81_FR_53295 81 FR 53140 - Texas Eastern Transmission, LP; Notice of Intent To Prepare an Environmental Assessment for the Proposed Bayway Lateral Project, and Request for Comments on Environmental Issues

81 FR 53140 - Texas Eastern Transmission, LP; Notice of Intent To Prepare an Environmental Assessment for the Proposed Bayway Lateral Project, and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 155 (August 11, 2016)

Page Range53140-53141
FR Document2016-19073

Federal Register, Volume 81 Issue 155 (Thursday, August 11, 2016)
[Federal Register Volume 81, Number 155 (Thursday, August 11, 2016)]
[Notices]
[Pages 53140-53141]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-19073]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-473-000]


Texas Eastern Transmission, LP; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Bayway Lateral Project, and 
Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Bayway Lateral Project 
involving construction and operation of facilities by Texas Eastern 
Transmission, LP (Texas Eastern) in the City of Linden, Union County, 
New Jersey. The Commission will use this EA in its decision-making 
process to determine whether the project is in the public convenience 
and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before September 6, 2016.
    If you sent comments on this project to the Commission before the 
opening of this docket on June 29, 2016, you will need to file those 
comments in Docket No. CP16-473-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    Texas Eastern provided landowners with a fact sheet prepared by the 
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do 
I Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP16-473-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Texas Eastern proposes to construct pipeline and aboveground 
facilities in the City of Linden, Union County, New Jersey: The Bayway 
Lateral Project would transport approximately 300,000 dekatherms per 
day from Texas Eastern's existing Line 38 to serve new commercial 
customers (the Linden Cogen Power Plant and the Phillips 66 Bayway 
Refinery).
    The Bayway Lateral Project would consist of the following 
facilities:
     Approximately 2,300 feet of new 24-inch-diameter natural 
gas pipeline, most of which involves a horizontal directional drill 
crossing under the New Jersey Turnpike;
     a new fenced metering and regulating station; and
     related appurtenances and ancillary facilities.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 23.4 
acres of land for the aboveground facilities and the pipeline. 
Following construction, Texas Eastern would maintain 6.79 acres for 
permanent operation of the project's facilities; the remaining acreage 
would be restored and revert to former uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:

     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;

[[Page 53141]]

     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.

    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies of the EA will be sent 
to the environmental mailing list for public review and comment. If you 
would prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site. Motions to intervene are more fully 
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP16-
473). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: August 5, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-19073 Filed 8-10-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                53140                       Federal Register / Vol. 81, No. 155 / Thursday, August 11, 2016 / Notices

                                                  Dated: August 1, 2016.                                the acquisition of an easement to                     Jersey: The Bayway Lateral Project
                                                Nathaniel J. Davis, Sr.,                                construct, operate, and maintain the                  would transport approximately 300,000
                                                Deputy Secretary.                                       proposed facilities. The company would                dekatherms per day from Texas
                                                [FR Doc. 2016–19080 Filed 8–10–16; 8:45 am]             seek to negotiate a mutually acceptable               Eastern’s existing Line 38 to serve new
                                                BILLING CODE 6717–01–P                                  agreement. However, if the Commission                 commercial customers (the Linden
                                                                                                        approves the project, that approval                   Cogen Power Plant and the Phillips 66
                                                                                                        conveys with it the right of eminent                  Bayway Refinery).
                                                DEPARTMENT OF ENERGY                                    domain. Therefore, if easement                          The Bayway Lateral Project would
                                                                                                        negotiations fail to produce an                       consist of the following facilities:
                                                Federal Energy Regulatory                               agreement, the pipeline company could                   • Approximately 2,300 feet of new
                                                Commission                                              initiate condemnation proceedings                     24-inch-diameter natural gas pipeline,
                                                [Docket No. CP16–473–000]                               where compensation would be                           most of which involves a horizontal
                                                                                                        determined in accordance with state                   directional drill crossing under the New
                                                Texas Eastern Transmission, LP;                         law.                                                  Jersey Turnpike;
                                                Notice of Intent To Prepare an                             Texas Eastern provided landowners                    • a new fenced metering and
                                                Environmental Assessment for the                        with a fact sheet prepared by the FERC                regulating station; and
                                                Proposed Bayway Lateral Project, and                    entitled ‘‘An Interstate Natural Gas                    • related appurtenances and ancillary
                                                Request for Comments on                                 Facility On My Land? What Do I Need                   facilities.
                                                Environmental Issues                                    To Know?’’ This fact sheet addresses a                  The general location of the project
                                                                                                        number of typically asked questions,                  facilities is shown in appendix 1.1
                                                   The staff of the Federal Energy                      including the use of eminent domain
                                                Regulatory Commission (FERC or                                                                                Land Requirements for Construction
                                                                                                        and how to participate in the
                                                Commission) will prepare an                             Commission’s proceedings. It is also                    Construction of the proposed facilities
                                                environmental assessment (EA) that will                 available for viewing on the FERC Web                 would disturb about 23.4 acres of land
                                                discuss the environmental impacts of                    site (www.ferc.gov).                                  for the aboveground facilities and the
                                                the Bayway Lateral Project involving                                                                          pipeline. Following construction, Texas
                                                construction and operation of facilities                Public Participation                                  Eastern would maintain 6.79 acres for
                                                by Texas Eastern Transmission, LP                         For your convenience, there are three               permanent operation of the project’s
                                                (Texas Eastern) in the City of Linden,                  methods you can use to submit your                    facilities; the remaining acreage would
                                                Union County, New Jersey. The                           comments to the Commission. The                       be restored and revert to former uses.
                                                Commission will use this EA in its                      Commission encourages electronic filing               The EA Process
                                                decision-making process to determine                    of comments and has expert staff
                                                whether the project is in the public                    available to assist you at (202) 502–8258                The National Environmental Policy
                                                convenience and necessity.                              or efiling@ferc.gov. Please carefully                 Act (NEPA) requires the Commission to
                                                   This notice announces the opening of                 follow these instructions so that your                take into account the environmental
                                                the scoping process the Commission                      comments are properly recorded.                       impacts that could result from an action
                                                will use to gather input from the public                   (1) You can file your comments                     whenever it considers the issuance of a
                                                and interested agencies on the project.                 electronically using the eComment                     Certificate of Public Convenience and
                                                You can make a difference by providing                  feature on the Commission’s Web site                  Necessity. NEPA also requires us 2 to
                                                us with your specific comments or                       (www.ferc.gov) under the link to                      discover and address concerns the
                                                concerns about the project. Your                        Documents and Filings. This is an easy                public may have about proposals. This
                                                comments should focus on the potential                  method for submitting brief, text-only                process is referred to as ‘‘scoping.’’ The
                                                environmental effects, reasonable                       comments on a project;                                main goal of the scoping process is to
                                                alternatives, and measures to avoid or                     (2) You can file your comments                     focus the analysis in the EA on the
                                                lessen environmental impacts. Your                      electronically by using the eFiling                   important environmental issues. By this
                                                input will help the Commission staff                    feature on the Commission’s Web site                  notice, the Commission requests public
                                                determine what issues they need to                      (www.ferc.gov) under the link to                      comments on the scope of the issues to
                                                evaluate in the EA. To ensure that your                 Documents and Filings. With eFiling,                  address in the EA. We will consider all
                                                comments are timely and properly                        you can provide comments in a variety                 filed comments during the preparation
                                                recorded, please send your comments so                  of formats by attaching them as a file                of the EA.
                                                that the Commission receives them in                    with your submission. New eFiling                        In the EA we will discuss impacts that
                                                Washington, DC on or before September                   users must first create an account by                 could occur as a result of the
                                                6, 2016.                                                clicking on ‘‘eRegister.’’ If you are filing          construction and operation of the
                                                   If you sent comments on this project                 a comment on a particular project,                    proposed project under these general
                                                to the Commission before the opening of                 please select ‘‘Comment on a Filing’’ as              headings:
                                                this docket on June 29, 2016, you will                  the filing type; or                                     • Geology and soils;
                                                need to file those comments in Docket                      (3) You can file a paper copy of your                • land use;
                                                No. CP16–473–000 to ensure they are                     comments by mailing them to the                         • water resources, fisheries, and wetlands;
                                                considered as part of this proceeding.                  following address. Be sure to reference
                                                   This notice is being sent to the                     the project docket number (CP16–473–                    1 The appendices referenced in this notice will

                                                Commission’s current environmental                      000) with your submission: Kimberly D.                not appear in the Federal Register. Copies of
                                                                                                                                                              appendices were sent to all those receiving this
sradovich on DSK3GMQ082PROD with NOTICES




                                                mailing list for this project. State and                Bose, Secretary, Federal Energy                       notice in the mail and are available at www.ferc.gov
                                                local government representatives should                 Regulatory Commission, 888 First Street               using the link called ‘‘eLibrary’’ or from the
                                                notify their constituents of this                       NE., Room 1A, Washington, DC 20426.                   Commission’s Public Reference Room, 888 First
                                                proposed project and encourage them to                                                                        Street NE., Washington, DC 20426, or call (202)
                                                comment on their areas of concern.                      Summary of the Proposed Project                       502–8371. For instructions on connecting to
                                                                                                                                                              eLibrary, refer to the last page of this notice.
                                                   If you are a landowner receiving this                  Texas Eastern proposes to construct                   2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
                                                notice, a pipeline company                              pipeline and aboveground facilities in                environmental staff of the Commission’s Office of
                                                representative may contact you about                    the City of Linden, Union County, New                 Energy Projects.



                                           VerDate Sep<11>2014   17:44 Aug 10, 2016   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\11AUN1.SGM   11AUN1


                                                                              Federal Register / Vol. 81, No. 155 / Thursday, August 11, 2016 / Notices                                                53141

                                                   •   cultural resources;                                construction right-of-way, contractor/               ‘‘eLibrary’’ link. Click on the eLibrary
                                                   •   vegetation and wildlife;                           pipe storage yards, compressor stations,             link, click on ‘‘General Search’’ and
                                                   •   air quality and noise;                             and access roads). Our EA for this                   enter the docket number, excluding the
                                                   •   endangered and threatened species;
                                                                                                          project will document our findings on                last three digits in the Docket Number
                                                   •   public safety; and
                                                   •   cumulative impacts.                                the impacts on historic properties and               field (i.e., CP16–473). Be sure you have
                                                                                                          summarize the status of consultations                selected an appropriate date range. For
                                                   We will also evaluate reasonable                       under section 106.
                                                alternatives to the proposed project or                                                                        assistance, please contact FERC Online
                                                portions of the project, and make                         Environmental Mailing List                           Support at FercOnlineSupport@ferc.gov
                                                recommendations on how to lessen or                                                                            or toll free at (866) 208–3676, or for
                                                                                                             The environmental mailing list
                                                avoid impacts on the various resource                     includes federal, state, and local                   TTY, contact (202) 502–8659. The
                                                areas.                                                    government representatives and                       eLibrary link also provides access to the
                                                   The EA will present our independent                    agencies; elected officials;                         texts of formal documents issued by the
                                                analysis of the issues. The EA will be                    environmental and public interest                    Commission, such as orders, notices,
                                                available in the public record through                    groups; Native American Tribes; other                and rulemakings.
                                                eLibrary. Depending on the comments                       interested parties; and local libraries                 In addition, the Commission offers a
                                                received during the scoping process, we                   and newspapers. This list also includes              free service called eSubscription which
                                                may also publish and distribute the EA                    all affected landowners (as defined in               allows you to keep track of all formal
                                                to the public for an allotted comment                     the Commission’s regulations) who are                issuances and submittals in specific
                                                period. We will consider all comments                     potential right-of-way grantors, whose               dockets. This can reduce the amount of
                                                on the EA before making our                               property may be used temporarily for                 time you spend researching proceedings
                                                recommendations to the Commission.                        project purposes, or who own homes                   by automatically providing you with
                                                To ensure we have the opportunity to                      within certain distances of aboveground              notification of these filings, document
                                                consider and address your comments,                       facilities, and anyone who submits
                                                please carefully follow the instructions                                                                       summaries, and direct links to the
                                                                                                          comments on the project. We will                     documents. Go to www.ferc.gov/docs-
                                                in the Public Participation section on                    update the environmental mailing list as
                                                page 2.                                                                                                        filing/esubscription.asp.
                                                                                                          the analysis proceeds to ensure that we
                                                   With this notice, we are asking                        send the information related to this                    Finally, public meetings or site visits
                                                agencies with jurisdiction by law and/                    environmental review to all individuals,             will be posted on the Commission’s
                                                or special expertise with respect to the                  organizations, and government entities               calendar located at www.ferc.gov/
                                                environmental issues of this project to                   interested in and/or potentially affected            EventCalendar/EventsList.aspx along
                                                formally cooperate with us in the                         by the proposed project.                             with other related information.
                                                preparation of the EA.3 Agencies that                        If we publish and distribute the EA,                Dated: August 5, 2016.
                                                would like to request cooperating                         copies of the EA will be sent to the
                                                agency status should follow the                                                                                Nathaniel J. Davis, Sr.,
                                                                                                          environmental mailing list for public
                                                instructions for filing comments                          review and comment. If you would                     Deputy Secretary.
                                                provided under the Public Participation                   prefer to receive a paper copy of the                [FR Doc. 2016–19073 Filed 8–10–16; 8:45 am]
                                                section of this notice.                                   document instead of the CD version or                BILLING CODE 6717–01–P

                                                Consultations Under Section 106 of the                    would like to remove your name from
                                                National Historic Preservation Act                        the mailing list, please return the
                                                                                                          attached Information Request (appendix               DEPARTMENT OF ENERGY
                                                  In accordance with the Advisory                         2).
                                                Council on Historic Preservation’s                                                                             Federal Energy Regulatory
                                                implementing regulations for section                      Becoming an Intervenor                               Commission
                                                106 of the National Historic                                 In addition to involvement in the EA
                                                Preservation Act, we are using this                       scoping process, you may want to                     [Docket No. EL16–97–000]
                                                notice to initiate consultation with the                  become an ‘‘intervenor’’ which is an
                                                applicable State Historic Preservation                    official party to the Commission’s                   NextEra Energy Transmission West,
                                                Office (SHPO), and to solicit their views                 proceeding. Intervenors play a more                  LLC; Notice of Institution of Section
                                                and those of other government agencies,                   formal role in the process and are able              206 Proceeding and Refund Effective
                                                interested Indian tribes, and the public                  to file briefs, appear at hearings, and be           Date
                                                on the project’s potential effects on                     heard by the courts if they choose to
                                                historic properties.4 We will define the                  appeal the Commission’s final ruling.                   On August 5, 2016, the Commission
                                                project-specific Area of Potential Effects                An intervenor formally participates in               issued an order in Docket No. EL16–97–
                                                (APE) in consultation with the SHPO as                    the proceeding by filing a request to                000, pursuant to section 206 of the
                                                the project develops. On natural gas                      intervene. Instructions for becoming an              Federal Power Act (FPA), 16 U.S.C.
                                                facility projects, the APE at a minimum                   intervenor are in the ‘‘Document-less                824e (2012), instituting an investigation
                                                encompasses all areas subject to ground                   Intervention Guide’’ under the ‘‘e-filing’’          into whether the formula rate protocols
                                                disturbance (examples include                             link on the Commission’s Web site.                   of NextEra Energy Transmission West,
                                                                                                          Motions to intervene are more fully                  LLC may be unjust, unreasonable,
                                                  3 The Council on Environmental Quality
                                                                                                          described at http://www.ferc.gov/                    unduly discriminatory or preferential.
                                                regulations addressing cooperating agency
sradovich on DSK3GMQ082PROD with NOTICES




                                                responsibilities are at Title 40, Code of Federal         resources/guides/how-to/intervene.asp.               NextEra Energy Transmission West,
                                                Regulations, Part 1501.6.                                                                                      LLC, 156 FERC ¶ 61,095 (2016).
                                                  4 The Advisory Council on Historic Preservation’s
                                                                                                          Additional Information
                                                regulations are at Title 36, Code of Federal                 Additional information about the                     The refund effective date in Docket
                                                Regulations, Part 800. Those regulations define           project is available from the                        No. EL16–97–000, established pursuant
                                                historic properties as any prehistoric or historic                                                             to section 206(b) of the FPA, will be the
                                                district, site, building, structure, or object included
                                                                                                          Commission’s Office of External Affairs,
                                                in or eligible for inclusion in the National Register     at (866) 208–FERC, or on the FERC Web                date of publication of this notice in the
                                                of Historic Places.                                       site at www.ferc.gov using the                       Federal Register.


                                           VerDate Sep<11>2014    17:44 Aug 10, 2016   Jkt 238001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\11AUN1.SGM   11AUN1



Document Created: 2018-02-09 11:27:26
Document Modified: 2018-02-09 11:27:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: