81_FR_63382 81 FR 63204 - Notice of Cancellation To Prepare a Draft Environmental Impact Statement for the San Carlos Irrigation Project, Arizona

81 FR 63204 - Notice of Cancellation To Prepare a Draft Environmental Impact Statement for the San Carlos Irrigation Project, Arizona

DEPARTMENT OF THE INTERIOR
Bureau of Reclamation

Federal Register Volume 81, Issue 178 (September 14, 2016)

Page Range63204-63204
FR Document2016-22053

The Bureau of Reclamation (Reclamation) is terminating preparation of an Environmental Impact Statement (EIS) for the San Carlos Irrigation Project. The proposed project scope has been modified, and Reclamation has determined that an Environmental Assessment (EA) rather than an EIS is the appropriate level of environmental documentation for the proposed action.

Federal Register, Volume 81 Issue 178 (Wednesday, September 14, 2016)
[Federal Register Volume 81, Number 178 (Wednesday, September 14, 2016)]
[Notices]
[Page 63204]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-22053]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Reclamation

[RR03250000; XXXR4079V1; RA.R3441003.0960000]


Notice of Cancellation To Prepare a Draft Environmental Impact 
Statement for the San Carlos Irrigation Project, Arizona

AGENCY: Bureau of Reclamation, Interior.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Reclamation (Reclamation) is terminating 
preparation of an Environmental Impact Statement (EIS) for the San 
Carlos Irrigation Project. The proposed project scope has been 
modified, and Reclamation has determined that an Environmental 
Assessment (EA) rather than an EIS is the appropriate level of 
environmental documentation for the proposed action.

FOR FURTHER INFORMATION CONTACT: Mr. Sean Heath at (623) 773-6250, or 
email at [email protected].

SUPPLEMENTARY INFORMATION: The proposed project includes rehabilitation 
and modernization of San Carlos Irrigation Project Joint Works and 
District Works irrigation canals. Primary components of the 
rehabilitation are the lining of all or most of the main canals with 
concrete to reduce seepage and evaporation losses from the system, the 
modification of the canal prism (cross-sections and profiles) to 
increase system efficiency, the inclusion of a water storage facility, 
and modernized measurement and control amenities to improve delivery 
service. To protect and preserve the new lined conveyance system, 
separate storm water drainage facilities would be dedicated to cross 
drainage storm water management.
    A Notice of Intent to prepare the EIS for the San Carlos Irrigation 
Project was published in the Federal Register on August 31, 2010 (75 FR 
53332). The proposed action was originally scoped as an EIS. 
Publication of the Federal Register notice was followed with a scoping 
letter to potentially interested individuals, organizations, tribes, 
and agencies, and posting of the notice on Reclamation's Phoenix Area 
Office Web site. In addition, a news release was submitted to 12 news 
media outlets. Two public scoping meetings were held to solicit public 
comment. Reclamation received nine comment letters regarding the 
proposed action, none of which identified potentially significant 
effects to the human environment.
    The Notice of Intent described a proposal to rehabilitate and line 
up to 40 miles of major canals, such as the Florence-Casa Grande, Casa 
Grande, and North Side canals, along with construction of new check 
structures and cross-drainage features. During preparation of the EIS, 
a new alternative was subsequently developed that would reduce 
potential environmental impacts of the project. The new alternative 
would accommodate the delivery of irrigation flows during construction, 
thereby reducing potential adverse impacts to sensitive riparian 
habitat and bird species on the Gila River. Furthermore, the geographic 
scope of the rehabilitation was reduced from 40 miles to 25 miles. 
Reclamation has not identified other environmental effects of the 
proposed action that are potentially significant and would warrant us 
to consider preparation of an EIS over an EA. Based on the reduction in 
scope, and the limited response to solicitation of comments, 
Reclamation has determined that an EA is the appropriate level of 
environmental analysis for the proposed action.

    Dated: September 8, 2016.
Marc Maynard,
Acting Regional Director, Lower Colorado Region.
[FR Doc. 2016-22053 Filed 9-13-16; 8:45 am]
 BILLING CODE 4332-90-P



                                                    63204                   Federal Register / Vol. 81, No. 178 / Wednesday, September 14, 2016 / Notices

                                                    statutory authority responsibility to                   summarize each comment in our request                 facilities would be dedicated to cross
                                                    protect the park areas it administers and               to OMB to approve this IC. Before                     drainage storm water management.
                                                    to manage the public use thereof (54                    including your address, phone number,                    A Notice of Intent to prepare the EIS
                                                    U.S.C. 100101, 100751, 3210102). NPS                    email address, or other personal                      for the San Carlos Irrigation Project was
                                                    regulations codified in 36 CFR parts 1                  identifying information in your                       published in the Federal Register on
                                                    through 7, 12 and 13 are designated to                  comment, you should be aware that
                                                                                                                                                                  August 31, 2010 (75 FR 53332). The
                                                    implement statutory mandates that                       your entire comment, including your
                                                                                                                                                                  proposed action was originally scoped
                                                    provide for resource protection and                     personal identifying information, may
                                                    pubic enjoyment. NPS Forms 10–404,                      be made publicly available at any time.               as an EIS. Publication of the Federal
                                                    ‘‘Backcountry/Wilderness Use Permit                     While you can ask us in your comment                  Register notice was followed with a
                                                    Application’’ and 10–404A,                              to withhold your personal identifying                 scoping letter to potentially interested
                                                    ‘‘Backcountry/Wilderness Use Permit                     information from public review, we                    individuals, organizations, tribes, and
                                                    Hangtag’’ are the primary forms used to                 cannot guarantee that we will be able to              agencies, and posting of the notice on
                                                    provide access into NPS backcountry                     do so.                                                Reclamation’s Phoenix Area Office Web
                                                    areas including those areas that require                                                                      site. In addition, a news release was
                                                                                                              Dated: September 8, 2016.
                                                    a reservation to enter where use limits                                                                       submitted to 12 news media outlets.
                                                                                                            Madonna L. Baucum,
                                                    are imposed in accordance with other                                                                          Two public scoping meetings were held
                                                                                                            Information Collection Clearance Officer,
                                                    NPS regulations. Such permitting                                                                              to solicit public comment. Reclamation
                                                                                                            National Park Service.
                                                    enhances the ability to the NPS to                                                                            received nine comment letters regarding
                                                                                                            [FR Doc. 2016–22010 Filed 9–13–16; 8:45 am]
                                                    educate users on potential hazards,                                                                           the proposed action, none of which
                                                                                                            BILLING CODE 4310–EH–P
                                                    search and rescue efforts, and resource                                                                       identified potentially significant effects
                                                    protection.                                                                                                   to the human environment.
                                                    II. Data                                                DEPARTMENT OF THE INTERIOR                               The Notice of Intent described a
                                                      OMB Control Number: 1024–0022.                                                                              proposal to rehabilitate and line up to
                                                                                                            Bureau of Reclamation                                 40 miles of major canals, such as the
                                                      Expiration Date: May 31, 2016.
                                                      Title: Backcountry/Wilderness Use                                                                           Florence-Casa Grande, Casa Grande, and
                                                    Permit (36 CFR 1.5, 1.6, and 2.10).                     [RR03250000; XXXR4079V1;                              North Side canals, along with
                                                      Service Form Numbers: NPS Forms                       RA.R3441003.0960000]                                  construction of new check structures
                                                    10–404, Backcountry/Wilderness Use                                                                            and cross-drainage features. During
                                                                                                            Notice of Cancellation To Prepare a
                                                    Permit’’ and 10–404A, ‘‘Backcountry/                                                                          preparation of the EIS, a new alternative
                                                                                                            Draft Environmental Impact Statement
                                                    Wilderness Use Permit Hangtag’’.                        for the San Carlos Irrigation Project,                was subsequently developed that would
                                                      Type of Request: Revision of a                                                                              reduce potential environmental impacts
                                                                                                            Arizona
                                                    currently approved collection of                                                                              of the project. The new alternative
                                                    information.                                            AGENCY:   Bureau of Reclamation,                      would accommodate the delivery of
                                                      Description of Respondents:                           Interior.                                             irrigation flows during construction,
                                                    Individuals wishing to use backcountry                  ACTION: Notice.                                       thereby reducing potential adverse
                                                    and wilderness areas within national                                                                          impacts to sensitive riparian habitat and
                                                    parks.                                                  SUMMARY:    The Bureau of Reclamation                 bird species on the Gila River.
                                                      Estimated Average Number of                           (Reclamation) is terminating preparation              Furthermore, the geographic scope of
                                                    Responses: 285,000.                                     of an Environmental Impact Statement                  the rehabilitation was reduced from 40
                                                      Frequency of Response: 1 per                          (EIS) for the San Carlos Irrigation
                                                    respondent.                                                                                                   miles to 25 miles. Reclamation has not
                                                                                                            Project. The proposed project scope has               identified other environmental effects of
                                                      Estimated Average Time Burden per                     been modified, and Reclamation has
                                                    Respondent: 5 minutes.                                                                                        the proposed action that are potentially
                                                                                                            determined that an Environmental
                                                      Estimated Total Annual Reporting                                                                            significant and would warrant us to
                                                                                                            Assessment (EA) rather than an EIS is
                                                    Burden: 23,750 hours.                                                                                         consider preparation of an EIS over an
                                                                                                            the appropriate level of environmental
                                                      Respondent’s Obligation: Required to                  documentation for the proposed action.                EA. Based on the reduction in scope,
                                                    obtain or retain a benefit.                                                                                   and the limited response to solicitation
                                                                                                            FOR FURTHER INFORMATION CONTACT: Mr.
                                                                                                                                                                  of comments, Reclamation has
                                                    III. Comments                                           Sean Heath at (623) 773–6250, or email
                                                                                                                                                                  determined that an EA is the
                                                      We invite comments concerning this                    at sheath@usbr.gov.
                                                                                                                                                                  appropriate level of environmental
                                                    information collection on:                              SUPPLEMENTARY INFORMATION: The                        analysis for the proposed action.
                                                      • Whether or not the collection of                    proposed project includes rehabilitation
                                                                                                            and modernization of San Carlos                         Dated: September 8, 2016.
                                                    information is necessary, including
                                                    whether or not the information will                     Irrigation Project Joint Works and                    Marc Maynard,
                                                    have practical utility;                                 District Works irrigation canals. Primary             Acting Regional Director, Lower Colorado
                                                      • The accuracy of our estimate of the                 components of the rehabilitation are the              Region.
                                                    burden for this collection of                           lining of all or most of the main canals              [FR Doc. 2016–22053 Filed 9–13–16; 8:45 am]
                                                    information;                                            with concrete to reduce seepage and                   BILLING CODE 4332–90–P
                                                      • Ways to enhance the quality, utility,               evaporation losses from the system, the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    and clarity of the information to be                    modification of the canal prism (cross-
                                                    collected; and                                          sections and profiles) to increase system
                                                      • Ways to minimize the burden of the                  efficiency, the inclusion of a water
                                                    collection of information on                            storage facility, and modernized
                                                    respondents.                                            measurement and control amenities to
                                                      Comments that you submit in                           improve delivery service. To protect and
                                                    response to this notice are a matter of                 preserve the new lined conveyance
                                                    public record. We will include or                       system, separate storm water drainage


                                               VerDate Sep<11>2014   20:55 Sep 13, 2016   Jkt 238001   PO 00000   Frm 00039   Fmt 4703   Sfmt 9990   E:\FR\FM\14SEN1.SGM   14SEN1



Document Created: 2016-09-14 02:27:28
Document Modified: 2016-09-14 02:27:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
ContactMr. Sean Heath at (623) 773-6250, or email at [email protected]
FR Citation81 FR 63204 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR