81_FR_60160 81 FR 59991 - Columbia Gas Transmission, LLC; Notice of Application

81 FR 59991 - Columbia Gas Transmission, LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 169 (August 31, 2016)

Page Range59991-59991
FR Document2016-20974

Federal Register, Volume 81 Issue 169 (Wednesday, August 31, 2016)
[Federal Register Volume 81, Number 169 (Wednesday, August 31, 2016)]
[Notices]
[Page 59991]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-20974]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-493-000]


Columbia Gas Transmission, LLC; Notice of Application

    Take notice that on August 12, 2016, Columbia Gas Transmission, LLC 
(Columbia), having its principal place of business at 5151 San Felipe, 
Suite 2500, Houston, TX 77056 filed in the above referenced docket an 
application pursuant to section 7(c) of the Natural Gas Act (NGA), and 
Part 157 of the Commission's regulations requesting authorization to 
install and operate compressions, pipeline and appurtenant facilities 
located in Louisa and Goochland Counties, Virginia, referred to as the 
Central Virginia Connector Project (Project), all as more fully set 
forth in the application which is on file with the Commission and open 
to public inspection. The filing is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site web at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at [email protected] or call toll-free, (886) 208-3676 or 
TYY, (202) 502-8659.
    Any questions concerning this application may be directed to Tyler 
Brown, Senior Counsel, 5151 San Felipe, Suite 2500, Houston, TX 77056; 
by calling (713) 386-3797; by faxing (304) 357-2509; or by emailing 
[email protected].
    Specifically, the applicant proposes the following modifications: 
(i) Replace unit at Louisa CS, (ii) convert replaced units to standby, 
(iii) increase horsepower (HP) by 2,080 HP, (iv) install 0.12 mile of 
8-inch-diameter pipeline, (v) install station pipe and valve to make 
section at Boswell's Tavern bi-directional, and (vi) install meter 
station near Goochland CS. The increase in HP will provide an 
additional capacity of 45 million cubic feet per day (MMcf/d). The 
total cost of the Project is $52,387,031.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: September 15, 2016.

    Dated: August 25, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-20974 Filed 8-30-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 81, No. 169 / Wednesday, August 31, 2016 / Notices                                                 59991

                                                  notice to the Commission that, through                  ‘‘eLibrary’’ link. Enter the docket                   maintained by the Secretary of the
                                                  its subsidiary Eagle Creek Development                  number excluding the last three digits in             Commission and will receive copies of
                                                  Holdings, LLC, it has acquired                          the docket number field to access the                 all documents filed by the applicant and
                                                  Champlain Spinners Power Company                        document. For assistance, contact FERC                by all other parties. A party must submit
                                                  Inc., the exemptee for the Champlain                    at FERCOnlineSupport@ferc.gov or call                 seven copies of filings made in the
                                                  Spinners Project No. 5296, originally                   toll-free, (886) 208–3676 or TYY, (202)               proceeding with the Commission and
                                                  issued March 1, 1982.1 In the course of                 502–8659.                                             must mail a copy to the applicant and
                                                  the transaction, Champlain Spinners                        Any questions concerning this                      to every other party. Only parties to the
                                                  Power Company, Inc. converted its                       application may be directed to Tyler                  proceeding can ask for court review of
                                                  corporate form from a corporation into                  Brown, Senior Counsel, 5151 San                       Commission orders in the proceeding.
                                                  a limited liability company and                         Felipe, Suite 2500, Houston, TX 77056;                   However, a person does not have to
                                                  transferred the exemption to Champlain                  by calling (713) 386–3797; by faxing                  intervene in order to have comments
                                                  Spinners Power, LLC. The project is                     (304) 357–2509; or by emailing tbrown@                considered. The second way to
                                                  located on the Champlain Canal in                       cpg.com.                                              participate is by filing with the
                                                  Washington County, New York. The                           Specifically, the applicant proposes               Secretary of the Commission, as soon as
                                                  transfer of an exemption does not                       the following modifications: (i) Replace              possible, an original and two copies of
                                                  require Commission approval.                            unit at Louisa CS, (ii) convert replaced              comments in support of or in opposition
                                                     2. Champlain Spinners Power, LLC is                  units to standby, (iii) increase                      to this project. The Commission will
                                                  now the exemptee of the Champlain                       horsepower (HP) by 2,080 HP, (iv)                     consider these comments in
                                                  Spinners Project No. 5296. All                          install 0.12 mile of 8-inch-diameter
                                                                                                                                                                determining the appropriate action to be
                                                  correspondence should be forwarded to:                  pipeline, (v) install station pipe and
                                                                                                                                                                taken, but the filing of a comment alone
                                                  Mr. Bernard Cherry, Champlain                           valve to make section at Boswell’s
                                                                                                                                                                will not serve to make the filer a party
                                                  Spinners Power, LLC, c/o Eagle Creek                    Tavern bi-directional, and (vi) install
                                                                                                                                                                to the proceeding. The Commission’s
                                                  Renewable Energy, LLC, 65 Madison                       meter station near Goochland CS. The
                                                                                                                                                                rules require that persons filing
                                                  Avenue, Suite 500, Morristown, NJ                       increase in HP will provide an
                                                                                                                                                                comments in opposition to the project
                                                  07960.                                                  additional capacity of 45 million cubic
                                                                                                                                                                provide copies of their protests only to
                                                    Dated: August 25, 2016.                               feet per day (MMcf/d). The total cost of
                                                                                                                                                                the party or parties directly involved in
                                                                                                          the Project is $52,387,031.
                                                  Kimberly D. Bose,
                                                                                                             Pursuant to section 157.9 of the                   the protest.
                                                  Secretary.                                              Commission’s rules (18 CFR 157.9),                       Persons who wish to comment only
                                                  [FR Doc. 2016–20979 Filed 8–30–16; 8:45 am]             within 90 days of this Notice, the                    on the environmental review of this
                                                  BILLING CODE 6717–01–P                                  Commission staff will either: Complete                project should submit an original and
                                                                                                          its environmental assessment (EA) and                 two copies of their comments to the
                                                                                                          place it into the Commission’s public                 Secretary of the Commission.
                                                  DEPARTMENT OF ENERGY                                    record (eLibrary) for this proceeding; or             Environmental commentors will be
                                                                                                          issue a Notice of Schedule for                        placed on the Commission’s
                                                  Federal Energy Regulatory                                                                                     environmental mailing list, will receive
                                                                                                          Environmental Review. If a Notice of
                                                  Commission                                                                                                    copies of the environmental documents,
                                                                                                          Schedule for Environmental Review is
                                                  [Docket No. CP16–493–000]                               issued, it will indicate, among other                 and will be notified of meetings
                                                                                                          milestones, the anticipated date for the              associated with the Commission’s
                                                  Columbia Gas Transmission, LLC;                         Commission staff’s issuance of the final              environmental review process.
                                                  Notice of Application                                   environmental impact statement (FEIS)                 Environmental commentors will not be
                                                                                                          or EA for this proposal. The filing of the            required to serve copies of filed
                                                    Take notice that on August 12, 2016,                                                                        documents on all other parties.
                                                                                                          EA in the Commission’s public record
                                                  Columbia Gas Transmission, LLC                                                                                However, the non-party commentors
                                                                                                          for this proceeding or the issuance of a
                                                  (Columbia), having its principal place of                                                                     will not receive copies of all documents
                                                                                                          Notice of Schedule for Environmental
                                                  business at 5151 San Felipe, Suite 2500,                                                                      filed by other parties or issued by the
                                                                                                          Review will serve to notify federal and
                                                  Houston, TX 77056 filed in the above                                                                          Commission (except for the mailing of
                                                                                                          state agencies of the timing for the
                                                  referenced docket an application                                                                              environmental documents issued by the
                                                                                                          completion of all necessary reviews, and
                                                  pursuant to section 7(c) of the Natural                 the subsequent need to complete all                   Commission) and will not have the right
                                                  Gas Act (NGA), and Part 157 of the                      federal authorizations within 90 days of              to seek court review of the
                                                  Commission’s regulations requesting                     the date of issuance of the Commission                Commission’s final order.
                                                  authorization to install and operate                    staff’s FEIS or EA.                                      The Commission strongly encourages
                                                  compressions, pipeline and appurtenant                     There are two ways to become                       electronic filings of comments, protests
                                                  facilities located in Louisa and                        involved in the Commission’s review of                and interventions in lieu of paper using
                                                  Goochland Counties, Virginia, referred                  this project. First, any person wishing to            the ‘‘eFiling’’ link at http://
                                                  to as the Central Virginia Connector                    obtain legal status by becoming a party               www.ferc.gov. Persons unable to file
                                                  Project (Project), all as more fully set                to the proceedings for this project                   electronically should submit an original
                                                  forth in the application which is on file               should, on or before the comment date                 and 7 copies of the protest or
                                                  with the Commission and open to                         stated below file with the Federal                    intervention to the Federal Energy
                                                  public inspection. The filing is available              Energy Regulatory Commission, 888                     Regulatory Commission, 888 First Street
                                                  for review at the Commission in the                     First Street NE., Washington, DC 20426,
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                                                                NE., Washington, DC 20426.
                                                  Public Reference Room or may be                         a motion to intervene in accordance
                                                  viewed on the Commission’s Web site                                                                              Comment Date: September 15, 2016.
                                                                                                          with the requirements of the
                                                  web at http://www.ferc.gov using the                    Commission’s Rules of Practice and                      Dated: August 25, 2016.
                                                                                                          Procedure (18 CFR 385.214 or 385.211)                 Kimberly D. Bose,
                                                    1 19 FERC ¶ 62,508 (1982), Order Granting
                                                                                                          and the Regulations under the NGA (18                 Secretary.
                                                  Exemption from Licensing of a Small Hydroelectric
                                                  Project of 5 Megawatts or Less and Dismissing           CFR 157.10). A person obtaining party                 [FR Doc. 2016–20974 Filed 8–30–16; 8:45 am]
                                                  Application for Preliminary Permit.                     status will be placed on the service list             BILLING CODE 6717–01–P




                                             VerDate Sep<11>2014   21:59 Aug 30, 2016   Jkt 238001   PO 00000   Frm 00016   Fmt 4703   Sfmt 9990   E:\FR\FM\31AUN1.SGM   31AUN1



Document Created: 2018-02-02 12:15:00
Document Modified: 2018-02-02 12:15:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesSeptember 15, 2016.
FR Citation81 FR 59991 

2025 Federal Register | Disclaimer | Privacy Policy