81_FR_63931 81 FR 63751 - Great Lakes Hydro America, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

81 FR 63751 - Great Lakes Hydro America, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 180 (September 16, 2016)

Page Range63751-63752
FR Document2016-22266

Federal Register, Volume 81 Issue 180 (Friday, September 16, 2016)
[Federal Register Volume 81, Number 180 (Friday, September 16, 2016)]
[Notices]
[Pages 63751-63752]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-22266]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2520-076]


Great Lakes Hydro America, LLC; Notice of Application Tendered 
for Filing With the Commission and Establishing Procedural Schedule for 
Licensing and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2520-076.
    c. Date Filed: August 31, 2016.
    d. Applicant: Great Lakes Hydro America, LLC (Great Lakes Hydro).
    e. Name of Project: Mattaceunk Hydroelectric Project.
    f. Location: The existing project is located on the Penobscot River 
in Aroostook and Penobscot Counties, Maine. The project does not affect 
federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Kevin Bernier, Senior Compliance Specialist, 
Great Lakes Hydro America, LLC, 1024

[[Page 63752]]

Central Street, Millinocket, Maine 04462; Telephone (207) 723-4341, 
x118.
    i. FERC Contact: Adam Peer, (202) 502-8449 or [email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. The Project Description: The existing Mattaceunk Hydroelectric 
Project consists of: (1) A 1,060-foot-long, 45-foot-high dam (Weldon 
Dam) with a crest elevation of 236.0 feet (USGS datum), and includes 
(i) a 110-foot-long earthen embankment extending to the left abutment; 
(ii) a combined intake and powerhouse structure; (iii) an upstream fish 
ladder; (iv) a 10-foot-wide log sluice structure, controlled by an 8-
foot-high vertical slide gate; (v) a 90-foot-long, 19-foot-high gated 
spillway with a single roller gate; (vi) a 657.5-foot-long, 70-foot 
high concrete gravity overflow spillway with 4-foot-high flashboards to 
create a maximum flashboard crest elevation of 240.0 feet; and (vii) a 
retaining wall at the right abutment; (2) a 1,664-acre reservoir with a 
total storage capacity of 20,981 acre-feet at a normal pool elevation 
of 240.00 feet (USGS datum); (3) a 142-foot-long, 99-foot-wide 
powerhouse (Weldon Station) integral to the dam containing two Kaplan 
turbines rated at 5,479 kilowatt (kW) and two fixed-blade propeller 
turbines rated at 5,489 kW, each driving a 6,000 kilovolt-ampere (kVA), 
4,800 kW vertical synchronous generator for an authorized installed 
capacity of 19.2 megawatts (MW); (4) a downstream fishway; (5) an 
outdoor substation adjacent to the powerhouse; (6) a 9-mile-long, 34.5-
kilovolt (kV) transmission line within a 120-foot-wide right of way; 
and (7) appurtenant facilities. The project generates about 123,332 
megawatt-hours (MWh) annually.
    The Mattaceunk Project is operated with minimal fluctuations of the 
reservoir surface elevation. Flexibility on reservoir elevations is 
required to provide for safe installation of the project's flashboards 
and to allow an adequate margin for wave action, debris loads, or 
sudden pool increases that might cause flashboard failure. The existing 
license requires a reservoir surface elevation no lower than 1.0 foot 
below the dam crest elevation of 236.0 feet when the 4-foot-high 
flashboards are not in use, and no lower than 2.0 feet below the top of 
flashboard elevation of 240.0 feet when the 4-foot-high flashboards are 
in use. The existing license also requires a year-round continuous 
minimum flow of 1,674 cubic feet per second (cfs) or inflow, whichever 
is less, and a daily average minimum flow of 2,392 cfs from July 1 
through September 30 and 2,000 cfs from October 1 through June 30, 
unless inflow is less than the stated daily average minimum flows (in 
which case outflow from the project must equal the inflow to the 
project). Great Lakes Hydro proposes to: (1) Install a seasonal 
upstream eel ramp; (2) install an upstream passage structure for 
American shad, alewife, and blueback herring; (3) install trashracks 
having 1-inch clear spacing to the full depth of the turbine intakes 
during the fish passage season; and (4) improve the recreation facility 
at the downstream angler access area.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in item (h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready   October 2016.
 for Environmental Analysis.
Filing of recommendations,             December 2016.
 preliminary terms and conditions,
 and fishway prescriptions.
Commission issues Draft Environmental  June 2017.
 Assessment (EA).
Comments on Draft EA.................  July 2017.
Modified terms and conditions........  September 2017.
Commission issues Final EA...........  December 2017.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: September 8, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-22266 Filed 9-15-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Notices                                                63751

                                                  include distinction between domestic                    what is the estimated tonnage                            • EIA–20 (standby) will consist of 491
                                                  and export sales of coke and breeze to                  representing the amount of coal                       respondents
                                                  gather more accurate data on each type                  identified in the reserve that is                        (6) Annual Estimated Number of
                                                  of sale.                                                technologically and economically                      Responses: 3,725.
                                                     • In Part 8, Question 2, revise coal                 feasible to extract?’’ and add ‘‘As of                   (7) Annual Estimated Number of
                                                  refining plant disposition categories to                December 31st of the reporting year,                  Burden Hours: 5,515.
                                                  allow for accurate accounting of refined                what is the estimated amount of coal in                  (8) Annual Estimated Reporting and
                                                  coal.                                                   the reserve that is feasible                          Recordkeeping Cost Burden: Additional
                                                     EIA proposes adding the following                    (economically/technologically) to                     costs to respondents are not anticipated
                                                  questions to Form EIA–3:                                extract? This rewording of the current                beyond costs associated with response
                                                     • In Part 2, Question 2, add the                     question requesting recoverable coal                  burden hours. The information is
                                                  question: ‘‘Does this site operate a coke               reserves helps clarify to respondents to              maintained in the normal course of
                                                  oven’’? This question will be used to                   report the amount of coal that can be                 business. The cost of the burden hours
                                                  identify active U.S. coking plants within               recovered from the coal reserve in place.             is estimated to be $397,190 (5,515
                                                  manufacturing sites.                                                                                          burden hours times $72.02 per hour).
                                                     • In Part 3, Question 3A, add the                    Form EIA–8A: Annual Survey of Coal
                                                                                                                                                                Other than the cost of burden hours, EIA
                                                  question ‘‘Please provide the contact                   Stocks and Coal Exports
                                                                                                                                                                estimates that there are no additional
                                                  information for your broker.’’ Contact                    • In Part 2, Question 2, revise list of             costs for generating, maintaining and
                                                  information will be used to help                        locations where U.S. produced coal                    providing the information.
                                                  maintain the EIA–8A frame, eliminate                    stocks are located to include ‘‘IT—In
                                                                                                                                                                  Statutory Authority: Section 13(b) of the
                                                  duplicative reporting on Form EIA–7A                    Transit’’                                             Federal Energy Administration Act of 1974,
                                                  and reduce burden between Forms EIA–                      • In Part 3, Question 2, add new field              Pub. L. 93–275, codified at 15 U.S.C. 772(b),
                                                  8A and EIA–7A.                                          requesting port of export and                         and the DOE Organization Act of 1977, Pub.
                                                                                                          destination country for export sales to               L. 95–91, codified at 42 U.S.C. 7101 et seq.
                                                  Form EIA–7A: Annual Survey of Coal                      gather more detailed export data and
                                                  Production and Preparation                                                                                      Issued in Washington, DC, on September 9,
                                                                                                          assist in cross-survey comparison with                2016.
                                                    • In Part 5, question 7, revise                       the EIA–7A and coal trade data
                                                                                                                                                                Renee Miller,
                                                  reporting categories of coal mine sales to              collected by the U.S. Census Bureau to
                                                  simplify question wording while adding                  quantify and eliminate double-counting                Acting Director, Office of Survey Development
                                                                                                                                                                and Statistical Integration, U.S. Energy
                                                  export categories to include open                       of export coal sales.
                                                                                                                                                                Information Administration.
                                                  market export sales, captive market                     Standby Forms EIA–6: Emergency Coal                   [FR Doc. 2016–22310 Filed 9–15–16; 8:45 am]
                                                  export sales, and broker export sales.                  Supply Survey (Standby) and EIA–20:                   BILLING CODE 6450–01–P
                                                  The new categories will provide more                    Emergency Weekly Coal Monitoring
                                                  accurate information on coal exports by                 Survey for Coal Burning Power
                                                  type of sale and seller by eliminating                  Producers (Standby)                                   DEPARTMENT OF ENERGY
                                                  potential double-counting of export coal
                                                  sales on Form EIA–8A. It will improve                     • No substantive changes will be
                                                                                                          made to these forms.                                  Federal Energy Regulatory
                                                  EIAs assessments on production trends                                                                         Commission
                                                  and coal supply by basin. It will also                    Request for Comments: As a potential
                                                  facilitate EIA’s comparison of coal                     respondent to the request for                         [Project No. 2520–076]
                                                  supply by basin with export data                        information, review the proposed
                                                                                                          changes mentioned above, the survey                   Great Lakes Hydro America, LLC;
                                                  collected by the U.S. Census Bureau.
                                                    EIA proposes adding the following                     forms and instructions, and please                    Notice of Application Tendered for
                                                  questions to Form EIA–7A:                               advise the following:                                 Filing With the Commission and
                                                    • In Part 3, Question 5A, add the                       • Is the proposed collection of                     Establishing Procedural Schedule for
                                                  question ‘‘What is the average depth of                 information necessary for the proper                  Licensing and Deadline for
                                                  the mine below the surface?’’ This                      performance of the functions of the                   Submission of Final Amendments
                                                  question will assist with data                          agency and does the information have
                                                                                                          practical utility?                                      Take notice that the following
                                                  discrepancies of coalbed data reported                                                                        hydroelectric application has been filed
                                                                                                            • What actions could be taken to help
                                                  by comparing coalbeds mined with U.S.                                                                         with the Commission and is available
                                                                                                          ensure and maximize the quality,
                                                  Geological Survey data.                                                                                       for public inspection.
                                                    • In Part 5, delete question 2 ‘‘With                 objectivity, utility, and integrity of the
                                                                                                          information to be collected?                            a. Type of Application: New Major
                                                  the existing equipment in place, what is                                                                      License.
                                                                                                            • Are the instructions and definitions
                                                  the maximum amount of coal that this                                                                            b. Project No.: 2520–076.
                                                                                                          clear and sufficient? If not, which
                                                  mining operation can produce during                                                                             c. Date Filed: August 31, 2016.
                                                                                                          instructions need clarification?
                                                  the reporting year?’’ and add ‘‘With the                  • Can the information be submitted                    d. Applicant: Great Lakes Hydro
                                                  existing equipment in place, what is the                by the respondent by the due date?                    America, LLC (Great Lakes Hydro).
                                                  annual operating capacity of this                         • Can information be submitted using                  e. Name of Project: Mattaceunk
                                                  mine?’’ This is a rewording to the                      the proposed collection method?                       Hydroelectric Project.
                                                  current question requesting annual                        (5) Estimated Number of Survey                        f. Location: The existing project is
                                                  operating/producing capacity. By                        Respondents: 2,429.                                   located on the Penobscot River in
                                                  comparing actual production compared                      • EIA–3 will consist of 432                         Aroostook and Penobscot Counties,
mstockstill on DSK3G9T082PROD with NOTICES




                                                  to operating capacity, EIA can assess if                respondents                                           Maine. The project does not affect
                                                  mines are producing at maximum                            • EIA–7A will consist of 848                        federal lands.
                                                  capacity and can use this as an indicator               respondents                                             g. Filed Pursuant to: Federal Power
                                                  of market conditions affecting coal                       • EIA–8A will consist of 48                         Act, 16 U.S.C. 791(a)–825(r).
                                                  supply.                                                 respondents                                             h. Applicant Contact: Kevin Bernier,
                                                    • In Part 5, delete question 5 ‘‘As of                  • EIA–6 (standby) will consist of 610               Senior Compliance Specialist, Great
                                                  December 31st of the reporting year,                    respondents                                           Lakes Hydro America, LLC, 1024


                                             VerDate Sep<11>2014   17:55 Sep 15, 2016   Jkt 238001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\16SEN1.SGM   16SEN1


                                                  63752                               Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Notices

                                                  Central Street, Millinocket, Maine                                     downstream fishway; (5) an outdoor                                      upstream eel ramp; (2) install an
                                                  04462; Telephone (207) 723–4341, x118.                                 substation adjacent to the powerhouse;                                  upstream passage structure for
                                                     i. FERC Contact: Adam Peer, (202)                                   (6) a 9-mile-long, 34.5-kilovolt (kV)                                   American shad, alewife, and blueback
                                                  502–8449 or adam.peer@ferc.gov.                                        transmission line within a 120-foot-                                    herring; (3) install trashracks having 1-
                                                     j. This application is not ready for                                wide right of way; and (7) appurtenant                                  inch clear spacing to the full depth of
                                                  environmental analysis at this time.                                   facilities. The project generates about                                 the turbine intakes during the fish
                                                     k. The Project Description: The                                     123,332 megawatt-hours (MWh)                                            passage season; and (4) improve the
                                                  existing Mattaceunk Hydroelectric                                      annually.                                                               recreation facility at the downstream
                                                  Project consists of: (1) A 1,060-foot-long,                                                                                                    angler access area.
                                                  45-foot-high dam (Weldon Dam) with a                                      The Mattaceunk Project is operated
                                                                                                                         with minimal fluctuations of the                                           l. Locations of the Application: A
                                                  crest elevation of 236.0 feet (USGS
                                                                                                                         reservoir surface elevation. Flexibility                                copy of the application is available for
                                                  datum), and includes (i) a 110-foot-long
                                                                                                                         on reservoir elevations is required to                                  review at the Commission in the Public
                                                  earthen embankment extending to the
                                                                                                                         provide for safe installation of the                                    Reference Room or may be viewed on
                                                  left abutment; (ii) a combined intake
                                                                                                                         project’s flashboards and to allow an                                   the Commission’s Web site at http://
                                                  and powerhouse structure; (iii) an
                                                                                                                         adequate margin for wave action, debris                                 www.ferc.gov using the ‘‘eLibrary’’ link.
                                                  upstream fish ladder; (iv) a 10-foot-wide
                                                                                                                         loads, or sudden pool increases that                                    Enter the docket number excluding the
                                                  log sluice structure, controlled by an 8-
                                                                                                                         might cause flashboard failure. The                                     last three digits in the docket number
                                                  foot-high vertical slide gate; (v) a 90-
                                                                                                                         existing license requires a reservoir                                   field to access the document. For
                                                  foot-long, 19-foot-high gated spillway
                                                  with a single roller gate; (vi) a 657.5-                               surface elevation no lower than 1.0 foot                                assistance, please contact FERC Online
                                                  foot-long, 70-foot high concrete gravity                               below the dam crest elevation of 236.0                                  Support at FERCOnlineSupport@
                                                  overflow spillway with 4-foot-high                                     feet when the 4-foot-high flashboards                                   ferc.gov, (866) 208–3676 (toll free), or
                                                  flashboards to create a maximum                                        are not in use, and no lower than 2.0                                   (202) 502–8659 (TTY). A copy is also
                                                  flashboard crest elevation of 240.0 feet;                              feet below the top of flashboard                                        available for inspection and
                                                  and (vii) a retaining wall at the right                                elevation of 240.0 feet when the 4-foot-                                reproduction at the address in item (h)
                                                  abutment; (2) a 1,664-acre reservoir with                              high flashboards are in use. The existing                               above.
                                                  a total storage capacity of 20,981 acre-                               license also requires a year-round                                         m. You may also register online at
                                                  feet at a normal pool elevation of 240.00                              continuous minimum flow of 1,674                                        http://www.ferc.gov/docs-filing/
                                                  feet (USGS datum); (3) a 142-foot-long,                                cubic feet per second (cfs) or inflow,                                  esubscription.asp to be notified via
                                                  99-foot-wide powerhouse (Weldon                                        whichever is less, and a daily average                                  email of new filings and issuances
                                                  Station) integral to the dam containing                                minimum flow of 2,392 cfs from July 1                                   related to this or other pending projects.
                                                  two Kaplan turbines rated at 5,479                                     through September 30 and 2,000 cfs                                      For assistance, contact FERC Online
                                                  kilowatt (kW) and two fixed-blade                                      from October 1 through June 30, unless                                  Support.
                                                  propeller turbines rated at 5,489 kW,                                  inflow is less than the stated daily                                       n. Procedural Schedule: The
                                                  each driving a 6,000 kilovolt-ampere                                   average minimum flows (in which case                                    application will be processed according
                                                  (kVA), 4,800 kW vertical synchronous                                   outflow from the project must equal the                                 to the following preliminary Hydro
                                                  generator for an authorized installed                                  inflow to the project). Great Lakes                                     Licensing Schedule. Revisions to the
                                                  capacity of 19.2 megawatts (MW); (4) a                                 Hydro proposes to: (1) Install a seasonal                               schedule may be made as appropriate.

                                                                                                                                  Milestone                                                                                              Target date

                                                  Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................                            October 2016.
                                                  Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................                                       December 2016.
                                                  Commission issues Draft Environmental Assessment (EA) ...................................................................................................                          June 2017.
                                                  Comments on Draft EA ...........................................................................................................................................................   July 2017.
                                                  Modified terms and conditions .................................................................................................................................................    September 2017.
                                                  Commission issues Final EA ...................................................................................................................................................     December 2017.



                                                    o. Final amendments to the                                           DEPARTMENT OF ENERGY                                                    • Board of Directors
                                                  application must be filed with the                                                                                                               Æ September 15, 8:30 a.m.–12 noon,
                                                  Commission no later than 30 days from                                  Federal Energy Regulatory                                                   St. Paul Hotel, 350 Market Street,
                                                  the issuance date of the notice of ready                               Commission                                                                  St. Paul, MN
                                                  for environmental analysis.
                                                                                                                         Notice of Commission Staff                                              • Board of Directors Markets Committee
                                                    Dated: September 8, 2016.                                            Attendance at MISO Meetings                                               Æ September 13, 9 a.m.–12 noon, St.
                                                  Kimberly D. Bose,                                                                                                                                  Paul Hotel, 350 Market Street, St.
                                                                                                                           The Federal Energy Regulatory                                             Paul, MN
                                                  Secretary.                                                             Commission (Commission) hereby gives                                    • Board of Directors Corporate
                                                  [FR Doc. 2016–22266 Filed 9–15–16; 8:45 am]                            notice that Commission staff may attend                                   Governance and Strategic Planning
                                                  BILLING CODE 6717–01–P                                                 the following MISO-related meetings:                                      Committee
                                                                                                                         • Advisory Committee                                                      Æ September 13, 11:15 a.m.–1 p.m.,
                                                                                                                           Æ September 14, 10:15 a.m.–3 p.m.,
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                                                                                                     St. Paul Hotel, 350 Market Street,
                                                                                                                              St. Paul Hotel, 350 Market Street,                                     St. Paul, MN
                                                                                                                              St. Paul, MN
                                                                                                                         • Board of Directors Audit & Finance                                      Unless otherwise noted all of the
                                                                                                                           Committee                                                             meetings above will be held at either:
                                                                                                                           Æ September 14, 3:45 p.m.–5 p.m., St.                                 Carmel, MISO Headquarters, 701 City
                                                                                                                              Paul Hotel, 350 Market Street, St.                                   Center Drive, 720 City Center Drive,
                                                                                                                              Paul, MN                                                             and Carmel, IN 46032.


                                             VerDate Sep<11>2014        17:55 Sep 15, 2016        Jkt 238001      PO 00000      Frm 00018       Fmt 4703      Sfmt 4703      E:\FR\FM\16SEN1.SGM            16SEN1



Document Created: 2016-09-16 00:24:54
Document Modified: 2016-09-16 00:24:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 63751 

2025 Federal Register | Disclaimer | Privacy Policy