81_FR_63935 81 FR 63755 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

81 FR 63755 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 180 (September 16, 2016)

Page Range63755-63755
FR Document2016-22260

Federal Register, Volume 81 Issue 180 (Friday, September 16, 2016)
[Federal Register Volume 81, Number 180 (Friday, September 16, 2016)]
[Notices]
[Page 63755]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-22260]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-497-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on August 29, 2016, Columbia Gas Transmission, LLC 
(Columbia), 5151 San Felipe, Suite 2500, Houston, Texas 77056, filed in 
Docket No. CP16-497-000, a prior notice request pursuant to sections 
157.205, 157.213, and 157.216 of the Commission's regulations under the 
Natural Gas Act (NGA). Columbia seeks authorization to: (i) Convert a 
storage well in Wayne County, Ohio from injection/withdrawal status to 
observation status and abandon its associated pipeline and 
appurtenances, and (ii) plug and abandon two storage wells, and their 
associated appurtenances, located in Ashland, and Vinton Counties, 
Ohio, respectively. Columbia proposes to perform these activities under 
its blanket certificate issued in Docket No. CP83-76-000, all as more 
fully set forth in the application which is on file with the Commission 
and open to public inspection.
    The filing may be viewed on the web at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding this application should be directed to 
William A. Sala, Jr., Senior Counsel, Columbia Gas Transmission, LLC, 
5151 San Felipe, Suite 2500, Houston, Texas 77056, or by calling (713) 
386-3743 (telephone), or (713) 386-3755 (fax) [email protected].
    Any person or the Commission's Staff may, within 60 days after the 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and, pursuant to section 157.205 of 
the Commission's Regulations under the NGA (18 CFR 157.205) a protest 
to the request. If no protest is filed within the time allowed 
therefore, the proposed activity shall be deemed to be authorized 
effective the day after the time allowed for protest. If a protest is 
filed and not withdrawn within 30 days after the time allowed for 
filing a protest, the instant request shall be treated as an 
application for authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file 
electronically should submit an original and 5 copies of the protest or 
intervention to the Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426.

    Dated: September 8, 2016.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-22260 Filed 9-15-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Notices                                                63755

                                                  Docket No. ER14–1485, PJM                               DEPARTMENT OF ENERGY                                  authorization pursuant to section 7 of
                                                    Interconnection, L.L.C.                                                                                     the NGA.
                                                  Docket Nos. ER13–1944, et al., PJM                      Federal Energy Regulatory                                Pursuant to section 157.9 of the
                                                    Interconnection, L.L.C., et al.                       Commission                                            Commission’s rules, 18 CFR 157.9,
                                                  Docket No. ER15–1344, PJM                                                                                     within 90 days of this Notice the
                                                                                                          [Docket No. CP16–497–000]
                                                    Interconnection, L.L.C.                                                                                     Commission staff will either: Complete
                                                  Docket No. ER15–1387, PJM                               Columbia Gas Transmission, LLC;                       its environmental assessment (EA) and
                                                    Interconnection, L.L.C. and Potomac                   Notice of Request Under Blanket                       place it into the Commission’s public
                                                    Electric Power Company                                Authorization                                         record (eLibrary) for this proceeding, or
                                                  Docket No. ER15–2562, PJM
                                                                                                             Take notice that on August 29, 2016,               issue a Notice of Schedule for
                                                    Interconnection, L.L.C.
                                                  Docket No. ER15–2563, PJM                               Columbia Gas Transmission, LLC                        Environmental Review. If a Notice of
                                                    Interconnection, L.L.C.                               (Columbia), 5151 San Felipe, Suite                    Schedule for Environmental Review is
                                                  Docket No. EL15–18, Consolidated                        2500, Houston, Texas 77056, filed in                  issued, it will indicate, among other
                                                    Edison Company of New York, Inc. v.                   Docket No. CP16–497–000, a prior                      milestones, the anticipated date for the
                                                    PJM Interconnection, L.L.C.                           notice request pursuant to sections                   Commission staff’s issuance of the final
                                                  Docket No. EL15–41, Essential Power                     157.205, 157.213, and 157.216 of the                  environmental impact statement (FEIS)
                                                    Rock Springs, L.L.C., et al. v. PJM                   Commission’s regulations under the                    or EA for this proposal. The filing of the
                                                    Interconnection, L.L.C.                               Natural Gas Act (NGA). Columbia seeks                 EA in the Commission’s public record
                                                  Docket No. ER15–2114, PJM                               authorization to: (i) Convert a storage               for this proceeding or the issuance of a
                                                    Interconnection, L.L.C. and                           well in Wayne County, Ohio from                       Notice of Schedule for Environmental
                                                    Transource West Virginia, L.L.C.                      injection/withdrawal status to                        Review will serve to notify federal and
                                                  Docket No. EL15–79, TransSource,                        observation status and abandon its                    state agencies of the timing for the
                                                    L.L.C. v. PJM Interconnection, L.L.C.                 associated pipeline and appurtenances,                completion of all necessary reviews, and
                                                  Docket No. EL15–95, Delaware Public                     and (ii) plug and abandon two storage                 the subsequent need to complete all
                                                    Service Commission, et al., v. PJM                    wells, and their associated                           federal authorizations within 90 days of
                                                    Interconnection, L.L.C., et al.                       appurtenances, located in Ashland, and                the date of issuance of the Commission
                                                  Docket No. EL15–67, Linden VFT, L.L.C.                  Vinton Counties, Ohio, respectively.                  staff’s FEIS or EA.
                                                    v. PJM Interconnection, L.L.C.                        Columbia proposes to perform these                       Persons who wish to comment only
                                                  Docket No. EL05–121, PJM                                activities under its blanket certificate              on the environmental review of this
                                                    Interconnection, L.L.C.                               issued in Docket No. CP83–76–000, all                 project should submit an original and
                                                  Docket No. ER13–198, PJM                                as more fully set forth in the application            two copies of their comments to the
                                                    Interconnection, L.L.C.                               which is on file with the Commission                  Secretary of the Commission.
                                                  Docket No. ER16–1335, PJM                                                                                     Environmental commenters will be
                                                                                                          and open to public inspection.
                                                    Interconnection, L.L.C.                                  The filing may be viewed on the web                placed on the Commission’s
                                                  Docket No. ER16–1232, PJM
                                                                                                          at http://www.ferc.gov using the                      environmental mailing list, will receive
                                                    Interconnection, L.L.C.
                                                                                                          ‘‘eLibrary’’ link. Enter the docket                   copies of the environmental documents,
                                                  Docket No. ER16–1499, PJM
                                                                                                          number excluding the last three digits in             and will be notified of meetings
                                                    Interconnection, L.L.C.
                                                  Docket No. ER16–1807, First Energy                      the docket number field to access the                 associated with the Commission’s
                                                    Solutions Corp.                                       document. For assistance, contact FERC                environmental review process.
                                                  Docket No. EL16–96, PJM                                 at FERCOnlineSupport@ferc.gov or call                 Environmental commenters will not be
                                                    Interconnection, L.L.C.                               toll-free, (886) 208–3676 or TYY, (202)               required to serve copies of filed
                                                  Docket No. EL16–71, Monongahela                         502–8659.                                             documents on all other parties.
                                                    Power Company et al.                                     Any questions regarding this                       However, the non-party commenters
                                                  Docket No. ER16–2518, PJM                               application should be directed to                     will not receive copies of all documents
                                                    Interconnection, L.L.C.                               William A. Sala, Jr., Senior Counsel,                 filed by other parties or issued by the
                                                  Docket No. ER16–2539, PJM                               Columbia Gas Transmission, LLC, 5151                  Commission (except for the mailing of
                                                    Interconnection, L.L.C.                               San Felipe, Suite 2500, Houston, Texas                environmental documents issued by the
                                                  Docket No. ER16–2401, PJM                               77056, or by calling (713) 386–3743                   Commission) and will not have the right
                                                    Interconnection, L.L.C.                               (telephone), or (713) 386–3755 (fax)                  to seek court review of the
                                                  Docket No. EL16–109–000, Virginia                       tsala@cpg.com.                                        Commission’s final order.
                                                    Electric and Power Company v. PJM                        Any person or the Commission’s Staff                  The Commission strongly encourages
                                                    Interconnection L.L.C.                                may, within 60 days after the issuance                electronic filings of comments, protests,
                                                    For more information, contact the                     of the instant notice by the Commission,              and interventions via the Internet in lieu
                                                  following:                                              file pursuant to Rule 214 of the                      of paper. See 18 CFR 385.2001(a)(1)(iii)
                                                  Jonathan Fernandez, Office of Energy                    Commission’s Procedural Rules (18 CFR                 and the instructions on the
                                                    Market Regulation, Federal Energy                     385.214) a motion to intervene or notice              Commission’s Web site (www.ferc.gov)
                                                    Regulatory Commission, (202) 502–                     of intervention and, pursuant to section              under the ‘‘e-Filing’’ link. Persons
                                                    6604, Jonathan.Fernandez@ferc.gov.                    157.205 of the Commission’s                           unable to file electronically should
                                                  Alina Halay, Office of Energy Market                    Regulations under the NGA (18 CFR                     submit an original and 5 copies of the
                                                    Regulation, Federal Energy Regulatory                 157.205) a protest to the request. If no              protest or intervention to the Federal
                                                                                                          protest is filed within the time allowed
mstockstill on DSK3G9T082PROD with NOTICES




                                                    Commission, (202) 502–6474,                                                                                 Energy Regulatory Commission, 888
                                                    Alina.Halay@ferc.gov.                                 therefore, the proposed activity shall be             First Street NE., Washington, DC 20426.
                                                                                                          deemed to be authorized effective the
                                                    Dated: September 7, 2016.                             day after the time allowed for protest. If              Dated: September 8, 2016.
                                                  Kimberly D. Bose,                                       a protest is filed and not withdrawn                  Kimberly D. Bose,
                                                  Secretary.                                              within 30 days after the time allowed                 Secretary.
                                                  [FR Doc. 2016–22267 Filed 9–15–16; 8:45 am]             for filing a protest, the instant request             [FR Doc. 2016–22260 Filed 9–15–16; 8:45 am]
                                                  BILLING CODE 6717–01–P                                  shall be treated as an application for                BILLING CODE 6717–01–P




                                             VerDate Sep<11>2014   17:55 Sep 15, 2016   Jkt 238001   PO 00000   Frm 00021   Fmt 4703   Sfmt 9990   E:\FR\FM\16SEN1.SGM   16SEN1



Document Created: 2016-09-16 00:24:57
Document Modified: 2016-09-16 00:24:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 63755 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR