81_FR_63880 81 FR 63700 - Drawbridge Operation Regulation; South Branch of the Elizabeth River, Atlantic Intracoastal Waterway, Chesapeake, VA

81 FR 63700 - Drawbridge Operation Regulation; South Branch of the Elizabeth River, Atlantic Intracoastal Waterway, Chesapeake, VA

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 81, Issue 180 (September 16, 2016)

Page Range63700-63700
FR Document2016-22320

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Gilmerton (US13/460) Bridge across the South Branch of the Elizabeth River, mile 5.8, on the Atlantic Intracoastal Waterway, at Chesapeake, VA. This deviation is necessary to avoid bridge failure and perform emergency bridge repairs. This deviation allows the bridge to remain in the closed-to-navigation position.

Federal Register, Volume 81 Issue 180 (Friday, September 16, 2016)
[Federal Register Volume 81, Number 180 (Friday, September 16, 2016)]
[Rules and Regulations]
[Page 63700]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-22320]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-0674]


Drawbridge Operation Regulation; South Branch of the Elizabeth 
River, Atlantic Intracoastal Waterway, Chesapeake, VA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Gilmerton (US13/460) Bridge across 
the South Branch of the Elizabeth River, mile 5.8, on the Atlantic 
Intracoastal Waterway, at Chesapeake, VA. This deviation is necessary 
to avoid bridge failure and perform emergency bridge repairs. This 
deviation allows the bridge to remain in the closed-to-navigation 
position.

DATES: This deviation is effective without actual notice from September 
16, 2016 through 5 a.m. on September 19, 2016. For the purposes of 
enforcement, actual notice will be used from September 13, 2016 at 9 
a.m., until September 16, 2016.

ADDRESSES: The docket for this deviation, [USCG-2016-0674] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Hal R. Pitts, Bridge 
Administration Branch Fifth District, Coast Guard, telephone 757-398-
6222, email [email protected].

SUPPLEMENTARY INFORMATION: The City of Chesapeake, that owns and 
operates the Gilmerton (US13/460) Bridge, across the South Branch of 
the Elizabeth River, mile 5.8, on the Atlantic Intracoastal Waterway, 
at Chesapeake, VA, has requested a temporary deviation from the current 
operating regulations to avoid bridge failure and perform emergency 
repairs to the bridge due to failure of operating mechanism components, 
requiring non-standard manual operation of the bridge until repair is 
completed. The bridge is a vertical lift draw bridge and has a vertical 
clearance in the closed position of 36 feet above mean high water. The 
vertical clearance of the bridge in the open-to-navigation position of 
136 feet above mean high water will be reduced to approximately 110 
feet above mean high water from 9 p.m. on September 16, 2016, through 5 
a.m. on September 19, 2016.
    The current operating schedule is set out in 33 CFR 117.997(c). 
Under this temporary deviation, the bridge will remain in the closed-
to-navigation position, except for scheduled openings at 9 a.m., noon, 
3 p.m. and 7 p.m., Monday through Friday; and 9 a.m. and 3 p.m. on 
Saturday and Sunday. The scheduled openings at 9 a.m. and 3 p.m. on 
Saturday and Sunday, September 17, 2016, and September 18, 2016; and 
emergency openings from 9 p.m. on September 16, 2016, through 5 a.m. on 
September 19, 2016, will provide a reduced vertical clearance of 
approximately 110 feet above mean high water.
    The South Branch of the Elizabeth River is used by a variety of 
vessels including U.S. government and public vessels, commercial 
vessels, tug and barge traffic, and recreational vessels. The Coast 
Guard has carefully coordinated the restrictions with waterway users in 
publishing this temporary deviation.
    Vessels able to safely pass through the bridge in the closed 
position may do so at any time. On Saturday and Sunday, September 17, 
2016, and September 18, 2016, vessels able to safely pass through the 
bridge in the closed position should contact the bridge tender to 
ensure safe passage through the bridge. There is no immediate alternate 
route for vessels unable to pass through the bridge in the closed 
position. The bridge will open on signal for emergency vessels, if at 
least one hour notice is given. The Coast Guard will also inform the 
users of the waterways through our Local and Broadcast Notices to 
Mariners of the change in operating schedule for the bridge so that 
vessel operators can arrange their transit to minimize any impact 
caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: September 13, 2016.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2016-22320 Filed 9-15-16; 8:45 am]
BILLING CODE 9110-04-P



                                           63700            Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Rules and Regulations

                                           Ohio Valley may be contacted on VHF                     emergency repairs to the bridge due to                  Dated: September 13, 2016.
                                           Channel 13 or 16, or at 1–800–253–                      failure of operating mechanism                        Hal R. Pitts,
                                           7465.                                                   components, requiring non-standard                    Bridge Program Manager, Fifth Coast Guard
                                             Dated: September 12, 2016.                            manual operation of the bridge until                  District.
                                           M.B. Zamperini,
                                                                                                   repair is completed. The bridge is a                  [FR Doc. 2016–22320 Filed 9–15–16; 8:45 am]
                                                                                                   vertical lift draw bridge and has a                   BILLING CODE 9110–04–P
                                           Captain, U.S. Coast Guard, Captain of the
                                           Port Ohio Valley.
                                                                                                   vertical clearance in the closed position
                                                                                                   of 36 feet above mean high water. The
                                           [FR Doc. 2016–22319 Filed 9–15–16; 8:45 am]
                                                                                                   vertical clearance of the bridge in the               DEPARTMENT OF HOMELAND
                                           BILLING CODE 9110–04–P
                                                                                                   open-to-navigation position of 136 feet               SECURITY
                                                                                                   above mean high water will be reduced
                                                                                                   to approximately 110 feet above mean                  Coast Guard
                                           DEPARTMENT OF HOMELAND
                                                                                                   high water from 9 p.m. on September
                                           SECURITY                                                                                                      33 CFR Part 117
                                                                                                   16, 2016, through 5 a.m. on September
                                           Coast Guard                                             19, 2016.                                             [Docket No. USCG–2016–0866]
                                                                                                      The current operating schedule is set
                                           33 CFR Part 117                                         out in 33 CFR 117.997(c). Under this                  Drawbridge Operation Regulation;
                                                                                                   temporary deviation, the bridge will                  James River, Isle of Wight and
                                           [Docket No. USCG–2016–0674]                             remain in the closed-to-navigation                    Newport News, VA
                                                                                                   position, except for scheduled openings
                                           Drawbridge Operation Regulation;                        at 9 a.m., noon, 3 p.m. and 7 p.m.,                   AGENCY: Coast Guard, DHS.
                                           South Branch of the Elizabeth River,                    Monday through Friday; and 9 a.m. and                 ACTION:Notice of deviation from
                                           Atlantic Intracoastal Waterway,                         3 p.m. on Saturday and Sunday. The                    drawbridge regulation.
                                           Chesapeake, VA                                          scheduled openings at 9 a.m. and 3 p.m.
                                                                                                   on Saturday and Sunday, September 17,                 SUMMARY:   The Coast Guard has issued a
                                           AGENCY: Coast Guard, DHS.
                                                                                                   2016, and September 18, 2016; and                     temporary deviation from the operating
                                           ACTION: Notice of deviation from
                                                                                                   emergency openings from 9 p.m. on                     schedule that governs the James River
                                           drawbridge regulation.                                                                                        Bridge (US17) across the James River,
                                                                                                   September 16, 2016, through 5 a.m. on
                                           SUMMARY:   The Coast Guard has issued a                 September 19, 2016, will provide a                    mile 5.0, at Isle of Wight and Newport
                                           temporary deviation from the operating                  reduced vertical clearance of                         News, VA. The deviation is necessary to
                                           schedule that governs the Gilmerton                     approximately 110 feet above mean high                perform bridge maintenance and
                                           (US13/460) Bridge across the South                      water.                                                repairs. This deviation allows the bridge
                                           Branch of the Elizabeth River, mile 5.8,                   The South Branch of the Elizabeth                  to remain in the closed-to-navigation
                                           on the Atlantic Intracoastal Waterway,                  River is used by a variety of vessels                 position.
                                           at Chesapeake, VA. This deviation is                    including U.S. government and public                  DATES:  This deviation is effective from
                                           necessary to avoid bridge failure and                   vessels, commercial vessels, tug and                  5 a.m. on September 19, 2016, to 7 p.m.
                                           perform emergency bridge repairs. This                  barge traffic, and recreational vessels.              on October 16, 2016.
                                           deviation allows the bridge to remain in                The Coast Guard has carefully
                                                                                                                                                         ADDRESSES: The docket for this
                                           the closed-to-navigation position.                      coordinated the restrictions with
                                                                                                                                                         deviation, [USCG–2016–0866] is
                                           DATES: This deviation is effective                      waterway users in publishing this
                                                                                                                                                         available at http://www.regulations.gov.
                                           without actual notice from September                    temporary deviation.
                                                                                                      Vessels able to safely pass through the            Type the docket number in the
                                           16, 2016 through 5 a.m. on September                                                                          ‘‘SEARCH’’ box and click ‘‘SEARCH’’.
                                                                                                   bridge in the closed position may do so
                                           19, 2016. For the purposes of                                                                                 Click on Open Docket Folder on the line
                                                                                                   at any time. On Saturday and Sunday,
                                           enforcement, actual notice will be used                                                                       associated with this deviation.
                                                                                                   September 17, 2016, and September 18,
                                           from September 13, 2016 at 9 a.m., until                                                                      FOR FURTHER INFORMATION CONTACT: If
                                                                                                   2016, vessels able to safely pass through
                                           September 16, 2016.                                                                                           you have questions on this temporary
                                                                                                   the bridge in the closed position should
                                           ADDRESSES: The docket for this                          contact the bridge tender to ensure safe              deviation, call or email Mr. Hal R. Pitts,
                                           deviation, [USCG–2016–0674] is                          passage through the bridge. There is no               Bridge Administration Branch Fifth
                                           available at http://www.regulations.gov.                immediate alternate route for vessels                 District, Coast Guard, telephone 757–
                                           Type the docket number in the                           unable to pass through the bridge in the              398–6222, email Hal.R.Pitts@uscg.mil.
                                           ‘‘SEARCH’’ box and click ‘‘SEARCH’’.                    closed position. The bridge will open on              SUPPLEMENTARY INFORMATION: The
                                           Click on Open Docket Folder on the line                 signal for emergency vessels, if at least             Virginia Department of Transportation,
                                           associated with this deviation.                         one hour notice is given. The Coast                   that owns and operates the James River
                                           FOR FURTHER INFORMATION CONTACT: If                     Guard will also inform the users of the               Bridge (US17), across the James River,
                                           you have questions on this temporary                    waterways through our Local and                       mile 5.0, at Isle of Wight and Newport
                                           deviation, call or email Mr. Hal R. Pitts,              Broadcast Notices to Mariners of the                  News, VA, has requested a temporary
                                           Bridge Administration Branch Fifth                      change in operating schedule for the                  deviation from the current operating
                                           District, Coast Guard, telephone 757–                   bridge so that vessel operators can                   regulations to perform repairs to the
                                           398–6222, email Hal.R.Pitts@uscg.mil.                   arrange their transit to minimize any                 aerial electrical cable connecting the
                                           SUPPLEMENTARY INFORMATION: The City                     impact caused by the temporary                        north tower to the south tower. The
                                           of Chesapeake, that owns and operates                   deviation.                                            bridge is a vertical lift draw bridge and
                                           the Gilmerton (US13/460) Bridge, across                    In accordance with 33 CFR 117.35(e),               has a vertical clearance in the closed
Lhorne on DSK30JT082PROD with RULES




                                           the South Branch of the Elizabeth River,                the drawbridge must return to its regular             position of 60 feet above mean high
                                           mile 5.8, on the Atlantic Intracoastal                  operating schedule immediately at the                 water.
                                           Waterway, at Chesapeake, VA, has                        end of the effective period of this                      The current operating schedule is
                                           requested a temporary deviation from                    temporary deviation. This deviation                   open on signal as set out in 33 CFR
                                           the current operating regulations to                    from the operating regulations is                     117.5. Under this temporary deviation,
                                           avoid bridge failure and perform                        authorized under 33 CFR 117.35.                       the bridge will remain in the closed-to-


                                      VerDate Sep<11>2014   13:04 Sep 15, 2016   Jkt 238001   PO 00000   Frm 00026   Fmt 4700   Sfmt 4700   E:\FR\FM\16SER1.SGM   16SER1



Document Created: 2016-09-16 00:24:50
Document Modified: 2016-09-16 00:24:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective without actual notice from September 16, 2016 through 5 a.m. on September 19, 2016. For the purposes of enforcement, actual notice will be used from September 13, 2016 at 9 a.m., until September 16, 2016.
ContactIf you have questions on this temporary deviation, call or email Mr. Hal R. Pitts, Bridge Administration Branch Fifth District, Coast Guard, telephone 757-398- 6222, email [email protected]
FR Citation81 FR 63700 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR