81_FR_54958 81 FR 54799 - Notice of Application Millennium Pipeline Company, LLC

81 FR 54799 - Notice of Application Millennium Pipeline Company, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 159 (August 17, 2016)

Page Range54799-54800
FR Document2016-19569

Federal Register, Volume 81 Issue 159 (Wednesday, August 17, 2016)
[Federal Register Volume 81, Number 159 (Wednesday, August 17, 2016)]
[Notices]
[Pages 54799-54800]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-19569]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP16-486-000, PF16-3-000]


Notice of Application Millennium Pipeline Company, LLC

    Take notice that on July 29, 2016, Millennium Pipeline Company 
(Millennium), One Blue Hill Plaza, Pearl River, New York 10965, filed 
in Docket No. CP16-486-000 an application pursuant to section 7(c) of 
the Natural Gas Act (NGA), and Part 157 of the Commission's 
Regulations, requesting a certificate of public convenience and 
necessity authorizing their Eastern System Upgrade Project. This 
project will provide an additional 223 million cubic feet per day 
(MMcf/d) of firm transportation capacity from Millennium's Corning 
Compressor Station (CS) to an existing interconnection with Algonquin 
Gas Transmission, LLC located in Ramapo, New York, all as more fully 
set forth in the application which is on file with the Commission and 
open to public inspection.
    The filing may also be viewed on the web at http://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to 
Georgia Carter, Vice President and General Counsel, Millennium Pipeline 
Company, LLC, 109 North Post Oak Lane, Suite 210, Houston, TX 77024, by 
calling 804-921-1408, or emailing [email protected].
    Specifically, Millennium proposes to construct, operate, and 
maintain (1) Approximately 7.8-miles of 30- and 36-inch-diameter 
pipeline loop in Orange County, New York; (2) a new 22,400 horsepower 
(HP) compressor station in Sullivan County, New York; (3) additional 
22,400 HP at the existing Hancock Compressor Station in Delaware 
County, New York; (4) modifications to the existing Ramapo Meter and 
Regulator Station in Rockland County, New York; (5) modifications to 
the Wagoner Interconnect in Orange County, New York; (6) additional 
pipeline appurtenant facilities at the existing Huguenot and Westtown 
Meter and Regulating Stations in Orange County, New York; and (7) an 
alternate interconnect to the 16-inch-diameter Valley Lateral at 
milepost 7.6 of the Project.
    Millennium states that 202.5 MMcf/d of project capacity is 
committed under precedent agreements with local distribution companies 
and municipalities. Millennium requests that that the Commission issue 
the requested authorizations by July 31, 2017, in order to allow 
Millennium sufficient time to meet a targeted in-service date in 
September 2018. Millennium proposes to charge negotiated rates to its 
project shippers and existing Rate Schedule FT-1 rates for service on 
the expansion capacity created by the project. The cost of the project 
is $275,000,000.
    On February 5, 2016, the Commission staff granted Millennium's 
request to utilize the Pre-Filing Process and assigned Docket No. PF16-
3-000 to staff activities involved in the above referenced project. 
Now, as of the filing of the July 29, 2016 application, the Pre-Filing 
Process for this project has ended. From this time forward, this 
proceeding will be conducted in Docket No. CP16-486-000, as noted in 
the caption of this Notice.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the

[[Page 54800]]

Commission staff will either: Complete its environmental assessment 
(EA) and place it into the Commission's public record (eLibrary) for 
this proceeding; or issue a Notice of Schedule for Environmental 
Review. If a Notice of Schedule for Environmental Review is issued, it 
will indicate, among other milestones, the anticipated date for the 
Commission staff's issuance of the EA for this proposal. The filing of 
the EA in the Commission's public record for this proceeding or the 
issuance of a Notice of Schedule for Environmental Review will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit five copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit original and five copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5 p.m. Eastern Time on September 1, 2016.

    Dated: August 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-19569 Filed 8-16-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 81, No. 159 / Wednesday, August 17, 2016 / Notices                                           54799

                                                  issue a Notice of Schedule for                          copies of the environmental documents,                number excluding the last three digits in
                                                  Environmental Review. If a Notice of                    and will be notified of meetings                      the docket number field to access the
                                                  Schedule for Environmental Review is                    associated with the Commission’s                      document. For assistance, please contact
                                                  issued, it will indicate, among other                   environmental review process.                         FERC Online Support at
                                                  milestones, the anticipated date for the                Environmental commentors will not be                  FERCOnlineSupport@ferc.gov or toll
                                                  Commission staff’s issuance of the EA                   required to serve copies of filed                     free at (866) 208–3676, or TTY, contact
                                                  for this proposal. The filing of the EA                 documents on all other parties.                       (202) 502–8659.
                                                  in the Commission’s public record for                   However, the non-party commentors                        Any questions concerning this
                                                  this proceeding or the issuance of a                    will not receive copies of all documents              application may be directed to Georgia
                                                  Notice of Schedule for Environmental                    filed by other parties or issued by the               Carter, Vice President and General
                                                  Review will serve to notify federal and                 Commission (except for the mailing of                 Counsel, Millennium Pipeline
                                                  state agencies of the timing for the                    environmental documents issued by the                 Company, LLC, 109 North Post Oak
                                                  completion of all necessary reviews, and                Commission) and will not have the right               Lane, Suite 210, Houston, TX 77024, by
                                                  the subsequent need to complete all                     to seek court review of the                           calling 804–921–1408, or emailing
                                                  federal authorizations within 90 days of                Commission’s final order.                             carter@millenniumpipeline.com.
                                                  the date of issuance of the Commission                     The Commission strongly encourages                    Specifically, Millennium proposes to
                                                  staff’s EA.                                             electronic filings of comments, protests              construct, operate, and maintain (1)
                                                     There are two ways to become                         and interventions in lieu of paper using              Approximately 7.8-miles of 30- and 36-
                                                  involved in the Commission’s review of                  the ‘‘eFiling’’ link at http://                       inch-diameter pipeline loop in Orange
                                                  this project. First, any person wishing to              www.ferc.gov. Persons unable to file                  County, New York; (2) a new 22,400
                                                  obtain legal status by becoming a party                 electronically should submit original                 horsepower (HP) compressor station in
                                                  to the proceedings for this project                     and five copies of the protest or                     Sullivan County, New York; (3)
                                                  should, on or before the comment date                   intervention to the Federal Energy                    additional 22,400 HP at the existing
                                                  stated below, file with the Federal                     Regulatory Commission, 888 First Street               Hancock Compressor Station in
                                                  Energy Regulatory Commission, 888                       NE., Washington, DC 20426.                            Delaware County, New York; (4)
                                                  First Street NE., Washington, DC 20426,                    Comment Date: 5:00 p.m. Eastern                    modifications to the existing Ramapo
                                                  a motion to intervene in accordance                     Time on September 1, 2016.                            Meter and Regulator Station in
                                                  with the requirements of the                                                                                  Rockland County, New York; (5)
                                                  Commission’s Rules of Practice and                        Dated: August 11, 2016.                             modifications to the Wagoner
                                                  Procedure (18 CFR 385.214 or 385.211)                   Nathaniel J. Davis, Sr.,                              Interconnect in Orange County, New
                                                  and the Regulations under the NGA (18                   Deputy Secretary.                                     York; (6) additional pipeline
                                                  CFR 157.10). A person obtaining party                   [FR Doc. 2016–19570 Filed 8–16–16; 8:45 am]           appurtenant facilities at the existing
                                                  status will be placed on the service list               BILLING CODE 6717–01–P                                Huguenot and Westtown Meter and
                                                  maintained by the Secretary of the                                                                            Regulating Stations in Orange County,
                                                  Commission and will receive copies of                                                                         New York; and (7) an alternate
                                                  all documents filed by the applicant and                DEPARTMENT OF ENERGY                                  interconnect to the 16-inch-diameter
                                                  by all other parties. A party must submit                                                                     Valley Lateral at milepost 7.6 of the
                                                  five copies of filings made with the                    Federal Energy Regulatory                             Project.
                                                  Commission and must mail a copy to                      Commission                                               Millennium states that 202.5 MMcf/d
                                                  the applicant and to every other party in               [Docket Nos. CP16–486–000, PF16–3–000]
                                                                                                                                                                of project capacity is committed under
                                                  the proceeding. Only parties to the                                                                           precedent agreements with local
                                                  proceeding can ask for court review of                  Notice of Application Millennium                      distribution companies and
                                                  Commission orders in the proceeding.                    Pipeline Company, LLC                                 municipalities. Millennium requests
                                                     However, a person does not have to                                                                         that that the Commission issue the
                                                  intervene in order to have comments                        Take notice that on July 29, 2016,                 requested authorizations by July 31,
                                                  considered. The second way to                           Millennium Pipeline Company                           2017, in order to allow Millennium
                                                  participate is by filing with the                       (Millennium), One Blue Hill Plaza, Pearl              sufficient time to meet a targeted in-
                                                  Secretary of the Commission, as soon as                 River, New York 10965, filed in Docket                service date in September 2018.
                                                  possible, an original and two copies of                 No. CP16–486–000 an application                       Millennium proposes to charge
                                                  comments in support of or in opposition                 pursuant to section 7(c) of the Natural               negotiated rates to its project shippers
                                                  to this project. The Commission will                    Gas Act (NGA), and Part 157 of the                    and existing Rate Schedule FT–1 rates
                                                  consider these comments in                              Commission’s Regulations, requesting a                for service on the expansion capacity
                                                  determining the appropriate action to be                certificate of public convenience and                 created by the project. The cost of the
                                                  taken, but the filing of a comment alone                necessity authorizing their Eastern                   project is $275,000,000.
                                                  will not serve to make the filer a party                System Upgrade Project. This project                     On February 5, 2016, the Commission
                                                  to the proceeding. The Commission’s                     will provide an additional 223 million                staff granted Millennium’s request to
                                                  rules require that persons filing                       cubic feet per day (MMcf/d) of firm                   utilize the Pre-Filing Process and
                                                  comments in opposition to the project                   transportation capacity from                          assigned Docket No. PF16–3–000 to staff
                                                  provide copies of their protests only to                Millennium’s Corning Compressor                       activities involved in the above
                                                  the party or parties directly involved in               Station (CS) to an existing                           referenced project. Now, as of the filing
                                                  the protest.                                            interconnection with Algonquin Gas                    of the July 29, 2016 application, the Pre-
                                                     Persons who wish to comment only                     Transmission, LLC located in Ramapo,                  Filing Process for this project has ended.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  on the environmental review of this                     New York, all as more fully set forth in              From this time forward, this proceeding
                                                  project should submit an original and                   the application which is on file with the             will be conducted in Docket No. CP16–
                                                  two copies of their comments to the                     Commission and open to public                         486–000, as noted in the caption of this
                                                  Secretary of the Commission.                            inspection.                                           Notice.
                                                  Environmental commentors will be                           The filing may also be viewed on the                  Pursuant to section 157.9 of the
                                                  placed on the Commission’s                              web at http://www.ferc.gov using the                  Commission’s rules, 18 CFR 157.9,
                                                  environmental mailing list, will receive                ‘‘eLibrary’’ link. Enter the docket                   within 90 days of this Notice the


                                             VerDate Sep<11>2014   16:39 Aug 16, 2016   Jkt 238001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\17AUN1.SGM   17AUN1


                                                  54800                      Federal Register / Vol. 81, No. 159 / Wednesday, August 17, 2016 / Notices

                                                  Commission staff will either: Complete                  Secretary of the Commission.                          ambient air quality standards
                                                  its environmental assessment (EA) and                   Environmental commentors will be                      (‘‘NAAQS’’), EPA has failed to perform
                                                  place it into the Commission’s public                   placed on the Commission’s                            non-discretionary duties to take final
                                                  record (eLibrary) for this proceeding; or               environmental mailing list, will receive              action on portions of the state
                                                  issue a Notice of Schedule for                          copies of the environmental documents,                implementation plan (‘‘SIP’’)
                                                  Environmental Review. If a Notice of                    and will be notified of meetings                      submission from Wyoming intended to
                                                  Schedule for Environmental Review is                    associated with the Commission’s                      address various interstate transport
                                                  issued, it will indicate, among other                   environmental review process.                         requirements. The proposed consent
                                                  milestones, the anticipated date for the                Environmental commentors will not be                  decree would establish a deadline for
                                                  Commission staff’s issuance of the EA                   required to serve copies of filed                     EPA to take certain specified actions.
                                                  for this proposal. The filing of the EA                 documents on all other parties.                       DATES: Written comments on the
                                                  in the Commission’s public record for                   However, the non-party commentors                     Wyoming portions of the proposed
                                                  this proceeding or the issuance of a                    will not receive copies of all documents              consent decree must be received by
                                                  Notice of Schedule for Environmental                    filed by other parties or issued by the               September 1, 2016.
                                                  Review will serve to notify federal and                 Commission (except for the mailing of                 ADDRESSES: Submit your comments,
                                                  state agencies of the timing for the                    environmental documents issued by the                 identified by Docket ID number EPA–
                                                  completion of all necessary reviews, and                Commission) and will not have the right               HQ–OGC–2016–0364, online at
                                                  the subsequent need to complete all                     to seek court review of the                           www.regulations.gov. For comments
                                                  federal authorizations within 90 days of                Commission’s final order.                             submitted at Regulations.gov, follow the
                                                  the date of issuance of the Commission                     The Commission strongly encourages                 online instructions for submitting
                                                  staff’s EA.                                             electronic filings of comments, protests              comments. Once submitted, comments
                                                     There are two ways to become                         and interventions in lieu of paper using              cannot be edited or removed from
                                                  involved in the Commission’s review of                  the ‘‘eFiling’’ link at http://                       Regulations.gov. The EPA may publish
                                                  this project. First, any person wishing to              www.ferc.gov. Persons unable to file                  any comment received to its public
                                                  obtain legal status by becoming a party                 electronically should submit original                 docket. Do not submit electronically any
                                                  to the proceedings for this project                     and five copies of the protest or                     information you consider to be
                                                  should, on or before the comment date                   intervention to the Federal Energy                    Confidential Business Information (CBI)
                                                  stated below, file with the Federal                     Regulatory Commission, 888 First Street               or other information whose disclosure is
                                                  Energy Regulatory Commission, 888                       NE., Washington, DC 20426.                            restricted by statute. Multimedia
                                                  First Street NE., Washington, DC 20426,                    Comment Date: 5 p.m. Eastern Time                  submissions (audio, video, etc.) must be
                                                  a motion to intervene in accordance                     on September 1, 2016.                                 accompanied by a written comment.
                                                  with the requirements of the
                                                                                                            Dated: August 11, 2016.                             The written comment is considered the
                                                  Commission’s Rules of Practice and
                                                  Procedure (18 CFR 385.214 or 385.211)                   Nathaniel J. Davis, Sr.,                              official comment and should include
                                                  and the Regulations under the NGA (18                   Deputy Secretary.                                     discussion of all points you wish to
                                                  CFR 157.10). A person obtaining party                   [FR Doc. 2016–19569 Filed 8–16–16; 8:45 am]           make. The EPA will generally not
                                                  status will be placed on the service list               BILLING CODE 6717–01–P
                                                                                                                                                                consider comments or comment
                                                  maintained by the Secretary of the                                                                            contents located outside of the primary
                                                  Commission and will receive copies of                                                                         submission (i.e. on the web, cloud, or
                                                  all documents filed by the applicant and                                                                      other file sharing system). For
                                                                                                          ENVIRONMENTAL PROTECTION
                                                  by all other parties. A party must submit                                                                     additional submission methods, please
                                                                                                          AGENCY
                                                  five copies of filings made with the                                                                          contact the person identified in the ‘‘For
                                                  Commission and must mail a copy to                      [FRL–9950–99–OGC; EPA–HQ–OGC–2016–                    Further Information Contact’’ section.
                                                                                                          0364]                                                 For the full EPA public comment policy,
                                                  the applicant and to every other party in
                                                  the proceeding. Only parties to the                                                                           information about CBI or multimedia
                                                                                                          Proposed Consent Decree, Clean Air                    submissions, and general guidance on
                                                  proceeding can ask for court review of                  Act Citizen Suit
                                                  Commission orders in the proceeding.                                                                          making effective comments, please visit
                                                     However, a person does not have to                   AGENCY:  Environmental Protection                     http://www2.epa.gov/dockets/
                                                  intervene in order to have comments                     Agency (EPA).                                         commenting-epa-dockets.
                                                  considered. The second way to                           ACTION: Supplemental notice of                        FOR FURTHER INFORMATION CONTACT:
                                                  participate is by filing with the                       proposed consent decree; request for                  Zachary Pilchen, Air and Radiation Law
                                                  Secretary of the Commission, as soon as                 public comment.                                       Office, Office of General Counsel, U.S.
                                                  possible, an original and two copies of                                                                       Environmental Protection Agency;
                                                  comments in support of or in opposition                 SUMMARY:    Supplemental notice is                    telephone: (202) 564–2812; fax number
                                                  to this project. The Commission will                    hereby given for the Wyoming portions                 (202) 564–5603; email address:
                                                  consider these comments in                              of a proposed consent decree to address               pilchen.zach@epa.gov.
                                                  determining the appropriate action to be                a lawsuit filed by the Sierra Club                    SUPPLEMENTARY INFORMATION:
                                                  taken, but the filing of a comment alone                (‘‘Plaintiff’’) in the United States District
                                                  will not serve to make the filer a party                Court for the Northern District of                    I. Additional Information About the
                                                  to the proceeding. The Commission’s                     California: Sierra Club v. Gina                       Proposed Consent Decree and This
                                                  rules require that persons filing                       McCarthy, No. 3:15–cv–04328–JD (N.D.                  Supplemental Notice With Regard to
                                                  comments in opposition to the project                   Cal.). On September 22, 2015, Plaintiffs              Wyoming
mstockstill on DSK3G9T082PROD with NOTICES




                                                  provide copies of their protests only to                filed this matter against Gina McCarthy,                 This proposed consent decree would
                                                  the party or parties directly involved in               in her official capacity as Administrator             resolve a lawsuit filed by Plaintiffs
                                                  the protest.                                            of the United States Environmental                    seeking to compel the Administrator to
                                                     Persons who wish to comment only                     Protection Agency (‘‘EPA’’). On                       take action under Clean Air Act
                                                  on the environmental review of this                     February 9, 2016, Plaintiff filed a first             (‘‘CAA’’) section 110(k)(2)–(4). As
                                                  project should submit an original and                   amended complaint alleging that, with                 relevant to this supplemental notice,
                                                  two copies of their comments to the                     respect to the 2008 ozone national                    Plaintiffs allege that the Administrator


                                             VerDate Sep<11>2014   16:39 Aug 16, 2016   Jkt 238001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\17AUN1.SGM   17AUN1



Document Created: 2018-02-09 11:35:05
Document Modified: 2018-02-09 11:35:05
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5 p.m. Eastern Time on September 1, 2016.
FR Citation81 FR 54799 