81_FR_62542 81 FR 62367 - Drawbridge Operation Regulation; Black Warrior River, Eutaw, Alabama

81 FR 62367 - Drawbridge Operation Regulation; Black Warrior River, Eutaw, Alabama

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 81, Issue 175 (September 9, 2016)

Page Range62367-62368
FR Document2016-21778

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Norfolk Southern Railroad vertical lift span bridge across the Black Warrior River, mile 267.8, at Eutaw, Greene County, Alabama. This deviation is necessary to install drive motors necessary for the continued safe operation of the bridge. This deviation allows the bridge to remain closed for two (2) three-hour periods daily, Monday through Thursday for two consecutive weeks. Additionally, this deviation allows the bridge to be closed continuously eight hours nightly on the following week, Monday evening through Friday morning. This deviation is necessary to install new bushings to the primary drive axle.

Federal Register, Volume 81 Issue 175 (Friday, September 9, 2016)
[Federal Register Volume 81, Number 175 (Friday, September 9, 2016)]
[Rules and Regulations]
[Pages 62367-62368]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-21778]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-0858]


Drawbridge Operation Regulation; Black Warrior River, Eutaw, 
Alabama

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulations.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Norfolk Southern Railroad vertical 
lift span bridge across the Black Warrior River, mile 267.8, at Eutaw, 
Greene County, Alabama. This deviation is necessary to install drive 
motors necessary for the continued safe operation of the bridge. This 
deviation allows the bridge to remain closed for two (2) three-hour 
periods daily, Monday through Thursday for two consecutive weeks. 
Additionally, this deviation allows the bridge to be closed 
continuously eight hours nightly on the following week, Monday evening 
through Friday morning. This deviation is necessary to install new 
bushings to the primary drive axle.

DATES: This deviation is effective from September 19, 2016 through 
October 7, 2016.

ADDRESSES: The docket for this deviation, [USCG-2016-0682] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Donna Gagliano, Bridge 
Administration Branch, Coast Guard; telephone 504-671-2128, email 
Donna.Gagliano@uscg.mil.

SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation requested a 
temporary deviation in order to perform maintenance on the Norfolk 
Southern Railroad vertical lift span bridge across the Black Warrior 
River, mile 267.8, at Eutaw, Greene County, Alabama. This deviation 
allows the bridge owner to install drive motors necessary to improve 
reliability and safe operation of the movable bridge and install new 
bushings to the primary drive axle. This temporary deviation allows the 
bridge to remain closed-to-navigation from 8 a.m. until 11 a.m. and 
from 1 p.m. until 4 p.m. daily, Monday through Thursday, September 19, 
2016

[[Page 62368]]

through September 22, 2016 and September 26, 2016 through September 29, 
2016. The following week of October 3, 2016 through October 7, 2016 the 
deviation will allow the bridge to remain closed-to-navigation from 8 
p.m. until 4 a.m. daily Monday evening through Friday morning.
    The Norfolk Southern Railroad vertical lift span drawbridge 
currently operates in accordance with 33 CFR 117.5, which states the 
general requirement that the drawbridge shall open on signal. The 
bridge has a vertical clearance of 18.3 feet above Bridge Reference 
Elevation for Navigation Clearance (BRENC), elevation 99.2 feet, in the 
closed-to-navigation position and 72 feet above BRENC in the open-to-
navigation position. Navigation on the waterway consists primarily of 
tugs with tows and occasional recreational craft. The Coast Guard has 
coordinated this temporary deviation with the Warrior-Tombigbee 
Waterway Association (WTWA). The WTWA representative indicated that the 
vessel operators will be able to schedule transits through the bridge 
such that operations will not significantly be hindered. Thus, it has 
been determined that this temporary deviation will not have a 
significant effect on these vessels.
    Vessels able to pass through the bridge in the closed position may 
do so at anytime and should pass at the slowest safe speed. The bridge 
will be able to open for emergencies and there are no immediate 
alternate routes for vessels to pass.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: September 6, 2016.
David M. Frank,
Bridge Administrator, Eighth Coast Guard District.
[FR Doc. 2016-21778 Filed 9-8-16; 8:45 am]
 BILLING CODE 9110-04-P



                                                            Federal Register / Vol. 81, No. 175 / Friday, September 9, 2016 / Rules and Regulations                                        62367

                                           about this rule or any policy or action                 figure 2–1, paragraph (32)(e), of the                 DEPARTMENT OF HOMELAND
                                           of the Coast Guard.                                     Instruction.                                          SECURITY
                                           C. Collection of Information                               Under figure 2–1, paragraph (32)(e), of
                                                                                                                                                         Coast Guard
                                             This rule calls for no new collection                 the Instruction, an environmental
                                           of information under the Paperwork                      analysis checklist and a categorical
                                                                                                                                                         33 CFR Part 117
                                           Reduction Act of 1995 (44 U.S.C. 3501–                  exclusion determination are not
                                                                                                   required for this rule.                               [Docket No. USCG–2016–0858]
                                           3520).
                                           D. Federalism and Indian Tribal                         G. Protest Activities                                 Drawbridge Operation Regulation;
                                           Government                                                                                                    Black Warrior River, Eutaw, Alabama
                                                                                                     The Coast Guard respects the First
                                              A rule has implications for federalism               Amendment rights of protesters.                       AGENCY: Coast Guard, DHS.
                                           under Executive Order 13132,                            Protesters are asked to contact the                   ACTION:Notice of deviation from
                                           Federalism, if it has a substantial direct              person listed in the FOR FURTHER                      drawbridge regulations.
                                           effect on the States, on the relationship               INFORMATION CONTACT section to
                                           between the national government and                                                                           SUMMARY:   The Coast Guard has issued a
                                                                                                   coordinate protest activities so that your
                                           the States, or on the distribution of                                                                         temporary deviation from the operating
                                                                                                   message can be received without
                                           power and responsibilities among the                                                                          schedule that governs the Norfolk
                                                                                                   jeopardizing the safety or security of                Southern Railroad vertical lift span
                                           various levels of government. We have
                                                                                                   people, places or vessels.                            bridge across the Black Warrior River,
                                           analyzed this rule under that Order and
                                           have determined that it is consistent                   List of Subjects in 33 CFR Part 117                   mile 267.8, at Eutaw, Greene County,
                                           with the fundamental federalism                                                                               Alabama. This deviation is necessary to
                                           principles and preemption requirements                      Bridges.                                          install drive motors necessary for the
                                           described in E.O. 13132.                                  For the reasons discussed in the                    continued safe operation of the bridge.
                                              Also, this rule does not have tribal                                                                       This deviation allows the bridge to
                                                                                                   preamble, the Coast Guard amends 33
                                           implications under Executive Order                                                                            remain closed for two (2) three-hour
                                                                                                   CFR part 117 as follows:
                                           13175, Consultation and Coordination                                                                          periods daily, Monday through
                                           with Indian Tribal Governments,                         PART 117—DRAWBRIDGE                                   Thursday for two consecutive weeks.
                                           because it does not have a substantial                  OPERATION REGULATIONS                                 Additionally, this deviation allows the
                                           direct effect on one or more Indian                                                                           bridge to be closed continuously eight
                                           tribes, on the relationship between the                                                                       hours nightly on the following week,
                                                                                                   ■ 1. The authority citation for part 117
                                           Federal Government and Indian tribes,                                                                         Monday evening through Friday
                                           or on the distribution of power and                     continues to read as follows:                         morning. This deviation is necessary to
                                           responsibilities between the Federal                      Authority: 33 U.S.C. 499; 33 CFR 1.05–1;            install new bushings to the primary
                                           Government and Indian tribes.                           and Department of Homeland Security                   drive axle.
                                                                                                   Delegation No. 0170.1.                                DATES: This deviation is effective from
                                           E. Unfunded Mandates Reform Act
                                                                                                   ■ 2. Amend § 117.723 by adding                        September 19, 2016 through October 7,
                                             The Unfunded Mandates Reform Act                                                                            2016.
                                           of 1995 (2 U.S.C. 1531–1538) requires                   paragraph (k) to read as follows:
                                                                                                                                                         ADDRESSES: The docket for this
                                           Federal agencies to assess the effects of               § 117.723      Hackensack River.                      deviation, [USCG–2016–0682] is
                                           their discretionary regulatory actions. In
                                                                                                   *      *    *    *     *                              available at http://www.regulations.gov.
                                           particular, the Act addresses actions
                                                                                                      (k) The draw of the Route 1 & 9                    Type the docket number in the
                                           that may result in the expenditure by a
                                                                                                                                                         ‘‘SEARCH’’ box and click ‘‘SEARCH’’.
                                           State, local, or tribal government, in the              (Lincoln Highway) Bridge, mile 2.0,
                                                                                                                                                         Click on Open Docket Folder on the line
                                           aggregate, or by the private sector of                  between Kearny and Jersey City, shall
                                                                                                                                                         associated with this deviation.
                                           $100,000,000 (adjusted for inflation) or                open on signal; except that, the draw
                                           more in any one year. Though this rule                                                                        FOR FURTHER INFORMATION CONTACT: If
                                                                                                   need not open for the passage of vessel
                                           will not result in such an expenditure,                                                                       you have questions on this temporary
                                                                                                   traffic between 6 a.m. and 10 a.m. and
                                           we do discuss the effects of this rule                                                                        deviation, call or email Donna Gagliano,
                                                                                                   between 2 p.m. and 6 p.m., Monday
                                           elsewhere in this preamble.                                                                                   Bridge Administration Branch, Coast
                                                                                                   through Friday, except holidays. Tide                 Guard; telephone 504–671–2128, email
                                           F. Environment                                          dependent deep draft vessels may                      Donna.Gagliano@uscg.mil.
                                                                                                   request bridge openings between 6 a.m.
                                             We have analyzed this rule under                                                                            SUPPLEMENTARY INFORMATION: The
                                                                                                   and 10 a.m. and between 2 p.m. and 6
                                           Department of Homeland Security                                                                               Norfolk Southern Corporation requested
                                                                                                   p.m. provided at least a twelve hour
                                           Management Directive 023–01 and                                                                               a temporary deviation in order to
                                           Commandant Instruction M16475.lD,                       advance notice is given by calling the                perform maintenance on the Norfolk
                                           which guides the Coast Guard in                         number posted at the bridge.                          Southern Railroad vertical lift span
                                           complying with the National                               Dated: August 26, 2016.                             bridge across the Black Warrior River,
                                           Environmental Policy Act of 1969                        S.D. Poulin,                                          mile 267.8, at Eutaw, Greene County,
                                           (NEPA)(42 U.S.C. 4321–4370f), and                       Rear Admiral, U.S. Coast Guard, Commander,            Alabama. This deviation allows the
                                           have made a determination that this                     First Coast Guard District.                           bridge owner to install drive motors
                                           action is one of a category of actions                  [FR Doc. 2016–21766 Filed 9–8–16; 8:45 am]
                                                                                                                                                         necessary to improve reliability and safe
                                           which do not individually or                                                                                  operation of the movable bridge and
ehiers on DSK5VPTVN1PROD with RULES




                                                                                                   BILLING CODE 9110–04–P
                                           cumulatively have a significant effect on                                                                     install new bushings to the primary
                                           the human environment. This rule                                                                              drive axle. This temporary deviation
                                           simply promulgates the operating                                                                              allows the bridge to remain closed-to-
                                           regulations or procedures for                                                                                 navigation from 8 a.m. until 11 a.m. and
                                           drawbridges. This action is categorically                                                                     from 1 p.m. until 4 p.m. daily, Monday
                                           excluded from further review, under                                                                           through Thursday, September 19, 2016


                                      VerDate Sep<11>2014   15:26 Sep 08, 2016   Jkt 238001   PO 00000   Frm 00015   Fmt 4700   Sfmt 4700   E:\FR\FM\09SER1.SGM   09SER1


                                           62368            Federal Register / Vol. 81, No. 175 / Friday, September 9, 2016 / Rules and Regulations

                                           through September 22, 2016 and                          DEPARTMENT OF HOMELAND                                   The Delaware River is used by a
                                           September 26, 2016 through September                    SECURITY                                              variety of vessels including U.S.
                                           29, 2016. The following week of October                                                                       government and public vessels, large
                                           3, 2016 through October 7, 2016 the                     Coast Guard                                           commercial vessels, tug and barge traffic
                                           deviation will allow the bridge to                                                                            and recreational vessels. The Coast
                                           remain closed-to-navigation from 8 p.m.                 33 CFR Part 117                                       Guard has carefully coordinated the
                                           until 4 a.m. daily Monday evening                                                                             restrictions with waterway users in
                                                                                                   [Docket No. USCG–2016–0855]                           publishing this temporary deviation.
                                           through Friday morning.
                                                                                                                                                            Vessels able to safely pass through the
                                              The Norfolk Southern Railroad                        Drawbridge Operation Regulation;                      bridge in the closed-to-navigation
                                           vertical lift span drawbridge currently                 Delaware River, Tacony, PA and                        position may do so at any time. The
                                           operates in accordance with 33 CFR                      Palmyra, NJ                                           bridge will not be able to open for
                                           117.5, which states the general                                                                               emergencies and there is no immediate
                                                                                                   AGENCY: Coast Guard, DHS.
                                           requirement that the drawbridge shall                                                                         alternative route for vessels to pass. The
                                           open on signal. The bridge has a vertical               ACTION:Notice of deviation from
                                                                                                                                                         Coast Guard will also inform the users
                                           clearance of 18.3 feet above Bridge                     drawbridge regulation.
                                                                                                                                                         of the waterway through our Local and
                                           Reference Elevation for Navigation                      SUMMARY:   The Coast Guard has issued a               Broadcast Notices to Mariners of the
                                           Clearance (BRENC), elevation 99.2 feet,                 temporary deviation from the operating                change in operating schedule for the
                                           in the closed-to-navigation position and                schedule that governs the SR 73/                      bridge so that vessel operators can
                                           72 feet above BRENC in the open-to-                     Tacony-Palmyra bridge, across the                     arrange their transits to minimize any
                                           navigation position. Navigation on the                  Delaware River, mile 107.2, at Tacony,                impact caused by the temporary
                                           waterway consists primarily of tugs                     PA and Palmyra, NJ. The deviation is                  deviation.
                                           with tows and occasional recreational                   necessary to facilitate bridge                           In accordance with 33 CFR 117.35(e),
                                           craft. The Coast Guard has coordinated                  maintenance and repairs. This deviation               the drawbridge must return to its regular
                                           this temporary deviation with the                       allows the bridge to remain in the                    operating schedule immediately at the
                                           Warrior-Tombigbee Waterway                              closed-to-navigation position.                        end of the effective period of this
                                           Association (WTWA). The WTWA                                                                                  temporary deviation. This deviation
                                                                                                   DATES: The deviation is effective from 6
                                           representative indicated that the vessel                                                                      from the operating regulations is
                                                                                                   a.m. on Monday, September 12, 2016
                                                                                                                                                         authorized under 33 CFR 117.35.
                                           operators will be able to schedule                      through 6 p.m. on Friday, September 30,
                                           transits through the bridge such that                   2016.                                                   Dated: September 2, 2016.
                                           operations will not significantly be                    ADDRESSES: The docket for this                        Hal R. Pitts,
                                           hindered. Thus, it has been determined                  deviation, [USCG–2016–0855] is                        Bridge Program Manager, Fifth Coast Guard
                                           that this temporary deviation will not                  available at http://www.regulations.gov.              District.
                                           have a significant effect on these                      Type the docket number in the                         [FR Doc. 2016–21692 Filed 9–8–16; 8:45 am]
                                           vessels.                                                ‘‘SEARCH’’ box and click ‘‘SEARCH’’.                  BILLING CODE 9110–04–P

                                              Vessels able to pass through the                     Click on Open Docket Folder on the line
                                           bridge in the closed position may do so                 associated with this deviation.
                                                                                                                                                         DEPARTMENT OF HOMELAND
                                           at anytime and should pass at the                       FOR FURTHER INFORMATION CONTACT: If
                                                                                                                                                         SECURITY
                                           slowest safe speed. The bridge will be                  you have questions on this temporary
                                           able to open for emergencies and there                  deviation, call or email Mr. Michael                  Coast Guard
                                           are no immediate alternate routes for                   Thorogood, Bridge Administration
                                           vessels to pass.                                        Branch Fifth District, Coast Guard,                   33 CFR Part 165
                                                                                                   telephone 757–398–6557, email
                                              The Coast Guard will also inform the                 Michael.R.Thorogood@uscg.mil.                         [Docket Number USCG–2016–0513]
                                           users of the waterways through our
                                                                                                   SUPPLEMENTARY INFORMATION:       The                  RIN 1625–AA11
                                           Local and Broadcast Notices to Mariners
                                           of the change in operating schedule for                 Burlington County Bridge Commission,
                                                                                                   who owns and operates the SR 73/                      Regulated Navigation Area;
                                           the bridge.                                                                                                   Portsmouth Naval Shipyard, Kittery,
                                                                                                   Tacony-Palmyra bridge, has requested a
                                              In accordance with 33 CFR 117.35(e),                 temporary deviation from the current                  ME and Portsmouth, NH
                                           the drawbridge must return to its regular               operating regulations set out in 33 CFR               AGENCY:    Coast Guard, DHS.
                                           operating schedule immediately at the                   117.716, to facilitate electrical                     ACTION:   Temporary final rule.
                                           end of the effective period of this                     maintenance and repairs to the bridge.
                                           temporary deviation. This deviation                       Under this temporary deviation, the                 SUMMARY:   The Coast Guard is
                                           from the operating regulations is                       bridge will remain in the closed-to-                  establishing a temporary regulated
                                           authorized under 33 CFR 117.35.                         navigation position from 6 a.m. to 6                  navigation area (RNA) on the Piscataqua
                                             Dated: September 6, 2016.                             p.m., Monday–Friday, September 12,                    River near the Portsmouth Naval
                                                                                                   2016 through September 16, 2016 and                   Shipyard, Kittery, ME between
                                           David M. Frank,
                                                                                                   September 19, 2016 through September                  Henderson Point Light on Seavey Island
                                           Bridge Administrator, Eighth Coast Guard                23, 2016. The bridge will also remain in              and the Memorial Bridge. This RNA
                                           District.                                               the closed-to-navigation position from 7              establishes speed restrictions to
                                           [FR Doc. 2016–21778 Filed 9–8–16; 8:45 am]              a.m. to 6 p.m. on alternative work dates              eliminate vessel wake which could
ehiers on DSK5VPTVN1PROD with RULES




                                           BILLING CODE 9110–04–P                                  from September 26, 2016 through                       endanger the lives of divers and support
                                                                                                   September 30, 2016. The bridge is a                   crews working at the Portsmouth Naval
                                                                                                   double bascule bridge and has a vertical              Shipyard. The speed restrictions apply
                                                                                                   clearance in the closed-to-navigation                 to all vessels transiting the regulated
                                                                                                   position of 50 feet above mean high                   area unless authorized by the First Coast
                                                                                                   water.                                                Guard District Commander or the


                                      VerDate Sep<11>2014   15:26 Sep 08, 2016   Jkt 238001   PO 00000   Frm 00016   Fmt 4700   Sfmt 4700   E:\FR\FM\09SER1.SGM   09SER1



Document Created: 2018-02-09 13:15:00
Document Modified: 2018-02-09 13:15:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulations.
DatesThis deviation is effective from September 19, 2016 through October 7, 2016.
ContactIf you have questions on this temporary deviation, call or email Donna Gagliano, Bridge Administration Branch, Coast Guard; telephone 504-671-2128, email [email protected]
FR Citation81 FR 62367 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR