81_FR_52823 81 FR 52670 - City of Farmington, NM; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 52670 - City of Farmington, NM; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 153 (August 9, 2016)

Page Range52670-52671
FR Document2016-18827

Federal Register, Volume 81 Issue 153 (Tuesday, August 9, 2016)
[Federal Register Volume 81, Number 153 (Tuesday, August 9, 2016)]
[Notices]
[Pages 52670-52671]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-18827]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-18-000]


City of Farmington, NM; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On July 28, 2016, the City of Farmington, NM filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA), as amended by section 4 
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 
proposed Animas Hydroelectric Project would have an installed capacity 
of 250 kilowatts (kW) and would be located at the end of Willet Ditch, 
the last 75 feet of which varies in depth from 5.6 feet to 10 feet. The 
Willet Ditch is used for municipal water supply and irrigation. The 
project would be located near the City of Farmington in San Juan 
County, New Mexico.
    Applicant Contact: Britt Chesnut, City of Farmington Electric 
Utility, 501 McCormick School Rd., Farmington, NM 87401, Phone No. 
(505) 599-8342.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
robert.bell@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed short 6-inch diameter pipe, 
(2) a proposed 250-kW turbine located at the end of Willet Ditch where 
it discharges into the Animas River, and (3) appurtenant facilities. 
The proposed project would have an estimated annual generating capacity 
of 1,080 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

[[Page 52671]]



      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit is a                     Y
 HREA.                            tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff has preliminarily determined that the proposal 
satisfies the requirements for a qualifying conduit hydropower facility 
under 16 U.S.C. 823a, and is exempted from the licensing requirements 
of the FPA.
    Comments and Motions to Intervene: The deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    The deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD16-18-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, 
call (202) 502-8659.

    Dated: August 3, 2016.
Kimberly Bose,
Secretary.
[FR Doc. 2016-18827 Filed 8-8-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    52670                         Federal Register / Vol. 81, No. 153 / Tuesday, August 9, 2016 / Notices

                                                    completing the three components of the                     Docket Numbers: RP16–1104–000.                     docs-filing/efiling/filing-req.pdf. For
                                                    Survey is expected to take 30 minutes,                     Applicants: Midcontinent Express                   other information, call (866) 208–3676
                                                    leading to a total burden of                            Pipeline LLC.                                         (toll free). For TTY, call (202) 502–8659.
                                                    approximately 28,250 hours (an increase                    Description: § 4(d) Rate Filing: Filing              Dated: July 27, 2016.
                                                    2,500 hours above the total burden in                   to remove expiring Enerfin, Newfield                  Nathaniel J. Davis, Sr.,
                                                    hours for the two currently approved                    and Tenaska agreements to be effective
                                                                                                                                                                  Deputy Secretary.
                                                    collections).                                           8/1/2016.
                                                                                                                                                                  [FR Doc. 2016–18800 Filed 8–8–16; 8:45 am]
                                                      (5) Type of Respondents: Public; (6)                     Filed Date: 7/26/16.
                                                                                                                                                                  BILLING CODE 6717–01–P
                                                    Annual Estimated Number of                                 Accession Number: 20160726–5068.
                                                    Respondents for all three information                      Comments Due: 5 p.m. ET 8/8/16.
                                                    collections: 16,250; (7) Annual                            Docket Numbers: RP16–1105–000.                     DEPARTMENT OF ENERGY
                                                    Estimated Number of Total Responses:                       Applicants: Northwest Pipeline LLC.
                                                    16,300; (7) Annual Estimated Number of                     Description: § 4(d) Rate Filing: Small             Federal Energy Regulatory
                                                    Burden Hours: 28,250 (25,625 for PEV                    Customer Tariff Update to be effective                Commission
                                                    Scorecard, 125 for Clean Fleets                         8/26/2016.
                                                    Partnership, and 2,500 for the Ride and                    Filed Date: 7/26/16.                               [Docket No. CD16–18–000]
                                                    Drive Surveys for PEV Showcases); and                      Accession Number: 20160726–5146.
                                                    (8) Annual Estimated Reporting and                                                                            City of Farmington, NM; Notice of
                                                                                                               Comments Due: 5 p.m. ET 8/8/16.
                                                    Recordkeeping Cost Burden: There is no                                                                        Preliminary Determination of a
                                                    cost associated with reporting and                         Docket Numbers: RP16–1106–000.                     Qualifying Conduit Hydropower
                                                    recordkeeping.                                             Applicants: Northwest Pipeline LLC.                Facility and Soliciting Comments and
                                                                                                               Description: § 4(d) Rate Filing: LS–1              Motions To Intervene
                                                      Statutory Authority: 42 U.S.C. 13233; 42
                                                                                                            Rate Schedule Removal to be effective
                                                    U.S.C. 13252 (a)–(b); 42 U.S.C. 13255.                                                                          On July 28, 2016, the City of
                                                                                                            8/26/2016.
                                                      Issued in Washington, DC, on August 3,                   Filed Date: 7/26/16.                               Farmington, NM filed a notice of intent
                                                    2016.                                                      Accession Number: 20160726–5147.                   to construct a qualifying conduit
                                                    Kathryn C. Cooper,                                         Comments Due: 5 p.m. ET 8/8/16.                    hydropower facility, pursuant to section
                                                    Acting Director, Vehicle Technologies Office,              Docket Numbers: RP16–1107–000.                     30 of the Federal Power Act (FPA), as
                                                    Energy Efficiency and Renewable Energy.                                                                       amended by section 4 of the
                                                                                                               Applicants: Northwest Pipeline LLC.
                                                    [FR Doc. 2016–18849 Filed 8–8–16; 8:45 am]                                                                    Hydropower Regulatory Efficiency Act
                                                                                                               Description: § 4(d) Rate Filing:
                                                    BILLING CODE 6450–01–P                                                                                        of 2013 (HREA). The proposed Animas
                                                                                                            Measurment Adjustments/Corrections
                                                                                                                                                                  Hydroelectric Project would have an
                                                                                                            Filing to be effective 8/26/2016.
                                                                                                                                                                  installed capacity of 250 kilowatts (kW)
                                                                                                               Filed Date: 7/26/16.
                                                    DEPARTMENT OF ENERGY                                                                                          and would be located at the end of
                                                                                                               Accession Number: 20160726–5149.
                                                                                                                                                                  Willet Ditch, the last 75 feet of which
                                                    Federal Energy Regulatory                                  Comments Due: 5 p.m. ET 8/8/16.                    varies in depth from 5.6 feet to 10 feet.
                                                    Commission                                                 Docket Numbers: RP16–1108–000.                     The Willet Ditch is used for municipal
                                                                                                               Applicants: Northwest Pipeline LLC.                water supply and irrigation. The project
                                                    Combined Notice of Filings                                 Description: § 4(d) Rate Filing: Tariff            would be located near the City of
                                                                                                            Title Sheet Update to be effective 8/26/              Farmington in San Juan County, New
                                                      Take notice that the Commission has                   2016.                                                 Mexico.
                                                    received the following Natural Gas                         Filed Date: 7/26/16.
                                                    Pipeline Rate and Refund Report filings:                                                                        Applicant Contact: Britt Chesnut, City
                                                                                                               Accession Number: 20160726–5150.                   of Farmington Electric Utility, 501
                                                    Filings Instituting Proceedings                            Comments Due: 5 p.m. ET 8/8/16.                    McCormick School Rd., Farmington,
                                                      Docket Numbers: RP16–1085–000.                           The filings are accessible in the                  NM 87401, Phone No. (505) 599–8342.
                                                      Applicants: Northern Natural Gas                      Commission’s eLibrary system by                         FERC Contact: Robert Bell, Phone No.
                                                    Company.                                                clicking on the links or querying the                 (202) 502–6062, email: robert.bell@
                                                      Description: Files a Petition for a                   docket number.                                        ferc.gov.
                                                    Limited Waiver of Northern Natural Gas                     Any person desiring to intervene or                  Qualifying Conduit Hydropower
                                                    Company under RP16–1085.                                protest in any of the above proceedings               Facility Description: The proposed
                                                      Filed Date: 7/7/16.                                   must file in accordance with Rules 211                project would consist of: (1) A proposed
                                                                                                            and 214 of the Commission’s                           short 6-inch diameter pipe, (2) a
                                                      Accession Number: 20160707–5096.
                                                                                                            Regulations (18 CFR 385.211 and                       proposed 250-kW turbine located at the
                                                      Comments Due: 5 p.m. ET 8/8/16.
                                                                                                            § 385.214) on or before 5:00 p.m. Eastern             end of Willet Ditch where it discharges
                                                      Docket Numbers: RP16–1103–000.                        time on the specified comment date.                   into the Animas River, and (3)
                                                      Applicants: Northern Natural Gas                      Protests may be considered, but                       appurtenant facilities. The proposed
                                                    Company.                                                intervention is necessary to become a                 project would have an estimated annual
                                                      Description: § 4(d) Rate Filing:                      party to the proceeding.                              generating capacity of 1,080 megawatt-
                                                    20160623 Filing to Remove CS–1 Rate                       eFiling is encouraged. More detailed                hours.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    Schedule to be effective 8/25/2016.                     information relating to filing                          A qualifying conduit hydropower
                                                      Filed Date: 7/25/16.                                  requirements, interventions, protests,                facility is one that is determined or
                                                      Accession Number: 20160725–5117.                      service, and qualifying facilities filings            deemed to meet all of the criteria shown
                                                      Comments Due: 5 p.m. ET 8/8/16.                       can be found at: http://www.ferc.gov/                 in the table below.




                                               VerDate Sep<11>2014   20:00 Aug 08, 2016   Jkt 238001   PO 00000   Frm 00061   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1


                                                                                   Federal Register / Vol. 81, No. 153 / Tuesday, August 9, 2016 / Notices                                              52671

                                                                                         TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                     Satisfies
                                                                   Statutory provision                                                          Description                                           (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ..              The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade            Y
                                                                                                          water conveyance that is operated for the distribution of water for agricultural,
                                                                                                          municipal, or industrial consumption and not primarily for the generation of elec-
                                                                                                          tricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA              The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                          power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                          erally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amended               by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                      HREA.
                                                    FPA 30(a)(3)(C)(iii), as amended              by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-             Y
                                                      HREA.                                              censing requirements of Part I of the FPA.



                                                       Preliminary Determination: Based                      registration, using the eComment system               notice that members of the
                                                    upon the above criteria, Commission                      at http://www.ferc.gov/docs-filing/                   Commission’s staff may attend the
                                                    staff has preliminarily determined that                  ecomment.asp. You must include your                   following meetings related to the
                                                    the proposal satisfies the requirements                  name and contact information at the end               transmission planning activities of the
                                                    for a qualifying conduit hydropower                      of your comments. For assistance,                     PJM Interconnection, L.L.C. (PJM):
                                                    facility under 16 U.S.C. 823a, and is                    please contact FERC Online Support at                 PJM Planning Committee
                                                    exempted from the licensing                              FERCOnlineSupport@ferc.gov, (866)                     August 11, 2016, 9:30 a.m.–12:00 p.m.
                                                    requirements of the FPA.                                 208–3676 (toll free), or (202) 502–8659                  (EST)
                                                       Comments and Motions to Intervene:                    (TTY). In lieu of electronic filing, please           PJM Transmission Expansion Advisory
                                                    The deadline for filing comments                         send a paper copy to: Secretary, Federal                 Committee
                                                    contesting whether the facility meets the                Energy Regulatory Commission, 888
                                                    qualifying criteria is 45 days from the                                                                        August 11, 2016, 11:00 a.m.—3:00 p.m.
                                                                                                             First Street NE., Washington, DC 20426.                  (EST)
                                                    issuance date of this notice.                            A copy of all other filings in reference
                                                       The deadline for filing motions to                    to this application must be accompanied                  The above-referenced meetings will
                                                    intervene is 30 days from the issuance                   by proof of service on all persons listed             be held at: PJM Conference and Training
                                                    date of this notice.                                     in the service list prepared by the                   Center, PJM Interconnection, 2750
                                                       Anyone may submit comments or a                       Commission in this proceeding, in                     Monroe Boulevard, Audubon, PA
                                                    motion to intervene in accordance with                   accordance with 18 CFR 4.34(b) and                    19403.
                                                    the requirements of Rules of Practice                    385.2010.                                                The above-referenced meetings are
                                                    and Procedure, 18 CFR 385.210 and                           Locations of Notice of Intent: Copies              open to stakeholders.
                                                    385.214. Any motions to intervene must                   of the notice of intent can be obtained                  Further information may be found at
                                                    be received on or before the specified                   directly from the applicant or such                   www.pjm.com.
                                                    deadline date for the particular                         copies can be viewed and reproduced at                   The discussions at the meetings
                                                    proceeding.                                              the Commission in its Public Reference                described above may address matters at
                                                       Filing and Service of Responsive                      Room, Room 2A, 888 First Street NE.,                  issue in the following proceedings:
                                                    Documents: All filings must (1) bear in                  Washington, DC 20426. The filing may                  Docket No. ER16–453, PJM
                                                    all capital letters the ‘‘COMMENTS                       also be viewed on the web at http://                     Interconnection, L.L.C. and Northeast
                                                    CONTESTING QUALIFICATION FOR A                           www.ferc.gov/docs-filing/elibrary.asp                    Transmission Development, LLC
                                                    CONDUIT HYDROPOWER FACILITY’’                            using the ‘‘eLibrary’’ link. Enter the                Docket No. ER16–736, PJM
                                                    or ‘‘MOTION TO INTERVENE,’’ as                           docket number (e.g., CD16–18–000) in                     Interconnection, L.L.C.
                                                    applicable; (2) state in the heading the                 the docket number field to access the
                                                    name of the applicant and the project                                                                          Docket No. ER14–972, PJM
                                                                                                             document. For assistance, call toll-free                 Interconnection, L.L.C.
                                                    number of the application to which the                   1–866–208–3676 or email
                                                    filing responds; (3) state the name,                                                                           Docket No. ER14–1485, PJM
                                                                                                             FERCOnlineSupport@ferc.gov. For TTY,                     Interconnection, L.L.C.
                                                    address, and telephone number of the                     call (202) 502–8659.
                                                    person filing; and (4) otherwise comply                                                                        Docket Nos. ER13–1944, et al., PJM
                                                    with the requirements of sections                          Dated: August 3, 2016.                                 Interconnection, L.L.C., et al.
                                                    385.2001 through 385.2005 of the                         Kimberly Bose,                                        Docket No. ER15–1344, PJM
                                                    Commission’s regulations.1 All                           Secretary.                                               Interconnection, L.L.C.
                                                    comments contesting Commission staff’s                   [FR Doc. 2016–18827 Filed 8–8–16; 8:45 am]            Docket No. ER15–1387, PJM
                                                    preliminary determination that the                       BILLING CODE 6717–01–P                                   Interconnection, L.L.C. and Potomac
                                                    facility meets the qualifying criteria                                                                            Electric Power Company
                                                    must set forth their evidentiary basis.                                                                        Docket No. ER15–2562, PJM
                                                       The Commission strongly encourages                    DEPARTMENT OF ENERGY                                     Interconnection, L.L.C.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    electronic filing. Please file motions to                                                                      Docket No. ER15–2563, PJM
                                                    intervene and comments using the                         Federal Energy Regulatory                                Interconnection, L.L.C.
                                                    Commission’s eFiling system at http://                   Commission                                            Docket No. EL15–18, Consolidated
                                                    www.ferc.gov/docs-filing/efiling.asp.                                                                             Edison Company of New York, Inc. v.
                                                                                                             Notice of Commission Staff
                                                    Commenters can submit brief comments                                                                              PJM Interconnection, L.L.C.
                                                                                                             Attendance
                                                    up to 6,000 characters, without prior                                                                          Docket No. EL15–41, Essential Power
                                                                                                               The Federal Energy Regulatory                          Rock Springs, LLC, et. al. v. PJM
                                                      1 18   CFR 385.2001–2005 (2015).                       Commission (Commission) hereby gives                     Interconnection, L.L.C.


                                               VerDate Sep<11>2014    20:00 Aug 08, 2016   Jkt 238001   PO 00000   Frm 00062   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1



Document Created: 2016-08-09 01:10:00
Document Modified: 2016-08-09 01:10:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 52670 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR