

    \1\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

Questions?

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web

[[Page 49973]]

site (www.ferc.gov) using the eLibrary link. Click on the eLibrary 
link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP15-
558-000). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676; for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription that allows you to keep track of all formal issuances and 
submittals in specific dockets. This can reduce the amount of time you 
spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: July 22, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18038 Filed 7-28-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 81, No. 146 / Friday, July 29, 2016 / Notices                                           49971

                                                an application in Docket No. CP16–98–                    landowners; federal, state, and local                 DEPARTMENT OF ENERGY
                                                000 requesting a Certificate of Public                   government agencies; elected officials;
                                                Convenience and Necessity pursuant to                    environmental and public interest                     Federal Energy Regulatory
                                                Section 7(c) of the Natural Gas Act to                   groups; Native American tribes; other                 Commission
                                                construct and operate certain natural gas                interested parties; and local libraries               [Docket No. CP15–558–000]
                                                pipeline facilities. The proposed project                and newspapers. In response to the NOI,
                                                is known as the Transco to Charleston                    the Commission received comments                      PennEast Pipeline Company, LLC;
                                                Project (Project), and would provide                     from the U.S. Fish and Wildlife Service,              Notice of Availability of the Draft
                                                firm transportation service of 80,000                    the South Carolina Department of                      Environmental Impact Statement for
                                                dekatherms per day (Dth/day) to local                    Natural Resources, the Columbia South                 the Proposed Penneast Pipeline
                                                commercial, industrial, and power                                                                              Project
                                                                                                         Carolina Chamber of Commerce, the
                                                generation customers.
                                                   On March 21, 2016, the Federal                        South Carolina Electric and Gas                          The staff of the Federal Energy
                                                Energy Regulatory Commission                             Company, the Natural Gas Supply                       Regulatory Commission (FERC or
                                                (Commission or FERC) issued its Notice                   Association, Upstate Forever, and 20                  Commission) has prepared a draft
                                                of Application for the Project. Among                    landowners. The primary issues raised                 environmental impact statement (EIS)
                                                other things, that notice alerted agencies               by the commentors are potential                       for the PennEast Pipeline Project,
                                                issuing federal authorizations of the                    crossings of private lands, wildlife                  proposed by PennEast Pipeline
                                                requirement to complete all necessary                    species and habitat, and water quality,               Company, LLC (PennEast) in the above-
                                                reviews and to reach a final decision on                 as well as general support for, and                   referenced docket. PennEast requests
                                                a request for a federal authorization                    opposition to, the Project.                           authorization to construct and operate a
                                                within 90 days of the date of issuance                                                                         118.8-mile-long pipeline to provide 1.1
                                                of the Commission staff’s Environmental                  Additional Information                                million dekatherms per day (MMDth/d)
                                                Assessment (EA) for the Project. This                                                                          of year-round natural gas transportation
                                                                                                            In order to receive notification of the            service from northern Pennsylvania to
                                                instant notice identifies the FERC staff’s               issuance of the EA and to keep track of
                                                planned schedule for the completion of                                                                         markets in eastern Pennsylvania, New
                                                                                                         all formal issuances and submittals in                Jersey, and surrounding states.
                                                the EA for the Project.                                  specific dockets, the Commission offers                  The draft EIS assesses the potential
                                                Schedule for Environmental Review                        a free service called eSubscription. This             environmental effects of the
                                                Issuance of EA September 19, 2016                        can reduce the amount of time you                     construction and operation of the
                                                90-day Federal Authorization Decision                    spend researching proceedings by                      PennEast Pipeline Project in accordance
                                                   Deadline December 18, 2016                            automatically providing you with                      with the requirements of the National
                                                   If a schedule change becomes                          notification of these filings, document               Environmental Policy Act (NEPA). The
                                                necessary, additional notice will be                     summaries, and direct links to the                    FERC staff concludes that approval of
                                                provided so that the relevant agencies                   documents. Go to www.ferc.gov/docs-                   the proposed project, with the
                                                are kept informed of the Project’s                       filing/esubscription.asp.                             mitigation measures recommended in
                                                progress.                                                                                                      the EIS, would result in some adverse
                                                                                                            Additional information about the
                                                                                                                                                               environmental impacts, but impacts
                                                Project Description                                      Project is available from the                         would be reduced to less-than-
                                                                                                         Commission’s Office of External Affairs               significant levels with the
                                                   Dominion would construct and
                                                                                                         at (866) 208–FERC or on the FERC Web                  implementation of PennEast’s proposed
                                                operate 55 miles of 12-inch-diameter
                                                natural gas pipeline in Spartanburg,                     site (www.ferc.gov). Using the                        and FERC staff recommended mitigation
                                                Laurens, Newberry, and Greenwood                         ‘‘eLibrary’’ link, select ‘‘General Search’’          measures. This determination is based
                                                Counties, South Carolina; 5 miles of 4-                  from the eLibrary menu, enter the                     on a review of the information provided
                                                inch-diameter natural gas pipeline in                    selected date range and ‘‘Docket                      by PennEast and further developed from
                                                Dillon County, South Carolina; a new                     Number’’ excluding the last three digits              data requests; field investigations;
                                                3,600-horsepower (hp) compressor                         (i.e., CP16–98), and follow the                       scoping; literature research; alternatives
                                                station in Dorchester County, South                      instructions. For assistance with access              analysis; and contacts with federal,
                                                Carolina; add 2,800 hp of compression                    to eLibrary, the helpline can be reached              state, and local agencies as well as
                                                at an existing compressor station in                     at (866) 208–3676, TTY (202) 502–8659,                Indian tribes and individual members of
                                                Spartanburg County, South Carolina;                      or at FERCOnlineSupport@ferc.gov. The                 the public.
                                                modify operation at an existing                          eLibrary link on the FERC Web site also                  The U.S. Environmental Protection
                                                compressor station in Aiken County,                      provides access to the texts of formal                Agency, U.S. Army Corps of Engineers,
                                                South Carolina; and construct and                        documents issued by the Commission,                   U.S. Fish and Wildlife Service, U.S.
                                                operate support facilities in Aiken,                     such as orders, notices, and rule                     Department of Agriculture, Natural
                                                Charleston, Dillon, Dorchester,                          makings.                                              Resource Conservation Service, and U.S.
                                                Greenwood, Laurens, Newberry, and                                                                              Department of Transportation’s Pipeline
                                                                                                           Dated: July 25, 2016.                               and Hazardous Materials Safety
                                                Spartanburg Counties, South Carolina.
                                                                                                         Kimberly D. Bose,                                     Administration participated as
                                                Background                                               Secretary.                                            cooperating agencies in the preparation
                                                   On October 30, 2015, the Commission                   [FR Doc. 2016–18040 Filed 7–28–16; 8:45 am]           of the EIS. Cooperating agencies have
                                                issued a Notice of Intent to Prepare an                                                                        jurisdiction by law or special expertise
ebenthall on DSK5MVXVN1PROD with NOTICES




                                                                                                         BILLING CODE 6717–01–P
                                                Environmental Assessment for the                                                                               with respect to resources potentially
                                                Planned Transco to Charleston Project                                                                          affected by the proposal and participate
                                                and Request for Comments on                                                                                    in the NEPA analysis. Although these
                                                Environmental Issues (NOI). The NOI                                                                            agencies provided input to the
                                                was issued during the pre-filing review                                                                        conclusions and recommendations
                                                of the Project in Docket No. PF15–29–                                                                          presented in the draft EIS, the agencies
                                                000 and was sent to affected                                                                                   will present their own conclusions and


                                           VerDate Sep<11>2014   21:05 Jul 29, 2016   Jkt 238001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\29JYN1.SGM   29JYN1


                                                49972                            Federal Register / Vol. 81, No. 146 / Friday, July 29, 2016 / Notices

                                                recommendations in any respective                         other interested individuals and groups;                 (1) You can file your comments
                                                record of decision or determination for                   and newspapers and libraries in the                   electronically using the eComment
                                                the Project.                                              project area. Paper copy versions of this             feature on the Commission’s Web site
                                                   The draft EIS addresses the potential                  EIS (Volume I in paper copy, Volumes                  (www.ferc.gov) under the link to
                                                environmental effects of the                              II and III on CD) were mailed to those                Documents and Filings. This is an easy
                                                construction and operation of the                         specifically requesting them; all others              method for submitting brief, text-only
                                                following project facilities:                             received a CD version of the entire                   comments on a project;
                                                   • 115.1 miles of new, 36-inch-                         document. In addition, the draft EIS is                  (2) You can file your comments
                                                diameter pipeline extending from                          available for public viewing on the                   electronically by using the eFiling
                                                Luzerne County, Pennsylvania to                           FERC’s Web site (www.ferc.gov) using                  feature on the Commission’s Web site
                                                Mercer County, New Jersey (77 miles in                    the eLibrary link. A limited number of                (www.ferc.gov) under the link to
                                                Pennsylvania and 38 miles in New                          copies are available for distribution and             Documents and Filings. With eFiling,
                                                Jersey);                                                  public inspection at: Federal Energy                  you can provide comments in a variety
                                                   • the 2.1-mile Hellertown Lateral                      Regulatory Commission, Public                         of formats by attaching them as a file
                                                consisting of 24-inch-diameter pipe in                    Reference Room, 888 First Street NE.,                 with your submission. New eFiling
                                                Northampton County, Pennsylvania;                         Room 2A, Washington, DC 20426, (202)                  users must first create an account by
                                                   • the 0.1-mile Gilbert Lateral                         502–8371.                                             clicking on ‘‘eRegister.’’ If you are filing
                                                consisting of 12-inch-diameter pipe in                                                                          a comment on a particular project,
                                                                                                             Any person wishing to comment on
                                                Hunterdon County, New Jersey;                                                                                   please select ‘‘Comment on a Filing’’ as
                                                   • the 1.5-mile Lambertville Lateral                    the draft EIS may do so. To ensure
                                                                                                          consideration of your comments on the                 the filing type; or
                                                consisting of 36-inch-diameter pipe in
                                                Hunterdon County, New Jersey;                             proposal in the final EIS, it is important               (3) You can file a paper copy of your
                                                   • new, 47,700 total hp Kidder                          that the Commission receive your                      comments by mailing them to the
                                                Compressor Station in Kidder                              comments on or before September 12,                   following address. Be sure to reference
                                                Township, Carbon County,                                  2016.                                                 the project docket number (CP15–558–
                                                Pennsylvania; and                                            For your convenience, there are four               000) with your submission: Kimberly D.
                                                   • associated aboveground facilities                    methods you can use to submit your                    Bose, Secretary, Federal Energy
                                                including eight metering and regulating                   comments to the Commission. The                       Regulatory Commission, 888 First Street
                                                stations for interconnections, 11 main                    Commission will provide equal                         NE., Room 1A, Washington, DC 20426;
                                                line valve sites, and four pig launcher/                  consideration to all comments received,                  (4) In lieu of sending written or
                                                receiver sites.                                           whether filed in written form or                      electronic comments, the Commission
                                                   The FERC staff mailed copies of the                    provided verbally. The Commission                     invites you to attend one of the public
                                                draft EIS to federal, state, and local                    encourages electronic filing of                       comment meetings its staff will conduct
                                                government representatives and                            comments and has expert staff available               in the project area to receive comments
                                                agencies; elected officials;                              to assist you at (202) 502–8258 or                    on the draft EIS. To ensure interested
                                                environmental and public interest                         efiling@ferc.gov. Please carefully follow             parties have ample opportunity to
                                                groups; Native American tribes;                           these instructions so that your                       attend a public comment meeting six
                                                potentially affected landowners and                       comments are properly recorded.                       meetings are scheduled as follows:

                                                                  Date and time                                                                            Location

                                                Monday, August 15, 2016         6–10 p.m. .............   Best Western Lehigh Valley & Conference Center, 300 Gateway Drive, Bethlehem, PA 18017,
                                                                                                            Phone: 610–866–5800.
                                                Monday, August 15, 2016 6–10 p.m. .............           Penn’s Peak, 325 Maury Road, Jim Thorpe, PA 18229, Phone: 610–826–9000.
                                                Tuesday, August 16, 2016 6–10 p.m. ............           Grand Colonial, 86 Route 173 West, Hampton, NJ 08827, Phone: 908–735–7889.
                                                Tuesday, August 16, 2016 6–10 p.m. ............           Peddler’s Village, (Lahaska and Neshaminy Rooms), Routes 202 & 263, Lahaska, PA 19831,
                                                                                                            Phone: 215–794–4000.
                                                Wednesday, August 17, 2016            6–10 p.m. .......   Best Western Genetti Hotel & Conference Center, 77 E Market Street, Wilkes-Barre, PA 18701,
                                                                                                            Phone: 570–823–6152.
                                                Wednesday, August 17, 2016            6–10 p.m. .......   Clifford B. Memorial Hall, 1666 Pennington Road, Ewing, NJ 08618, Phone: 609–882–3221.



                                                  The meetings will be scheduled from                     for each commenter. It is important to                rehearing of the Commission’s decision.
                                                6:00 p.m. to 10:00 p.m. There will not                    note that verbal comments hold the                    The Commission grants affected
                                                be a formal presentation by Commission                    same weight as written or electronically              landowners and others with
                                                staff. The primary goal will be to have                   submitted comments. Although there                    environmental concerns intervenor
                                                your verbal environmental comments on                     will not be a formal presentation,                    status upon showing good cause by
                                                the draft EIS documented in the public                    Commission staff will be available                    stating that they have a clear and direct
                                                record. Verbal comments will be                           throughout the meetings to answer your                interest in this proceeding which no
                                                recorded by stenographers in one-on-                      questions about the environmental                     other party can adequately represent.
                                                one settings, and transcriptions will be                  review process.                                       Simply filing environmental comments
                                                placed into the docket for the project                      Any person seeking to become a party                will not give you intervenor status, but
ebenthall on DSK5MVXVN1PROD with NOTICES




                                                                                                          to the proceeding must file a motion to               you do not need intervenor status to
                                                and made available for public viewing
                                                                                                          intervene pursuant to Rule 214 of the                 have your comments considered.
                                                on FERC’s eLibrary system (see below
                                                                                                          Commission’s Rules of Practice and                    Questions?
                                                for instructions on using eLibrary). If a
                                                                                                          Procedures (18 CFR part 385.214).1 Only
                                                significant number of people are                                                                                   Additional information about the
                                                                                                          intervenors have the right to seek
                                                interested in providing verbal comments                                                                         project is available from the
                                                in the one-on-one settings, a time limit                     1 See the previous discussion on the methods for   Commission’s Office of External Affairs,
                                                of 3 to 5 minutes may be implemented                      filing comments.                                      at (866) 208–FERC, or on the FERC Web


                                           VerDate Sep<11>2014   21:05 Jul 29, 2016   Jkt 238001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\29JYN1.SGM   29JYN1


                                                                                 Federal Register / Vol. 81, No. 146 / Friday, July 29, 2016 / Notices                                                 49973

                                                site (www.ferc.gov) using the eLibrary                     Description: Supplement to July 14,                 DEPARTMENT OF ENERGY
                                                link. Click on the eLibrary link, click on               2016 Clinton Battery Utility, LLC
                                                ‘‘General Search,’’ and enter the docket                 submits filing.                                       Federal Energy Regulatory
                                                number excluding the last three digits in                  Filed Date: 7/22/16.                                Commission
                                                the Docket Number field (i.e., CP15–
                                                                                                           Accession Number: 20160722–5185.                    Combined Notice of Filings
                                                558–000). Be sure you have selected an
                                                appropriate date range. For assistance,                    Comments Due: 5 p.m. ET 8/5/16.
                                                                                                                                                                 Take notice that the Commission has
                                                please contact FERC Online Support at                      Docket Numbers: ER16–2272–000.                      received the following Natural Gas
                                                FercOnlineSupport@ferc.gov or toll free                    Applicants: Puget Sound Energy, Inc                 Pipeline Rate and Refund Report filings:
                                                at (866) 208–3676; for TTY, contact
                                                (202) 502–8659. The eLibrary link also                     Description: § 205(d) Rate Filing:                  Filings Instituting Proceedings
                                                provides access to the texts of formal                   Attachment O Revisions to Implement
                                                                                                         Intrachange Scheduling and Imbalance                     Docket Numbers: RP16–1098–000.
                                                documents issued by the Commission,                                                                               Applicants: Dominion Carolina Gas
                                                such as orders, notices, and                             Charges to be effective 9/20/2016.
                                                                                                                                                               Transmission, LLC.
                                                rulemakings.                                               Filed Date: 7/22/16.
                                                                                                                                                                  Description: § 4(d) Rate Filing:
                                                   In addition, the Commission offers a                    Accession Number: 20160722–5180.                    DCGT—July 20, 2016, Administrative
                                                free service called eSubscription that                     Comments Due: 5 p.m. ET 8/12/16.                    Changes to be effective 8/19/2016.
                                                allows you to keep track of all formal                                                                            Filed Date: 7/20/16.
                                                issuances and submittals in specific                       Docket Numbers: ER16–2273–000.
                                                                                                                                                                  Accession Number: 20160720–5086.
                                                dockets. This can reduce the amount of                     Applicants: Passadumkeag Windpark,                     Comments Due: 5 p.m. ET 8/1/16.
                                                time you spend researching proceedings                   LLC.
                                                by automatically providing you with                                                                               Docket Numbers: RP16–1099–000.
                                                                                                           Description: § 205(d) Rate Filing:                     Applicants: Colorado Interstate Gas
                                                notification of these filings, document                  Passadumkeag Market-Based Rate Tariff
                                                summaries, and direct links to the                                                                             Company, L.L.C.
                                                                                                         Amendment Filing to be effective 7/26/
                                                documents. Go to www.ferc.gov/docs-                                                                               Description: § 4(d) Rate Filing:
                                                                                                         2016.
                                                filing/esubscription.asp.                                                                                      Negotiated Rate Update Filing—
                                                                                                           Filed Date: 7/25/16.                                Colorado Springs Utilities to be effective
                                                  Dated: July 22, 2016.
                                                                                                           Accession Number: 20160725–5057.                    8/1/2016.
                                                Kimberly D. Bose,                                                                                                 Filed Date: 7/20/16.
                                                                                                           Comments Due: 5 p.m. ET 8/15/16.
                                                Secretary.                                                                                                        Accession Number: 20160720–5122.
                                                [FR Doc. 2016–18038 Filed 7–28–16; 8:45 am]                Docket Numbers: ER16–2274–000.                         Comments Due: 5 p.m. ET 8/1/16.
                                                BILLING CODE 6717–01–P                                     Applicants: Parrey, LLC.                               Docket Numbers: RP16–1100–000.
                                                                                                           Description: § 205(d) Rate Filing:                     Applicants: Rockies Express Pipeline
                                                                                                         Parrey Market-Based Rate Tariff                       LLC.
                                                DEPARTMENT OF ENERGY                                     Amendment Filing to be effective 7/26/                   Description: § 4(d) Rate Filing: Neg
                                                Federal Energy Regulatory                                2016.                                                 Rate 2016–07–20, CP, Encana to be
                                                Commission                                                 Filed Date: 7/25/16.                                effective 7/21/2016.
                                                                                                           Accession Number: 20160725–5058.                       Filed Date: 7/20/16.
                                                Combined Notice of Filings #1                                                                                     Accession Number: 20160720–5123.
                                                                                                           Comments Due: 5 p.m. ET 8/15/16.
                                                                                                                                                                  Comments Due: 5 p.m. ET 8/1/16.
                                                   Take notice that the Commission                          The filings are accessible in the
                                                received the following electric corporate                                                                         The filings are accessible in the
                                                                                                         Commission’s eLibrary system by                       Commission’s eLibrary system by
                                                filings:                                                 clicking on the links or querying the
                                                   Docket Numbers: EC16–156–000.                                                                               clicking on the links or querying the
                                                                                                         docket number.                                        docket number.
                                                   Applicants: Town Square Energy East,                     Any person desiring to intervene or
                                                LLC, Town Square Energy, LLC.                                                                                     Any person desiring to intervene or
                                                                                                         protest in any of the above proceedings               protest in any of the above proceedings
                                                   Description: Application of Town                      must file in accordance with Rules 211
                                                Square Energy East, LLC, et al. for                                                                            must file in accordance with Rules 211
                                                                                                         and 214 of the Commission’s                           and 214 of the Commission’s
                                                Authorization Under Federal Power Act                    Regulations (18 CFR 385.211 and
                                                Section 203 and Requests for Expedited                                                                         Regulations (18 CFR 385.211 and
                                                                                                         385.214) on or before 5:00 p.m. Eastern               385.214) on or before 5:00 p.m. Eastern
                                                Treatment and Confidential                               time on the specified comment date.
                                                Information.                                                                                                   time on the specified comment date.
                                                                                                         Protests may be considered, but                       Protests may be considered, but
                                                   Filed Date: 7/22/16.
                                                                                                         intervention is necessary to become a                 intervention is necessary to become a
                                                   Accession Number: 20160722–5197.
                                                                                                         party to the proceeding.                              party to the proceeding.
                                                   Comments Due: 5 p.m. ET 8/12/16.
                                                   Take notice that the Commission                          eFiling is encouraged. More detailed                  eFiling is encouraged. More detailed
                                                received the following electric rate                     information relating to filing                        information relating to filing
                                                filings:                                                 requirements, interventions, protests,                requirements, interventions, protests,
                                                                                                         service, and qualifying facilities filings            service, and qualifying facilities filings
                                                   Docket Numbers: ER16–2035–000.                        can be found at: http://www.ferc.gov/                 can be found at: http://www.ferc.gov/
                                                   Applicants: Black Oak Wind, LLC.                      docs-filing/efiling/filing-req.pdf. For               docs-filing/efiling/filing-req.pdf. For
                                                   Description: Supplement to June 27,
ebenthall on DSK5MVXVN1PROD with NOTICES




                                                                                                         other information, call (866) 208–3676                other information, call (866) 208–3676
                                                2016 Black Oak Wind, LLC tariff filing.                  (toll free). For TTY, call (202) 502–8659.            (toll free). For TTY, call (202) 502–8659.
                                                   Filed Date: 7/21/16.
                                                   Accession Number: 20160721–5124.                        Dated: July 25, 2016.                                 Dated July 21, 2016.
                                                   Comments Due: 5 p.m. ET 8/1/16.                       Nathaniel J. Davis, Sr.,                              Nathaniel J. Davis, Sr.,
                                                   Docket Numbers: ER16–2194–000.                        Deputy Secretary.                                     Deputy Secretary.
                                                   Applicants: Clinton Battery Utility,                  [FR Doc. 2016–17993 Filed 7–28–16; 8:45 am]           [FR Doc. 2016–17994 Filed 7–28–16; 8:45 am]
                                                LLC.                                                     BILLING CODE 6717–01–P                                BILLING CODE 6717–01–P




                                           VerDate Sep<11>2014   21:05 Jul 29, 2016   Jkt 238001   PO 00000   Frm 00052   Fmt 4703   Sfmt 9990   E:\FR\FM\29JYN1.SGM   29JYN1



Document Created: 2018-02-08 07:51:23
Document Modified: 2018-02-08 07:51:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 49971 