81_FR_60161 81 FR 59992 - Amador Water Agency; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 59992 - Amador Water Agency; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 169 (August 31, 2016)

Page Range59992-59992
FR Document2016-20981

Federal Register, Volume 81 Issue 169 (Wednesday, August 31, 2016)
[Federal Register Volume 81, Number 169 (Wednesday, August 31, 2016)]
[Notices]
[Page 59992]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-20981]



[[Page 59992]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No., CD16-19-000]


Amador Water Agency; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On August 15, 2016, the Amador Water Agency filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA), as amended by section 4 
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 
proposed Ione Hydroelectric Station Project would have an installed 
capacity of 447.6 kilowatts (kW) and would be located on an existing 
16-inch-diameter gravity fed raw water transmission pipe. The project 
would be located near the City of Ione in Amador County, California.
    Applicant Contact: Gene Mancebo, Amador Water Agency, 12800 Ridge 
Road, Sutter Creek, CA 95685, Phone No. (209) 257-5245.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed 90-foot long, 12-inch-diameter 
intake pipe, (2) a proposed 447.6-kW turbine parallel to and replacing 
the existing pressure reducing valve, (3) a proposed 260-foot-long 12-
inch diameter outlet pipe emptying into the supply reservoir, and (4) 
appurtenant facilities. The proposed project would have an estimated 
annual generating capacity of 1,400 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                               Satisfies
       Statutory provision                Description            (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by     The conduit is a tunnel,           Y
 HREA.                              canal, pipeline,
                                    aqueduct, flume, ditch,
                                    or similar manmade water
                                    conveyance that is
                                    operated for the
                                    distribution of water
                                    for agricultural,
                                    municipal, or industrial
                                    consumption and not
                                    primarily for the
                                    generation of
                                    electricity.
FPA 30(a)(3)(C)(i), as amended by  The facility is                    Y
 HREA.                              constructed, operated,
                                    or maintained for the
                                    generation of electric
                                    power and uses for such
                                    generation only the
                                    hydroelectric potential
                                    of a non-federally owned
                                    conduit.
FPA 30(a)(3)(C)(ii), as amended    The facility has an                Y
 by HREA.                           installed capacity that
                                    does not exceed 5
                                    megawatts.
FPA 30(a)(3)(C)(iii), as amended   On or before August 9,             Y
 by HREA.                           2013, the facility is
                                    not licensed, or
                                    exempted from the
                                    licensing requirements
                                    of Part I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff has preliminarily determined that the proposal 
satisfies the requirements for a qualifying conduit hydropower facility 
under 16 U.S.C. 823a, and is exempted from the licensing requirements 
of the FPA.
    Comments and Motions to Intervene: The deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    The deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD16-19-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email [email protected]. For TTY, 
call (202) 502-8659.

    Dated: August 25, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-20981 Filed 8-30-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  59992                      Federal Register / Vol. 81, No. 169 / Wednesday, August 31, 2016 / Notices

                                                  DEPARTMENT OF ENERGY                                    amended by section 4 of the                                Qualifying Conduit Hydropower
                                                                                                          Hydropower Regulatory Efficiency Act                     Facility Description: The proposed
                                                  Federal Energy Regulatory                               of 2013 (HREA). The proposed Ione                        project would consist of: (1) A proposed
                                                  Commission                                              Hydroelectric Station Project would                      90-foot long, 12-inch-diameter intake
                                                                                                          have an installed capacity of 447.6                      pipe, (2) a proposed 447.6-kW turbine
                                                  [Docket No., CD16–19–000]                               kilowatts (kW) and would be located on                   parallel to and replacing the existing
                                                  Amador Water Agency; Notice of                          an existing 16-inch-diameter gravity fed                 pressure reducing valve, (3) a proposed
                                                  Preliminary Determination of a                          raw water transmission pipe. The                         260-foot-long 12-inch diameter outlet
                                                  Qualifying Conduit Hydropower                           project would be located near the City                   pipe emptying into the supply reservoir,
                                                  Facility and Soliciting Comments and                    of Ione in Amador County, California.                    and (4) appurtenant facilities. The
                                                  Motions To Intervene                                      Applicant Contact: Gene Mancebo,                       proposed project would have an
                                                                                                          Amador Water Agency, 12800 Ridge                         estimated annual generating capacity of
                                                    On August 15, 2016, the Amador                        Road, Sutter Creek, CA 95685, Phone                      1,400 megawatt-hours.
                                                  Water Agency filed a notice of intent to                No. (209) 257–5245.                                        A qualifying conduit hydropower
                                                  construct a qualifying conduit                            FERC Contact: Robert Bell, Phone No.                   facility is one that is determined or
                                                  hydropower facility, pursuant to section                (202) 502–6062, email: robert.bell@                      deemed to meet all of the criteria shown
                                                  30 of the Federal Power Act (FPA), as                   ferc.gov.                                                in the table below.

                                                                                    TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                          Satisfies
                                                                   Statutory provision                                                               Description                                           (Y/N)

                                                  FPA 30(a)(3)(A), as amended by HREA ..............        The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar man-                Y
                                                                                                              made water conveyance that is operated for the distribution of water for agri-
                                                                                                              cultural, municipal, or industrial consumption and not primarily for the genera-
                                                                                                              tion of electricity.
                                                  FPA 30(a)(3)(C)(i), as amended by HREA ..........         The facility is constructed, operated, or maintained for the generation of electric              Y
                                                                                                              power and uses for such generation only the hydroelectric potential of a non-
                                                                                                              federally owned conduit.
                                                  FPA 30(a)(3)(C)(ii), as amended by HREA .........         The facility has an installed capacity that does not exceed 5 megawatts ..............           Y
                                                  FPA 30(a)(3)(C)(iii), as amended by HREA .........        On or before August 9, 2013, the facility is not licensed, or exempted from the li-              Y
                                                                                                              censing requirements of Part I of the FPA.



                                                     Preliminary Determination: Based                     person filing; and (4) otherwise comply                  accordance with 18 CFR 4.34(b) and
                                                  upon the above criteria, Commission                     with the requirements of sections                        385.2010.
                                                  staff has preliminarily determined that                 385.2001 through 385.2005 of the                           Locations of Notice of Intent: Copies
                                                  the proposal satisfies the requirements                 Commission’s regulations.1 All                           of the notice of intent can be obtained
                                                  for a qualifying conduit hydropower                     comments contesting Commission staff’s                   directly from the applicant or such
                                                  facility under 16 U.S.C. 823a, and is                   preliminary determination that the                       copies can be viewed and reproduced at
                                                  exempted from the licensing                             facility meets the qualifying criteria
                                                  requirements of the FPA.                                                                                         the Commission in its Public Reference
                                                                                                          must set forth their evidentiary basis.
                                                     Comments and Motions to Intervene:                                                                            Room, Room 2A, 888 First Street NE.,
                                                                                                             The Commission strongly encourages                    Washington, DC 20426. The filing may
                                                  The deadline for filing comments
                                                  contesting whether the facility meets the               electronic filing. Please file motions to                also be viewed on the web at http://
                                                  qualifying criteria is 45 days from the                 intervene and comments using the                         www.ferc.gov/docs-filing/elibrary.asp
                                                  issuance date of this notice.                           Commission’s eFiling system at http://                   using the ‘‘eLibrary’’ link. Enter the
                                                     The deadline for filing motions to                   www.ferc.gov/docs-filing/efiling.asp.                    docket number (e.g., CD16–19–000) in
                                                  intervene is 30 days from the issuance                  Commenters can submit brief comments                     the docket number field to access the
                                                  date of this notice.                                    up to 6,000 characters, without prior                    document. For assistance, call toll-free
                                                     Anyone may submit comments or a                      registration, using the eComment system                  1–866–208–3676 or email
                                                  motion to intervene in accordance with                  at http://www.ferc.gov/docs-filing/
                                                                                                                                                                   FERCOnlineSupport@ferc.gov. For TTY,
                                                  the requirements of Rules of Practice                   ecomment.asp. You must include your
                                                                                                                                                                   call (202) 502–8659.
                                                  and Procedure, 18 CFR 385.210 and                       name and contact information at the end
                                                  385.214. Any motions to intervene must                  of your comments. For assistance,                          Dated: August 25, 2016.
                                                  be received on or before the specified                  please contact FERC Online Support at                    Kimberly D. Bose,
                                                  deadline date for the particular                        FERCOnlineSupport@ferc.gov, (866)                        Secretary.
                                                  proceeding.                                             208–3676 (toll free), or (202) 502–8659                  [FR Doc. 2016–20981 Filed 8–30–16; 8:45 am]
                                                     Filing and Service of Responsive                     (TTY). In lieu of electronic filing, please
                                                                                                                                                                   BILLING CODE 6717–01–P
                                                  Documents: All filings must (1) bear in                 send a paper copy to: Secretary, Federal
                                                  all capital letters the ‘‘COMMENTS                      Energy Regulatory Commission, 888
                                                  CONTESTING QUALIFICATION FOR A                          First Street NE., Washington, DC 20426.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  CONDUIT HYDROPOWER FACILITY’’                           A copy of all other filings in reference
                                                  or ‘‘MOTION TO INTERVENE,’’ as                          to this application must be accompanied
                                                  applicable; (2) state in the heading the                by proof of service on all persons listed
                                                  name of the applicant and the project                   in the service list prepared by the
                                                  number of the application to which the                  Commission in this proceeding, in
                                                  filing responds; (3) state the name,
                                                  address, and telephone number of the                      1 18   CFR 385.2001–2005 (2015).



                                             VerDate Sep<11>2014   21:59 Aug 30, 2016   Jkt 238001   PO 00000   Frm 00017   Fmt 4703   Sfmt 9990   E:\FR\FM\31AUN1.SGM    31AUN1



Document Created: 2018-02-02 12:15:09
Document Modified: 2018-02-02 12:15:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 59992 