81_FR_60034 81 FR 59865 - Safety Zone; Great Egg Harbor Bay, Marmora, NJ

81 FR 59865 - Safety Zone; Great Egg Harbor Bay, Marmora, NJ

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 81, Issue 169 (August 31, 2016)

Page Range59865-59869
FR Document2016-20951

The Coast Guard is establishing two temporary safety zones on the waters of Great Egg Harbor Bay in Marmora, NJ. The first safety zone includes all waters within 250 feet of vessel and machinery conducting demolition operations on the remaining portions of the Route 9, Beesley Point Bridge bascule span. This safety zone is necessary to provide for the safety of life on navigable waters during the demolition and will re-route vessel traffic through an alternate channel to facilitate heavy marine equipment operating in the main navigational channel to remove the bascule span of the bridge and will be in place throughout the entire duration of the demolition work. The second safety zone includes all waters within 500 yards of a blasting vessel and equipment being used to conduct bridge pile blasting operations, which is the final phase of the demolition of the Route 9, Beesley Point Bridge bascule span. This safety zone will only be enforced during times of explosive detonation. The safety zone will temporarily restrict vessel traffic from transiting or anchoring in a portion of the Great Egg Harbor Bay while pile blasting and removal operations are being conducted to facilitate the removal of bridge piles from the demolished Route 9, Beesley Point Bridge.

Federal Register, Volume 81 Issue 169 (Wednesday, August 31, 2016)
[Federal Register Volume 81, Number 169 (Wednesday, August 31, 2016)]
[Rules and Regulations]
[Pages 59865-59869]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-20951]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 165

[Docket Number USCG-2016-0665]
RIN 1625-AA00


Safety Zone; Great Egg Harbor Bay, Marmora, NJ

AGENCY: Coast Guard, DHS.

ACTION: Temporary final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing two temporary safety zones on 
the waters of Great Egg Harbor Bay in Marmora, NJ. The first safety 
zone includes all waters within 250 feet of vessel and machinery 
conducting demolition operations on the remaining portions of the Route 
9, Beesley Point Bridge bascule span. This safety zone is necessary to 
provide for the safety of life on navigable waters during the 
demolition and will re-route vessel traffic through an alternate 
channel to facilitate heavy marine equipment operating in the main 
navigational channel to remove the bascule span of the bridge and will 
be in place throughout the entire duration of the demolition work.
    The second safety zone includes all waters within 500 yards of a 
blasting vessel and equipment being used to conduct bridge pile 
blasting operations, which is the final phase of the demolition of the 
Route 9, Beesley Point Bridge bascule span. This safety zone will only 
be enforced during times of explosive detonation. The safety zone will 
temporarily restrict vessel traffic from transiting or anchoring in a 
portion of the Great Egg Harbor Bay while pile blasting and removal 
operations are being conducted to facilitate the removal of bridge 
piles from the demolished Route 9, Beesley Point Bridge.

DATES: This rule is effective without actual notice from August 31, 
2016 through October 20, 2016. For the purposes of enforcement, actual 
notice will be used from August 22, 2016, until August 31, 2016. The 
second safety zone will be enforced on or about October 1, 2016, only 
during times of explosive detonation.

ADDRESSES: To view documents mentioned in this preamble as being 
available in the docket, go to, type USCG-2016-0665 in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this rule.

FOR FURTHER INFORMATION CONTACT: If you have questions about this rule, 
call or email Marine Science Technician First Class Tom Simkins, U.S. 
Coast Guard, Sector Delaware Bay, Waterways Management Division, Coast 
Guard; telephone (215) 271-4889, email [email protected].

SUPPLEMENTARY INFORMATION: 

I. Table of Abbreviations

CFR Code of Federal Regulations
DHS Department of Homeland Security
FR Federal Register
NPRM Notice of proposed rulemaking
Sec.  Section
U.S.C. United States Code
COTP Captain of the Port

II. Background Information and Regulatory History

    In June of 2013, demolition work began on the Route 9, Beesley 
Point Bridge between Somers Point and Marmora, NJ. Route 52 
Construction, the company performing this demolition work, has 
completed all demolition of the bridge and piles except the portion of 
the bridge which has the bascule span opening for the navigational 
channel.
    During this phase of demolition heavy marine equipment, to include 
a large crane and barge, will be used to remove the large bascule span 
arms and what is left of the bridge tender house and roadway. The barge 
and crane must be placed in the navigational channel to properly secure 
and remove what remains of the bridge.
    All piles from the demolished bridge south of the bascule span have 
been removed. All piles north of the bascule span have been removed 
with the exception of four piles, which are attached to the bascule 
span for support. The Coast Guard has reviewed Route 52 Construction's 
plan to move the main navigational channel 100 feet south of the most 
southern portion of the remaining bridge to allow vessel traffic to 
safely pass during the demolition of the bascule span. Once the bascule 
span is removed, the piles will be removed

[[Page 59866]]

and the bridge will be completely removed from the waterway.
    The removal of the remaining piles, which are secured to the sea 
floor bed, will be completed by using explosives, after which the piles 
and debris will be removed. The Captain of the Port, Delaware Bay, has 
determined that potential hazards associated with pile blasting and 
removal operations, beginning on or about October 1, 2016, will be a 
safety concern for anyone operating within 500 yards of pile blasting 
and removal operations during times of explosive detonation.
    The purpose of this rule is to promote maritime safety and protect 
vessels from the hazards of bridge demolition and pile blasting 
operations, and to maintain safety of navigation in the Great Egg 
Harbor Bay, in the vicinity of the Route 9, Beesley Point Bridge. The 
rule will provide for a clear transit route for vessels, provide a 
safety buffer around the crane and barge while demolition operations 
are conducted, and provide a safety buffer around the blasting vessel 
during times of explosive detonation.
    The Coast Guard is issuing this temporary rule without prior notice 
and opportunity to comment pursuant to authority under section 4(a) of 
the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This 
provision authorizes an agency to issue a rule without prior notice and 
opportunity to comment when the agency for good cause finds that those 
procedures are ``impracticable, unnecessary, or contrary to the public 
interest.'' Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good 
cause exists for not publishing a notice of proposed rulemaking (NPRM) 
with respect to this rule because the final details for this event were 
not received by the Coast Guard until August 18, 2016, and the 
demolition work will begin August 22, 2016. The first safety zone is 
required by August 22, 2016, for the demolition of the remaining 
portion of the bridge, and it is impracticable to publish an NPRM and 
consider comments before that date. Allowing this event to go forward 
without a safety zone in place would expose mariners and the public to 
unnecessary dangers associated with bridge demolition operations. The 
crane and barge must be placed in the main navigational channel to 
facilitate the removal of the remaining portion of the bridge. 
Therefore, it is imperative that there is a clear transit route and 
safety zone around the demolition location.
    Furthermore, the second safety zone is needed for blasting 
operations which will begin on or about October 1, 2016. It is 
impracticable to publish an NPRM and consider comments due to the short 
window of time until the operation begins. Allowing this event to go 
forward without a safety zone in place would expose mariners and the 
public to unnecessary dangers associated with pile blasting operations.
    We are issuing this rule, and under 5 U.S.C. 553(d)(3), the Coast 
Guard finds that good cause exists for making it effective less than 30 
days after publication in the Federal Register for the reasons we 
stated for not publishing an NPRM. The Coast Guard expects minimal 
impact to vessels transiting through the alternate channel. Vessels 
will be able to safely transit through the alternate channel at all 
times, except during times of explosive detonation. The alternate 
channel will have the same horizontal clearance and no vertical 
clearance restriction, similar to the current navigational channel. 
Furthermore, notification for the first safety zone will be made via 
marine safety broadcast using VHF-FM channel 16 and through the Local 
Notice to Mariners.
    For the second safety zone, the pile blasting operation, two 
blasting events will occur on consecutive days to complete both piers. 
Notification for the second safety zone will be a combination of 
broadcast notice to mariners, local notice to mariners, posted warning 
signs, 500 yard marine traffic safety zone maintained by the 
contractor's safety boats during time of explosive detonations, a 10 
minute, 5 minutes, and 1 minute warning made by the blasting vessel via 
VHF-FM channel 16, and warning signals at 5 minutes with 3 short blasts 
of the air horn, and 1 minute warning of 2 short blasts of the air 
horn. The schedule of the signals will be posted along with all other 
required company, Local, State, and Federal signage.

III. Legal Authority and Need for Rule

    The Coast Guard is issuing this rule under authority in 33 U.S.C. 
1231. The Captain of the Port, Delaware Bay has determined that 
potential hazards are associated with demolition and pile blasting 
operations of the Route 9, Beesley Point Bridge, over the Great Egg 
Harbor Bay, in Marmora, NJ from August 22, 2016, through October 20, 
2016. The rule will provide for a clear transit route for vessels, 
provide a safety buffer around the crane and barge while demolition 
operations are conducted, and provide a safety buffer around the 
blasting vessel during times of explosive detonation.
    The rule will minimally impact vessels transiting through the Great 
Egg Harbor Bay navigational channel, in the vicinity of the Route 9, 
Beesley Point Bridge because vessels will be able to safely transit 
through an adequate alternate channel, except during times of explosive 
detonation. The alternate channel will have the same horizontal 
clearance and no vertical clearance restriction, similar to the current 
navigational channel.

IV. Discussion of the Rule

    On August 22, 2016, demolition work will begin on the remaining 
portion of the Route 9, Beesley Point Bridge, over the Great Egg Harbor 
Bay, in Marmora, NJ. The Captain of the Port, Delaware Bay, has 
determined that the hazards associated with demolition and pile 
blasting operations require two separate safety zones. The first safety 
zone will encompass all the navigable waters within 250 feet of the 
marine equipment and demolition operation. Entry into, transiting, or 
anchoring within the safety zone is prohibited unless authorized by the 
Captain of the Port, Delaware Bay, or his designated representative. 
Vessels wishing to transit the waterway may navigate approximately 100 
feet south of the main navigational channel to the alternate 
navigational channel to safely pass the demolition equipment. An 
adequate alternate navigational channel will be established 100 feet 
south of the most southern portion of the bascule span which will have 
the a horizontal clearance of 60 feet and an unlimited vertical 
clearance. The alternate navigational channel will be clearly marked 
with red and green buoys; during the evening the buoys will be lit with 
red and green lights to signify the channel. The alternate channel will 
have the same horizontal clearance and no vertical clearance 
restrictions; the State of New Jersey has marked the channel with best 
water for passage of vessels. Vessels are requested to contact the 
demolition crew via VHF-FM channel 13 or 16 to make satisfactory 
passing arrangement and maintain a safe speed when transiting the 
alternate navigational channel.
    The second safety zone will be enforced starting on or about 
October 1, 2016, only during times of explosive detonation, and 
encompasses all navigable waters in the Great Egg Harbor Bay within 500 
yards of vessels and machinery being used to conduct pile blasting and 
removal operations. The duration of the enforcement of the zone is 
intended to protect personnel, vessels, and the marine environment in 
these navigable waters while explosive detonation occurs. There will be 
two blasting events occurring on consecutive days to complete both 
piers. Actual dates and times of explosive detonation

[[Page 59867]]

will be published with a combination of broadcast notice to mariners, 
local notice to mariners, posted warning signs, 500 yard marine traffic 
safety zone maintained by the contractors safety boats, a 10 minute, 5 
minutes, and 1 minute warning made by the blasting vessel via VHF-FM 
channel 16, and warning signals at 5 minutes with 3 short blasts of the 
air horn, and 1 minute warning of 2 short blasts of the air horn. The 
schedule of the signals will be posted along with warning signs.
    Entry into, transiting, or anchoring within the safety zone is 
prohibited unless authorized by the Captain of the Port, Delaware Bay, 
or his designated representative. No vessels may transit through the 
safety zone during times of explosives detonation. During pile blasting 
explosive detonation, vessels will be required to maintain a 500-yard 
distance from vessels and equipment used to conduct pile blasting and 
removal operations. This 500 yard radius will be secured by two 
contractor safety boats in the adjacent waterways. For safety reasons 
associated with the blasting operation, during times of explosive 
detonation the alternate navigational channel will be closed. At all 
other times vessels may transit through the established alternate 
navigational channel approximately 100 feet south of the southernmost 
remaining pile of the Route 9, Beesley Point Bridge.
    Signs will be posted to identify the blast area and warning signs 
will be posted with the schedule of the warning signals. The contractor 
will verify that all vessels and persons are clear of safety zone 10 
minutes prior to the scheduled shot time and will remain secured until 
the blaster gives the ``All Clear''. All persons involved with securing 
the blast zone will be equipped with marine radios. A 10 minute, 5 
minutes, and 1 minute warning made by the blasting vessel via VHF-FM 
channel 16, and warning signals at 5 minutes with 3 short blasts of the 
air horn, and 1 minute warning of 2 short blasts of the air horn. After 
every explosive detonation the blasting vessels will give the ``All 
Clear'' when the alternate channel is clear for vessels to transit.

V. Regulatory Analyses

    We developed this rule after considering numerous statutes and 
Executive order related to rulemaking. Below we summarize our analyses 
based on a number of these statutes and Executive orders, and we 
discuss First Amendment rights of protestors.

A. Regulatory Planning and Review

    Executive Orders 12866 and 13563 direct agencies to assess the 
costs and benefits of available regulatory alternatives and, if 
regulation is necessary, to select regulatory approaches that maximize 
net benefits. Executive Order 13563 emphasizes the importance of 
quantifying both costs and benefits, of reducing costs, of harmonizing 
rules, and of promoting flexibility. This rule has not been designated 
a ``significant regulatory action,'' under Executive Order 12866. 
Accordingly, it has not been reviewed by the Office of Management and 
Budget.
    This finding is based on the limited size of the zone and the 
availability for vessels to transit freely through the alternate 
channel, around the first safety zone. Vessels will only be affected 
during times of explosive detonation, where the second safety zone will 
be enforced. The second safety zone is of a limited size and duration 
as blasting will occur only for a consecutive two day period. In 
addition, the zones will be well publicized to allow mariners to make 
alternative plans for transiting the affected area.

B. Impact on Small Entities

    The Regulatory Flexibility Act of 1980, 5 U.S.C. 601-612, as 
amended, requires Federal agencies to consider the potential impact of 
regulations on small entities during rulemaking. The term ``small 
entities'' comprises small businesses, not-for-profit organizations 
that are independently owned and operated and are not dominant in their 
fields, and governmental jurisdictions with populations of less than 
50,000. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule 
will not have a significant economic impact on a substantial number of 
small entities.
    It is expected that there will be minimal disruption to the 
maritime community. Before the effective period, the Coast Guard will 
issue maritime advisories widely available to users of the river to 
allow mariners to make alternative plans for transiting the affected 
areas. In addition, vessels may transit around the zone through an 
alternate channel, except during time of explosive detonation.
    Under section 213(a) of the Small Business Regulatory Enforcement 
Fairness Act of 1996 (Pub. L. 104-121), we want to assist small 
entities in understanding this rule. If the rule would affect your 
small business, organization, or governmental jurisdiction and you have 
questions concerning its provisions or options for compliance, please 
contact the person listed in the FOR FURTHER INFORMATION CONTACT 
section.
    Small businesses may send comments on the actions of Federal 
employees who enforce, or otherwise determine compliance with, Federal 
regulations to the Small Business and Agriculture Regulatory 
Enforcement Ombudsman and the Regional Small Business Regulatory 
Fairness Boards. The Ombudsman evaluates these actions annually and 
rates each agency's responsiveness to small business. If you wish to 
comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR 
(1-888-734-3247). The Coast Guard will not retaliate against small 
entities that question or complain about this rule or any policy or 
action of the Coast Guard.

C. Collection of Information

    This rule will not call for a new collection of information under 
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

D. Federalism and Indian Tribal Governments

    A rule has implications for federalism under Executive Order 13132, 
Federalism, if it has a substantial direct effect on the States, on the 
relationship between the national government and the States, or on the 
distribution of power and responsibilities among the various levels of 
government. We have analyzed this rule under that Order and have 
determined that it is consistent with the fundamental federalism 
principles and preemption requirements described in Executive Order 
13132.
    Also, this rule does not have tribal implications under Executive 
Order 13175, Consultation and Coordination with Indian Tribal 
Governments, because it does not have a substantial direct effect on 
one or more Indian tribes, on the relationship between the Federal 
Government and Indian tribes, or on the distribution of power and 
responsibilities between the Federal Government and Indian tribes. If 
you believe this rule has implications for federalism or Indian tribes, 
please contact the person listed in the FOR FURTHER INFORMATION CONTACT 
section above.

E. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) 
requires Federal agencies to assess the effects of their discretionary 
regulatory actions. In particular, the Act addresses actions that may 
result in the expenditure by a State, local, or tribal government, in 
the aggregate, or by the private sector of

[[Page 59868]]

$100,000,000 (adjusted for inflation) or more in any one year. Though 
this rule will not result in such an expenditure, we do discuss the 
effects of this rule elsewhere in this preamble.

F. Environment

    We have analyzed this rule under Department of Homeland Security 
Management Directive 023-01 and Commandant Instruction M16475.lD, which 
guide the Coast Guard in complying with the National Environmental 
Policy Act of 1969 (42 U.S.C. 4321-4370f), and have determined that 
this action is one of a category of actions that do not individually or 
cumulatively have a significant effect on the human environment. This 
rule involves two safety zones, the first encompassing all the waters 
within 250 feet of demolition operations on the remaining portion of 
the Route 9, Beesley Point Bridge, over Great Egg Harbor Bay, in 
Marmora, NJ and the second encompassing all navigable waters in the 
Great Egg Harbor Bay within 500 yards of vessels and machinery being 
used to conduct pile blasting and removal operations during times of 
explosive detonation. It is categorically excluded from further review 
under paragraph 34(g) of Figure 2-1 of the Commandant Instruction. An 
environmental analysis checklist supporting this determination and a 
Categorical Exclusion Determination are available in the docket where 
indicated under ADDRESSES. We seek any comments or information that may 
lead to the discovery of a significant environmental impact from this 
rule.

G. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. 
Protesters are asked to contact the person listed in the FOR FURTHER 
INFORMATION CONTACT section to coordinate protest activities so that 
your message can be received without jeopardizing the safety or 
security of people, places or vessels.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Security measures, Waterways.

    For the reasons discussed in the preamble, the Coast Guard amends 
33 CFR part 165 as follows:

PART 165--REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS

0
1. The authority citation for part 165 continues to read as follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1, 6.04-1, 
6.04-6, and 160.5; Department of Homeland Security Delegation No. 
0170.1.


0
2. Add temporary Sec.  165.T05-0665, to read as follows:


Sec.  165.T05-0665  Safety Zone; Great Egg Harbor Bay, Marmora, NJ.

    (a) Regulated areas. The following areas are safety zones:
    (1) Bascule span demolition zone. All waters within 250 feet of 
vessels and machinery conducting demolition operations in Great Egg 
Harbor Bay, in the vicinity of Route 9, Beesley Point Bridge bascule 
span, in Marmora, NJ.
    (2) Bridge pile blasting zone. All waters within 500 yards of the 
blasting vessel and equipment conducting pile blasting operations, in 
Great Egg Harbor Bay, in the vicinity of Route 9, Beesley Point Bridge, 
in Marmora, NJ.
    (b) Regulations. The general safety zone regulations in Sec.  
165.23 apply to the safety zones created by this temporary section, 
Sec.  165.T05-0665.
    (1) All vessels and persons are prohibited from entering into or 
moving within the safety zones described in paragraph (a) of this 
section while they are subject to enforcement, unless authorized by the 
Captain of the Port, Delaware Bay, or by his designated representative.
    (2) Persons or vessels seeking to enter or pass through the safety 
zones must contact the Captain of the Port, Delaware Bay, or his 
designated representative to seek permission to transit the area. The 
Captain of the Port, Delaware Bay can be contacted at telephone number 
215-271-4807 or on Marine Band Radio VHF Channel 16 (156.8 MHz).
    (3) Vessels may freely transit through the marked alternate 
channel, approximately 100 feet south of the most southern portion of 
the bascule span. The alternate channel has a horizontal clearance of 
60 feet and unlimited vertical clearance. The alternate channel will be 
marked with red and green buoys and the buoys will be lit at night. 
Vessels are requested to contact the demolition crew via VHF-FM channel 
13 or 16 to make satisfactory passing arrangement and maintain a safe 
speed when transiting the alternate navigational channel.
    (4) No vessels may transit through the safety zone described in 
paragraph (a)(2) of this section during times of explosives detonation. 
During pile blasting detonation, vessels will be required to maintain a 
500 yard distance from the blasting vessel and equipment. Within the 
500 yards is the alternate channel, approximately 100 feet south of the 
most southern portion of the bascule span. Therefore no vessel may 
transit the alternate channel during times of explosive detonation. 
Actual dates and times of explosive detonation will be announced with a 
combination of broadcast notice to mariners, local notice to mariners, 
posted warning signs, 500 yard marine traffic safety zone maintained by 
the contractors safety boats, 10 minute, 5 minutes, and 1 minute 
warning made by the blasting vessel via VHF-FM channel 16, and warning 
signals at 5 minutes with 3 short blasts of the air horn, and 1 minute 
warning of 2 short blasts of the air horn. The schedule of the signals 
will be posted along with all other required signage.
    (5) This section applies to all vessels except those engaged in the 
following operations: enforcing laws, servicing aids to navigation, and 
emergency response vessels.
    (c) Definitions. As used in this section:
    Captain of the Port Delaware Bay means the Commander, U.S. Coast 
Guard Sector Delaware Bay, Philadelphia, PA.
    Designated representative means any Coast Guard commissioned, 
warrant, or petty officer who has been authorized by the Captain of the 
Port Delaware Bay to assist in enforcing the safety zone described in 
paragraph (a) of this section.
    (d) Enforcement. The U.S. Coast Guard may be assisted by Federal, 
State and local agencies in the patrol and enforcement of the zone.
    (e) Enforcement period. This first safety zone will be enforced 
from August 22, 2016, through October 20, 2016, unless cancelled 
earlier by the Captain of the Port. The second safety zone for pile 
blasting will only be enforced during times of explosive detonation. 
Pile Blasting operations are schedule to begin on or about October 1, 
2016. Actual dates and times of explosive detonation will be published 
with a combination of broadcast notice to mariners, local notice to 
mariners, posted warning signs, 500 yard marine traffic safety zone 
maintained by the contractors safety boats, 10 minute, 5 minutes, and 1 
minute warning made by the blasting vessel via VHF-FM channel 16, and 
warning signals at 5 minutes with 3 short blasts of the air horn, and 1 
minute warning of 2 short blasts of the air horn. The schedule of the 
signals will be posted along with warning signs.


[[Page 59869]]


    Dated: August 22, 2016.
Benjamin A. Cooper,
Captain, U.S. Coast Guard, Captain of the Port Delaware Bay.
[FR Doc. 2016-20951 Filed 8-30-16; 8:45 am]
 BILLING CODE 9110-04-P



                                                            Federal Register / Vol. 81, No. 169 / Wednesday, August 31, 2016 / Rules and Regulations                                      59865

                                              Example 11. Above-market lease. REIT K               determining whether the taxpayer met                  DATES:  This rule is effective without
                                           acquires an office building from an unrelated           the requirements of section 856(c)(4) at              actual notice from August 31, 2016
                                           third party subject to a long-term lease with           the close of prior quarters. Taxpayers                through October 20, 2016. For the
                                           a single tenant under which the tenant pays                                                                   purposes of enforcement, actual notice
                                                                                                   may rely on this section for quarters that
                                           above-market rents. The above-market lease
                                           is an intangible asset under GAAP. Seventy              end before the applicability date.                    will be used from August 22, 2016, until
                                           percent of the value of the above-market lease            Approved: August 8, 2016.                           August 31, 2016. The second safety zone
                                           asset is attributable to income from the long-                                                                will be enforced on or about October 1,
                                                                                                   John Dalrymple,
                                           term lease that qualifies as rents from real                                                                  2016, only during times of explosive
                                                                                                   Deputy Commissioner for Services and
                                           property, as defined in section 856(d)(1). The                                                                detonation.
                                                                                                   Enforcement.
                                           remaining thirty percent of the value of the                                                                  ADDRESSES: To view documents
                                           above-market lease asset is attributable to             Mark J. Mazur,
                                           income from the long-term lease that does               Assistant Secretary of the Treasury (Tax              mentioned in this preamble as being
                                           not qualify as rents from real property. The            Policy).                                              available in the docket, go to, type
                                           portion of the value of the above-market lease          [FR Doc. 2016–20987 Filed 8–30–16; 8:45 am]
                                                                                                                                                         USCG–2016–0665 in the ‘‘SEARCH’’
                                           asset that is attributable to rents from real                                                                 box and click ‘‘SEARCH.’’ Click on
                                                                                                   BILLING CODE 4830–01–P
                                           property (here, seventy percent) derives its                                                                  Open Docket Folder on the line
                                           value from real property, is inseparable from                                                                 associated with this rule.
                                           that real property, does not produce or                                                                       FOR FURTHER INFORMATION CONTACT: If
                                           contribute to the production of income other            DEPARTMENT OF HOMELAND                                you have questions about this rule, call
                                           than consideration for the use or occupancy             SECURITY                                              or email Marine Science Technician
                                           of space, and, therefore, is an interest in real
                                           property under section 856(c)(5)(C) and a real          Coast Guard                                           First Class Tom Simkins, U.S. Coast
                                           estate asset under section 856(c)(5)(B). The                                                                  Guard, Sector Delaware Bay, Waterways
                                           remaining portion of the above-market lease             33 CFR Part 165                                       Management Division, Coast Guard;
                                           asset does not derive its value from real                                                                     telephone (215) 271–4889, email
                                           property and, therefore, is not a real estate           [Docket Number USCG–2016–0665]                        Tom.J.Simkins@uscg.mil.
                                           asset.                                                                                                        SUPPLEMENTARY INFORMATION:
                                              Example 12. Land use permit. REIT L                  RIN 1625–AA00
                                           receives a special use permit from the                                                                        I. Table of Abbreviations
                                           government to place a cell tower on Federal             Safety Zone; Great Egg Harbor Bay,
                                                                                                   Marmora, NJ                                           CFR Code of Federal Regulations
                                           Government land that abuts a federal                                                                          DHS Department of Homeland Security
                                           highway. Government regulations provide                                                                       FR Federal Register
                                           that the permit is not a lease of the land, but         AGENCY:    Coast Guard, DHS.
                                                                                                                                                         NPRM Notice of proposed rulemaking
                                           is a permit to use the land for a cell tower.           ACTION:   Temporary final rule.                       § Section
                                           Under the permit, the government reserves                                                                     U.S.C. United States Code
                                           the right to cancel the permit and                      SUMMARY:    The Coast Guard is                        COTP Captain of the Port
                                           compensate REIT L if the site is needed for             establishing two temporary safety zones
                                           a higher public purpose. REIT L leases space            on the waters of Great Egg Harbor Bay                 II. Background Information and
                                           on the tower to various cell service providers.         in Marmora, NJ. The first safety zone                 Regulatory History
                                           Each cell service provider installs its                 includes all waters within 250 feet of
                                           equipment on a designated space on REIT L’s
                                                                                                                                                            In June of 2013, demolition work
                                                                                                   vessel and machinery conducting                       began on the Route 9, Beesley Point
                                           cell tower. The permit does not produce, or
                                           contribute to the production of, any income             demolition operations on the remaining                Bridge between Somers Point and
                                           other than REIT L’s receipt of payments from            portions of the Route 9, Beesley Point                Marmora, NJ. Route 52 Construction, the
                                           the cell service providers in consideration for         Bridge bascule span. This safety zone is              company performing this demolition
                                           their being allowed to use space on the                 necessary to provide for the safety of life           work, has completed all demolition of
                                           tower. The permit is in the nature of a                 on navigable waters during the                        the bridge and piles except the portion
                                           leasehold that allows REIT L to place a cell            demolition and will re-route vessel                   of the bridge which has the bascule span
                                           tower in a specific location on government              traffic through an alternate channel to               opening for the navigational channel.
                                           land. Therefore, the permit is an interest in           facilitate heavy marine equipment                        During this phase of demolition heavy
                                           real property.
                                                                                                   operating in the main navigational                    marine equipment, to include a large
                                              Example 13. License to operate a business.
                                           REIT M owns a building and receives a                   channel to remove the bascule span of                 crane and barge, will be used to remove
                                           license from State to operate a casino in the           the bridge and will be in place                       the large bascule span arms and what is
                                           building. The license applies only to REIT              throughout the entire duration of the                 left of the bridge tender house and
                                           M’s building and cannot be transferred to               demolition work.                                      roadway. The barge and crane must be
                                           another location. REIT M’s building is an                  The second safety zone includes all                placed in the navigational channel to
                                           inherently permanent structure under                    waters within 500 yards of a blasting                 properly secure and remove what
                                           paragraph (d)(2)(i) of this section and,                vessel and equipment being used to                    remains of the bridge.
                                           therefore, is real property. However, REIT              conduct bridge pile blasting operations,                 All piles from the demolished bridge
                                           M’s license to operate a casino is not a right
                                                                                                   which is the final phase of the                       south of the bascule span have been
                                           for the use, enjoyment, or occupation of REIT
                                           M’s building but is rather a license to engage          demolition of the Route 9, Beesley Point              removed. All piles north of the bascule
                                           in the business of operating a casino in the            Bridge bascule span. This safety zone                 span have been removed with the
                                           building. Therefore, the casino license is not          will only be enforced during times of                 exception of four piles, which are
                                           real property.                                          explosive detonation. The safety zone                 attached to the bascule span for support.
                                             (h) Effective/applicability date. The                 will temporarily restrict vessel traffic              The Coast Guard has reviewed Route 52
                                           rules of this section apply for taxable                 from transiting or anchoring in a portion             Construction’s plan to move the main
ehiers on DSK5VPTVN1PROD with RULES




                                           years beginning after August 31, 2016.                  of the Great Egg Harbor Bay while pile                navigational channel 100 feet south of
                                           For purposes of applying the first                      blasting and removal operations are                   the most southern portion of the
                                           sentence of the flush language of section               being conducted to facilitate the                     remaining bridge to allow vessel traffic
                                           856(c)(4) to a quarter in a taxable year                removal of bridge piles from the                      to safely pass during the demolition of
                                           that begins after August 31, 2016, the                  demolished Route 9, Beesley Point                     the bascule span. Once the bascule span
                                           rules of this section apply in                          Bridge.                                               is removed, the piles will be removed


                                      VerDate Sep<11>2014   14:15 Aug 30, 2016   Jkt 238001   PO 00000   Frm 00039   Fmt 4700   Sfmt 4700   E:\FR\FM\31AUR1.SGM   31AUR1


                                           59866            Federal Register / Vol. 81, No. 169 / Wednesday, August 31, 2016 / Rules and Regulations

                                           and the bridge will be completely                       window of time until the operation                    Bridge because vessels will be able to
                                           removed from the waterway.                              begins. Allowing this event to go                     safely transit through an adequate
                                              The removal of the remaining piles,                  forward without a safety zone in place                alternate channel, except during times
                                           which are secured to the sea floor bed,                 would expose mariners and the public                  of explosive detonation. The alternate
                                           will be completed by using explosives,                  to unnecessary dangers associated with                channel will have the same horizontal
                                           after which the piles and debris will be                pile blasting operations.                             clearance and no vertical clearance
                                           removed. The Captain of the Port,                          We are issuing this rule, and under 5              restriction, similar to the current
                                           Delaware Bay, has determined that                       U.S.C. 553(d)(3), the Coast Guard finds               navigational channel.
                                           potential hazards associated with pile                  that good cause exists for making it
                                           blasting and removal operations,                        effective less than 30 days after                     IV. Discussion of the Rule
                                           beginning on or about October 1, 2016,                  publication in the Federal Register for                  On August 22, 2016, demolition work
                                           will be a safety concern for anyone                     the reasons we stated for not publishing              will begin on the remaining portion of
                                           operating within 500 yards of pile                      an NPRM. The Coast Guard expects                      the Route 9, Beesley Point Bridge, over
                                           blasting and removal operations during                  minimal impact to vessels transiting                  the Great Egg Harbor Bay, in Marmora,
                                           times of explosive detonation.                          through the alternate channel. Vessels                NJ. The Captain of the Port, Delaware
                                              The purpose of this rule is to promote               will be able to safely transit through the            Bay, has determined that the hazards
                                           maritime safety and protect vessels from                alternate channel at all times, except                associated with demolition and pile
                                           the hazards of bridge demolition and                    during times of explosive detonation.                 blasting operations require two separate
                                           pile blasting operations, and to maintain               The alternate channel will have the                   safety zones. The first safety zone will
                                           safety of navigation in the Great Egg                   same horizontal clearance and no                      encompass all the navigable waters
                                           Harbor Bay, in the vicinity of the Route                vertical clearance restriction, similar to            within 250 feet of the marine equipment
                                           9, Beesley Point Bridge. The rule will                  the current navigational channel.                     and demolition operation. Entry into,
                                           provide for a clear transit route for                   Furthermore, notification for the first               transiting, or anchoring within the
                                           vessels, provide a safety buffer around                 safety zone will be made via marine                   safety zone is prohibited unless
                                           the crane and barge while demolition                    safety broadcast using VHF–FM channel                 authorized by the Captain of the Port,
                                           operations are conducted, and provide a                 16 and through the Local Notice to                    Delaware Bay, or his designated
                                           safety buffer around the blasting vessel                Mariners.                                             representative. Vessels wishing to
                                           during times of explosive detonation.                      For the second safety zone, the pile               transit the waterway may navigate
                                              The Coast Guard is issuing this                      blasting operation, two blasting events               approximately 100 feet south of the
                                           temporary rule without prior notice and                 will occur on consecutive days to                     main navigational channel to the
                                           opportunity to comment pursuant to                      complete both piers. Notification for the             alternate navigational channel to safely
                                           authority under section 4(a) of the                     second safety zone will be a                          pass the demolition equipment. An
                                           Administrative Procedure Act (APA) (5                   combination of broadcast notice to                    adequate alternate navigational channel
                                           U.S.C. 553(b)). This provision                          mariners, local notice to mariners,                   will be established 100 feet south of the
                                           authorizes an agency to issue a rule                    posted warning signs, 500 yard marine                 most southern portion of the bascule
                                           without prior notice and opportunity to                 traffic safety zone maintained by the                 span which will have the a horizontal
                                           comment when the agency for good                        contractor’s safety boats during time of              clearance of 60 feet and an unlimited
                                           cause finds that those procedures are                   explosive detonations, a 10 minute, 5                 vertical clearance. The alternate
                                           ‘‘impracticable, unnecessary, or contrary               minutes, and 1 minute warning made by                 navigational channel will be clearly
                                           to the public interest.’’ Under 5 U.S.C.                the blasting vessel via VHF–FM channel                marked with red and green buoys;
                                           553(b)(B), the Coast Guard finds that                   16, and warning signals at 5 minutes                  during the evening the buoys will be lit
                                           good cause exists for not publishing a                  with 3 short blasts of the air horn, and              with red and green lights to signify the
                                           notice of proposed rulemaking (NPRM)                    1 minute warning of 2 short blasts of the             channel. The alternate channel will
                                           with respect to this rule because the                   air horn. The schedule of the signals                 have the same horizontal clearance and
                                           final details for this event were not                   will be posted along with all other                   no vertical clearance restrictions; the
                                           received by the Coast Guard until                       required company, Local, State, and                   State of New Jersey has marked the
                                           August 18, 2016, and the demolition                     Federal signage.                                      channel with best water for passage of
                                           work will begin August 22, 2016. The                                                                          vessels. Vessels are requested to contact
                                           first safety zone is required by August                 III. Legal Authority and Need for Rule                the demolition crew via VHF–FM
                                           22, 2016, for the demolition of the                        The Coast Guard is issuing this rule               channel 13 or 16 to make satisfactory
                                           remaining portion of the bridge, and it                 under authority in 33 U.S.C. 1231. The                passing arrangement and maintain a safe
                                           is impracticable to publish an NPRM                     Captain of the Port, Delaware Bay has                 speed when transiting the alternate
                                           and consider comments before that date.                 determined that potential hazards are                 navigational channel.
                                           Allowing this event to go forward                       associated with demolition and pile                      The second safety zone will be
                                           without a safety zone in place would                    blasting operations of the Route 9,                   enforced starting on or about October 1,
                                           expose mariners and the public to                       Beesley Point Bridge, over the Great Egg              2016, only during times of explosive
                                           unnecessary dangers associated with                     Harbor Bay, in Marmora, NJ from                       detonation, and encompasses all
                                           bridge demolition operations. The crane                 August 22, 2016, through October 20,                  navigable waters in the Great Egg Harbor
                                           and barge must be placed in the main                    2016. The rule will provide for a clear               Bay within 500 yards of vessels and
                                           navigational channel to facilitate the                  transit route for vessels, provide a safety           machinery being used to conduct pile
                                           removal of the remaining portion of the                 buffer around the crane and barge while               blasting and removal operations. The
                                           bridge. Therefore, it is imperative that                demolition operations are conducted,                  duration of the enforcement of the zone
                                           there is a clear transit route and safety               and provide a safety buffer around the                is intended to protect personnel,
ehiers on DSK5VPTVN1PROD with RULES




                                           zone around the demolition location.                    blasting vessel during times of explosive             vessels, and the marine environment in
                                              Furthermore, the second safety zone                  detonation.                                           these navigable waters while explosive
                                           is needed for blasting operations which                    The rule will minimally impact                     detonation occurs. There will be two
                                           will begin on or about October 1, 2016.                 vessels transiting through the Great Egg              blasting events occurring on consecutive
                                           It is impracticable to publish an NPRM                  Harbor Bay navigational channel, in the               days to complete both piers. Actual
                                           and consider comments due to the short                  vicinity of the Route 9, Beesley Point                dates and times of explosive detonation


                                      VerDate Sep<11>2014   14:15 Aug 30, 2016   Jkt 238001   PO 00000   Frm 00040   Fmt 4700   Sfmt 4700   E:\FR\FM\31AUR1.SGM   31AUR1


                                                            Federal Register / Vol. 81, No. 169 / Wednesday, August 31, 2016 / Rules and Regulations                                       59867

                                           will be published with a combination of                 A. Regulatory Planning and Review                     compliance, please contact the person
                                           broadcast notice to mariners, local                        Executive Orders 12866 and 13563                   listed in the FOR FURTHER INFORMATION
                                           notice to mariners, posted warning                                                                            CONTACT section.
                                                                                                   direct agencies to assess the costs and
                                           signs, 500 yard marine traffic safety                                                                            Small businesses may send comments
                                                                                                   benefits of available regulatory
                                           zone maintained by the contractors                                                                            on the actions of Federal employees
                                                                                                   alternatives and, if regulation is
                                           safety boats, a 10 minute, 5 minutes,                                                                         who enforce, or otherwise determine
                                                                                                   necessary, to select regulatory
                                           and 1 minute warning made by the                                                                              compliance with, Federal regulations to
                                                                                                   approaches that maximize net benefits.
                                           blasting vessel via VHF–FM channel 16,                                                                        the Small Business and Agriculture
                                                                                                   Executive Order 13563 emphasizes the
                                           and warning signals at 5 minutes with                                                                         Regulatory Enforcement Ombudsman
                                                                                                   importance of quantifying both costs
                                           3 short blasts of the air horn, and 1                                                                         and the Regional Small Business
                                                                                                   and benefits, of reducing costs, of
                                           minute warning of 2 short blasts of the                                                                       Regulatory Fairness Boards. The
                                                                                                   harmonizing rules, and of promoting
                                           air horn. The schedule of the signals                                                                         Ombudsman evaluates these actions
                                                                                                   flexibility. This rule has not been
                                           will be posted along with warning signs.                                                                      annually and rates each agency’s
                                                                                                   designated a ‘‘significant regulatory
                                                                                                                                                         responsiveness to small business. If you
                                              Entry into, transiting, or anchoring                 action,’’ under Executive Order 12866.
                                                                                                                                                         wish to comment on actions by
                                           within the safety zone is prohibited                    Accordingly, it has not been reviewed
                                                                                                                                                         employees of the Coast Guard, call 1–
                                           unless authorized by the Captain of the                 by the Office of Management and
                                                                                                                                                         888–REG–FAIR (1–888–734–3247). The
                                           Port, Delaware Bay, or his designated                   Budget.
                                                                                                                                                         Coast Guard will not retaliate against
                                           representative. No vessels may transit                     This finding is based on the limited
                                                                                                                                                         small entities that question or complain
                                           through the safety zone during times of                 size of the zone and the availability for
                                                                                                                                                         about this rule or any policy or action
                                           explosives detonation. During pile                      vessels to transit freely through the
                                                                                                                                                         of the Coast Guard.
                                           blasting explosive detonation, vessels                  alternate channel, around the first safety
                                           will be required to maintain a 500-yard                 zone. Vessels will only be affected                   C. Collection of Information
                                                                                                   during times of explosive detonation,                   This rule will not call for a new
                                           distance from vessels and equipment
                                                                                                   where the second safety zone will be                  collection of information under the
                                           used to conduct pile blasting and
                                                                                                   enforced. The second safety zone is of                Paperwork Reduction Act of 1995 (44
                                           removal operations. This 500 yard
                                                                                                   a limited size and duration as blasting               U.S.C. 3501–3520).
                                           radius will be secured by two contractor
                                                                                                   will occur only for a consecutive two
                                           safety boats in the adjacent waterways.                                                                       D. Federalism and Indian Tribal
                                                                                                   day period. In addition, the zones will
                                           For safety reasons associated with the                  be well publicized to allow mariners to               Governments
                                           blasting operation, during times of                     make alternative plans for transiting the                A rule has implications for federalism
                                           explosive detonation the alternate                      affected area.                                        under Executive Order 13132,
                                           navigational channel will be closed. At
                                                                                                   B. Impact on Small Entities                           Federalism, if it has a substantial direct
                                           all other times vessels may transit
                                                                                                                                                         effect on the States, on the relationship
                                           through the established alternate                          The Regulatory Flexibility Act of                  between the national government and
                                           navigational channel approximately 100                  1980, 5 U.S.C. 601–612, as amended,                   the States, or on the distribution of
                                           feet south of the southernmost                          requires Federal agencies to consider                 power and responsibilities among the
                                           remaining pile of the Route 9, Beesley                  the potential impact of regulations on                various levels of government. We have
                                           Point Bridge.                                           small entities during rulemaking. The                 analyzed this rule under that Order and
                                              Signs will be posted to identify the                 term ‘‘small entities’’ comprises small               have determined that it is consistent
                                           blast area and warning signs will be                    businesses, not-for-profit organizations              with the fundamental federalism
                                           posted with the schedule of the warning                 that are independently owned and                      principles and preemption requirements
                                           signals. The contractor will verify that                operated and are not dominant in their                described in Executive Order 13132.
                                           all vessels and persons are clear of                    fields, and governmental jurisdictions                   Also, this rule does not have tribal
                                           safety zone 10 minutes prior to the                     with populations of less than 50,000.                 implications under Executive Order
                                           scheduled shot time and will remain                     The Coast Guard certifies under 5 U.S.C.              13175, Consultation and Coordination
                                           secured until the blaster gives the ‘‘All               605(b) that this rule will not have a                 with Indian Tribal Governments,
                                           Clear’’. All persons involved with                      significant economic impact on a                      because it does not have a substantial
                                           securing the blast zone will be equipped                substantial number of small entities.                 direct effect on one or more Indian
                                           with marine radios. A 10 minute, 5                         It is expected that there will be                  tribes, on the relationship between the
                                           minutes, and 1 minute warning made by                   minimal disruption to the maritime                    Federal Government and Indian tribes,
                                           the blasting vessel via VHF–FM channel                  community. Before the effective period,               or on the distribution of power and
                                           16, and warning signals at 5 minutes                    the Coast Guard will issue maritime                   responsibilities between the Federal
                                                                                                   advisories widely available to users of               Government and Indian tribes. If you
                                           with 3 short blasts of the air horn, and
                                                                                                   the river to allow mariners to make                   believe this rule has implications for
                                           1 minute warning of 2 short blasts of the
                                                                                                   alternative plans for transiting the                  federalism or Indian tribes, please
                                           air horn. After every explosive
                                                                                                   affected areas. In addition, vessels may              contact the person listed in the FOR
                                           detonation the blasting vessels will give
                                                                                                   transit around the zone through an                    FURTHER INFORMATION CONTACT section
                                           the ‘‘All Clear’’ when the alternate
                                                                                                   alternate channel, except during time of              above.
                                           channel is clear for vessels to transit.                explosive detonation.
                                                                                                      Under section 213(a) of the Small                  E. Unfunded Mandates Reform Act
                                           V. Regulatory Analyses
                                                                                                   Business Regulatory Enforcement                         The Unfunded Mandates Reform Act
                                             We developed this rule after                          Fairness Act of 1996 (Pub. L. 104–121),               of 1995 (2 U.S.C. 1531–1538) requires
ehiers on DSK5VPTVN1PROD with RULES




                                           considering numerous statutes and                       we want to assist small entities in                   Federal agencies to assess the effects of
                                           Executive order related to rulemaking.                  understanding this rule. If the rule                  their discretionary regulatory actions. In
                                           Below we summarize our analyses                         would affect your small business,                     particular, the Act addresses actions
                                           based on a number of these statutes and                 organization, or governmental                         that may result in the expenditure by a
                                           Executive orders, and we discuss First                  jurisdiction and you have questions                   State, local, or tribal government, in the
                                           Amendment rights of protestors.                         concerning its provisions or options for              aggregate, or by the private sector of


                                      VerDate Sep<11>2014   14:15 Aug 30, 2016   Jkt 238001   PO 00000   Frm 00041   Fmt 4700   Sfmt 4700   E:\FR\FM\31AUR1.SGM   31AUR1


                                           59868            Federal Register / Vol. 81, No. 169 / Wednesday, August 31, 2016 / Rules and Regulations

                                           $100,000,000 (adjusted for inflation) or                  Authority: 33 U.S.C. 1231; 50 U.S.C. 191;           of the most southern portion of the
                                           more in any one year. Though this rule                  33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5;             bascule span. Therefore no vessel may
                                           will not result in such an expenditure,                 Department of Homeland Security Delegation            transit the alternate channel during
                                           we do discuss the effects of this rule                  No. 0170.1.
                                                                                                                                                         times of explosive detonation. Actual
                                           elsewhere in this preamble.                             ■ 2. Add temporary § 165.T05–0665, to                 dates and times of explosive detonation
                                                                                                   read as follows:                                      will be announced with a combination
                                           F. Environment
                                                                                                   § 165.T05–0665 Safety Zone; Great Egg                 of broadcast notice to mariners, local
                                             We have analyzed this rule under                      Harbor Bay, Marmora, NJ.                              notice to mariners, posted warning
                                           Department of Homeland Security                                                                               signs, 500 yard marine traffic safety
                                                                                                      (a) Regulated areas. The following
                                           Management Directive 023–01 and                                                                               zone maintained by the contractors
                                                                                                   areas are safety zones:
                                           Commandant Instruction M16475.lD,                                                                             safety boats, 10 minute, 5 minutes, and
                                                                                                      (1) Bascule span demolition zone. All
                                           which guide the Coast Guard in                                                                                1 minute warning made by the blasting
                                                                                                   waters within 250 feet of vessels and
                                           complying with the National                                                                                   vessel via VHF–FM channel 16, and
                                                                                                   machinery conducting demolition
                                           Environmental Policy Act of 1969 (42
                                                                                                   operations in Great Egg Harbor Bay, in                warning signals at 5 minutes with 3
                                           U.S.C. 4321–4370f), and have
                                                                                                   the vicinity of Route 9, Beesley Point                short blasts of the air horn, and 1
                                           determined that this action is one of a
                                                                                                   Bridge bascule span, in Marmora, NJ.                  minute warning of 2 short blasts of the
                                           category of actions that do not                            (2) Bridge pile blasting zone. All
                                           individually or cumulatively have a                                                                           air horn. The schedule of the signals
                                                                                                   waters within 500 yards of the blasting               will be posted along with all other
                                           significant effect on the human                         vessel and equipment conducting pile
                                           environment. This rule involves two                                                                           required signage.
                                                                                                   blasting operations, in Great Egg Harbor
                                           safety zones, the first encompassing all                Bay, in the vicinity of Route 9, Beesley                 (5) This section applies to all vessels
                                           the waters within 250 feet of demolition                Point Bridge, in Marmora, NJ.                         except those engaged in the following
                                           operations on the remaining portion of                     (b) Regulations. The general safety                operations: enforcing laws, servicing
                                           the Route 9, Beesley Point Bridge, over                 zone regulations in § 165.23 apply to the             aids to navigation, and emergency
                                           Great Egg Harbor Bay, in Marmora, NJ                    safety zones created by this temporary                response vessels.
                                           and the second encompassing all                         section, § 165.T05–0665.                                 (c) Definitions. As used in this
                                           navigable waters in the Great Egg Harbor                   (1) All vessels and persons are                    section:
                                           Bay within 500 yards of vessels and                     prohibited from entering into or moving
                                           machinery being used to conduct pile                                                                             Captain of the Port Delaware Bay
                                                                                                   within the safety zones described in
                                           blasting and removal operations during                  paragraph (a) of this section while they              means the Commander, U.S. Coast
                                           times of explosive detonation. It is                    are subject to enforcement, unless                    Guard Sector Delaware Bay,
                                           categorically excluded from further                     authorized by the Captain of the Port,                Philadelphia, PA.
                                           review under paragraph 34(g) of Figure                  Delaware Bay, or by his designated                       Designated representative means any
                                           2–1 of the Commandant Instruction. An                   representative.                                       Coast Guard commissioned, warrant, or
                                           environmental analysis checklist                           (2) Persons or vessels seeking to enter            petty officer who has been authorized
                                           supporting this determination and a                     or pass through the safety zones must                 by the Captain of the Port Delaware Bay
                                           Categorical Exclusion Determination are                 contact the Captain of the Port,                      to assist in enforcing the safety zone
                                           available in the docket where indicated                 Delaware Bay, or his designated                       described in paragraph (a) of this
                                           under ADDRESSES. We seek any                            representative to seek permission to                  section.
                                           comments or information that may lead                   transit the area. The Captain of the Port,
                                           to the discovery of a significant                       Delaware Bay can be contacted at                         (d) Enforcement. The U.S. Coast
                                           environmental impact from this rule.                    telephone number 215–271–4807 or on                   Guard may be assisted by Federal, State
                                                                                                   Marine Band Radio VHF Channel 16                      and local agencies in the patrol and
                                           G. Protest Activities
                                                                                                   (156.8 MHz).                                          enforcement of the zone.
                                             The Coast Guard respects the First                       (3) Vessels may freely transit through                (e) Enforcement period. This first
                                           Amendment rights of protesters.                         the marked alternate channel,                         safety zone will be enforced from
                                           Protesters are asked to contact the                     approximately 100 feet south of the                   August 22, 2016, through October 20,
                                           person listed in the FOR FURTHER                        most southern portion of the bascule                  2016, unless cancelled earlier by the
                                           INFORMATION CONTACT section to                          span. The alternate channel has a                     Captain of the Port. The second safety
                                           coordinate protest activities so that your              horizontal clearance of 60 feet and                   zone for pile blasting will only be
                                           message can be received without                         unlimited vertical clearance. The                     enforced during times of explosive
                                           jeopardizing the safety or security of                  alternate channel will be marked with                 detonation. Pile Blasting operations are
                                           people, places or vessels.                              red and green buoys and the buoys will                schedule to begin on or about October
                                           List of Subjects in 33 CFR Part 165                     be lit at night. Vessels are requested to             1, 2016. Actual dates and times of
                                                                                                   contact the demolition crew via VHF–
                                             Harbors, Marine safety, Navigation                                                                          explosive detonation will be published
                                                                                                   FM channel 13 or 16 to make
                                           (water), Reporting and recordkeeping                                                                          with a combination of broadcast notice
                                                                                                   satisfactory passing arrangement and
                                           requirements, Security measures,                        maintain a safe speed when transiting                 to mariners, local notice to mariners,
                                           Waterways.                                              the alternate navigational channel.                   posted warning signs, 500 yard marine
                                                                                                      (4) No vessels may transit through the             traffic safety zone maintained by the
                                             For the reasons discussed in the
                                                                                                   safety zone described in paragraph (a)(2)             contractors safety boats, 10 minute, 5
                                           preamble, the Coast Guard amends 33
                                                                                                   of this section during times of                       minutes, and 1 minute warning made by
                                           CFR part 165 as follows:
ehiers on DSK5VPTVN1PROD with RULES




                                                                                                   explosives detonation. During pile                    the blasting vessel via VHF–FM channel
                                           PART 165—REGULATED NAVIGATION                           blasting detonation, vessels will be                  16, and warning signals at 5 minutes
                                           AREAS AND LIMITED ACCESS AREAS                          required to maintain a 500 yard distance              with 3 short blasts of the air horn, and
                                                                                                   from the blasting vessel and equipment.               1 minute warning of 2 short blasts of the
                                           ■ 1. The authority citation for part 165                Within the 500 yards is the alternate                 air horn. The schedule of the signals
                                           continues to read as follows:                           channel, approximately 100 feet south                 will be posted along with warning signs.


                                      VerDate Sep<11>2014   14:15 Aug 30, 2016   Jkt 238001   PO 00000   Frm 00042   Fmt 4700   Sfmt 4700   E:\FR\FM\31AUR1.SGM   31AUR1


                                                            Federal Register / Vol. 81, No. 169 / Wednesday, August 31, 2016 / Rules and Regulations                                                59869

                                             Dated: August 22, 2016.                               Approval of these portions of the SIP                 section 110(a)(2)(D)(i)(I) concerning
                                           Benjamin A. Cooper,                                     revision fully satisfies Alabama’s good               interstate transport of air pollution.1 As
                                           Captain, U.S. Coast Guard, Captain of the               neighbor obligation under the CAA to                  amended, CSAPR requires 28 Eastern
                                           Port Delaware Bay.                                      prohibit emissions which will                         states to limit their statewide emissions
                                           [FR Doc. 2016–20951 Filed 8–30–16; 8:45 am]             significantly contribute to                           of SO2 and/or NOX in order to mitigate
                                           BILLING CODE 9110–04–P                                  nonattainment or interfere with                       transported air pollution unlawfully
                                                                                                   maintenance of the 1997 and 2006 PM2.5                impacting other states’ ability to attain
                                                                                                   NAAQS in any other state. This                        or maintain three NAAQS: the 1997
                                           ENVIRONMENTAL PROTECTION                                approval also addresses the judicial                  ozone NAAQS, the 1997 annual PM2.5
                                           AGENCY                                                  remand of the federally-established                   NAAQS, and the 2006 24-hour PM2.5
                                                                                                   CSAPR Phase 2 SO2 budget for                          NAAQS. The CSAPR emissions
                                           40 CFR Part 52                                          Alabama. EPA is not acting at this time               limitations are defined in terms of
                                                                                                   on the portion of Alabama’s SIP                       maximum statewide ‘‘budgets’’ for
                                           [EPA–R04–OAR–2016–0294; FRL–9951–52–
                                           Region 4]                                               submittal intended to replace Alabama                 emissions of annual SO2, annual NOX,
                                                                                                   units’ obligations to participate in                  and/or ozone-season NOX by each
                                           Air Plan Approval; Alabama; Cross-                      CSAPR’s federal trading program for                   covered state’s large EGUs. The CSAPR
                                           State Air Pollution Rule                                ozone-season NOX emissions under a                    state budgets are implemented in two
                                                                                                   separate CSAPR FIP.                                   phases of generally increasing
                                           AGENCY:  Environmental Protection                                                                             stringency, with the Phase 1 budgets
                                                                                                   DATES: This rule is effective September
                                           Agency.                                                                                                       applying to emissions in 2015 and 2016
                                                                                                   30, 2016.
                                           ACTION: Final rule.                                                                                           and the Phase 2 budgets applying to
                                                                                                   ADDRESSES: EPA has established a
                                                                                                   docket for this action under Docket                   emissions in 2017 and later years. As a
                                           SUMMARY:   The Environmental Protection
                                                                                                   Identification No EPA–R04–OAR–2016–                   mechanism for achieving compliance
                                           Agency (EPA) is approving portions of
                                                                                                   0294. All documents in the docket are                 with the emissions limitations, CSAPR
                                           the October 26, 2015, State
                                                                                                   listed on the www.regulations.gov Web                 established four federal emissions
                                           Implementation Plan (SIP) submittal
                                                                                                   site. Although listed in the index, some              trading programs: A program for annual
                                           from Alabama concerning the Cross-
                                                                                                   information may not be publicly                       NOX emissions, a program for ozone-
                                           State Air Pollution Rule (CSAPR).
                                                                                                   available, i.e., Confidential Business                season NOX emissions, and two
                                           Under CSAPR, large electricity
                                                                                                   Information or other information whose                geographically separate programs for
                                           generating units (EGUs) in Alabama are
                                                                                                   disclosure is restricted by statute.                  annual SO2 emissions. CSAPR also
                                           subject to Federal Implementation Plans
                                                                                                                                                         established FIP requirements applicable
                                           (FIPs) requiring the units to participate               Certain other material, such as
                                                                                                                                                         to the large electricity generating units
                                           in CSAPR’s federal trading program for                  copyrighted material, is not placed on
                                                                                                                                                         in each covered state. The CSAPR FIP
                                           annual emissions of nitrogen oxides                     the Internet and will be publicly
                                                                                                                                                         provisions require each state’s units to
                                           (NOX) and one of CSAPR’s two federal                    available only in hard copy form.
                                                                                                                                                         participate in up to three of the four
                                           trading programs for annual emissions                   Publicly available docket materials are
                                                                                                                                                         CSAPR trading programs.
                                           of sulfur dioxide (SO2). This action                    available either electronically through                  CSAPR includes provisions under
                                           approves the incorporation into                         www.regulations.gov or in hard copy at                which states may submit and EPA will
                                           Alabama’s SIP of the state’s regulations                the Air Regulatory Management Section,                approve SIP revisions to modify or
                                           requiring Alabama EGUs to participate                   Air Planning and Implementation                       replace the CSAPR FIP requirements
                                           in new CSAPR state trading programs                     Branch, Air, Pesticides and Toxics                    while allowing states to continue to
                                           for annual NOX and SO2 emissions                        Management Division, U.S.                             meet their transport-related obligations
                                           integrated with the CSAPR federal                       Environmental Protection Agency,                      using either CSAPR’s federal emissions
                                           trading programs, replacing the                         Region 4, 61 Forsyth Street SW.,                      trading programs or state emissions
                                           corresponding FIP requirements. These                   Atlanta, Georgia 30303–8960. EPA                      trading programs integrated with the
                                           CSAPR state trading programs are                        requests that if at all possible, you                 federal programs.2 Through such a SIP
                                           substantively identical to the CSAPR                    contact the person listed in the FOR                  revision, a state may replace EPA’s
                                           federal trading programs except with                    FURTHER INFORMATION CONTACT section to                default provisions for allocating
                                           regard to the provisions allocating                     schedule your inspection. The Regional                emission allowances among the state’s
                                           emission allowances among Alabama                       Office’s official hours of business are               units, employing any state-selected
                                           units. EPA is approving the portions of                 Monday through Friday 8:30 a.m. to                    methodology to allocate or auction the
                                           the SIP revision concerning these                       4:30 p.m., excluding federal holidays.                allowances, subject to timing conditions
                                           CSAPR state trading programs because                    FOR FURTHER INFORMATION CONTACT:                      and limits on overall allowance
                                           these portions of the SIP revision meet                 Steven Scofield, Air Regulatory                       quantities. In the case of CSAPR’s
                                           the requirements of the Clean Air Act                   Management Section, Air Planning and                  federal trading program for ozone-
                                           (CAA or Act) and EPA’s regulations for                  Implementation Branch, Air, Pesticides                season NOX emissions (or an integrated
                                           approval of a CSAPR full SIP revision                   and Toxics Management Division,                       state trading program), a state may also
                                           replacing the requirements of a CSAPR                   Region 4, U.S. Environmental Protection               expand trading program applicability to
                                           FIP. Under the CSAPR regulations,                       Agency, 61 Forsyth Street SW., Atlanta,               include certain smaller electricity
                                           approval of these portions of the SIP                   Georgia 30303–8960. Mr. Scofield can
                                           revision automatically eliminates                       be reached by telephone at (404) 562–                    1 Federal Implementation Plans; Interstate

                                           Alabama units’ obligations to participate               9034 or via electronic mail at                        Transport of Fine Particulate Matter and Ozone and
                                           in CSAPR’s federal trading programs for                                                                       Correction of SIP Approvals, 76 FR 48208 (August
                                                                                                   scofield.steve@epa.gov.
ehiers on DSK5VPTVN1PROD with RULES




                                                                                                                                                         8, 2011) (codified as amended at 40 CFR 52.38 and
                                           annual NOX and SO2 emissions under                      SUPPLEMENTARY INFORMATION:                            52.39 and subparts AAAAA through DDDDD of 40
                                           the corresponding CSAPR FIPs                                                                                  CFR part 97).
                                           addressing interstate transport                         I. Background on CSAPR and CSAPR-                        2 See 40 CFR 52.38, 52.39. States also retain the

                                           requirements for the 1997 and 2006 Fine                 Related SIP revisions                                 ability to submit SIP revisions to meet their
                                                                                                                                                         transport-related obligations using mechanisms
                                           Particulate Matter (PM2.5) national                        EPA issued CSAPR in July 2011 to                   other than the CSAPR federal trading programs or
                                           ambient air quality standards (NAAQS).                  address the requirements of CAA                       integrated state trading programs.



                                      VerDate Sep<11>2014   14:15 Aug 30, 2016   Jkt 238001   PO 00000   Frm 00043   Fmt 4700   Sfmt 4700   E:\FR\FM\31AUR1.SGM   31AUR1



Document Created: 2018-02-02 12:15:07
Document Modified: 2018-02-02 12:15:07
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionTemporary final rule.
DatesThis rule is effective without actual notice from August 31, 2016 through October 20, 2016. For the purposes of enforcement, actual notice will be used from August 22, 2016, until August 31, 2016. The second safety zone will be enforced on or about October 1, 2016, only during times of explosive detonation.
ContactIf you have questions about this rule, call or email Marine Science Technician First Class Tom Simkins, U.S. Coast Guard, Sector Delaware Bay, Waterways Management Division, Coast Guard; telephone (215) 271-4889, email [email protected]
FR Citation81 FR 59865 
RIN Number1625-AA00
CFR AssociatedHarbors; Marine Safety; Navigation (water); Reporting and Recordkeeping Requirements; Security Measures and Waterways

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR