81_FR_52029 81 FR 51878 - Notice of Commissioner and Staff Attendance at the National Association of Regulatory Utility Commissioners Summer Committee Meetings

81 FR 51878 - Notice of Commissioner and Staff Attendance at the National Association of Regulatory Utility Commissioners Summer Committee Meetings

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 151 (August 5, 2016)

Page Range51878-51879
FR Document2016-18581

Federal Register, Volume 81 Issue 151 (Friday, August 5, 2016)
[Federal Register Volume 81, Number 151 (Friday, August 5, 2016)]
[Notices]
[Pages 51878-51879]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-18581]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commissioner and Staff Attendance at the National 
Association of Regulatory Utility Commissioners Summer Committee 
Meetings

    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that members of the Commission and/or Commission staff may 
attend the 2016 National Association of Regulatory Utility 
Commissioners Summer Committee Meetings, including the following:

Joint meeting with FERC, Part I: Are we building what we need?

    July 27, 2016, 9:00 a.m.-10:30 a.m. (CDT)
    The above-referenced meeting will be held at: Omni Nashville Hotel, 
250 Fifth Avenue South, Nashville, TN 37203.
    Further information may be found at http://naruc.org/summermeetings/.
    The discussions at the meeting described above may address matters 
at issue in the following proceedings:

ISO New England Inc.--Docket Nos. RT04-2 & ER09-1532
Midwest Independent Transmission System Operator, Inc.--Docket No. 
ER11-1844
Northern Indiana Public Service Company v. Midcontinent Independent 
System Operator, Inc. and PJM Interconnection, L.L.C.--Docket No. EL13-
88
New York Independent System Operator, Inc.--Docket No. ER13-102
PJM Interconnection, L.L.C.--Docket No. ER13-1924
PJM Interconnection, L.L.C.--Docket No. ER13-1942
PJM Interconnection, L.L.C.--Docket No. ER13-1944
PJM Interconnection, L.L.C.--Docket No. ER13-1945
PJM Interconnection, L.L.C.--Docket No. ER14-972
PJM Interconnection, L.L.C.--Docket No. ER14-1485
Xcel Energy Southwest Transmission Co., LLC--Docket No. ER14-2751
Consolidate Edison Company of New York, Inc. v. PJM Interconnection, 
L.L.C.--Docket No. EL15-18
Linden VFT, LLC v. PJM Interconnection, L.L.C.--Docket No. EL15-67
TranSource, LLC v. PJM Interconnection, L.L.C.--Docket No. EL15-79
Delaware Public Service Commission and Maryland Public Service 
Commission v. PJM and Certain Transmission Owners Designated Under 
Attachment A to the Consolidated Transmission Owners Agreement--Docket 
No. EL15-95
San Diego Gas & Electric Company--Docket No. EL15-103
New York Transco, LLC--Docket No. ER15-572
PJM Interconnection, L.L.C.--Docket No. ER15-1344
PJM Interconnection, L.L.C.--Docket No. ER15-1387
New York Independent System Operator, Inc.--Docket No. ER15-2059

[[Page 51879]]

NextEra Energy Transmission West, LLC--Docket No. ER15-2239
PJM Interconnection, L.L.C.--Docket No. ER15-2562
PJM Interconnection, L.L.C.--Docket No. ER15-2563
Southwestern Public Service Co. and Xcel Energy Southwest Transmission 
Co., LLC--Docket No. EC16-64
Pacific Gas and Electric Company--Docket No. EL16-47
DesertLink, LLC--Docket No. EL16-68
Boundless Energy NE, LLC v. New York Independent System Operator, 
Inc.--Docket No. EL16-84
New York Independent System Operator, Inc.--Docket No. ER16-120
PJM Interconnection, L.L.C.--Docket No. ER16-453
PJM Interconnection, L.L.C.--Docket No. ER16-736
New York Independent System Operator, Inc.--Docket No. ER16-835
New York Independent System Operator, Inc.--Docket No. ER16-966
PJM Interconnection, L.L.C.--Docket No. ER16-1232
PJM Interconnection, L.L.C.--Docket No. ER16-1335
PJM Interconnection, L.L.C.--Docket No. ER16-1499
Midcontinent Independent System Operator, Inc.--Docket No. ER16-1534
Citizens Energy Corporation--Docket No. EL16-102
New York Independent System Operator, Inc.--Docket No. ER16-1968

    For more information, contact Sandra Waldstein, Office of External 
Affairs, Federal Energy Regulatory Commission at (202) 502-8092 or 
[email protected].

    Dated: July 26, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18581 Filed 8-4-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  51878                          Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices

                                                  ecomment.asp. You must include your                     available for inspection and                          2016 National Association of Regulatory
                                                  name and contact information at the end                 reproduction at the address in item (h)               Utility Commissioners Summer
                                                  of your comments. For assistance,                       above. Agencies may obtain copies of                  Committee Meetings, including the
                                                  please contact FERC Online Support at                   the application directly from the                     following:
                                                  FERCOnlineSupport@ferc.gov, (866)                       applicant.
                                                                                                             m. Individuals desiring to be included             Joint meeting with FERC, Part I: Are we
                                                  208–3676 (toll free), or (202) 502–8659
                                                  (TTY). In lieu of electronic filing, please             on the Commission’s mailing list should               building what we need?
                                                  send a paper copy to: Secretary, Federal                so indicate by writing to the Secretary                  July 27, 2016, 9:00 a.m.–10:30 a.m.
                                                  Energy Regulatory Commission, 888                       of the Commission.                                    (CDT)
                                                  First Street NE., Washington, DC 20426.                    n. Comments, Protests, or Motions to                  The above-referenced meeting will be
                                                  The first page of any filing should                     Intervene: Anyone may submit                          held at: Omni Nashville Hotel, 250 Fifth
                                                  include docket number P–2558–046.                       comments, a protest, or a motion to                   Avenue South, Nashville, TN 37203.
                                                     The Commission’s Rules of Practice                   intervene in accordance with the                         Further information may be found at
                                                  and Procedure require all intervenors                   requirements of Rules of Practice and                 http://naruc.org/summermeetings/.
                                                  filing documents with the Commission                    Procedure, 18 CFR 385.210, .211, .214,                   The discussions at the meeting
                                                  to serve a copy of that document on                     respectively. In determining the                      described above may address matters at
                                                  each person whose name appears on the                   appropriate action to take, the                       issue in the following proceedings:
                                                  official service list for the project.                  Commission will consider all protests or              ISO New England Inc.—Docket Nos.
                                                  Further, if an intervenor files comments                other comments filed, but only those                     RT04–2 & ER09–1532
                                                  or documents with the Commission                        who file a motion to intervene in                     Midwest Independent Transmission
                                                  relating to the merits of an issue that                 accordance with the Commission’s                         System Operator, Inc.—Docket No.
                                                  may affect the responsibilities of a                    Rules may become a party to the                          ER11–1844
                                                  particular resource agency, they must                   proceeding. Any comments, protests, or                Northern Indiana Public Service
                                                  also serve a copy of the document on                    motions to intervene must be received                    Company v. Midcontinent
                                                  that resource agency.                                   on or before the specified comment date                  Independent System Operator, Inc.
                                                     k. Description of Request: The                       for the particular application.                          and PJM Interconnection, L.L.C.—
                                                  licensee filed a recreation plan for                       o. Filing and Service of Documents:                   Docket No. EL13–88
                                                  Commission approval pursuant to                         Any filing must (1) bear in all capital               New York Independent System
                                                  articles 401 and 405 of the license order               letters the title ‘‘COMMENTS’’,                          Operator, Inc.—Docket No. ER13–102
                                                  issued October 23, 2014. The proposed                   ‘‘PROTEST’’, or ‘‘MOTION TO                           PJM Interconnection, L.L.C.—Docket
                                                  plan provides for the construction,                     INTERVENE’’ as applicable; (2) set forth                 No. ER13–1924
                                                  enhancement, and continued operation                    in the heading the name of the applicant              PJM Interconnection, L.L.C.—Docket
                                                  of recreation facilities at each of the                 and the project number of the                            No. ER13–1942
                                                  project’s four developments, including                                                                        PJM Interconnection, L.L.C.—Docket
                                                                                                          application to which the filing
                                                  picnic areas, parking areas, interpretive                                                                        No. ER13–1944
                                                                                                          responds; (3) furnish the name, address,
                                                  signage, portages, and an observation                                                                         PJM Interconnection, L.L.C.—Docket
                                                                                                          and telephone number of the person
                                                  deck. The proposed plan includes                                                                                 No. ER13–1945
                                                                                                          commenting, protesting or intervening;                PJM Interconnection, L.L.C.—Docket
                                                  preliminary design drawings, an                         and (4) otherwise comply with the
                                                  implementation schedule, and a                                                                                   No. ER14–972
                                                                                                          requirements of 18 CFR 385.2001                       PJM Interconnection, L.L.C.—Docket
                                                  provision for revising the plan, as                     through 385.2005. All comments,                          No. ER14–1485
                                                  needed, over the license term. Contrary                 motions to intervene, or protests must                Xcel Energy Southwest Transmission
                                                  to Article 405, the licensee proposes to                set forth their evidentiary basis. Any                   Co., LLC—Docket No. ER14–2751
                                                  not relocate the boat barrier at the                    filing made by an intervenor must be                  Consolidate Edison Company of New
                                                  Huntington Falls Development and,                       accompanied by proof of service on all                   York, Inc. v. PJM Interconnection,
                                                  instead, would maintain the boat barrier                persons listed in the service list                       L.L.C.—Docket No. EL15–18
                                                  in its current location and provide a                   prepared by the Commission in this                    Linden VFT, LLC v. PJM
                                                  portage take-out on the northern                        proceeding, in accordance with 18 CFR                    Interconnection, L.L.C.—Docket No.
                                                  shoreline of Otter Creek upstream of the                385.2010.                                                EL15–67
                                                  bridge on Morgan Horse Farm Road.                                                                             TranSource, LLC v. PJM
                                                     l. Locations of the Application: A                     Dated: July 27, 2016.
                                                                                                          Kimberly D. Bose,                                        Interconnection, L.L.C.—Docket No.
                                                  copy of the application is available for                                                                         EL15–79
                                                  inspection and reproduction at the                      Secretary.
                                                                                                                                                                Delaware Public Service Commission
                                                  Commission’s Public Reference Room,                     [FR Doc. 2016–18576 Filed 8–4–16; 8:45 am]               and Maryland Public Service
                                                  located at 888 First Street NE., Room                   BILLING CODE 6717–01–P                                   Commission v. PJM and Certain
                                                  2A, Washington, DC 20426, or by calling                                                                          Transmission Owners Designated
                                                  (202) 502–8371. This filing may also be                                                                          Under Attachment A to the
                                                  viewed on the Commission’s Web site at                  DEPARTMENT OF ENERGY
                                                                                                                                                                   Consolidated Transmission Owners
                                                  http://www.ferc.gov using the                                                                                    Agreement—Docket No. EL15–95
                                                  ‘‘eLibrary’’ link. Enter the docket                     Federal Energy Regulatory
                                                                                                          Commission                                            San Diego Gas & Electric Company—
                                                  number excluding the last three digits in                                                                        Docket No. EL15–103
                                                  the docket number field to access the                                                                         New York Transco, LLC—Docket No.
                                                                                                          Notice of Commissioner and Staff
                                                  document. You may also register online
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                          Attendance at the National Association                   ER15–572
                                                  at http://www.ferc.gov/docs-filing/                                                                           PJM Interconnection, L.L.C.—Docket
                                                                                                          of Regulatory Utility Commissioners
                                                  esubscription.asp to be notified via                                                                             No. ER15–1344
                                                                                                          Summer Committee Meetings
                                                  email of new filings and issuances                                                                            PJM Interconnection, L.L.C.—Docket
                                                  related to this or other pending projects.                The Federal Energy Regulatory                          No. ER15–1387
                                                  For assistance, call 1–866–208–3676 or                  Commission (Commission) hereby gives                  New York Independent System
                                                  email FERCOnlineSupport@ferc.gov, for                   notice that members of the Commission                    Operator, Inc.—Docket No. ER15–
                                                  TTY, call (202) 502–8659. A copy is also                and/or Commission staff may attend the                   2059


                                             VerDate Sep<11>2014   17:42 Aug 04, 2016   Jkt 238001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\05AUN1.SGM   05AUN1


                                                                                 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices                                           51879

                                                  NextEra Energy Transmission West,                       (collectively Annova LNG), 100                        Schedule for Environmental Review is
                                                     LLC—Docket No. ER15–2239                             Constellation Way, Suite 500C,                        issued, it will indicate, among other
                                                  PJM Interconnection, L.L.C.—Docket                      Baltimore, MD 21202, filed an                         milestones, the anticipated date for the
                                                     No. ER15–2562                                        application, in Docket No. CP16–480–                  Commission staff’s issuance of the final
                                                  PJM Interconnection, L.L.C.—Docket                      000, pursuant to section 3(a) of the                  environmental impact statement (FEIS)
                                                     No. ER15–2563                                        Natural Gas Act (NGA) and Part 153 of                 or EA for this proposal. The filing of the
                                                  Southwestern Public Service Co. and                     the Commission’s Regulations,                         EA in the Commission’s public record
                                                     Xcel Energy Southwest Transmission                   requesting authorization to site,                     for this proceeding or the issuance of a
                                                     Co., LLC—Docket No. EC16–64                          construct, modify, and operate a natural              Notice of Schedule will serve to notify
                                                  Pacific Gas and Electric Company—                       gas liquefaction and liquefied natural                federal and state agencies of the timing
                                                     Docket No. EL16–47                                   gas export facility, located on the                   for the completion of all necessary
                                                  DesertLink, LLC—Docket No. EL16–68                      Brownsville Ship Channel in Cameron                   reviews, and the subsequent need to
                                                  Boundless Energy NE, LLC v. New York                    County, Texas. This filing may be                     complete all federal authorizations
                                                     Independent System Operator, Inc.—                   viewed on the web at http://                          within 90 days of the date of issuance
                                                     Docket No. EL16–84                                   www.ferc.gov using the ‘‘eLibrary’’ link.             of the Commission staff’s FEIS or EA.
                                                  New York Independent System                             Enter the docket number excluding the                    There are two ways to become
                                                     Operator, Inc.—Docket No. ER16–120                   last three digits in the docket number                involved in the Commission’s review of
                                                  PJM Interconnection, L.L.C.—Docket                      field to access the document. For                     this project. First, any person wishing to
                                                     No. ER16–453                                         assistance, contact FERC at                           obtain legal status by becoming a party
                                                  PJM Interconnection, L.L.C.—Docket                      FERCOnlineSupport@ferc.gov or call                    to the proceedings for this project
                                                     No. ER16–736                                         toll-free (886) 208–3676 or TYY (202)                 should, on or before the comment date
                                                  New York Independent System                             502–8659.                                             stated below, file with the Federal
                                                     Operator, Inc.—Docket No. ER16–835                      Any questions regarding this                       Energy Regulatory Commission, 888
                                                  New York Independent System                             application should be directed to                     First Street NE., Washington, DC 20426,
                                                     Operator, Inc.—Docket No. ER16–966                   Christopher D. Young, Exelon                          a motion to intervene in accordance
                                                  PJM Interconnection, L.L.C.—Docket                      Corporation, 100 Constellation Way,                   with the requirements of the
                                                     No. ER16–1232                                        Suite 500C, Baltimore, MD 21202, by                   Commission’s Rules of Practice and
                                                  PJM Interconnection, L.L.C.—Docket                      phone at (410) 470–3500, or by email at               Procedure (18 CFR 385.214 or 385.211)
                                                     No. ER16–1335                                        Christopher.Young@constellation.com,                  and the Regulations under the NGA (18
                                                  PJM Interconnection, L.L.C.—Docket                      or to William Harris, Communications                  CFR 157.10). A person obtaining party
                                                     No. ER16–1499                                        Senior Manager, South/West Region,                    status will be placed on the service list
                                                  Midcontinent Independent System                         Exelon Generation, by phone at (512)                  maintained by the Secretary of the
                                                     Operator, Inc.—Docket No. ER16–                      542–7812, or by email at                              Commission and will receive copies of
                                                     1534                                                 Williamp.Harris@exeloncorp.com.                       all documents filed by the applicant and
                                                  Citizens Energy Corporation—Docket                         Specifically, Annova LNG proposes to               by all other parties. A party must submit
                                                     No. EL16–102                                         construct a LNG liquefaction and export               5 copies of filings made with the
                                                  New York Independent System                             terminal on the Port of Brownsville ship              Commission and must mail a copy to
                                                     Operator, Inc.—Docket No. ER16–                      channel. The terminal will consist of six             the applicant and to every other party in
                                                     1968                                                 liquefaction trains with a total capacity             the proceeding. Only parties to the
                                                     For more information, contact Sandra                 of 0.9 Bcf per day, two LNG tanks                     proceeding can ask for court review of
                                                  Waldstein, Office of External Affairs,                  capable of storing 6.8 Bcf of LNG, gas                Commission orders in the proceeding.
                                                  Federal Energy Regulatory Commission                    pretreatment facilities, boil-off gas                    However, a person does not have to
                                                  at (202) 502–8092 or sandra.waldstein@                  handling system, flare system, marine                 intervene in order to have comments
                                                  ferc.gov.                                               transfer facilities, and all necessary                considered. The second way to
                                                                                                          ancillary and support facilities. Natural             participate is by filing with the
                                                    Dated: July 26, 2016.                                 gas will be supplied by a third party-                Secretary of the Commission, as soon as
                                                  Kimberly D. Bose,                                       owned and operated intrastate pipeline.               possible, an original and two copies of
                                                  Secretary.                                                 On March 27, 2015, Commission staff                comments in support of or in opposition
                                                  [FR Doc. 2016–18581 Filed 8–4–16; 8:45 am]              granted Annova LNG’s request to use                   to this project. The Commission will
                                                  BILLING CODE 6717–01–P                                  the National Environmental Policy Act                 consider these comments in
                                                                                                          (NEPA) Pre-Filing Process and assigned                determining the appropriate action to be
                                                                                                          Docket No. PF15–15–000 to staff                       taken, but the filing of a comment alone
                                                  DEPARTMENT OF ENERGY                                    activities involving the proposed                     will not serve to make the filer a party
                                                                                                          facilities. Now, as of the filing of this             to the proceeding. The Commission’s
                                                  Federal Energy Regulatory                               application on July 13, 2016, the NEPA                rules require that persons filing
                                                  Commission                                              Pre-Filing Process for this project has               comments in opposition to the project
                                                  [Docket Nos. CP16–480–000; PF15–15–000]                 ended. From this time forward, this                   provide copies of their protests only to
                                                                                                          proceeding will be conducted in Docket                the party or parties directly involved in
                                                  Annova LNG Common Infrastructure,                       No. CP16–480–000, as noted in the                     the protest.
                                                  LLC, Annova LNG Brownsville A, LLC,                     caption of this Notice.                                  Persons who wish to comment only
                                                  Annova LNG Brownsville B, LLC,                             Pursuant to section 157.9 of the                   on the environmental review of this
                                                                                                          Commission’s rules, 18 CFR 157.9,                     project should submit an original and
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Annova LNG Brownsville C, LLC;
                                                  Notice of Application                                   within 90 days of this Notice the                     two copies of their comments to the
                                                                                                          Commission staff will either: Complete                Secretary of the Commission.
                                                    Take notice that on July 13, 2016,                    its environmental assessment (EA) and                 Environmental commenters will be
                                                  Annova LNG Common Infrastructure,                       place it into the Commission’s public                 placed on the Commission’s
                                                  LLC, Annova LNG Brownsville A, LLC,                     record (eLibrary) for this proceeding, or             environmental mailing list, will receive
                                                  Annova LNG Brownsville B, LLC, and                      issue a Notice of Schedule for                        copies of the environmental documents,
                                                  Annova LNG Brownsville C, LLC                           Environmental Review. If a Notice of                  and will be notified of meetings


                                             VerDate Sep<11>2014   17:42 Aug 04, 2016   Jkt 238001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\05AUN1.SGM   05AUN1



Document Created: 2016-08-05 06:43:37
Document Modified: 2016-08-05 06:43:37
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 51878 

2025 Federal Register | Disclaimer | Privacy Policy