81_FR_53289 81 FR 53134 - Eastern Shore Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Planned 2017 Expansion Project and Request for Comments on Environmental Issues

81 FR 53134 - Eastern Shore Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Planned 2017 Expansion Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 155 (August 11, 2016)

Page Range53134-53136
FR Document2016-19082

Federal Register, Volume 81 Issue 155 (Thursday, August 11, 2016)
[Federal Register Volume 81, Number 155 (Thursday, August 11, 2016)]
[Notices]
[Pages 53134-53136]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-19082]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF16-7-000]


Eastern Shore Natural Gas Company; Notice of Intent To Prepare an 
Environmental Assessment for the Planned 2017 Expansion Project and 
Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the 2017 Expansion Project 
involving construction and operation of facilities by Eastern Shore 
Natural Gas Company (Eastern Shore) in Lancaster and Chester Counties, 
Pennsylvania; Cecil County, Maryland; and New Castle, Kent, and Sussex 
Counties, Delaware. The Commission will use this EA in its decision-
making process to determine whether the project is in the public 
convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC, on or before August 31, 2016.
    If you sent comments on this project to the Commission before the 
opening of this docket on May 17, 2016, you will need to file those 
comments in Docket No. PF16-7-000 to ensure they are considered as part 
of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the planned facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses 
a number of typically asked questions, including the use of eminent 
domain and how to participate in the Commission's proceedings.

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(PF16-7-000) with your submission: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Planned Project

    Eastern Shore plans to construct new pipeline and appurtenant 
aboveground facilities in the states of Pennsylvania, Maryland, and 
Delaware. The 2017 Expansion Project facilities consist of (1) 
approximately 30 miles of pipeline looping in Pennsylvania, Maryland 
and Delaware; (2) upgrades to existing metering facilities; (3) 
installation of an additional 3,550 horsepower (``hp'') compressor unit 
at the existing Daleville Compressor Station; and (4) approximately 17 
miles of new mainline extension and the addition of two pressure 
control stations in Sussex County, Delaware.
    The 2017 Expansion Project consists of the following components, 
listed below by geographic area:

Pennsylvania

Lancaster County
    Honey Brook Meter and Regulator Station: Replace existing meter 
runs and pressure/flow control valves at the existing interconnect site 
with Texas Eastern Transmission, LP (``Texas Eastern''). Modify the 
existing Honey Brook Meter and Regulator Station and lateral piping to 
accommodate the installation of upsized mainline taps and valves and 
the installation of a filter separator, associated piping, and storage 
tank as well as other ancillary equipment at Eastern Shore's existing 
interconnect with Texas Eastern. All construction work would be 
conducted within the fenceline in previously disturbed areas of the 
existing interconnect site.
Chester County
    Parkesburg Loop: Construct approximately 5 miles of 16-inch-
diameter pipeline loop \1\ beginning at Eastern Shore's existing 
Parkesburg

[[Page 53135]]

Meter and Regulator Station southward to Lime Stone Road (PA-10).
---------------------------------------------------------------------------

    \1\ A pipeline loop is a segment of pipe constructed parallel to 
an existing pipeline to increase capacity.
---------------------------------------------------------------------------

    Jennersville Loop: Construct approximately 7 miles of 24-inch-
diameter pipeline loop beginning at Eastern Shore's existing Daleville 
Compressor Station southward to Hess Mill Road.
    Daleville Compressor Station Upgrade: Install a new 3,550 hp gas-
fired compressor unit at the existing Daleville Compressor Station.

Maryland

Cecil County
    Fair Hill Loop: Construct approximately 6.3 miles of 24-inch-
diameter pipeline loop beginning at Eastern Shore's existing block 
valve on Walker Road in Chester County, Pennsylvania southward to Cecil 
County, Maryland to tie into the existing Eastern Shore pipeline north 
of Route 2 near the Maryland/Delaware state line.

Delaware

New Castle County
    Middletown Loop: Construct approximately 1 mile of 10-inch-diameter 
pipeline loop beginning on Peterson Road and extending to a location 
southeastern of Industrial Road. Construct approximately 0.65 mile of 
6-inch-diameter pipeline lateral and meter station from Industrial Road 
towards Auto Park Drive.
    Summit Loop: Construct approximately 0.5 mile of 10-inch-diameter 
pipeline loop starting along the south side of C&D Canal at Eastern 
Shore's existing 12- inch aerial crossing southward to tie into the 
existing Eastern Shore pipeline.
Kent County
    Woodside Loop: Construct approximately 5 miles of 16-inch-diameter 
pipeline loop beginning in Wyoming, Delaware southward to Viola, 
Delaware.
Sussex County
    Hearns Pond Loop: Construct approximately 1.5 miles of 10-inch-
diameter pipeline loop along U.S. 13 near Seaford southward to Eastern 
Shore's existing Seaford Pressure Control Station.
    Seaford to Millsboro Segment: Construct approximately 17.0 miles of 
10-inch-diameter pipeline extension from Seaford eastward to Eastern 
Shore's existing Millsboro Meter & Regulator Station near Millsboro.
    Laurel Loop: Construct approximately 5.1 miles of 10-inch-diameter 
pipeline loop along U.S. 13 near Laurel southward to connect with 
Eastern Shore's existing pipeline.
    Pressure Control Stations: Construct two pressure control stations 
located near the towns of Millsboro and Delmar.
    Please see appendix A for a map depicting the general locations of 
the planned 2017 Expansion Project facilities.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as scoping. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the planned project under these 
general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate possible alternatives to the planned project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Although no formal application has been filed, we have already 
initiated our NEPA review under the Commission's pre-filing process. 
The purpose of the pre-filing process is to encourage early involvement 
of interested stakeholders and to identify and resolve issues before 
the FERC receives an application. As part of our pre-filing review, we 
have begun to contact some federal and state agencies to discuss their 
involvement in the scoping process and the preparation of the EA.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before we make our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues 
related to this project to formally cooperate with us in the 
preparation of the EA.\3\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office(s), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO(s) as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest

[[Page 53136]]

groups; Native American Tribes; other interested parties; and local 
libraries and newspapers. This list also includes all affected 
landowners (as defined in the Commission's regulations) who are 
potential right-of-way grantors, whose property may be used temporarily 
for project purposes, or who own homes within certain distances of 
aboveground facilities, and anyone who submits comments on the project. 
We will update the environmental mailing list as the analysis proceeds 
to ensure that we send the information related to this environmental 
review to all individuals, organizations, and government entities 
interested in and/or potentially affected by the planned project.
    If we publish and distribute the EA, copies of the EA will be sent 
to the environmental mailing list for public review and comment. If you 
would prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix B).

Becoming an Intervenor

    Once Eastern Shore files its application with the Commission, you 
may want to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Motions to intervene are more fully described at 
http://www.ferc.gov/resources/guides/how-to/intervene.asp. Instructions 
for becoming an intervenor are in the ``Document-less Intervention 
Guide'' under the ``e-filing'' link on the Commission's Web site. 
Please note that the Commission will not accept requests for intervenor 
status at this time. You must wait until the Commission receives a 
formal application for the project.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., PF16-
7). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: August 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-19082 Filed 8-10-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                53134                       Federal Register / Vol. 81, No. 155 / Thursday, August 11, 2016 / Notices

                                                                  Date and time                                                                          Location

                                                Wednesday, August 17, 2016, 6–10 p.m ...........         Patriots Theater at War Memorial, George Washington Ballroom, 1 Memorial Drive, Trenton,
                                                                                                           NJ 08608, Phone: (609) 984–8484.



                                                  All other public comment meetings                     No. PF16–7–000 to ensure they are                     clicking on ‘‘eRegister.’’ If you are filing
                                                will be held as listed in the Notice of                 considered as part of this proceeding.                a comment on a particular project,
                                                Availability issued on July 22, 2016.                     This notice is being sent to the                    please select ‘‘Comment on a Filing’’ as
                                                  Dated: August 5, 2016.
                                                                                                        Commission’s current environmental                    the filing type; or
                                                                                                        mailing list for this project. State and                 (3) You can file a paper copy of your
                                                Nathaniel J. Davis, Sr.,
                                                                                                        local government representatives should               comments by mailing them to the
                                                Deputy Secretary.                                       notify their constituents of this planned             following address. Be sure to reference
                                                [FR Doc. 2016–19072 Filed 8–10–16; 8:45 am]             project and encourage them to comment                 the project docket number (PF16–7–000)
                                                BILLING CODE 6717–01–P                                  on their areas of concern.                            with your submission: Kimberly D.
                                                                                                          If you are a landowner receiving this               Bose, Secretary, Federal Energy
                                                                                                        notice, a pipeline company                            Regulatory Commission, 888 First Street
                                                DEPARTMENT OF ENERGY                                    representative may contact you about                  NE., Room 1A, Washington, DC 20426.
                                                                                                        the acquisition of an easement to
                                                Federal Energy Regulatory                               construct, operate, and maintain the                  Summary of the Planned Project
                                                Commission                                              planned facilities. The company would                   Eastern Shore plans to construct new
                                                [Docket No. PF16–7–000]                                 seek to negotiate a mutually acceptable               pipeline and appurtenant aboveground
                                                                                                        agreement. However, if the Commission                 facilities in the states of Pennsylvania,
                                                Eastern Shore Natural Gas Company;                      approves the project, that approval                   Maryland, and Delaware. The 2017
                                                Notice of Intent To Prepare an                          conveys with it the right of eminent                  Expansion Project facilities consist of (1)
                                                Environmental Assessment for the                        domain. Therefore, if easement                        approximately 30 miles of pipeline
                                                Planned 2017 Expansion Project and                      negotiations fail to produce an                       looping in Pennsylvania, Maryland and
                                                Request for Comments on                                 agreement, the pipeline company could                 Delaware; (2) upgrades to existing
                                                Environmental Issues                                    initiate condemnation proceedings                     metering facilities; (3) installation of an
                                                                                                        where compensation would be                           additional 3,550 horsepower (‘‘hp’’)
                                                   The staff of the Federal Energy                                                                            compressor unit at the existing Daleville
                                                                                                        determined in accordance with state
                                                Regulatory Commission (FERC or                                                                                Compressor Station; and (4)
                                                                                                        law.
                                                Commission) will prepare an                               A fact sheet prepared by the FERC                   approximately 17 miles of new mainline
                                                environmental assessment (EA) that will                 entitled ‘‘An Interstate Natural Gas                  extension and the addition of two
                                                discuss the environmental impacts of                    Facility On My Land? What Do I Need                   pressure control stations in Sussex
                                                the 2017 Expansion Project involving                    To Know?’’ is available for viewing on                County, Delaware.
                                                construction and operation of facilities                the FERC Web site (www.ferc.gov). This                  The 2017 Expansion Project consists
                                                by Eastern Shore Natural Gas Company                    fact sheet addresses a number of                      of the following components, listed
                                                (Eastern Shore) in Lancaster and Chester                typically asked questions, including the              below by geographic area:
                                                Counties, Pennsylvania; Cecil County,                   use of eminent domain and how to
                                                Maryland; and New Castle, Kent, and                                                                           Pennsylvania
                                                                                                        participate in the Commission’s
                                                Sussex Counties, Delaware. The                          proceedings.                                          Lancaster County
                                                Commission will use this EA in its
                                                                                                        Public Participation                                     Honey Brook Meter and Regulator
                                                decision-making process to determine
                                                                                                                                                              Station: Replace existing meter runs and
                                                whether the project is in the public                      For your convenience, there are three               pressure/flow control valves at the
                                                convenience and necessity.                              methods you can use to submit your                    existing interconnect site with Texas
                                                   This notice announces the opening of                 comments to the Commission. The                       Eastern Transmission, LP (‘‘Texas
                                                the scoping process the Commission                      Commission encourages electronic filing               Eastern’’). Modify the existing Honey
                                                will use to gather input from the public                of comments and has expert staff                      Brook Meter and Regulator Station and
                                                and interested agencies on the project.                 available to assist you at (202) 502–8258             lateral piping to accommodate the
                                                You can make a difference by providing                  or efiling@ferc.gov. Please carefully                 installation of upsized mainline taps
                                                us with your specific comments or                       follow these instructions so that your                and valves and the installation of a filter
                                                concerns about the project. Your                        comments are properly recorded.                       separator, associated piping, and storage
                                                comments should focus on the potential                    (1) You can file your comments                      tank as well as other ancillary
                                                environmental effects, reasonable                       electronically using the eComment                     equipment at Eastern Shore’s existing
                                                alternatives, and measures to avoid or                  feature on the Commission’s Web site                  interconnect with Texas Eastern. All
                                                lessen environmental impacts. Your                      (www.ferc.gov) under the link to                      construction work would be conducted
                                                input will help the Commission staff                    Documents and Filings. This is an easy                within the fenceline in previously
                                                determine what issues they need to                      method for submitting brief, text-only                disturbed areas of the existing
                                                evaluate in the EA. To ensure that your                 comments on a project;                                interconnect site.
                                                comments are timely and properly                          (2) You can file your comments
                                                recorded, please send your comments so                  electronically by using the eFiling                   Chester County
sradovich on DSK3GMQ082PROD with NOTICES




                                                that the Commission receives them in                    feature on the Commission’s Web site                    Parkesburg Loop: Construct
                                                Washington, DC, on or before August                     (www.ferc.gov) under the link to                      approximately 5 miles of 16-inch-
                                                31, 2016.                                               Documents and Filings. With eFiling,                  diameter pipeline loop 1 beginning at
                                                   If you sent comments on this project                 you can provide comments in a variety                 Eastern Shore’s existing Parkesburg
                                                to the Commission before the opening of                 of formats by attaching them as a file
                                                this docket on May 17, 2016, you will                   with your submission. New eFiling                       1 A pipeline loop is a segment of pipe constructed

                                                need to file those comments in Docket                   users must first create an account by                 parallel to an existing pipeline to increase capacity.



                                           VerDate Sep<11>2014   17:44 Aug 10, 2016   Jkt 238001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\11AUN1.SGM   11AUN1


                                                                            Federal Register / Vol. 81, No. 155 / Thursday, August 11, 2016 / Notices                                                       53135

                                                Meter and Regulator Station southward                   southward to connect with Eastern                     available in the public record through
                                                to Lime Stone Road (PA–10).                             Shore’s existing pipeline.                            eLibrary. Depending on the comments
                                                   Jennersville Loop: Construct                           Pressure Control Stations: Construct                received during the scoping process, we
                                                approximately 7 miles of 24-inch-                       two pressure control stations located                 may also publish and distribute the EA
                                                diameter pipeline loop beginning at                     near the towns of Millsboro and Delmar.               to the public for an allotted comment
                                                Eastern Shore’s existing Daleville                        Please see appendix A for a map                     period. We will consider all comments
                                                Compressor Station southward to Hess                    depicting the general locations of the                on the EA before we make our
                                                Mill Road.                                              planned 2017 Expansion Project                        recommendations to the Commission.
                                                   Daleville Compressor Station                         facilities.                                           To ensure we have the opportunity to
                                                Upgrade: Install a new 3,550 hp gas-                                                                          consider and address your comments,
                                                                                                        The EA Process                                        please carefully follow the instructions
                                                fired compressor unit at the existing
                                                Daleville Compressor Station.                              The National Environmental Policy                  in the Public Participation section,
                                                                                                        Act (NEPA) requires the Commission to                 beginning on page 2.
                                                Maryland                                                take into account the environmental                     With this notice, we are asking
                                                Cecil County                                            impacts that could result from an action              agencies with jurisdiction by law and/
                                                                                                        whenever it considers the issuance of a               or special expertise with respect to the
                                                  Fair Hill Loop: Construct                             Certificate of Public Convenience and                 environmental issues related to this
                                                approximately 6.3 miles of 24-inch-                     Necessity. NEPA also requires us 2 to                 project to formally cooperate with us in
                                                diameter pipeline loop beginning at                     discover and address concerns the                     the preparation of the EA.3 Agencies
                                                Eastern Shore’s existing block valve on                 public may have about proposals. This                 that would like to request cooperating
                                                Walker Road in Chester County,                          process is referred to as scoping. The                agency status should follow the
                                                Pennsylvania southward to Cecil                         main goal of the scoping process is to                instructions for filing comments
                                                County, Maryland to tie into the existing               focus the analysis in the EA on the                   provided under the Public Participation
                                                Eastern Shore pipeline north of Route 2                 important environmental issues. By this               section of this notice.
                                                near the Maryland/Delaware state line.                  notice, the Commission requests public                Consultations Under Section 106 of the
                                                Delaware                                                comments on the scope of the issues to                National Historic Preservation Act
                                                                                                        address in the EA. We will consider all
                                                New Castle County                                       filed comments during the preparation                   In accordance with the Advisory
                                                                                                        of the EA.                                            Council on Historic Preservation’s
                                                  Middletown Loop: Construct                                                                                  implementing regulations for section
                                                approximately 1 mile of 10-inch-                           In the EA we will discuss impacts that
                                                                                                        could occur as a result of the                        106 of the National Historic
                                                diameter pipeline loop beginning on                                                                           Preservation Act, we are using this
                                                Peterson Road and extending to a                        construction and operation of the
                                                                                                        planned project under these general                   notice to initiate consultation with the
                                                location southeastern of Industrial Road.                                                                     applicable State Historic Preservation
                                                Construct approximately 0.65 mile of 6-                 headings:
                                                                                                           • Geology and soils;                               Office(s), and to solicit their views and
                                                inch-diameter pipeline lateral and meter                                                                      those of other government agencies,
                                                station from Industrial Road towards                       • land use;
                                                                                                           • water resources, fisheries, and                  interested Indian tribes, and the public
                                                Auto Park Drive.                                                                                              on the project’s potential effects on
                                                  Summit Loop: Construct                                wetlands;
                                                                                                           • cultural resources;                              historic properties.4 We will define the
                                                approximately 0.5 mile of 10-inch-                                                                            project-specific Area of Potential Effects
                                                diameter pipeline loop starting along                      • vegetation and wildlife;
                                                                                                           • air quality and noise;                           (APE) in consultation with the SHPO(s)
                                                the south side of C&D Canal at Eastern                                                                        as the project develops. On natural gas
                                                Shore’s existing 12- inch aerial crossing                  • endangered and threatened species;
                                                                                                           • public safety; and                               facility projects, the APE at a minimum
                                                southward to tie into the existing                                                                            encompasses all areas subject to ground
                                                                                                           • cumulative impacts.
                                                Eastern Shore pipeline.                                                                                       disturbance (examples include
                                                                                                           We will also evaluate possible
                                                Kent County                                             alternatives to the planned project or                construction right-of-way, contractor/
                                                                                                        portions of the project, and make                     pipe storage yards, compressor stations,
                                                  Woodside Loop: Construct                                                                                    and access roads). Our EA for this
                                                approximately 5 miles of 16-inch-                       recommendations on how to lessen or
                                                                                                        avoid impacts on the various resource                 project will document our findings on
                                                diameter pipeline loop beginning in                                                                           the impacts on historic properties and
                                                Wyoming, Delaware southward to Viola,                   areas.
                                                                                                           Although no formal application has                 summarize the status of consultations
                                                Delaware.                                                                                                     under section 106.
                                                                                                        been filed, we have already initiated our
                                                Sussex County                                           NEPA review under the Commission’s                    Environmental Mailing List
                                                   Hearns Pond Loop: Construct                          pre-filing process. The purpose of the
                                                                                                                                                                The environmental mailing list
                                                approximately 1.5 miles of 10-inch-                     pre-filing process is to encourage early
                                                                                                                                                              includes federal, state, and local
                                                diameter pipeline loop along U.S. 13                    involvement of interested stakeholders
                                                                                                                                                              government representatives and
                                                near Seaford southward to Eastern                       and to identify and resolve issues before
                                                                                                                                                              agencies; elected officials;
                                                Shore’s existing Seaford Pressure                       the FERC receives an application. As
                                                                                                                                                              environmental and public interest
                                                Control Station.                                        part of our pre-filing review, we have
                                                                                                        begun to contact some federal and state
                                                   Seaford to Millsboro Segment:                                                                                3 The Council on Environmental Quality
                                                                                                        agencies to discuss their involvement in              regulations addressing cooperating agency
                                                Construct approximately 17.0 miles of
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        the scoping process and the preparation               responsibilities are at Title 40, Code of Federal
                                                10-inch-diameter pipeline extension                                                                           Regulations, Part 1501.6.
                                                                                                        of the EA.
                                                from Seaford eastward to Eastern                                                                                4 The Advisory Council on Historic Preservation
                                                                                                           The EA will present our independent
                                                Shore’s existing Millsboro Meter &                                                                            regulations are at Title 36, Code of Federal
                                                                                                        analysis of the issues. The EA will be
                                                Regulator Station near Millsboro.                                                                             Regulations, Part 800. Those regulations define
                                                                                                                                                              historic properties as any prehistoric or historic
                                                   Laurel Loop: Construct approximately                   2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the          district, site, building, structure, or object included
                                                5.1 miles of 10-inch-diameter pipeline                  environmental staff of the Commission’s Office of     in or eligible for inclusion in the National Register
                                                loop along U.S. 13 near Laurel                          Energy Projects.                                      of Historic Places.



                                           VerDate Sep<11>2014   17:44 Aug 10, 2016   Jkt 238001   PO 00000   Frm 00018   Fmt 4703   Sfmt 4703   E:\FR\FM\11AUN1.SGM   11AUN1


                                                53136                       Federal Register / Vol. 81, No. 155 / Thursday, August 11, 2016 / Notices

                                                groups; Native American Tribes; other                   at (866) 208–3676, or for TTY, contact                  The above-referenced meeting is open
                                                interested parties; and local libraries                 (202) 502–8659. The eLibrary link also                to stakeholders.
                                                and newspapers. This list also includes                 provides access to the texts of formal                  Further information may be found at:
                                                all affected landowners (as defined in                  documents issued by the Commission,                   http://www.nyiso.com/public/
                                                the Commission’s regulations) who are                   such as orders, notices, and                          committees/documents.jsp?
                                                potential right-of-way grantors, whose                  rulemakings.                                          com=bic&directory=2016-08-17.
                                                property may be used temporarily for                       In addition, the Commission offers a               The New York Independent System
                                                project purposes, or who own homes                      free service called eSubscription which               Operator, Inc. Operating Committee
                                                within certain distances of aboveground                 allows you to keep track of all formal                Meeting
                                                facilities, and anyone who submits                      issuances and submittals in specific
                                                comments on the project. We will                        dockets. This can reduce the amount of                August 18, 2016, 10:00 a.m.–4:00 p.m.
                                                update the environmental mailing list as                time you spend researching proceedings                (EST)
                                                the analysis proceeds to ensure that we                 by automatically providing you with                     The above-referenced meeting will be
                                                send the information related to this                    notification of these filings, document               via web conference and teleconference.
                                                environmental review to all individuals,                summaries, and direct links to the                      The above-referenced meeting is open
                                                organizations, and government entities                  documents. Go to www.ferc.gov/docs-                   to stakeholders.
                                                interested in and/or potentially affected               filing/esubscription.asp.                               Further information may be found at:
                                                by the planned project.                                    Finally, public meetings or site visits            http://www.nyiso.com/public/
                                                   If we publish and distribute the EA,                 will be posted on the Commission’s                    committees/documents.jsp?com=oc
                                                copies of the EA will be sent to the                                                                          &directory=2016-08-18.
                                                                                                        calendar located at www.ferc.gov/
                                                environmental mailing list for public
                                                                                                        EventCalendar/EventsList.aspx along                   The New York Independent System
                                                review and comment. If you would
                                                                                                        with other related information.                       Operator, Inc. Joint Electric System
                                                prefer to receive a paper copy of the
                                                document instead of the CD version or                     Dated: August 1, 2016.                              Planning Working Group and
                                                would like to remove your name from                     Nathaniel J. Davis, Sr.,                              Transmission Planning Advisory
                                                the mailing list, please return the                     Deputy Secretary.                                     Subcommittee Meeting
                                                attached Information Request (appendix                  [FR Doc. 2016–19082 Filed 8–10–16; 8:45 am]           August 25, 2016, 10:00 a.m.–4:00 p.m.
                                                B).                                                     BILLING CODE 6717–01–P                                (EST)
                                                Becoming an Intervenor                                                                                          The above-referenced meeting will be
                                                   Once Eastern Shore files its                         DEPARTMENT OF ENERGY                                  via web conference and teleconference.
                                                application with the Commission, you                                                                            The above-referenced meeting is open
                                                may want to become an ‘‘intervenor’’                    Federal Energy Regulatory                             to stakeholders.
                                                which is an official party to the                       Commission                                              Further information may be found at:
                                                Commission’s proceeding. Intervenors                                                                          http://www.nyiso.com/public/
                                                play a more formal role in the process                  Notice of Commission Staff                            committees/documents.jsp?com=bic_
                                                and are able to file briefs, appear at                  Attendance                                            espwg&directory=2016-08-25.
                                                hearings, and be heard by the courts if                                                                       The New York Independent System
                                                they choose to appeal the Commission’s                     The Federal Energy Regulatory
                                                                                                        Commission (Commission) hereby gives                  Operator, Inc. Management Committee
                                                final ruling. An intervenor formally                                                                          Meeting
                                                participates in the proceeding by filing                notice that members of the
                                                a request to intervene. Motions to                      Commission’s staff may attend the                     August 31, 2016, 10:00 a.m.–4:00 p.m.
                                                intervene are more fully described at                   following meetings related to the                     (EST)
                                                http://www.ferc.gov/resources/guides/                   transmission planning activities of the
                                                                                                        New York Independent System                              The above-referenced meeting will be
                                                how-to/intervene.asp. Instructions for                                                                        via web conference and teleconference.
                                                becoming an intervenor are in the                       Operator, Inc.
                                                                                                                                                                 The above-referenced meeting is open
                                                ‘‘Document-less Intervention Guide’’                    The New York Independent System                       to stakeholders.
                                                under the ‘‘e-filing’’ link on the                      Operator, Inc. Electric System Planning                  Further information may be found at:
                                                Commission’s Web site. Please note that                 Working Group Meeting                                 http://www.nyiso.com/public/
                                                the Commission will not accept requests                                                                       committees/documents.jsp?com=
                                                for intervenor status at this time. You                 August 9, 2016, 10:00 a.m.–4:00 p.m.
                                                                                                                                                              mc&directory=2016-08-31.
                                                must wait until the Commission                          (EST)                                                    The discussions at the meetings
                                                receives a formal application for the                     The above-referenced meeting will be                described above may address matters at
                                                project.                                                via web conference and teleconference.                issue in the following proceedings:
                                                Additional Information                                    The above-referenced meeting is open                New York Independent System
                                                                                                        to stakeholders.                                         Operator, Inc., Docket No. ER13–102.
                                                   Additional information about the                                                                           New York Independent System
                                                                                                          Further information may be found at:
                                                project is available from the                                                                                    Operator, Inc., Docket No. ER15–
                                                                                                        http://www.nyiso.com/public/
                                                Commission’s Office of External Affairs,                                                                         2059.
                                                                                                        committees/documents.jsp?com=bic_
                                                at (866) 208–FERC, or on the FERC Web                                                                         New York Independent System
                                                                                                        espwg&directory=2016-08-09.
                                                site (www.ferc.gov) using the eLibrary                                                                           Operator, Inc., Docket No. ER13–
                                                link. Click on the eLibrary link, click on              The New York Independent System
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                 1942.
                                                ‘‘General Search’’ and enter the docket                 Operator, Inc. Business Issues                        New York Transco, LLC, Docket No.
                                                number, excluding the last three digits                 Committee Meeting                                        ER15–572.
                                                in the Docket Number field (i.e., PF16–                                                                       New York Independent System
                                                                                                        August 17, 2016, 10:00 a.m.–4:00 p.m.
                                                7). Be sure you have selected an                                                                                 Operator, Inc., Docket No. ER16–966.
                                                                                                        (EST)
                                                appropriate date range. For assistance,                                                                       New York Independent System
                                                please contact FERC Online Support at                     The above-referenced meeting will be                   Operator, Inc., Docket No. ER16–
                                                FercOnlineSupport@ferc.gov or toll free                 via web conference and teleconference.                   1968.


                                           VerDate Sep<11>2014   17:44 Aug 10, 2016   Jkt 238001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\11AUN1.SGM   11AUN1



Document Created: 2018-02-09 11:27:27
Document Modified: 2018-02-09 11:27:27
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 53134 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR