81_FR_52078 81 FR 51927 - Rate Adjustments for Indian Irrigation Projects

81 FR 51927 - Rate Adjustments for Indian Irrigation Projects

DEPARTMENT OF THE INTERIOR
Bureau of Indian Affairs

Federal Register Volume 81, Issue 151 (August 5, 2016)

Page Range51927-51936
FR Document2016-18642

The Bureau of Indian Affairs (BIA) owns or has an interest in irrigation projects located on or associated with various Indian reservations throughout the United States. We are required to establish irrigation assessment rates to recover the costs to administer, operate, maintain, and rehabilitate these projects. We request your comments on the proposed rate adjustments.

Federal Register, Volume 81 Issue 151 (Friday, August 5, 2016)
[Federal Register Volume 81, Number 151 (Friday, August 5, 2016)]
[Notices]
[Pages 51927-51936]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-18642]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Indian Affairs

[167A2100DD/AAKC001030/A0A501010.999900]


Rate Adjustments for Indian Irrigation Projects

AGENCY: Bureau of Indian Affairs, Interior.

ACTION: Notice of proposed rate adjustments.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Indian Affairs (BIA) owns or has an interest in 
irrigation projects located on or associated with various Indian 
reservations throughout the United States. We are required to establish 
irrigation assessment rates to recover the costs to administer, 
operate, maintain, and rehabilitate these projects. We request your 
comments on the proposed rate adjustments.

DATES: Interested parties may submit comments on the proposed rate 
adjustments on or before October 4, 2016.

ADDRESSES: All comments on the proposed rate adjustments must be in 
writing and addressed to: Yulan Jin, Chief, Division of Water and 
Power, Office of Trust Services, Mail Stop 4637-MIB, 1849 C Street NW., 
Washington, DC 20240, Telephone (202) 219-0941.

FOR FURTHER INFORMATION CONTACT: For details about a particular 
irrigation project, please use the tables in SUPPLEMENTARY INFORMATION 
section to contact the regional or local office where the project is 
located.

SUPPLEMENTARY INFORMATION: The first table in this notice provides 
contact information for individuals who can give further information 
about the irrigation projects covered by this notice. The second table 
provides the current 2015 irrigation assessment rates, the proposed 
rates for Calendar Year (CY) 2016, and proposed rates for subsequent 
years where these rates are available.

What is the meaning of the key terms used in this notice?

    In this notice:
    Administrative costs means all costs we incur to administer our 
irrigation projects at the local project level and is a cost factor 
included in calculating your operation and maintenance assessment. 
Costs incurred at the local project level do not normally include 
Agency, Region, or Central Office costs unless we state otherwise in 
writing.
    Assessable acre means lands designated by us to be served by one of 
our irrigation projects, for which we collect assessments in order to 
recover costs for the provision of irrigation service. (See total 
assessable acres.)
    BIA means the Bureau of Indian Affairs.
    Bill means our statement to you of the assessment charges and/or 
fees you owe the United States for administration, operation, 
maintenance, and/or rehabilitation. The date we mail or hand-deliver 
your bill will be stated on it.
    Costs means the costs we incur for administration, operation, 
maintenance, and rehabilitation to provide direct support or benefit to 
an irrigation facility. (See administrative costs, operation costs, 
maintenance costs, and rehabilitation costs).
    Customer means any person or entity to whom or to which we provide 
irrigation service.
    Due date is the date on which your bill is due and payable. This 
date will be stated on your bill.
    I, me, my, you and your means all persons or entities that are 
affected by this notice.
    Irrigation project means a facility or portion thereof for the 
delivery, diversion, and storage of irrigation water that we own or 
have an interest in, including all appurtenant works. The term 
``irrigation project'' is used interchangeably with irrigation 
facility, irrigation system, and irrigation area.
    Irrigation service means the full range of services we provide 
customers of our irrigation projects. This includes our activities to 
administer, operate, maintain, and rehabilitate our projects in order 
to deliver water.
    Maintenance costs means costs we incur to maintain and repair our 
irrigation projects and associated equipment and is a cost factor 
included in calculating your operation and maintenance assessment.
    Operation and maintenance (O&M) assessment means the periodic 
charge you must pay us to reimburse costs of administering, operating, 
maintaining, and rehabilitating irrigation projects

[[Page 51928]]

consistent with this notice and our supporting policies, manuals, and 
handbooks.
    Operation or operating costs means costs we incur to operate our 
irrigation projects and equipment and is a cost factor included in 
calculating your O&M assessment.
    Past due bill means a bill that has not been paid by the close of 
business on the 30th day after the due date as stated on the bill. 
Beginning on the 31st day after the due date, we begin assessing 
additional charges accruing from the due date.
    Rehabilitation costs means costs we incur to restore our irrigation 
projects or features to original operating condition or to the nearest 
state which can be achieved using current technology and is a cost 
factor included in calculating your O&M assessment.
    Responsible party means an individual or entity that owns or leases 
land within the assessable acreage of one of our irrigation projects 
and is responsible for providing accurate information to our billing 
office and paying a bill for an annual irrigation rate assessment.
    Total assessable acres means the total acres served by one of our 
irrigation projects.
    Water delivery is an activity that is part of the irrigation 
service we provide our customers when water is available.
    We, us, and our means the United States Government, the Secretary 
of the Interior, the BIA, and all who are authorized to represent us in 
matters covered under this notice.

Does this notice affect me?

    This notice affects you if you own or lease land within the 
assessable acreage of one of our irrigation projects or if you have a 
carriage agreement with one of our irrigation projects.

Where can I get information on the regulatory and legal citations in 
this notice?

    You can contact the appropriate office(s) stated in the tables for 
the irrigation project that serves you, or you can use the Internet 
site for the Government Printing Office at http://www.thefederalregister.org.

Why are you publishing this notice?

    We are publishing this notice to inform you that we propose to 
adjust our irrigation assessment rates. This notice is published in 
accordance with the BIA's regulations governing its operation and 
maintenance of irrigation projects, found at 25 CFR part 171. This 
regulation provides for the establishment and publication of the 
proposed rates for annual irrigation assessments as well as related 
information about our irrigation projects.

What authorizes you to issue this notice?

    Our authority to issue this notice is vested in the Secretary of 
the Interior by 5 U.S.C. 301 and the Act of August 14, 1914 (38 Stat. 
583; 25 U.S.C. 385). The Secretary has in turn delegated this authority 
to the Assistant Secretary--Indian Affairs under Part 209, Chapter 
8.1A, of the Department of the Interior's Departmental Manual.

When will you put the rate adjustments into effect?

    We will put the rate adjustments into effect for the CY 2016 and 
subsequent years where applicable.

How do you calculate irrigation rates?

    We calculate annual irrigation assessment rates in accordance with 
25 CFR part 171.500 by estimating the annual costs of operation and 
maintenance at each of our irrigation projects and then dividing by the 
total assessable acres for that particular irrigation project. The 
result of this calculation for each project is stated in the rate table 
in this notice.

What kinds of expenses do you consider in determining the estimated 
annual costs of operation and maintenance?

    Consistent with 25 CFR part 171.500, these expenses include the 
following:
    (a) Salary and benefits for the project engineer/manager and 
project employees under the project engineer/manager's management or 
control;
    (b) Materials and supplies;
    (c) Vehicle and equipment repairs;
    (d) Equipment costs, including lease fees;
    (e) Depreciation;
    (f) Acquisition costs;
    (g) Maintenance of a reserve fund available for contingencies or 
emergency costs needed for the reliable operation of the irrigation 
facility infrastructure;
    (h) Maintenance of a vehicle and heavy equipment replacement fund;
    (i) Systematic rehabilitation and replacement of project 
facilities;
    (j) Carriage Agreements for the transfer of project water through 
irrigation facilities owned by others.
    (j) Any water storage fees for non-BIA-owned reservoirs, as 
applicable,
    (j) Contingencies for unknown costs and omitted budget items; and
    (k) Other expenses we determine necessary to properly perform the 
activities and functions characteristic of an irrigation project.

When should I pay my irrigation assessment?

    We will mail or hand-deliver your bill notifying you (a) the amount 
you owe to the United States and (b) when such amount is due. If we 
mail your bill, we will consider it as being delivered no later than 5 
business days after the day we mail it. You should pay your bill by the 
due date stated on the bill.

What information must I provide for billing purposes?

    All responsible parties are required to provide the following 
information to the billing office associated with the irrigation 
project where you own or lease land within the project's assessable 
acreage or to the billing office associated with the irrigation project 
with which you have a carriage agreement:
    (1) The full legal name of person or entity responsible for paying 
the bill;
    (2) An adequate and correct address for mailing or hand delivering 
our bill; and
    (3) The taxpayer identification number or Social Security number of 
the person or entity responsible for paying the bill.

Why are you collecting my taxpayer identification number or Social 
Security number?

    Public Law 104-134, the Debt Collection Improvement Act of 1996, 
requires that we collect the taxpayer identification number or Social 
Security number before billing a responsible party and as a condition 
to servicing the account.

What happens if I am a responsible party but I fail to furnish the 
information required to the billing office responsible for the 
irrigation project within which I own or lease assessable land or for 
which I have a carriage agreement?

    If you are late paying your bill because of your failure to furnish 
the required information listed above, you will be assessed interest 
and penalties as provided below, and your failure to provide the 
required information will not provide grounds for you to appeal your 
bill or any penalties assessed.

What can happen if I do not provide the information required for 
billing purposes?

    We can refuse to provide you irrigation service.

[[Page 51929]]

If I allow my bill to become past due, could this affect my water 
delivery?

    Yes. 25 CFR 171.545(a) states: ``We will not provide you irrigation 
service until: (1) Your bill is paid; or (2) You make arrangement for 
payment pursuant to Sec.  171.550 of this part.'' If we do not receive 
your payment before the close of business on the 30th day after the due 
date stated on your bill, we will send you a past due notice. This past 
due notice will have additional information concerning your rights. We 
will consider your past due notice as delivered no later than 5 
business days after the day we mail it. We follow the procedures 
provided in 31 CFR 901.2, ``Demand for Payment,'' when demanding 
payment of your past due bill.

Are there any additional charges if I am late paying my bill?

    Yes. We will assess you interest on the amount owed, using the rate 
of interest established annually by the Secretary of the United States 
Treasury (Treasury) to calculate what you will be assessed. You will 
not be assessed this charge until your bill is past due. However, if 
you allow your bill to become past due, interest will accrue from the 
original due date, not the past due date. Also, you will be charged an 
administrative fee of $12.50 for each time we try to collect your past 
due bill. If your bill becomes more than 90 days past due, you will be 
assessed a penalty charge of 6 percent per year, which will accrue from 
the date your bill initially became past due. Pursuant to 31 CFR 901.9, 
``Interest, penalties and administrative costs,'' as a Federal agency, 
we are required to charge interest, penalties, and administrative costs 
in accordance with 31 U.S.C. 3717.

What else will happen to my past due bill?

    If you do not pay your bill or make payment arrangements to which 
we agree, we are required to send your past due bill to the Treasury 
for further action. Under the provisions of 31 CFR 901.1, ``Aggressive 
agency collection activity,'' Federal agencies should consider 
referring debts that are less than 180 days delinquent, and we must 
send any unpaid annual irrigation assessment bill to Treasury no later 
than 180 days after the original due date of the bill.

Who can I contact for further information?

    The following tables are the regional and project/agency contacts 
for our irrigation facilities.

------------------------------------------------------------------------
           Project name                    Project/agency contacts
------------------------------------------------------------------------
                        Northwest Region Contacts
------------------------------------------------------------------------
 Stanley Speaks, Regional Director, Bureau of Indian Affairs, Northwest
     Regional Office, 911 NE. 11th Avenue, Portland, OR 97232-4169,
                       Telephone: (503) 231-6702.
------------------------------------------------------------------------
Flathead Irrigation Project.......  Ernest Moran, Superintendent, Pete
                                     Plant, Irrigation Project Manager,
                                     P.O. Box 40, Pablo, MT 59855,
                                     Telephones: (406) 675-2700 ext.
                                     1300, Superintendent; (406) 745-
                                     2661 ext. 2, Project Manager.
Fort Hall Irrigation Project......  David Bollinger, Irrigation Project
                                     Manager, Building #2, Bannock Ave.,
                                     Fort Hall, ID 83203-0220,
                                     Telephone: (208) 238-6264.
Wapato Irrigation Project.........  David Shaw, Superintendent, Larry
                                     Nelson, Acting Project
                                     Administrator, P.O. Box 220,
                                     Wapato, WA 98951-0220, Telephone:
                                     (509) 865-2421, Superintendent;
                                     (509) 877-3155, Acting Project
                                     Administrator.
------------------------------------------------------------------------
                     Rocky Mountain Region Contacts
------------------------------------------------------------------------
   Darryl LaCounte, Regional Director, Bureau of Indian Affairs, Rocky
  Mountain Regional Office, 316 North 26th Street, Billings, MT 59101,
                       Telephone: (406) 247-7943.
------------------------------------------------------------------------
Blackfeet Irrigation Project......  Thedis Crowe, Superintendent, Greg
                                     Tatsey, Irrigation Project Manager,
                                     Box 880, Browning, MT 59417,
                                     Telephones: (406) 338-7544,
                                     Superintendent; (406) 338-7519,
                                     Irrigation Project Manager.
Crow Irrigation Project...........  Vianna Stewart, Superintendent, Karl
                                     Helvik, Acting Irrigation Project
                                     Manager, P.O. Box 69, Crow Agency,
                                     MT 59022, Telephones: (406) 638-
                                     2672, Superintendent; (406) 247-
                                     7469, Acting Irrigation Project
                                     Manager.
Fort Belknap Irrigation Project...  John St. Pierre, Superintendent,
                                     Vacant, Irrigation Project Manager,
                                     (Project operations & maintenance
                                     contracted to Tribes), R.R.1, Box
                                     980, Harlem, MT 59526, Telephones:
                                     (406) 353-2901, Superintendent;
                                     (406) 353-8454, Irrigation Project
                                     Manager (Tribal Office).
Fort Peck Irrigation Project......  Howard Beemer, Superintendent, Huber
                                     Wright, Acting Irrigation Project
                                     Manager, P.O. Box 637, Poplar, MT
                                     59255, Telephones: (406) 768-5312,
                                     Superintendent; (406) 653-1752,
                                     Irrigation Project Manager.
Wind River Irrigation Project.....  Norma Gourneau, Superintendent, Karl
                                     Helvik, Acting Irrigation Project
                                     Manager, P.O. Box 158, Fort
                                     Washakie, WY 82514, Telephones:
                                     (307) 332-7810, Superintendent;
                                     (406) 247-7469, Acting Irrigation
                                     Project Manager.
------------------------------------------------------------------------
                        Southwest Region Contacts
------------------------------------------------------------------------
     William T. Walker, Regional Director, Bureau of Indian Affairs,
   Southwest Regional Office, 1001 Indian School Road, Albuquerque, NM
                    87104, Telephone: (505) 563-3100.
------------------------------------------------------------------------
Pine River Irrigation Project.....  Priscilla Bancroft, Superintendent,
                                     Vickie Begay, Irrigation Project
                                     Manager, P.O. Box 315, Ignacio, CO
                                     81137-0315, Telephones: (970) 563-
                                     4511, Superintendent; (970) 563-
                                     9484, Irrigation Project Manager.
------------------------------------------------------------------------
                         Western Region Contacts
------------------------------------------------------------------------
   Bryan Bowker, Regional Director, Bureau of Indian Affairs, Western
 Regional Office, 2600 N. Central Ave., 4th Floor Mailroom, Phoenix, AZ
                    85004, Telephone: (602) 379-6600.
------------------------------------------------------------------------
Colorado River Irrigation Project.  Kellie Youngbear Superintendent,
                                     Gary Colvin, Irrigation Project
                                     Manager, 12124 1st Avenue, Parker,
                                     AZ 85344, Telephone: (928) 669-
                                     7111.

[[Page 51930]]

 
Duck Valley Irrigation Project....  Joseph McDade, Superintendent,
                                     (Project operations & management
                                     compacted to Tribes), 2719 Argent
                                     Ave., Suite 4, Gateway Plaza, Elko,
                                     NV 89801, Telephone: (775) 738-
                                     5165; (208) 759-3100, (Tribal
                                     Office).
Yuma Project, Indian Unit.........  Irene Herder, Superintendent, 256
                                     South Second Avenue, Suite D, Yuma,
                                     AZ 85364, Telephone: (928) 782-
                                     1202.
San Carlos Irrigation Project       Ferris Begay, Project Manager,
 Indian Works and Joint Works.       Clarence Begay, Irrigation Manager,
                                     13805 N. Arizona Boulevard,
                                     Coolidge, AZ 85128, Telephone:
                                     (520) 723-6225.
Uintah Irrigation Project.........  Bart Stevens Superintendent, Ken
                                     Asay, Irrigation System Manager,
                                     P.O. Box 130, Fort Duchesne, UT
                                     84026, Telephone: (435) 722-4300,
                                     (435) 722-4344.
Walker River Irrigation Project...  Robert Eben, Superintendent, 311 E.
                                     Washington Street, Carson City, NV
                                     89701, Telephone: (775) 887-3500.
------------------------------------------------------------------------

What irrigation assessments or charges are proposed for adjustment by 
this notice?

    The rate table below contains the current rates for all irrigation 
projects where we recover costs of administering, operating, 
maintaining, and rehabilitating them. The table also contains the 
proposed rates for the CY 2016 and subsequent years where applicable. 
An asterisk immediately following the rate category notes the 
irrigation projects where rates are proposed for adjustment.
BILLING CODE 4337-15-P

[[Page 51931]]

[GRAPHIC] [TIFF OMITTED] TN05AU16.039


[[Page 51932]]


[GRAPHIC] [TIFF OMITTED] TN05AU16.040


[[Page 51933]]


[GRAPHIC] [TIFF OMITTED] TN05AU16.041


[[Page 51934]]


[GRAPHIC] [TIFF OMITTED] TN05AU16.042


[[Page 51935]]


[GRAPHIC] [TIFF OMITTED] TN05AU16.043

Consultation and Coordination With Tribal Governments (Executive Order 
13175)

    The Department of the Interior strives to strengthen its 
government-to-government relationship with Indian Tribes through a 
commitment to consultation with Indian Tribes and recognition of their 
right to self-governance and Tribal sovereignty. We have evaluated this 
notice under the Department's consultation policy and under the 
criteria of Executive Order 13175 and have determined there to be 
substantial direct effects on federally recognized Tribes because the 
irrigation projects are located on or associated with Indian 
reservations. To fulfill its consultation responsibility to Tribes and 
Tribal organizations, BIA communicates, coordinates, and consults on a 
continuing basis with these entities on issues of water delivery, water 
availability, and costs of administration, operation, maintenance, and 
rehabilitation of projects that concern them. This is accomplished at 
the individual irrigation project by project, agency, and regional 
representatives, as appropriate, in accordance with local protocol and 
procedures. This notice is one component of our overall coordination 
and consultation process to provide notice to, and request comments 
from, these entities when we adjust irrigation assessment rates.

Actions Concerning Regulations That Significantly Affect Energy Supply, 
Distribution, or Use (Executive Order 13211)

    The proposed rate adjustments are not a significant energy action 
under the definition in Executive Order 13211. A Statement of Energy 
Effects is not required.

Regulatory Planning and Review (Executive Order 12866)

    These proposed rate adjustments are not a significant regulatory 
action and do not need to be reviewed by the Office of Management and 
Budget under Executive Order 12866.

Regulatory Flexibility Act

    These proposed rate adjustments are not a rule for the purposes of 
the Regulatory Flexibility Act because they establish ``a rule of 
particular applicability relating to rates.'' 5 U.S.C. 601(2).

Unfunded Mandates Reform Act of 1995

    These proposed rate adjustments do not impose an unfunded mandate 
on State, local, or tribal governments in the aggregate, or on the 
private sector, of more than $100 million per year. The rule does not 
have a significant or unique effect on State, local, or Tribal 
governments or the private sector. A statement containing the 
information required by the Unfunded Mandates Reform Act (2 U.S.C. 1531 
et seq.) is not required.

Takings (Executive Order 12630)

    These proposed rate adjustments do not effect a taking of private 
property or otherwise have ``takings'' implications under Executive 
Order 12630. The proposed rate adjustments do not deprive the public, 
state, or local governments of rights or property.

Federalism (Executive Order 13132)

    Under the criteria in section 1 of Executive Order 13132, these 
proposed rate adjustments do not have sufficient federalism 
implications to warrant the preparation of a federalism summary impact 
statement because they will not affect the States, the relationship 
between the national government and the States, or the distribution of 
power and responsibilities among various levels of government. A 
federalism summary impact statement is not required.

Civil Justice Reform (Executive Order 12988)

    This notice complies with the requirements of Executive Order 
12988. Specifically, in issuing this notice, the Department has taken 
the necessary steps to eliminate drafting errors and ambiguity, 
minimize potential litigation, and provide a clear legal standard for 
affected conduct, as required by section 3 of Executive Order 12988.

[[Page 51936]]

Paperwork Reduction Act of 1995

    These proposed rate adjustments do not affect the collections of 
information which have been approved by the Office of Information and 
Regulatory Affairs, Office of Management and Budget, under the 
Paperwork Reduction Act of 1995. The OMB Control Number is 1076-0141 
and expires June 30, 2019.

National Environmental Policy Act

    The Department has determined that these proposed rate adjustments 
do not constitute a major Federal action significantly affecting the 
quality of the human environment and that no detailed statement is 
required under the National Environmental Policy Act of 1969 (42 U.S.C. 
4321-4370(d)).

    Dated: August 1, 2016.
Lawrence S. Roberts,
Principal Deputy Secretary--Indian Affairs.
[FR Doc. 2016-18642 Filed 8-4-16; 8:45 am]
BILLING CODE 4337-15-P



                                                                                 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices                                            51927

                                                  III. Permit Applications                                  Concurrent with publishing this                     What is the meaning of the key terms
                                                                                                          notice in the Federal Register, we are                used in this notice?
                                                  A. Endangered Species
                                                                                                          forwarding copies of the above                            In this notice:
                                                  Applicant: Duke University, Durham,                     applications to the Marine Mammal                         Administrative costs means all costs
                                                    NC; PRT–92458B                                        Commission and the Committee of
                                                    The applicant requests a permit to                                                                          we incur to administer our irrigation
                                                                                                          Scientific Advisors for their review.                 projects at the local project level and is
                                                  import biological samples from wild
                                                  kakapo (strigops habroptilus) for the                   Brenda Tapia,                                         a cost factor included in calculating
                                                  purpose of scientific research. This                    Program Analyst/Data Administrator, Branch            your operation and maintenance
                                                  notification covers activities to be                    of Permits, Division of Management                    assessment. Costs incurred at the local
                                                  conducted by the applicant over a 2-                    Authority.                                            project level do not normally include
                                                  year period.                                            [FR Doc. 2016–18587 Filed 8–4–16; 8:45 am]            Agency, Region, or Central Office costs
                                                                                                          BILLING CODE 4333–15–P                                unless we state otherwise in writing.
                                                  Multiple Applicants                                                                                               Assessable acre means lands
                                                     The following applicants each request                                                                      designated by us to be served by one of
                                                  a permit to import the sport-hunted                     DEPARTMENT OF THE INTERIOR                            our irrigation projects, for which we
                                                  trophy of one male bontebok                                                                                   collect assessments in order to recover
                                                                                                          Bureau of Indian Affairs                              costs for the provision of irrigation
                                                  (Damaliscus pygargus pygargus) culled
                                                  from a captive herd maintained under                    [167A2100DD/AAKC001030/                               service. (See total assessable acres.)
                                                  the management program of the                           A0A501010.999900]                                         BIA means the Bureau of Indian
                                                  Republic of South Africa, for the                                                                             Affairs.
                                                  purpose of enhancement of the survival                  Rate Adjustments for Indian Irrigation                    Bill means our statement to you of the
                                                  of the species.                                         Projects                                              assessment charges and/or fees you owe
                                                  Applicant: Edwin Andrew, Frederica,                                                                           the United States for administration,
                                                                                                          AGENCY:   Bureau of Indian Affairs,
                                                     DE; PRT–00500C                                                                                             operation, maintenance, and/or
                                                                                                          Interior.
                                                  Applicant: Guy Maranga, Neponsit, NY;                                                                         rehabilitation. The date we mail or
                                                                                                          ACTION: Notice of proposed rate
                                                     PRT–98444B                                                                                                 hand-deliver your bill will be stated on
                                                                                                          adjustments.                                          it.
                                                  Applicant: Donald Bitz, West Palm
                                                     Beach, FL; PRT–00209C                                SUMMARY:   The Bureau of Indian Affairs                   Costs means the costs we incur for
                                                  Applicant: Christopher Sibert, Midland,                 (BIA) owns or has an interest in                      administration, operation, maintenance,
                                                     TX; PRT–98815B                                       irrigation projects located on or                     and rehabilitation to provide direct
                                                                                                          associated with various Indian                        support or benefit to an irrigation
                                                  B. Endangered Marine Mammals and                                                                              facility. (See administrative costs,
                                                  Marine Mammals                                          reservations throughout the United
                                                                                                          States. We are required to establish                  operation costs, maintenance costs, and
                                                  Applicant: University of California,                    irrigation assessment rates to recover the            rehabilitation costs).
                                                    Santa Cruz, CA; PRT–83954B                            costs to administer, operate, maintain,                   Customer means any person or entity
                                                    The applicant requests a permit to                    and rehabilitate these projects. We                   to whom or to which we provide
                                                  import blood and tissue samples                         request your comments on the proposed                 irrigation service.
                                                  collected from wild polar bears in                      rate adjustments.                                         Due date is the date on which your
                                                  Manitoba, Canada, for purposes of                       DATES: Interested parties may submit
                                                                                                                                                                bill is due and payable. This date will
                                                  scientific research. The goal of this                   comments on the proposed rate                         be stated on your bill.
                                                  study is to create an improved reference                adjustments on or before October 4,                       I, me, my, you and your means all
                                                  genome for polar bears (Ursus                           2016.                                                 persons or entities that are affected by
                                                  maritimus) and investigate the genetic                                                                        this notice.
                                                  diversity and unique adaptations of                     ADDRESSES: All comments on the                            Irrigation project means a facility or
                                                  polar bears. Samples to be imported                     proposed rate adjustments must be in                  portion thereof for the delivery,
                                                  have been collected under Manitoba                      writing and addressed to: Yulan Jin,                  diversion, and storage of irrigation water
                                                  Wildlife Research permits for a study                   Chief, Division of Water and Power,                   that we own or have an interest in,
                                                  assessing the status of the wild                        Office of Trust Services, Mail Stop                   including all appurtenant works. The
                                                  population for conservation and                         4637–MIB, 1849 C Street NW.,                          term ‘‘irrigation project’’ is used
                                                  ecological purposes. This notification                  Washington, DC 20240, Telephone (202)                 interchangeably with irrigation facility,
                                                  covers activities to be conducted by the                219–0941.                                             irrigation system, and irrigation area.
                                                  applicant over a 5-year period.                         FOR FURTHER INFORMATION CONTACT: For                      Irrigation service means the full range
                                                  Applicant: Passion Planet, London, UK;                  details about a particular irrigation                 of services we provide customers of our
                                                    PRT–01370C                                            project, please use the tables in                     irrigation projects. This includes our
                                                    The applicant requests a permit for                   SUPPLEMENTARY INFORMATION section to                  activities to administer, operate,
                                                  Level B Harassment of northern sea                      contact the regional or local office                  maintain, and rehabilitate our projects
                                                  otters (Enhydra lutris kenyoni) and                     where the project is located.                         in order to deliver water.
                                                  southern sea otters (Enhydra lutris                     SUPPLEMENTARY INFORMATION: The first                      Maintenance costs means costs we
                                                  nereis) for purposes of photography for                 table in this notice provides contact                 incur to maintain and repair our
                                                  educational and commercial purposes.                    information for individuals who can                   irrigation projects and associated
                                                  Filming will occur along the                            give further information about the                    equipment and is a cost factor included
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Washington State and California State                   irrigation projects covered by this                   in calculating your operation and
                                                  coastlines. The filming is part of a                    notice. The second table provides the                 maintenance assessment.
                                                  documentary explaining the importance                   current 2015 irrigation assessment rates,                 Operation and maintenance (O&M)
                                                  of sea otters to marine ecosystems. This                the proposed rates for Calendar Year                  assessment means the periodic charge
                                                  notification covers activities to be                    (CY) 2016, and proposed rates for                     you must pay us to reimburse costs of
                                                  conducted by the applicant over a 2-                    subsequent years where these rates are                administering, operating, maintaining,
                                                  year period.                                            available.                                            and rehabilitating irrigation projects


                                             VerDate Sep<11>2014   17:42 Aug 04, 2016   Jkt 238001   PO 00000   Frm 00088   Fmt 4703   Sfmt 4703   E:\FR\FM\05AUN1.SGM   05AUN1


                                                  51928                          Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices

                                                  consistent with this notice and our                     proposed rates for annual irrigation                  activities and functions characteristic of
                                                  supporting policies, manuals, and                       assessments as well as related                        an irrigation project.
                                                  handbooks.                                              information about our irrigation
                                                                                                                                                                When should I pay my irrigation
                                                     Operation or operating costs means                   projects.
                                                                                                                                                                assessment?
                                                  costs we incur to operate our irrigation
                                                                                                          What authorizes you to issue this
                                                  projects and equipment and is a cost                                                                             We will mail or hand-deliver your bill
                                                                                                          notice?
                                                  factor included in calculating your O&M                                                                       notifying you (a) the amount you owe to
                                                  assessment.                                               Our authority to issue this notice is               the United States and (b) when such
                                                     Past due bill means a bill that has not              vested in the Secretary of the Interior by            amount is due. If we mail your bill, we
                                                  been paid by the close of business on                   5 U.S.C. 301 and the Act of August 14,                will consider it as being delivered no
                                                  the 30th day after the due date as stated               1914 (38 Stat. 583; 25 U.S.C. 385). The               later than 5 business days after the day
                                                  on the bill. Beginning on the 31st day                  Secretary has in turn delegated this                  we mail it. You should pay your bill by
                                                  after the due date, we begin assessing                  authority to the Assistant Secretary—                 the due date stated on the bill.
                                                  additional charges accruing from the                    Indian Affairs under Part 209, Chapter
                                                  due date.                                               8.1A, of the Department of the Interior’s             What information must I provide for
                                                     Rehabilitation costs means costs we                  Departmental Manual.                                  billing purposes?
                                                  incur to restore our irrigation projects or                                                                      All responsible parties are required to
                                                                                                          When will you put the rate adjustments
                                                  features to original operating condition                                                                      provide the following information to the
                                                                                                          into effect?
                                                  or to the nearest state which can be                                                                          billing office associated with the
                                                  achieved using current technology and                      We will put the rate adjustments into
                                                                                                                                                                irrigation project where you own or
                                                  is a cost factor included in calculating                effect for the CY 2016 and subsequent
                                                                                                                                                                lease land within the project’s
                                                  your O&M assessment.                                    years where applicable.
                                                                                                                                                                assessable acreage or to the billing office
                                                     Responsible party means an                           How do you calculate irrigation rates?                associated with the irrigation project
                                                  individual or entity that owns or leases                                                                      with which you have a carriage
                                                  land within the assessable acreage of                      We calculate annual irrigation
                                                                                                          assessment rates in accordance with 25                agreement:
                                                  one of our irrigation projects and is
                                                  responsible for providing accurate                      CFR part 171.500 by estimating the                       (1) The full legal name of person or
                                                  information to our billing office and                   annual costs of operation and                         entity responsible for paying the bill;
                                                  paying a bill for an annual irrigation rate             maintenance at each of our irrigation                    (2) An adequate and correct address
                                                  assessment.                                             projects and then dividing by the total               for mailing or hand delivering our bill;
                                                     Total assessable acres means the total               assessable acres for that particular                  and
                                                  acres served by one of our irrigation                   irrigation project. The result of this                   (3) The taxpayer identification
                                                  projects.                                               calculation for each project is stated in             number or Social Security number of
                                                     Water delivery is an activity that is                the rate table in this notice.                        the person or entity responsible for
                                                  part of the irrigation service we provide               What kinds of expenses do you                         paying the bill.
                                                  our customers when water is available.                  consider in determining the estimated
                                                     We, us, and our means the United                                                                           Why are you collecting my taxpayer
                                                                                                          annual costs of operation and                         identification number or Social
                                                  States Government, the Secretary of the
                                                                                                          maintenance?                                          Security number?
                                                  Interior, the BIA, and all who are
                                                  authorized to represent us in matters                      Consistent with 25 CFR part 171.500,
                                                                                                                                                                  Public Law 104–134, the Debt
                                                  covered under this notice.                              these expenses include the following:
                                                                                                                                                                Collection Improvement Act of 1996,
                                                                                                             (a) Salary and benefits for the project
                                                  Does this notice affect me?                                                                                   requires that we collect the taxpayer
                                                                                                          engineer/manager and project
                                                                                                                                                                identification number or Social Security
                                                    This notice affects you if you own or                 employees under the project engineer/
                                                                                                                                                                number before billing a responsible
                                                  lease land within the assessable acreage                manager’s management or control;
                                                                                                             (b) Materials and supplies;                        party and as a condition to servicing the
                                                  of one of our irrigation projects or if you
                                                                                                             (c) Vehicle and equipment repairs;                 account.
                                                  have a carriage agreement with one of
                                                  our irrigation projects.                                   (d) Equipment costs, including lease               What happens if I am a responsible
                                                                                                          fees;                                                 party but I fail to furnish the
                                                  Where can I get information on the                         (e) Depreciation;                                  information required to the billing
                                                  regulatory and legal citations in this                     (f) Acquisition costs;                             office responsible for the irrigation
                                                  notice?                                                    (g) Maintenance of a reserve fund                  project within which I own or lease
                                                     You can contact the appropriate                      available for contingencies or                        assessable land or for which I have a
                                                  office(s) stated in the tables for the                  emergency costs needed for the reliable               carriage agreement?
                                                  irrigation project that serves you, or you              operation of the irrigation facility
                                                  can use the Internet site for the                       infrastructure;                                         If you are late paying your bill
                                                  Government Printing Office at http://                      (h) Maintenance of a vehicle and                   because of your failure to furnish the
                                                  www.gpo.gov.                                            heavy equipment replacement fund;                     required information listed above, you
                                                                                                             (i) Systematic rehabilitation and                  will be assessed interest and penalties
                                                  Why are you publishing this notice?                     replacement of project facilities;                    as provided below, and your failure to
                                                    We are publishing this notice to                         (j) Carriage Agreements for the                    provide the required information will
                                                  inform you that we propose to adjust                    transfer of project water through                     not provide grounds for you to appeal
mstockstill on DSK3G9T082PROD with NOTICES




                                                  our irrigation assessment rates. This                   irrigation facilities owned by others.                your bill or any penalties assessed.
                                                  notice is published in accordance with                     (j) Any water storage fees for non-BIA-            What can happen if I do not provide the
                                                  the BIA’s regulations governing its                     owned reservoirs, as applicable,                      information required for billing
                                                  operation and maintenance of irrigation                    (j) Contingencies for unknown costs                purposes?
                                                  projects, found at 25 CFR part 171. This                and omitted budget items; and
                                                  regulation provides for the                                (k) Other expenses we determine                       We can refuse to provide you
                                                  establishment and publication of the                    necessary to properly perform the                     irrigation service.


                                             VerDate Sep<11>2014   17:42 Aug 04, 2016   Jkt 238001   PO 00000   Frm 00089   Fmt 4703   Sfmt 4703   E:\FR\FM\05AUN1.SGM   05AUN1


                                                                                    Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices                                          51929

                                                  If I allow my bill to become past due,                    Are there any additional charges if I am              interest, penalties, and administrative
                                                  could this affect my water delivery?                      late paying my bill?                                  costs in accordance with 31 U.S.C. 3717.
                                                     Yes. 25 CFR 171.545(a) states: ‘‘We                       Yes. We will assess you interest on                What else will happen to my past due
                                                  will not provide you irrigation service                   the amount owed, using the rate of                    bill?
                                                  until: (1) Your bill is paid; or (2) You                  interest established annually by the                    If you do not pay your bill or make
                                                  make arrangement for payment pursuant                     Secretary of the United States Treasury               payment arrangements to which we
                                                  to § 171.550 of this part.’’ If we do not                 (Treasury) to calculate what you will be              agree, we are required to send your past
                                                  receive your payment before the close of                  assessed. You will not be assessed this               due bill to the Treasury for further
                                                  business on the 30th day after the due                    charge until your bill is past due.                   action. Under the provisions of 31 CFR
                                                  date stated on your bill, we will send                    However, if you allow your bill to                    901.1, ‘‘Aggressive agency collection
                                                  you a past due notice. This past due                      become past due, interest will accrue                 activity,’’ Federal agencies should
                                                  notice will have additional information                   from the original due date, not the past              consider referring debts that are less
                                                  concerning your rights. We will                           due date. Also, you will be charged an                than 180 days delinquent, and we must
                                                  consider your past due notice as                          administrative fee of $12.50 for each                 send any unpaid annual irrigation
                                                  delivered no later than 5 business days                   time we try to collect your past due bill.            assessment bill to Treasury no later than
                                                                                                            If your bill becomes more than 90 days                180 days after the original due date of
                                                  after the day we mail it. We follow the
                                                                                                            past due, you will be assessed a penalty              the bill.
                                                  procedures provided in 31 CFR 901.2,
                                                                                                            charge of 6 percent per year, which will
                                                  ‘‘Demand for Payment,’’ when                              accrue from the date your bill initially              Who can I contact for further
                                                  demanding payment of your past due                        became past due. Pursuant to 31 CFR                   information?
                                                  bill.                                                     901.9, ‘‘Interest, penalties and                         The following tables are the regional
                                                                                                            administrative costs,’’ as a Federal                  and project/agency contacts for our
                                                                                                            agency, we are required to charge                     irrigation facilities.

                                                               Project name                                                                    Project/agency contacts

                                                                                                                      Northwest Region Contacts

                                                      Stanley Speaks, Regional Director, Bureau of Indian Affairs, Northwest Regional Office, 911 NE. 11th Avenue, Portland, OR 97232–4169,
                                                                                                           Telephone: (503) 231–6702.

                                                  Flathead Irrigation Project ...............    Ernest Moran, Superintendent, Pete Plant, Irrigation Project Manager, P.O. Box 40, Pablo, MT 59855,
                                                                                                   Telephones: (406) 675–2700 ext. 1300, Superintendent; (406) 745–2661 ext. 2, Project Manager.
                                                  Fort Hall Irrigation Project ...............   David Bollinger, Irrigation Project Manager, Building #2, Bannock Ave., Fort Hall, ID 83203–0220, Tele-
                                                                                                   phone: (208) 238–6264.
                                                  Wapato Irrigation Project ................     David Shaw, Superintendent, Larry Nelson, Acting Project Administrator, P.O. Box 220, Wapato, WA
                                                                                                   98951–0220, Telephone: (509) 865–2421, Superintendent; (509) 877–3155, Acting Project Administrator.

                                                                                                                  Rocky Mountain Region Contacts

                                                      Darryl LaCounte, Regional Director, Bureau of Indian Affairs, Rocky Mountain Regional Office, 316 North 26th Street, Billings, MT 59101,
                                                                                                           Telephone: (406) 247–7943.

                                                  Blackfeet Irrigation Project ..............    Thedis Crowe, Superintendent, Greg Tatsey, Irrigation Project Manager, Box 880, Browning, MT 59417,
                                                                                                   Telephones: (406) 338–7544, Superintendent; (406) 338–7519, Irrigation Project Manager.
                                                  Crow Irrigation Project ....................   Vianna Stewart, Superintendent, Karl Helvik, Acting Irrigation Project Manager, P.O. Box 69, Crow Agency,
                                                                                                   MT 59022, Telephones: (406) 638–2672, Superintendent; (406) 247–7469, Acting Irrigation Project Man-
                                                                                                   ager.
                                                  Fort Belknap Irrigation Project ........       John St. Pierre, Superintendent, Vacant, Irrigation Project Manager, (Project operations & maintenance
                                                                                                   contracted to Tribes), R.R.1, Box 980, Harlem, MT 59526, Telephones: (406) 353–2901, Superintendent;
                                                                                                   (406) 353–8454, Irrigation Project Manager (Tribal Office).
                                                  Fort Peck Irrigation Project .............     Howard Beemer, Superintendent, Huber Wright, Acting Irrigation Project Manager, P.O. Box 637, Poplar,
                                                                                                   MT 59255, Telephones: (406) 768–5312, Superintendent; (406) 653–1752, Irrigation Project Manager.
                                                  Wind River Irrigation Project ...........      Norma Gourneau, Superintendent, Karl Helvik, Acting Irrigation Project Manager, P.O. Box 158, Fort
                                                                                                   Washakie, WY 82514, Telephones: (307) 332–7810, Superintendent; (406) 247–7469, Acting Irrigation
                                                                                                   Project Manager.

                                                                                                                     Southwest Region Contacts

                                                    William T. Walker, Regional Director, Bureau of Indian Affairs, Southwest Regional Office, 1001 Indian School Road, Albuquerque, NM 87104,
                                                                                                             Telephone: (505) 563–3100.

                                                  Pine River Irrigation Project ............     Priscilla Bancroft, Superintendent, Vickie Begay, Irrigation Project Manager, P.O. Box 315, Ignacio, CO
                                                                                                   81137–0315, Telephones: (970) 563–4511, Superintendent; (970) 563–9484, Irrigation Project Manager.
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                       Western Region Contacts

                                                     Bryan Bowker, Regional Director, Bureau of Indian Affairs, Western Regional Office, 2600 N. Central Ave., 4th Floor Mailroom, Phoenix, AZ
                                                                                                       85004, Telephone: (602) 379–6600.

                                                  Colorado River Irrigation Project ....         Kellie Youngbear Superintendent, Gary Colvin, Irrigation Project Manager, 12124 1st Avenue, Parker, AZ
                                                                                                   85344, Telephone: (928) 669–7111.



                                             VerDate Sep<11>2014    17:42 Aug 04, 2016    Jkt 238001   PO 00000   Frm 00090   Fmt 4703   Sfmt 4703   E:\FR\FM\05AUN1.SGM   05AUN1


                                                  51930                             Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices

                                                               Project name                                                                    Project/agency contacts

                                                  Duck Valley Irrigation Project .........       Joseph McDade, Superintendent, (Project operations & management compacted to Tribes), 2719 Argent
                                                                                                    Ave., Suite 4, Gateway Plaza, Elko, NV 89801, Telephone: (775) 738–5165; (208) 759–3100, (Tribal Of-
                                                                                                    fice).
                                                  Yuma Project, Indian Unit ...............      Irene Herder, Superintendent, 256 South Second Avenue, Suite D, Yuma, AZ 85364, Telephone: (928)
                                                                                                    782–1202.
                                                  San Carlos Irrigation Project Indian           Ferris Begay, Project Manager, Clarence Begay, Irrigation Manager, 13805 N. Arizona Boulevard, Coo-
                                                    Works and Joint Works.                          lidge, AZ 85128, Telephone: (520) 723–6225.
                                                  Uintah Irrigation Project ..................   Bart Stevens Superintendent, Ken Asay, Irrigation System Manager, P.O. Box 130, Fort Duchesne, UT
                                                                                                    84026, Telephone: (435) 722–4300, (435) 722–4344.
                                                  Walker River Irrigation Project ........       Robert Eben, Superintendent, 311 E. Washington Street, Carson City, NV 89701, Telephone: (775) 887–
                                                                                                    3500.



                                                  What irrigation assessments or charges                    where we recover costs of                             applicable. An asterisk immediately
                                                  are proposed for adjustment by this                       administering, operating, maintaining,                following the rate category notes the
                                                  notice?                                                   and rehabilitating them. The table also               irrigation projects where rates are
                                                    The rate table below contains the                       contains the proposed rates for the CY                proposed for adjustment.
                                                  current rates for all irrigation projects                 2016 and subsequent years where                       BILLING CODE 4337–15–P
mstockstill on DSK3G9T082PROD with NOTICES




                                             VerDate Sep<11>2014    17:42 Aug 04, 2016    Jkt 238001   PO 00000   Frm 00091   Fmt 4703   Sfmt 4703   E:\FR\FM\05AUN1.SGM   05AUN1


                                                                                 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices                                           51931


                                                                                                           Northwest Region Rate Table
                                                         Project Name                             Rate                            Final                        Final                 Proposed
                                                                                                Category                        2015 Rate                    2016 Rate              2017 Rate**
                                                         Flathead Irrigation            Basic per acre - A *                      $26.00                       $26.00                 $33.50
                                                         Project
                                                                                        Basic per acre - B *                      $13.00                       $13.00                 $16.75
                                                         (See Note #1)
                                                                                        Minimum Charge per                        $75.00                       $75.00                 $75.00
                                                                                              tract



                                                         Project Name                                                          Rate                             Final                Proposed
                                                                                                                             Category                         2015 Rate              2016 Rate
                                                        Fort Hall Irrigation Project                                 Basic per acre *                          $49.00                 $52.00


                                                                                                            Minimum Charge per tract *                         $35.00                 $37.00


                                                        Fort Hall Irrigation Project -Minor                          Basic per acre *                          $27.00                 $31.00
                                                        Units
                                                                                                            Minimum Charge per tract *                         $35.00                 $37.00


                                                        Fort Hall Irrigation Project-                                Basic per acre *                          $50.50                 $55.00
                                                        Michaud
                                                                                                                    Pressure per acre *                        $72.50                 $83.00


                                                                                                            Minimum Charge per tract *                         $35.00                 $37.00


                                                        Wapato Irrigation Project-                              Minimum Charge per bill *                      $24.00                 $25.00
                                                        Toppenish/Simcoe Units
                                                                                                                     Basic per acre *                          $24.00                 $25.00


                                                        Wapato Irrigation Project -                             Minimum Charge per bill *                      $25.00                 $30.00
                                                        Ahtanum Units
                                                                                                                     Basic per acre *                          $25.00                 $30.00


                                                        Wapato Irrigation Project -                             Minimum Charge per bill                        $79.00                 $79.00
                                                         Satus Unit
                                                                                                                    "A" Basic per acre                         $79.00                 $79.00


                                                                                                                    "B" Basic per acre                         $85.00                 $85.00
mstockstill on DSK3G9T082PROD with NOTICES




                                                        Wapato Irrigation Project -                             Minimum Charge per bill *                      $75.00                 $78.00
                                                                                                                                                                                                          EN05AU16.039</GPH>




                                             VerDate Sep<11>2014   17:42 Aug 04, 2016   Jkt 238001   PO 00000    Frm 00092    Fmt 4703   Sfmt 4725   E:\FR\FM\05AUN1.SGM   05AUN1


                                                  51932                          Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices


                                                        Additional Works                                            Basic per acre      *                    $75.00                $78.00


                                                        Wapato Irrigation Project -                                Minimum Charge                            $86.00                $86.00
                                                        Water Rental
                                                                                                                     Basic per acre                          $86.00                $86.00




                                                                                                       Rocky Mountain Region Rate Table
                                                        Project Name                                                      Rate                               Final                Proposed
                                                                                                                        Category                           2015 Rate              2016 Rate

                                                        Blackfeet Irrigation Project                                 Basic-per acre                          $20.00                $20.00


                                                        Crow Irrigation Project- Willow                            Basic-per acre       *                    $24.80                $26.00
                                                        Creek O&M (includes Agency,
                                                        Lodge Grass #1, Lodge Grass #2,
                                                        Reno, Upper Little Horn, and Forty
                                                        Mile Units)
                                                        Crow Irrigation Project- All                               Basic-per acre       *                    $24.80                $26.00
                                                        Others (includes Bighorn, Soap
                                                        Creek, and Pryor Units)
                                                        Crow Irrigation Project - Two                                Basic-per acre                          $14.00                $14.00
                                                        Leggins Unit
                                                        Crow Irrigation Two Leggins                                  Basic-per acre                          $2.00                  $2.00
                                                        Drainage District
                                                        Fort Belknap Irrigation Project                            Basic-per acre       *                    $15.00                $16.00



                                                        Fort Peck Irrigation Project                                 Basic-per acre                          $26.00                $26.00


                                                        Wind River Irrigation Project-                             Basic-per acre       *                    $21.00                $22.50
                                                        Units 2, 3 and 4


                                                        Wind River Irrigation Project- Unit                          Basic-per acre                          $21.00                $21.00
                                                        6


                                                        Wind River Irrigation Project-                             Basic-per acre       *                    $25.70                $47.00
                                                        LeClair District
                                                        (See Note #2)
                                                        Wind River Irrigation Project-                             Basic-per acre       *                    $14.00                $15.50
                                                        Crow Heart Unit
mstockstill on DSK3G9T082PROD with NOTICES




                                                        Wind River Irrigation Project- A                           Basic-per acre       *                   $ 14.00                $15.50
                                                        Canal Unit
                                                                                                                                                                                              EN05AU16.040</GPH>




                                             VerDate Sep<11>2014   17:42 Aug 04, 2016   Jkt 238001   PO 00000   Frm 00093   Fmt 4703   Sfmt 4725   E:\FR\FM\05AUN1.SGM   05AUN1


                  Federal Register/Vol. 81, No. 151 /Friday, August 5, 2016 /Notices               51933


Wind River Irrigation Project —              Basic—per acre *        $21.00              $26.00
Riverton Valley Irrigation District



                                      Southwest Region Rate Table
Project Name                                        Rate             Final             Proposed
                                                  Category         2015 Rate           2016 Rate

Pine River Irrigation Project             Minimum Charge per        $50.00              $50.00
                                                     tract

                                               Basic—per acre *     $17.00              $18.00



                                      Western Region Rate Table
Project Name                             Rate Category               Final             Proposed
                                                                   2015 Rate           2016 Rate

Colorado River Irrigation Project        Basic per acre up to       $54.00              $54.00
                                         5.75 acre—feet
                                         Excess Water per acre—     $17.00              $17.00
                                         foot over 5.75 acre—
                                         feet
Duck Valley Irrigation Project           Basic per acre *            $5.30               $6.30

Yuma Project, Indian Unit                Basic per acre up to      $108.50              $113.00
(See Note #3)                            5.0 acre—feet *

                                         Excess Water per acre—     $24.50              $24.50
                                         foot over 5.0 acre—feet

                                         Basic per acre up to       $108.50             $113.00
                                         5.0 acre—feet (Ranch 5)
                                         *


                                                  51934                          Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices


                                                           Project Name                 Rate Category                             Final                       Final                  Proposed
                                                                                                                                2015 Rate                   2016 Rate              2017 Rate**
                                                           San Carlos                   Basic per acre *                          $35.00                      $30.00                  $25.00
                                                           Irrigation Project
                                                           (Joint Works)                   Proposed 2016-2017 Construction Water Rate Schedule:

                                                           (See Note #4)
                                                                                                                               Off Project                 On Project               On Project
                                                                                                                               Construction               Construction-           Construction-
                                                                                                                                                          Gravity Water            Pump Water
                                                                                           Administrative Fee                     $300.00                     $300.00                 $300.00
                                                                                           Usage Fee                        $250.00 per month                 No Fee              $100.00 per acre
                                                                                                                                                                                        foot
                                                                                           Excess Water Rate t              $5.00 per 1,000 gal.            No Charge               No Charge
                                                                                           t The excess water rate applies to all water used in excess of 50,000 gallons in any one
                                                                                           month.


                                                           Project Name                                            Rate Category                            Final                  Proposed
                                                                                                                                                          2015 Rate                2016 Rate
                                                           San Carlos Irrigation Project (Indian                   Basic per acre *                         $86.00                   $81.00
                                                           Works)
                                                           (See Note#5)
                                                           Uintah Irrigation Project                               Basic per acre                           $18.00                   $18.00
                                                                                                                   Minimum Bill                             $25.00                   $25.00
                                                           Walker River Irrigation Project                         Basic per acre                           $31.00                   $31.00
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                                                                                                     EN05AU16.042</GPH>




                                             VerDate Sep<11>2014   17:42 Aug 04, 2016   Jkt 238001   PO 00000   Frm 00095   Fmt 4703   Sfmt 4725   E:\FR\FM\05AUN1.SGM   05AUN1


                                                                                 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices                                            51935




                                                  Consultation and Coordination With                      Actions Concerning Regulations That                   Reform Act (2 U.S.C. 1531 et seq.) is not
                                                  Tribal Governments (Executive Order                     Significantly Affect Energy Supply,                   required.
                                                  13175)                                                  Distribution, or Use (Executive Order
                                                                                                                                                                Takings (Executive Order 12630)
                                                                                                          13211)
                                                    The Department of the Interior strives                                                                        These proposed rate adjustments do
                                                  to strengthen its government-to-                           The proposed rate adjustments are not
                                                                                                          a significant energy action under the                 not effect a taking of private property or
                                                  government relationship with Indian                                                                           otherwise have ‘‘takings’’ implications
                                                  Tribes through a commitment to                          definition in Executive Order 13211. A
                                                                                                          Statement of Energy Effects is not                    under Executive Order 12630. The
                                                  consultation with Indian Tribes and                                                                           proposed rate adjustments do not
                                                  recognition of their right to self-                     required.
                                                                                                                                                                deprive the public, state, or local
                                                  governance and Tribal sovereignty. We                   Regulatory Planning and Review                        governments of rights or property.
                                                  have evaluated this notice under the                    (Executive Order 12866)
                                                  Department’s consultation policy and                                                                          Federalism (Executive Order 13132)
                                                                                                            These proposed rate adjustments are
                                                  under the criteria of Executive Order                   not a significant regulatory action and                  Under the criteria in section 1 of
                                                  13175 and have determined there to be                   do not need to be reviewed by the Office              Executive Order 13132, these proposed
                                                  substantial direct effects on federally                 of Management and Budget under                        rate adjustments do not have sufficient
                                                  recognized Tribes because the irrigation                Executive Order 12866.                                federalism implications to warrant the
                                                  projects are located on or associated                                                                         preparation of a federalism summary
                                                  with Indian reservations. To fulfill its                Regulatory Flexibility Act                            impact statement because they will not
                                                  consultation responsibility to Tribes and                 These proposed rate adjustments are                 affect the States, the relationship
                                                  Tribal organizations, BIA                               not a rule for the purposes of the                    between the national government and
                                                  communicates, coordinates, and                          Regulatory Flexibility Act because they               the States, or the distribution of power
                                                  consults on a continuing basis with                     establish ‘‘a rule of particular                      and responsibilities among various
                                                  these entities on issues of water                       applicability relating to rates.’’ 5 U.S.C.           levels of government. A federalism
                                                  delivery, water availability, and costs of              601(2).                                               summary impact statement is not
                                                  administration, operation, maintenance,                                                                       required.
                                                  and rehabilitation of projects that                     Unfunded Mandates Reform Act of
                                                  concern them. This is accomplished at                   1995                                                  Civil Justice Reform (Executive Order
                                                  the individual irrigation project by                      These proposed rate adjustments do                  12988)
                                                  project, agency, and regional                           not impose an unfunded mandate on                        This notice complies with the
                                                  representatives, as appropriate, in                     State, local, or tribal governments in the            requirements of Executive Order 12988.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  accordance with local protocol and                      aggregate, or on the private sector, of               Specifically, in issuing this notice, the
                                                  procedures. This notice is one                          more than $100 million per year. The                  Department has taken the necessary
                                                  component of our overall coordination                   rule does not have a significant or                   steps to eliminate drafting errors and
                                                  and consultation process to provide                     unique effect on State, local, or Tribal              ambiguity, minimize potential litigation,
                                                  notice to, and request comments from,                   governments or the private sector. A                  and provide a clear legal standard for
                                                  these entities when we adjust irrigation                statement containing the information                  affected conduct, as required by section
                                                                                                                                                                                                             EN05AU16.043</GPH>




                                                  assessment rates.                                       required by the Unfunded Mandates                     3 of Executive Order 12988.


                                             VerDate Sep<11>2014   17:42 Aug 04, 2016   Jkt 238001   PO 00000   Frm 00096   Fmt 4703   Sfmt 4703   E:\FR\FM\05AUN1.SGM   05AUN1


                                                  51936                          Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices

                                                  Paperwork Reduction Act of 1995                         FOR FURTHER INFORMATION CONTACT:      Greg            or modified with additional or different
                                                    These proposed rate adjustments do                    Larson, Project Manager, at the address               terms. Distinct from this effort, the
                                                  not affect the collections of information               above, by telephone at 970–876–9000,                  USFS has also been updating its 1993
                                                  which have been approved by the Office                  or by email at glarson@blm.gov. Persons               Oil and Gas Leasing EIS to address
                                                  of Information and Regulatory Affairs,                  who use a telecommunications device                   future oil and gas leasing availability on
                                                  Office of Management and Budget,                        for the deaf (TDD) may call the Federal               the WRNF. The USFS released the Final
                                                  under the Paperwork Reduction Act of                    Information Relay Service (FIRS) at 1–                EIS and Draft Record of Decision in
                                                  1995. The OMB Control Number is                         800–877–8339 to contact the above                     December 2014. The Final USFS Record
                                                  1076–0141 and expires June 30, 2019.                    individual during normal business                     of Decision was signed in December
                                                                                                          hours. The FIRS is available 24 hours a               2015. The USFS EIS and ROD are
                                                  National Environmental Policy Act                       day, seven days a week, to leave a                    forward-looking and do not directly
                                                    The Department has determined that                    message or question with the above                    affect the 65 previously issued leases;
                                                  these proposed rate adjustments do not                  individual. You will receive a reply                  however, the information generated as
                                                  constitute a major Federal action                       during normal business hours.                         part of that process was relevant to the
                                                  significantly affecting the quality of the              SUPPLEMENTARY INFORMATION: The BLM                    BLM’s analysis. As part of its process,
                                                  human environment and that no                           developed this EIS to address a NEPA                  the BLM has incorporated as much of
                                                  detailed statement is required under the                deficiency identified by the Interior                 the new USFS NEPA analysis of future
                                                  National Environmental Policy Act of                    Board of Land Appeals (IBLA) related to               oil and gas leasing on WRNF lands as
                                                  1969 (42 U.S.C. 4321–4370(d)).                          the issuance of oil and gas leases on                 possible into the BLM’s analysis of the
                                                                                                          WRNF lands from 1995 to 2004. In                      existing leases.
                                                    Dated: August 1, 2016.                                                                                         The BLM considered six alternatives
                                                  Lawrence S. Roberts,                                    2007, the IBLA ruled that before
                                                                                                                                                                in the Final EIS, including the No
                                                  Principal Deputy Secretary—Indian Affairs.              including WRNF parcels in an oil and
                                                                                                                                                                Action Alternative. The No Action
                                                                                                          gas lease sale, the BLM must either
                                                  [FR Doc. 2016–18642 Filed 8–4–16; 8:45 am]                                                                    Alternative would reaffirm the lease
                                                                                                          formally adopt the NEPA analysis
                                                  BILLING CODE 4337–15–P                                                                                        stipulations on the 65 leases as they
                                                                                                          completed by the U.S. Forest Service
                                                                                                                                                                were issued. Under this alternative, the
                                                                                                          (USFS) or conduct a NEPA analysis of
                                                                                                                                                                BLM would take no action by
                                                  DEPARTMENT OF THE INTERIOR                              its own (Board of Commissioners of
                                                                                                                                                                continuing to administer the leases with
                                                                                                          Pitkin County, 173 IBLA 173 (2007)).                  their current stipulations. Alternative 2
                                                  Bureau of Land Management                               The BLM canceled the three leases at                  would address inconsistencies in some
                                                                                                          issue in that case and has identified 65              of the existing leases by adding
                                                  [LLCON04000 L16100000.DP000]                            additional leases with effective dates                stipulations identified in the 1993
                                                                                                          ranging from 1995 to 2012, which the                  WRNF EIS that should have been but
                                                  Notice of Availability of the Final
                                                                                                          BLM leased without either: (i) Adopting               were not attached to eight leases when
                                                  Environmental Impact Statement for
                                                                                                          applicable USFS NEPA, or (ii) Preparing               they were issued. Alternative 3 would
                                                  Previously Issued Oil and Gas Leases
                                                                                                          its own NEPA analysis. For these 65                   modify the 65 leases to match the
                                                  in the White River National Forest,
                                                                                                          existing leases, the most recent USFS                 stipulations identified for future leasing
                                                  Colorado
                                                                                                          decision to make these lands available                in the 2014 USFS Final EIS Proposed
                                                  AGENCY:   Bureau of Land Management,                    for oil and gas leasing was analyzed in               Action. Alternative 4 would modify or
                                                  Interior.                                               the 1993 USFS WRNF Oil and Gas                        cancel the 65 leases to match the
                                                  ACTION: Notice.                                         Leasing EIS, which was reaffirmed in                  stipulations and availability decision for
                                                                                                          the 2002 WRNF Plan.                                   future leasing identified in the 2014
                                                  SUMMARY:   In compliance with the                          While the BLM obtained USFS                        USFS Draft Record of Decision. In areas
                                                  National Environmental Policy Act of                    consent before offering and                           the USFS identified as open to future
                                                  1969, as amended (NEPA), the Bureau of                  subsequently issuing these 65 leases, it              leasing, lease stipulations would be
                                                  Land Management (BLM) Colorado                          did not adopt the USFS’ NEPA analysis                 modified to track those found in the
                                                  River Valley Field Office (CRVFO),                      or prepare its own analysis. As a result,             most recent decisions, and all or part of
                                                  located in Silt, Colorado, prepared a                   the BLM determined that the issuance of               25 existing leases in areas identified as
                                                  Final Environmental Impact Statement                    the leases in question was not in                     closed to future leasing would be
                                                  (EIS) that analyzes the environmental                   compliance with applicable NEPA                       cancelled. Alternative 5 would cancel
                                                  impacts of previous decisions to issue                  requirements, rendering the leases                    all 65 leases.
                                                  65 leases on lands within the White                     voidable. The BLM therefore                              For purposes of the Final EIS, the
                                                  River National Forest (WRNF) from                       determined that additional actions were               BLM identified a combination of
                                                  1995 to 2012.                                           necessary to either reaffirm, modify, or              Alternatives 2 and 4 as its Preferred
                                                  DATES: The BLM will not issue a final                   cancel those leases. As part of its                   Alternative. Under this alternative, the
                                                  decision on the proposal for a minimum                  determination of what additional action               BLM would cancel in their entirety 25
                                                  of 30 days after the date that the                      needs to be taken, the BLM determined                 leases that are not producing or
                                                  Environmental Protection Agency                         that the WRNF NEPA analysis relevant                  committed to a unit or communitization
                                                  publishes its Notice of Availability in                 to the 65 previously issued leases was                agreement, and that overlap with the
                                                  the Federal Register.                                   no longer adequate due to changes in                  area identified as closed to future
                                                  ADDRESSES: Copies of the Previously                     laws, regulations, policies and                       leasing by the USFS’s Final Record of
                                                  Issued Oil and Gas Leases in the WRNF                   conditions since the earlier EIS was                  Decision (USFS 2015f). It would apply
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Final EIS are available for public                      finalized in 1993. As a result, the BLM               Alternative 4 stipulations (i.e., those
                                                  inspection at the CRVFO, 2300 River                     prepared this EIS, which analyzes the                 that were identified in the 2015 USFS
                                                  Frontage Road, Silt, CO 81652.                          previous decisions to lease WRNF lands                Record of Decision) to the 13
                                                  Interested persons may also review the                  for oil and gas development.                          undeveloped leases that are within parts
                                                  Final EIS on the project Web site at                       Based on the analysis in the EIS, the              of the WRNF identified as open to
                                                  http://www.blm.gov/co/st/en/fo/                         BLM will determine whether these 65                   future leasing, and would apply
                                                  crvfo.html.                                             leases should be cancelled, reaffirmed,               Alternative 2 stipulations (i.e., those


                                             VerDate Sep<11>2014   17:42 Aug 04, 2016   Jkt 238001   PO 00000   Frm 00097   Fmt 4703   Sfmt 4703   E:\FR\FM\05AUN1.SGM   05AUN1



Document Created: 2016-08-05 06:43:50
Document Modified: 2016-08-05 06:43:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of proposed rate adjustments.
DatesInterested parties may submit comments on the proposed rate adjustments on or before October 4, 2016.
ContactFor details about a particular irrigation project, please use the tables in SUPPLEMENTARY INFORMATION section to contact the regional or local office where the project is located.
FR Citation81 FR 51927 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR