81_FR_63682 81 FR 63503 - In the Matter of Duke Energy Florida, Inc., and Seminole Electric Cooperative, Inc., Crystal River Unit 3 Nuclear Generating Plant

81 FR 63503 - In the Matter of Duke Energy Florida, Inc., and Seminole Electric Cooperative, Inc., Crystal River Unit 3 Nuclear Generating Plant

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 179 (September 15, 2016)

Page Range63503-63504
FR Document2016-22232

The U.S. Nuclear Regulatory Commission (NRC) is issuing an order approving the direct transfer of the 1.6994 percent of Crystal River Unit 3 Nuclear Generating Plant (CR-3) currently owned by Seminole Electric Cooperative, Inc. (SEC), to Duke Energy Florida, Inc. (DEF). The NRC is also amending the facility-operating license for administrative purposes to reflect the license transfer of the 1.6994 percent ownership from SEC to DEF. The NRC confirmed that the transfer of the license is otherwise consistent with the applicable provisions of law, regulations, and orders issued by the Commission. The order approving the transfer of the 1.6994 percent of CR-3 currently owned by SEC, to DEF became effective on August 10, 2016.

Federal Register, Volume 81 Issue 179 (Thursday, September 15, 2016)
[Federal Register Volume 81, Number 179 (Thursday, September 15, 2016)]
[Notices]
[Pages 63503-63504]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-22232]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-302; NRC-2011-0024]


In the Matter of Duke Energy Florida, Inc., and Seminole Electric 
Cooperative, Inc., Crystal River Unit 3 Nuclear Generating Plant

AGENCY: Nuclear Regulatory Commission.

ACTION: Direct transfer of license; order.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an 
order approving the direct transfer of the 1.6994 percent of Crystal 
River Unit 3 Nuclear Generating Plant (CR-3) currently owned by 
Seminole Electric Cooperative, Inc. (SEC), to Duke Energy Florida, Inc. 
(DEF). The NRC is also amending the facility-operating license for 
administrative purposes to reflect the license transfer of the 1.6994 
percent ownership from SEC to DEF. The NRC confirmed that the transfer 
of the license is otherwise consistent with the applicable provisions 
of law, regulations, and orders issued by the Commission. The order 
approving the transfer of the 1.6994 percent of CR-3 currently owned by 
SEC, to DEF became effective on August 10, 2016.

DATES: The Order was issued on August 10, 2016, and is effective for 
one year.

ADDRESSES: Please refer to Docket ID NRC-2011-0024 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2011-0024. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; or via email: [email protected]. For technical questions, 
contact the individual listed in the FOR FURTHER INFORMATION CONTACT 
section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at: http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at: 
1-800-397-4209, 301-415-4737, or via email to: [email protected]. 
The license transfer Order, the NRC safety evaluation supporting the 
staff's findings, and the conforming license amendment are available in 
ADAMS under Accession Nos. ML16123A073, ML16123A074, and ML16123A057, 
respectively.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: John B. Hickman, Office of Nuclear 
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-415-3017, email: 
[email protected].

SUPPLEMENTARY INFORMATION: The text of the Order is attached.

    Dated at Rockville, Maryland, this 1st day of September 2016.

    For the U.S. Nuclear Regulatory Commission.
Andrea L. Kock,
 Deputy Director, Division of Decommissioning, Uranium Recovery and 
Waste Programs, Office of Nuclear Material Safety and Safeguards.

Attachment--Order Approving the Transfer of License and Conforming 
Amendment

United States of America

Nuclear Regulatory Commission

    In the Matter of Duke Energy Florida, Inc.; Crystal River Unit 3 
Nuclear Generating Plant

Docket No. 50-302
License No. DPR-72

Order Approving Transfer of License and Conforming Amendment

I.

    Duke Energy Florida, Inc. (DEF or the applicant) and Seminole 
Electric Cooperative, Inc., are holders of Facility Operating 
License No. DPR-72, which authorizes the possession of the Crystal 
River Unit 3 Nuclear Generating Plant (CR-3). Facility Operating 
License No. DPR-72 also authorizes DEF (currently owner of 98.3006 
percent of CR-3) to use and operate CR-3. CR-3 is located in Red 
Level, Florida, in Citrus County, about 5 miles south of Levy

[[Page 63504]]

County. The site is 7.5 miles northwest of Crystal River, Florida, 
and 90 miles north of St. Petersburg, Florida. CR-3 is situated on 
the Gulf of Mexico, within the Crystal River Energy Complex.
    CR-3 has been shut down since September 26, 2009, and the final 
removal of fuel from the reactor vessel was completed on May 28, 
2011. By letter dated February 20, 2013, the licensee submitted a 
certification to the U.S. Nuclear Regulatory Commission (NRC) of 
permanent cessation of power operations and the removal of fuel from 
the reactor vessel, pursuant to Sections 50.82(a)(1)(i) and 
50.82(a)(1)(ii) of Title 10 of the Code of Federal Regulations (10 
CFR). Upon docketing of this certification, the 10 CFR part 50 
license for CR-3 no longer authorizes operation of the reactor or 
emplacement or retention of fuel into the reactor vessel, as 
specified in 10 CFR 50.82(a)(2).

II.

    By application dated July 28, 2015, as supplemented by letter 
dated September 22, 2015 (collectively, the application), DEF 
requested that the NRC approve the direct transfer of control of 
Facility Operating License No. DPR-72 for CR-3, to the extent held 
by Seminole Electric Cooperative, Inc., to DEF. Seminole Electric 
Cooperative, Inc. currently owns 1.6994 percent of CR-3. As a result 
of the transaction, DEF will become the sole owner of CR-3.
    The applicant also requested approval of a conforming 
administrative license amendment that would remove the references to 
Seminole Electric Cooperative, Inc., in the license. DEF did not 
propose any physical changes to the facilities or operational 
changes in the application. After completion of the proposed 
transfer, DEF will be the sole owner of CR-3, and DEF will remain 
the operator of the facility.
    DEF requested approval of the direct transfer of the facility 
operating license and the conforming license amendment pursuant to 
10 CFR 50.80, ``Transfer of licenses,'' and 10 CFR 50.90, 
``Application for amendment of license, construction permit, or 
early site permit.'' A notice entitled, ``Crystal River Nuclear 
Generating Plant, Unit 3; Consideration of Approval of Transfer of 
License and Conforming Amendment,'' was published in the Federal 
Register on January 4, 2016 (81 FR 98). The NRC did not receive any 
public comments regarding the proposed license transfer.
    Pursuant to 10 CFR 50.80, no license, or any right thereunder, 
shall be transferred, directly or indirectly, through transfer of 
control of the license, unless the Commission provides its consent 
in writing. Upon review of the information in the licensee's 
application and other information before the Commission, and relying 
upon the representations and agreements contained in the 
application, the NRC staff has determined that DEF is qualified to 
hold the ownership interests in the facility previously held by 
Seminole Electric Cooperative, Inc. The NRC staff has also 
determined that the direct transfer of ownership interests in the 
facility to DEF, as described in the application, is otherwise 
consistent with applicable provisions of laws, regulations, and 
orders issued by the Commission, subject to the conditions set forth 
below. The NRC staff has further found that the application for the 
proposed license amendment complies with the standards and 
requirements of the Atomic Energy Act of 1954, as amended (the Act), 
and the Commission's rules and regulations set forth in 10 CFR 
Chapter I; the facility will operate in conformity with the 
applications, the provisions of the Act, and the rules and 
regulations of the Commission; there is reasonable assurance that 
the activities authorized by the proposed license amendment can be 
conducted without endangering the health and safety of the public 
and that such activities will be conducted in compliance with the 
Commission's regulations; the issuance of the proposed license 
amendment will not be inimical to the common defense and security or 
to the health and safety of the public; and the issuance of the 
proposed amendment will be in accordance with 10 CFR part 51 of the 
Commission's regulations and all applicable requirements have been 
satisfied.
    The findings set forth above are supported by the NRC safety 
evaluation dated August 10, 2016.

III.

    Accordingly, pursuant to Sections 161b, 161i, 161o and 184 of 
the Act, 42 U.S.C. Sections 2201(b), 2201(i), 2201(o) and 2234; and 
10 CFR 50.80, IT IS HEREBY ORDERED that the direct transfer of the 
license, as described herein, to DEF is approved, subject to the 
following condition:
    1. DEF shall provide satisfactory documentary evidence to the 
Director of the Office of Nuclear Material Safety and Safeguards 
that it has obtained the insurance required of a licensee under 10 
CFR part 140, ``Financial Protection Requirements and Indemnity 
Agreements,'' in the appropriate amount pursuant to the exemption to 
10 CFR 140.11(a)(4) granted to DEF by NRC letter dated April 27, 
2015 (Agencywide Documents Access and Management System (ADAMS) 
Accession No. ML14183B338).
    It is further ordered that, consistent with 10 CFR 2.1315(b), 
the license amendment that makes changes, as indicated in Enclosure 
2 to the cover letter forwarding this Order, to conform the license 
to reflect the subject direct license transfer is approved. The 
license amendment shall be issued and made effective at the time the 
proposed direct transfer is completed.
    It is further ordered that after receipt of all required 
regulatory approvals of the proposed direct transfer action, DEF 
shall inform the Director of the Office of Nuclear Material Safety 
and Safeguards in writing of such receipt, and the date of closing 
of the transfer no later than one business day prior to the date of 
the closing of the direct transfer. Should the direct transfer not 
be completed within 1 year of this Order's date of issue, this Order 
shall become null and void, provided, however, that upon written 
application and good cause shown, such date may be extended by 
Order.
    This Order is effective upon issuance.
    For further details with respect to this Order, see the initial 
application dated July 28, 2015 (ADAMS Accession No. ML15216A123), 
as supplemented by letter dated September 22, 2015 (ADAMS Accession 
No. ML15265A590), and the safety evaluation dated August 10, 2016 
(ADAMS Accession No. ML16173A019), which are available for public 
inspection at the Commission's Public Document Room (PDR), located 
at One White Flint North, 11555 Rockville Pike, Room O-1 F21 (First 
Floor), Rockville, Maryland, and accessible electronically though 
the ADAMS Public Electronic Reading Room on the Internet at the NRC 
Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do 
not have access to ADAMS or who encounter problems in accessing the 
documents located in ADAMS should contact the NRC PDR reference 
staff by telephone at 1-800-397-4209, 301-415-4737, or by email at 
[email protected].

    Dated at Rockville, Maryland, this 10th day of August 2016.

    For the Nuclear Regulatory Commission.

Scott W. Moore,
Acting Director, Office of Nuclear Material Safety and Safeguards.


[FR Doc. 2016-22232 Filed 9-14-16; 8:45 am]
 BILLING CODE 7590-01-P



                                                                         Federal Register / Vol. 81, No. 179 / Thursday, September 15, 2016 / Notices                                              63503

                                                   Participants who believe that they                   Register and served on the parties to the                • NRC’s Agencywide Documents
                                                have a good cause for not submitting                    hearing.                                              Access and Management System
                                                documents electronically must file an                     For further details with respect to this            (ADAMS): You may obtain publicly-
                                                exemption request, in accordance with                   application, see the application dated                available documents online in the
                                                10 CFR 2.302(g), with their initial paper               August 18, 2016.                                      ADAMS Public Documents collection
                                                filing stating why there is good cause for                 Dated at Rockville, Maryland, this 9th day         at: http://www.nrc.gov/reading-rm/
                                                not filing electronically and requesting                of September 2016.                                    adams.html. To begin the search, select
                                                authorization to continue to submit                        For the Nuclear Regulatory Commission.             ‘‘ADAMS Public Documents’’ and then
                                                documents in paper format. Such filings                 Diane Render,                                         select ‘‘Begin Web-based ADAMS
                                                must be submitted by: (1) First class                                                                         Search.’’ For problems with ADAMS,
                                                                                                        Project Manager, Plant Licensing Branch I–
                                                mail addressed to the Office of the                     1, Division of Operator Reactor Licensing,            please contact the NRC’s Public
                                                Secretary of the Commission, U.S.                       Office of Nuclear Reactor Regulation.                 Document Room (PDR) reference staff
                                                Nuclear Regulatory Commission,                                                                                at: 1–800–397–4209, 301–415–4737, or
                                                                                                        [FR Doc. 2016–22229 Filed 9–14–16; 8:45 am]
                                                Washington, DC 20555–0001, Attention:                                                                         via email to: pdr.resource@nrc.gov. The
                                                                                                        BILLING CODE 7590–01–P
                                                Rulemaking and Adjudications Staff; or                                                                        license transfer Order, the NRC safety
                                                (2) courier, express mail, or expedited                                                                       evaluation supporting the staff’s
                                                delivery service to the Office of the                   NUCLEAR REGULATORY                                    findings, and the conforming license
                                                Secretary, Sixteenth Floor, One White                   COMMISSION                                            amendment are available in ADAMS
                                                Flint North, 11555 Rockville Pike,                                                                            under Accession Nos. ML16123A073,
                                                Rockville, Maryland 20852, Attention:                   [Docket No. 50–302; NRC–2011–0024]                    ML16123A074, and ML16123A057,
                                                Rulemaking and Adjudications Staff.                                                                           respectively.
                                                                                                        In the Matter of Duke Energy Florida,
                                                Participants filing a document in this                                                                           • NRC’s PDR: You may examine and
                                                manner are responsible for serving the                  Inc., and Seminole Electric
                                                                                                                                                              purchase copies of public documents at
                                                document on all other participants.                     Cooperative, Inc., Crystal River Unit 3
                                                                                                                                                              the NRC’s PDR, Room O1–F21, One
                                                Filing is considered complete by first-                 Nuclear Generating Plant
                                                                                                                                                              White Flint North, 11555 Rockville
                                                class mail as of the time of deposit in                 AGENCY: Nuclear Regulatory                            Pike, Rockville, Maryland 20852.
                                                the mail, or by courier, express mail, or               Commission.                                           FOR FURTHER INFORMATION CONTACT: John
                                                expedited delivery service upon
                                                                                                        ACTION: Direct transfer of license; order.            B. Hickman, Office of Nuclear Material
                                                depositing the document with the
                                                                                                                                                              Safety and Safeguards, U.S. Nuclear
                                                provider of the service. A presiding                    SUMMARY:   The U.S. Nuclear Regulatory                Regulatory Commission, Washington,
                                                officer, having granted an exemption                    Commission (NRC) is issuing an order                  DC 20555–0001; telephone: 301–415–
                                                request from using E-Filing, may require                approving the direct transfer of the                  3017, email: John.Hickman@nrc.gov.
                                                a participant or party to use E-Filing if               1.6994 percent of Crystal River Unit 3
                                                the presiding officer subsequently                                                                            SUPPLEMENTARY INFORMATION: The text of
                                                                                                        Nuclear Generating Plant (CR–3)
                                                determines that the reason for granting                                                                       the Order is attached.
                                                                                                        currently owned by Seminole Electric
                                                the exemption from use of E-Filing no                   Cooperative, Inc. (SEC), to Duke Energy                 Dated at Rockville, Maryland, this 1st day
                                                longer exists.                                          Florida, Inc. (DEF). The NRC is also                  of September 2016.
                                                   Documents submitted in adjudicatory                  amending the facility-operating license                 For the U.S. Nuclear Regulatory
                                                proceedings will appear in the NRC’s                    for administrative purposes to reflect                Commission.
                                                electronic hearing docket which is                      the license transfer of the 1.6994 percent            Andrea L. Kock,
                                                available to the public at http://                      ownership from SEC to DEF. The NRC                    Deputy Director, Division of
                                                ehd1.nrc.gov/ehd/, unless excluded                      confirmed that the transfer of the license            Decommissioning, Uranium Recovery and
                                                pursuant to an order of the Commission,                 is otherwise consistent with the                      Waste Programs, Office of Nuclear Material
                                                or the presiding officer. Participants are              applicable provisions of law,                         Safety and Safeguards.
                                                requested not to include personal                       regulations, and orders issued by the                 Attachment—Order Approving the
                                                privacy information, such as social                     Commission. The order approving the                   Transfer of License and Conforming
                                                security numbers, home addresses, or                    transfer of the 1.6994 percent of CR–3                Amendment
                                                home phone numbers in their filings,
                                                                                                        currently owned by SEC, to DEF became
                                                unless an NRC regulation or other law                                                                         United States of America
                                                                                                        effective on August 10, 2016.
                                                requires submission of such
                                                information. However, in some                           DATES: The Order was issued on August                 Nuclear Regulatory Commission
                                                instances, a petition will require                      10, 2016, and is effective for one year.                In the Matter of Duke Energy Florida, Inc.;
                                                including information on local                          ADDRESSES: Please refer to Docket ID                  Crystal River Unit 3 Nuclear Generating Plant
                                                residence in order to demonstrate a                     NRC–2011–0024 when contacting the                     Docket No. 50–302
                                                proximity assertion of interest in the                  NRC about the availability of                         License No. DPR–72
                                                proceeding. With respect to copyrighted                 information regarding this document.
                                                                                                                                                              Order Approving Transfer of License and
                                                works, except for limited excerpts that                 You may obtain publicly available                     Conforming Amendment
                                                serve the purpose of the adjudicatory                   information related to this document
                                                filings and would constitute a Fair Use                 using any of the following methods:                   I.
                                                application, participants are requested                    • Federal Rulemaking Web site: Go to                 Duke Energy Florida, Inc. (DEF or the
                                                not to include copyrighted materials in                 http://www.regulations.gov and search                 applicant) and Seminole Electric
                                                                                                        for Docket ID NRC–2011–0024. Address                  Cooperative, Inc., are holders of Facility
sradovich on DSK3GMQ082PROD with NOTICES




                                                their submission.
                                                   The Commission will issue a notice or                questions about NRC dockets to Carol                  Operating License No. DPR–72, which
                                                                                                        Gallagher; telephone: 301–415–3463; or                authorizes the possession of the Crystal River
                                                order granting or denying a hearing
                                                                                                                                                              Unit 3 Nuclear Generating Plant (CR–3).
                                                request or intervention petition,                       via email: Carol.Gallagher@nrc.gov. For               Facility Operating License No. DPR–72 also
                                                designating the issues for any hearing                  technical questions, contact the                      authorizes DEF (currently owner of 98.3006
                                                that will be held and designating the                   individual listed in the FOR FURTHER                  percent of CR–3) to use and operate CR–3.
                                                Presiding Officer. A notice granting a                  INFORMATION CONTACT section of this                   CR–3 is located in Red Level, Florida, in
                                                hearing will be published in the Federal                document.                                             Citrus County, about 5 miles south of Levy



                                           VerDate Sep<11>2014   17:34 Sep 14, 2016   Jkt 238001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\15SEN1.SGM   15SEN1


                                                63504                    Federal Register / Vol. 81, No. 179 / Thursday, September 15, 2016 / Notices

                                                County. The site is 7.5 miles northwest of              issued by the Commission, subject to the              ML15216A123), as supplemented by letter
                                                Crystal River, Florida, and 90 miles north of           conditions set forth below. The NRC staff has         dated September 22, 2015 (ADAMS
                                                St. Petersburg, Florida. CR–3 is situated on            further found that the application for the            Accession No. ML15265A590), and the safety
                                                the Gulf of Mexico, within the Crystal River            proposed license amendment complies with              evaluation dated August 10, 2016 (ADAMS
                                                Energy Complex.                                         the standards and requirements of the                 Accession No. ML16173A019), which are
                                                   CR–3 has been shut down since September              Atomic Energy Act of 1954, as amended (the            available for public inspection at the
                                                26, 2009, and the final removal of fuel from            Act), and the Commission’s rules and                  Commission’s Public Document Room (PDR),
                                                the reactor vessel was completed on May 28,             regulations set forth in 10 CFR Chapter I; the        located at One White Flint North, 11555
                                                2011. By letter dated February 20, 2013, the            facility will operate in conformity with the          Rockville Pike, Room O–1 F21 (First Floor),
                                                licensee submitted a certification to the U.S.          applications, the provisions of the Act, and          Rockville, Maryland, and accessible
                                                Nuclear Regulatory Commission (NRC) of                  the rules and regulations of the Commission;          electronically though the ADAMS Public
                                                permanent cessation of power operations and             there is reasonable assurance that the                Electronic Reading Room on the Internet at
                                                the removal of fuel from the reactor vessel,            activities authorized by the proposed license         the NRC Web site, http://www.nrc.gov/
                                                pursuant to Sections 50.82(a)(1)(i) and                 amendment can be conducted without                    reading-rm/adams.html. Persons who do not
                                                50.82(a)(1)(ii) of Title 10 of the Code of              endangering the health and safety of the              have access to ADAMS or who encounter
                                                Federal Regulations (10 CFR). Upon                      public and that such activities will be               problems in accessing the documents located
                                                docketing of this certification, the 10 CFR             conducted in compliance with the                      in ADAMS should contact the NRC PDR
                                                part 50 license for CR–3 no longer authorizes           Commission’s regulations; the issuance of the         reference staff by telephone at 1–800–397–
                                                operation of the reactor or emplacement or              proposed license amendment will not be                4209, 301–415–4737, or by email at
                                                retention of fuel into the reactor vessel, as           inimical to the common defense and security           pdr.resource@nrc.gov.
                                                specified in 10 CFR 50.82(a)(2).                        or to the health and safety of the public; and          Dated at Rockville, Maryland, this 10th day
                                                                                                        the issuance of the proposed amendment will           of August 2016.
                                                II.                                                     be in accordance with 10 CFR part 51 of the
                                                   By application dated July 28, 2015, as               Commission’s regulations and all applicable             For the Nuclear Regulatory Commission.
                                                supplemented by letter dated September 22,              requirements have been satisfied.                     Scott W. Moore,
                                                2015 (collectively, the application), DEF                  The findings set forth above are supported         Acting Director, Office of Nuclear Material
                                                requested that the NRC approve the direct               by the NRC safety evaluation dated August             Safety and Safeguards.
                                                transfer of control of Facility Operating               10, 2016.
                                                License No. DPR–72 for CR–3, to the extent                                                                    [FR Doc. 2016–22232 Filed 9–14–16; 8:45 am]
                                                held by Seminole Electric Cooperative, Inc.,            III.
                                                                                                                                                              BILLING CODE 7590–01–P
                                                to DEF. Seminole Electric Cooperative, Inc.                Accordingly, pursuant to Sections 161b,
                                                currently owns 1.6994 percent of CR–3. As a             161i, 161o and 184 of the Act, 42 U.S.C.
                                                result of the transaction, DEF will become the          Sections 2201(b), 2201(i), 2201(o) and 2234;
                                                sole owner of CR–3.                                     and 10 CFR 50.80, IT IS HEREBY ORDERED                PEACE CORPS
                                                   The applicant also requested approval of a           that the direct transfer of the license, as
                                                conforming administrative license                       described herein, to DEF is approved, subject         Information Collection Request
                                                amendment that would remove the                         to the following condition:                           Submission for OMB Review
                                                references to Seminole Electric Cooperative,               1. DEF shall provide satisfactory
                                                Inc., in the license. DEF did not propose any           documentary evidence to the Director of the           AGENCY:Peace Corps.
                                                physical changes to the facilities or                   Office of Nuclear Material Safety and                       30-Day notice and request for
                                                                                                                                                              ACTION:
                                                operational changes in the application. After           Safeguards that it has obtained the insurance         comments.
                                                completion of the proposed transfer, DEF                required of a licensee under 10 CFR part 140,
                                                will be the sole owner of CR–3, and DEF will            ‘‘Financial Protection Requirements and               SUMMARY:   The Peace Corps will be
                                                remain the operator of the facility.                    Indemnity Agreements,’’ in the appropriate            submitting the following information
                                                   DEF requested approval of the direct                 amount pursuant to the exemption to 10 CFR            collection request to the Office of
                                                transfer of the facility operating license and          140.11(a)(4) granted to DEF by NRC letter             Management and Budget (OMB) for
                                                the conforming license amendment pursuant               dated April 27, 2015 (Agencywide                      review and approval. The purpose of
                                                to 10 CFR 50.80, ‘‘Transfer of licenses,’’ and          Documents Access and Management System
                                                10 CFR 50.90, ‘‘Application for amendment               (ADAMS) Accession No. ML14183B338).
                                                                                                                                                              this notice is to allow 30 days for public
                                                of license, construction permit, or early site             It is further ordered that, consistent with        comment in the Federal Register
                                                permit.’’ A notice entitled, ‘‘Crystal River            10 CFR 2.1315(b), the license amendment               preceding submission to OMB. We are
                                                Nuclear Generating Plant, Unit 3;                       that makes changes, as indicated in                   conducting this process in accordance
                                                Consideration of Approval of Transfer of                Enclosure 2 to the cover letter forwarding            with the Paperwork Reduction Act of
                                                License and Conforming Amendment,’’ was                 this Order, to conform the license to reflect         1995.
                                                published in the Federal Register on January            the subject direct license transfer is
                                                4, 2016 (81 FR 98). The NRC did not receive             approved. The license amendment shall be              DATES: Submit comments on or before
                                                any public comments regarding the proposed              issued and made effective at the time the             October 17, 2016.
                                                license transfer.                                       proposed direct transfer is completed.                ADDRESSES: Comments should be
                                                   Pursuant to 10 CFR 50.80, no license, or                It is further ordered that after receipt of all    addressed to Denora Miller, FOIA/
                                                any right thereunder, shall be transferred,             required regulatory approvals of the                  Privacy Act Officer. Denora Miller can
                                                directly or indirectly, through transfer of             proposed direct transfer action, DEF shall            be contacted by telephone at 202–692–
                                                control of the license, unless the Commission           inform the Director of the Office of Nuclear          1236 or email at pcfr@peacecorps.gov.
                                                provides its consent in writing. Upon review            Material Safety and Safeguards in writing of
                                                of the information in the licensee’s                    such receipt, and the date of closing of the
                                                                                                                                                              Email comments must be made in text
                                                application and other information before the            transfer no later than one business day prior         and not in attachments.
                                                Commission, and relying upon the                        to the date of the closing of the direct              FOR FURTHER INFORMATION CONTACT:
                                                representations and agreements contained in             transfer. Should the direct transfer not be           Denora Miller at Peace Corps address
                                                the application, the NRC staff has determined           completed within 1 year of this Order’s date          above.
sradovich on DSK3GMQ082PROD with NOTICES




                                                that DEF is qualified to hold the ownership             of issue, this Order shall become null and
                                                interests in the facility previously held by            void, provided, however, that upon written            SUPPLEMENTARY INFORMATION:
                                                Seminole Electric Cooperative, Inc. The NRC             application and good cause shown, such date             Title: Health History Form.
                                                staff has also determined that the direct               may be extended by Order.                               OMB Control Number: 0420–0510.
                                                transfer of ownership interests in the facility            This Order is effective upon issuance.               Type of Request: Revison.
                                                to DEF, as described in the application, is                For further details with respect to this             Affected Public: Individuals.
                                                otherwise consistent with applicable                    Order, see the initial application dated July           Respondents Obligation to Reply:
                                                provisions of laws, regulations, and orders             28, 2015 (ADAMS Accession No.                         Voluntary.


                                           VerDate Sep<11>2014   17:34 Sep 14, 2016   Jkt 238001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\15SEN1.SGM   15SEN1



Document Created: 2018-02-09 13:18:14
Document Modified: 2018-02-09 13:18:14
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDirect transfer of license; order.
DatesThe Order was issued on August 10, 2016, and is effective for one year.
ContactJohn B. Hickman, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3017, email: [email protected]
FR Citation81 FR 63503 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR