81_FR_62668 81 FR 62493 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Revised Schedule for Environmental Review of the Abandonment and Capacity Restoration Project

81 FR 62493 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Revised Schedule for Environmental Review of the Abandonment and Capacity Restoration Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 175 (September 9, 2016)

Page Range62493-62493
FR Document2016-21748

Federal Register, Volume 81 Issue 175 (Friday, September 9, 2016)
[Federal Register Volume 81, Number 175 (Friday, September 9, 2016)]
[Notices]
[Page 62493]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-21748]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-88-000]


Tennessee Gas Pipeline Company, L.L.C.; Notice of Revised 
Schedule for Environmental Review of the Abandonment and Capacity 
Restoration Project

    This notice identifies the Federal Energy Regulatory Commission 
(Commission or FERC) staff's revised schedule for the completion of the 
environmental assessment (EA) for Tennessee Gas Pipeline Company, 
L.L.C.'s (Tennessee) Abandonment and Capacity Restoration Project. The 
first notice of schedule, issued on June 30, 2016, identified September 
2, 2016 as the EA issuance date. However, Tennessee provided 
modifications to the proposed facilities that require additional time 
for staff to consider. Therefore, staff has revised the schedule for 
issuance of the EA.

Schedule for Environmental Review

    Issuance of the EA: November 2, 2016.
    90-day Federal Authorization Decision Deadline: January 31, 2017.
    If a schedule change becomes necessary, an additional notice will 
be provided so that the relevant agencies are kept informed of the 
project's progress.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription (http://www.ferc.gov/docs-filing/esubscription.asp).

    Dated: September 2, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-21748 Filed 9-8-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                Federal Register / Vol. 81, No. 175 / Friday, September 9, 2016 / Notices                                                 62493

                                                    Hardship and Competitive                                (B.2a)                                                  Dated: September 2, 2016.
                                                    Disadvantage                                            Battery Control 2—Robot control powered               Kimberly D. Bose,
                                                                                                            from the mains                                        Secretary.
                                                       In absence of a favorable
                                                                                                               The battery charger provides energy in             [FR Doc. 2016–21748 Filed 9–8–16; 8:45 am]
                                                    determination, the Robot design would                   parallel both to the battery and to the non-
                                                    have to be modified in order to add a                   charging functionalities (red trace). By              BILLING CODE 6717–01–P
                                                    switch that would implement the same                    isolating the terminal only the power drawn
                                                    isolation obtained by the isolating tape.               by the battery is accounted (blue trace).
                                                       The cost in addition to the current bill                See the following Web site for Appendix            DEPARTMENT OF ENERGY
                                                    of materials would be around 0.3 USD,                   B.2a graphs: http://www.regulations.gov/
                                                    but the real burden is that this switch                 #!docketDetail;D=EERE-2016-BT-WAV-0034.               Federal Energy Regulatory
                                                    would have to be added only to enable                   (B.2b)                                                Commission
                                                    the measurement of the true energy                      Battery Control 2—Circuit diagram                     [Docket No. CP15–557–000]
                                                    consumption and would not bring any                        See the following Web site for Appendix
                                                    real benefit for the user. Indeed, as                   B.2b graphs: http://www.regulations.gov/              Total Peaking Services, LLC; Notice of
                                                    prescribed by the test procedure, if the                #!docketDetail;D=EERE-2016-BT-WAV-0034.               Schedule for Environmental Review of
                                                    switch is made accessible to users, it                  [FR Doc. 2016–21749 Filed 9–8–16; 8:45 am]            the Vaporization Capacity Increase and
                                                    could result in inadvertent operations.                 BILLING CODE 6450–01–P                                Bog Compressor Project
                                                    The reliability of the Robot might be                                                                            On September 23, 2015, Total Peaking
                                                    affected, including, but not limited to:                                                                      Services, LLC (Total Peaking) filed an
                                                       • Preventing the Robot from being                    DEPARTMENT OF ENERGY
                                                                                                                                                                  application in Docket No. CP15–557–
                                                    controlled remotely as intended;
                                                                                                                                                                  000 requesting a Certificate of Public
                                                       • Random malfunction and bad user                    Federal Energy Regulatory
                                                                                                            Commission                                            Convenience and Necessity pursuant to
                                                    experience; and
                                                       • Abrupt abortion of software                                                                              Section 7(c) of the Natural Gas Act to
                                                    upgrades with the typical consequences                                                                        construct and operate certain liquefied
                                                                                                            [Docket No. CP15–88–000]
                                                    (i.e., software corruption).                                                                                  natural gas facilities. The proposed
                                                       The actual cost cannot be easily                     Tennessee Gas Pipeline Company,                       project is known as the Vaporization
                                                    quantified in advance, but would                        L.L.C.; Notice of Revised Schedule for                Capacity Increase and BOG Compressor
                                                    disparage the Dyson brand.                              Environmental Review of the                           Project (Project), and would increase the
                                                                                                            Abandonment and Capacity                              vaporization send out capacity at Total
                                                    Likely Success of the Petition                                                                                Peaking’s Milford, Connecticut facility
                                                                                                            Restoration Project
                                                      Our proposal is in compliance with                                                                          from 90 million cubic feet per day
                                                    the test method’s intent of measuring                     This notice identifies the Federal                  (MMcf/d) to 105 MMcf/d, along with the
                                                    the energy efficiency parameters of                     Energy Regulatory Commission                          construction and operation of an
                                                    battery chargers, as it ensures that such               (Commission or FERC) staff’s revised                  additional boil-off gas compressor unit.
                                                    energy consumption is still measured. It                schedule for the completion of the                       On October 7, 2015, the Federal
                                                    does not add unnecessary burden to the                  environmental assessment (EA) for                     Energy Regulatory Commission
                                                    work of the test technician when                        Tennessee Gas Pipeline Company,                       (Commission or FERC) issued its Notice
                                                    applying the test procedure. It is also a               L.L.C.’s (Tennessee) Abandonment and                  of Application for the Project. Among
                                                    proposal that would benefit other                       Capacity Restoration Project. The first               other things, that notice alerted agencies
                                                    manufacturers of consumer products                      notice of schedule, issued on June 30,                issuing federal authorizations of the
                                                    employing advanced connectivity                         2016, identified September 2, 2016 as                 requirement to complete all necessary
                                                    features by providing more flexibility at               the EA issuance date. However,                        reviews and to reach a final decision on
                                                    evaluating compliance with the relevant                 Tennessee provided modifications to                   a request for a federal authorization
                                                    energy metrics.                                         the proposed facilities that require                  within 90 days of the date of issuance
                                                                                                            additional time for staff to consider.                of the Commission staff’s Environmental
                                                    Appendix A—Access to the Battery                                                                              Assessment (EA) for the Project. This
                                                                                                            Therefore, staff has revised the schedule
                                                    Terminal                                                                                                      instant notice identifies the FERC staff’s
                                                                                                            for issuance of the EA.
                                                      See the following Web site for Appendix A                                                                   planned schedule for the completion of
                                                    pictures: http://www.regulations.gov/                   Schedule for Environmental Review                     the EA for the Project.
                                                    #!docketDetail;D=EERE-2016-BT-WAV-0034.
                                                                                                              Issuance of the EA: November 2,                     Schedule for Environmental Review
                                                    Appendix B—Power Consumption                            2016.
                                                                                                                                                                  Issuance of EA October 14, 2016
                                                    Graphs                                                    90-day Federal Authorization                        90-day Federal Authorization Decision
                                                    (B.1a)                                                  Decision Deadline: January 31, 2017.                     Deadline January 12, 2017
                                                    Battery Control 1—Robot control powered                   If a schedule change becomes                           If a schedule change becomes
                                                    from the battery                                        necessary, an additional notice will be               necessary, additional notice will be
                                                       The battery charger periodically refills the         provided so that the relevant agencies                provided so that the relevant agencies
                                                    energy used by the non-charging                         are kept informed of the project’s                    are kept informed of the Project’s
                                                    functionalities (red trace). By isolating the           progress.
                                                    terminal only the power drawn by the battery
                                                                                                                                                                  progress.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    is accounted (blue trace).                              Additional Information                                Project Description
                                                       See the following Web site for Appendix
                                                    B.1a graphs: http://www.regulations.gov/                   In order to receive notification of the              The Project would include
                                                    #!docketDetail;D=EERE-2016-BT-WAV-0034.                 issuance of the EA and to keep track of               modifications at Total Peaking’s
                                                    (B.1b)                                                  all formal issuances and submittals in                Milford, Connecticut facility. Total
                                                    Battery Control 1—Circuit diagram                       specific dockets, the Commission offers               Peaking would remove its existing
                                                       See the following Web site for Appendix              a free service called eSubscription                   vaporizers and install a single vaporizer
                                                    B.1b graphs: http://www.regulations.gov/                (http://www.ferc.gov/docs-filing/                     operating at 105 MMcf/d as well as a
                                                    #!docketDetail;D=EERE-2016-BT-WAV-0034.                 esubscription.asp).                                   heater system for the new vaporizer.


                                               VerDate Sep<11>2014   17:11 Sep 08, 2016   Jkt 238001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\09SEN1.SGM   09SEN1



Document Created: 2018-02-09 13:15:09
Document Modified: 2018-02-09 13:15:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 62493 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR