81_FR_68199 81 FR 68008 - Columbia Gas Transmission, LLC.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Central Virginia Connector Project and Request for Comments on Environmental Issues

81 FR 68008 - Columbia Gas Transmission, LLC.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Central Virginia Connector Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 191 (October 3, 2016)

Page Range68008-68010
FR Document2016-23818

Federal Register, Volume 81 Issue 191 (Monday, October 3, 2016)
[Federal Register Volume 81, Number 191 (Monday, October 3, 2016)]
[Notices]
[Pages 68008-68010]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-23818]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-493-000]


Columbia Gas Transmission, LLC.; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Central Virginia Connector 
Project and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Central Virginia Connector 
Project involving construction and operation of facilities by Columbia 
Gas Transmission, L.L.C. (Columbia) in Louisa and Goochland Counties, 
Virginia. The Commission will use this EA in its decision-making 
process to determine whether the project is in the public convenience 
and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before October 27, 2016.
    If you sent comments on this project to the Commission before the 
opening of this docket on August 12, 2016, you will need to file those 
comments in Docket No. CP16-493-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    Columbia provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or efiling@ferc.gov. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP16-493-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

[[Page 68009]]

Summary of the Proposed Project

    Columbia proposes to replace three Solar Saturn units with one 
Solar Centaur 50 unit at the existing Louisa Compressor Station, 
convert the replaced units to standby, increase the certificated 
horsepower (HP) at the Louisa Compressor Station from 4,050 HP to 6,130 
HP, install pipe and valve modifications to make the existing point of 
delivery between Columbia's Mainline VM-108 and VM-109 at Boswell's 
Tavern Compressor Station bi-directional, install a new point of 
delivery meter station adjacent to Columbia's Goochland Compressor 
Station, and install other appurtenant facilities.
    The Central Virginia Connector Project is in Louisa and Goochland 
Counties, Virginia and would provide 45,000 cubic feet per day of 
natural gas on its system and modernize compression at the Louisa 
Compressor Station.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice would not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would temporarily disturb 
about 13.3 acres of land. Following construction, Columbia Gas would 
maintain about 0.9 acre for permanent operation of the project's 
facilities; the remaining acreage would be restored and revert to 
former uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies of the EA will be sent 
to the environmental mailing list for public review and comment. If you 
would prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site.

[[Page 68010]]

Motions to intervene are more fully described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP16-
493). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits would be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: September 27, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-23818 Filed 9-30-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                68008                        Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices

                                                DEPARTMENT OF ENERGY                                      Comment Date: 5:00 p.m. Eastern                        If you are a landowner receiving this
                                                                                                        Time on October 17, 2016.                             notice, a pipeline company
                                                Federal Energy Regulatory                                 Dated: September 27, 2016.                          representative may contact you about
                                                Commission                                                                                                    the acquisition of an easement to
                                                                                                        Kimberly D. Bose,
                                                [Docket Nos. EL16–115–000; QF16–362–                                                                          construct, operate, and maintain the
                                                                                                        Secretary.
                                                002; QF16–363–002; QF16–364–002; QF16–                                                                        proposed facilities. The company would
                                                                                                        [FR Doc. 2016–23815 Filed 9–30–16; 8:45 am]
                                                365–002; QF16–366–002; QF16–367–002;                                                                          seek to negotiate a mutually acceptable
                                                QF16–368–002; QF16–369–002; QF16–370–                   BILLING CODE 6717–01–P                                agreement. However, if the Commission
                                                002; QF16–371–002; QF16–372–002; QF16–                                                                        approves the project, that approval
                                                373–002; QF16–374–002; QF16–375–002;                                                                          conveys with it the right of eminent
                                                QF16–376–002; QF16–377–002; QF16–378–                   DEPARTMENT OF ENERGY
                                                                                                                                                              domain. Therefore, if easement
                                                002; QF16–379–002; QF16–380–002; QF16–
                                                381–002; QF16–382–002; QF16–383–002;                    Federal Energy Regulatory                             negotiations fail to produce an
                                                QF16–384–002; QF16–385–002; QF16–386–                   Commission                                            agreement, the pipeline company could
                                                002; QF16–387–002]                                                                                            initiate condemnation proceedings
                                                                                                        [Docket No. CP16–493–000]                             where compensation would be
                                                Windham Solar LLC; Allco Finance                                                                              determined in accordance with state
                                                Limited; Windham Solar LLC; Notice of                   Columbia Gas Transmission, LLC.;                      law.
                                                Amendment of Petition for                               Notice of Intent To Prepare an
                                                                                                        Environmental Assessment for the                         Columbia provided landowners with
                                                Enforcement                                                                                                   a fact sheet prepared by the FERC
                                                                                                        Proposed Central Virginia Connector
                                                   Take notice that on September 26,                    Project and Request for Comments on                   entitled ‘‘An Interstate Natural Gas
                                                2016, Windham Solar LLC filed an                        Environmental Issues                                  Facility On My Land? What Do I Need
                                                amendment to the September 12, 2016                                                                           To Know?’’ This fact sheet addresses a
                                                filed petition for enforcement pursuant                    The staff of the Federal Energy                    number of typically asked questions,
                                                to section 210 of Public Utility                        Regulatory Commission (FERC or                        including the use of eminent domain
                                                Regulatory Policies Act of 1978                         Commission) will prepare an                           and how to participate in the
                                                (PURPA), 16 U.S.C. 824a–3.                              environmental assessment (EA) that will               Commission’s proceedings. It is also
                                                   Any person desiring to intervene or to               discuss the environmental impacts of                  available for viewing on the FERC Web
                                                protest this filing must file in                        the Central Virginia Connector Project                site (www.ferc.gov).
                                                accordance with Rules 211 and 214 of                    involving construction and operation of
                                                                                                        facilities by Columbia Gas                            Public Participation
                                                the Commission’s Rules of Practice and
                                                Procedure (18 CFR 385.211, 385.214).                    Transmission, L.L.C. (Columbia) in                      For your convenience, there are three
                                                Protests will be considered by the                      Louisa and Goochland Counties,                        methods you can use to submit your
                                                Commission in determining the                           Virginia. The Commission will use this                comments to the Commission. The
                                                appropriate action to be taken, but will                EA in its decision-making process to                  Commission encourages electronic filing
                                                not serve to make protestants parties to                determine whether the project is in the               of comments and has expert staff
                                                the proceeding. Any person wishing to                   public convenience and necessity.                     available to assist you at (202) 502–8258
                                                become a party must file a notice of                       This notice announces the opening of               or efiling@ferc.gov. Please carefully
                                                intervention or motion to intervene, as                 the scoping process the Commission                    follow these instructions so that your
                                                appropriate. Such notices, motions, or                  will use to gather input from the public              comments are properly recorded.
                                                protests must be filed on or before the                 and interested agencies on the project.
                                                                                                                                                                 (1) You can file your comments
                                                comment date. On or before the                          You can make a difference by providing
                                                                                                                                                              electronically using the eComment
                                                comment date, it is not necessary to                    us with your specific comments or
                                                                                                                                                              feature on the Commission’s Web site
                                                serve motions to intervene or protests                  concerns about the project. Your
                                                                                                                                                              (www.ferc.gov) under the link to
                                                on persons other than the Applicant.                    comments should focus on the potential
                                                                                                                                                              Documents and Filings. This is an easy
                                                   The Commission encourages                            environmental effects, reasonable
                                                                                                                                                              method for submitting brief, text-only
                                                electronic submission of protests and                   alternatives, and measures to avoid or
                                                                                                                                                              comments on a project;
                                                interventions in lieu of paper using the                lessen environmental impacts. Your
                                                ‘‘eFiling’’ link at http://www.ferc.gov.                input will help the Commission staff                     (2) You can file your comments
                                                Persons unable to file electronically                   determine what issues they need to                    electronically by using the eFiling
                                                should submit an original and 5 copies                  evaluate in the EA. To ensure that your               feature on the Commission’s Web site
                                                of the protest or intervention to the                   comments are timely and properly                      (www.ferc.gov) under the link to
                                                Federal Energy Regulatory Commission,                   recorded, please send your comments so                Documents and Filings. With eFiling,
                                                888 First Street NE., Washington, DC                    that the Commission receives them in                  you can provide comments in a variety
                                                20426.                                                  Washington, DC on or before October                   of formats by attaching them as a file
                                                   This filing is accessible on-line at                 27, 2016.                                             with your submission. New eFiling
                                                http://www.ferc.gov, using the                             If you sent comments on this project               users must first create an account by
                                                ‘‘eLibrary’’ link and is available for                  to the Commission before the opening of               clicking on ‘‘eRegister.’’ If you are filing
                                                review in the Commission’s Public                       this docket on August 12, 2016, you will              a comment on a particular project,
                                                Reference Room in Washington, DC.                       need to file those comments in Docket                 please select ‘‘Comment on a Filing’’ as
                                                There is an ‘‘eSubscription’’ link on the               No. CP16–493–000 to ensure they are                   the filing type; or
                                                Web site that enables subscribers to                    considered as part of this proceeding.                   (3) You can file a paper copy of your
sradovich on DSK3GMQ082PROD with NOTICES




                                                receive email notification when a                          This notice is being sent to the                   comments by mailing them to the
                                                document is added to a subscribed                       Commission’s current environmental                    following address. Be sure to reference
                                                docket(s). For assistance with any FERC                 mailing list for this project. State and              the project docket number (CP16–493–
                                                Online service, please email                            local government representatives should               000) with your submission: Kimberly D.
                                                FERCOnlineSupport@ferc.gov, or call                     notify their constituents of this                     Bose, Secretary, Federal Energy
                                                (866) 208–3676 (toll free). For TTY, call               proposed project and encourage them to                Regulatory Commission, 888 First Street
                                                (202) 502–8659.                                         comment on their areas of concern.                    NE., Room 1A, Washington, DC 20426.


                                           VerDate Sep<11>2014   17:56 Sep 30, 2016   Jkt 241001   PO 00000   Frm 00053   Fmt 4703   Sfmt 4703   E:\FR\FM\03OCN1.SGM   03OCN1


                                                                             Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices                                                        68009

                                                Summary of the Proposed Project                            In the EA we will discuss impacts that             project-specific Area of Potential Effects
                                                  Columbia proposes to replace three                    could occur as a result of the                        (APE) in consultation with the SHPO as
                                                Solar Saturn units with one Solar                       construction and operation of the                     the project develops. On natural gas
                                                Centaur 50 unit at the existing Louisa                  proposed project under these general                  facility projects, the APE at a minimum
                                                Compressor Station, convert the                         headings:                                             encompasses all areas subject to ground
                                                replaced units to standby, increase the                    • geology and soils;                               disturbance (examples include
                                                                                                           • land use;                                        construction right-of-way, contractor/
                                                certificated horsepower (HP) at the
                                                                                                           • water resources, fisheries, and                  pipe storage yards, compressor stations,
                                                Louisa Compressor Station from 4,050
                                                                                                        wetlands;                                             and access roads). Our EA for this
                                                HP to 6,130 HP, install pipe and valve                     • cultural resources;                              project will document our findings on
                                                modifications to make the existing point                   • vegetation and wildlife;                         the impacts on historic properties and
                                                of delivery between Columbia’s                             • air quality and noise;                           summarize the status of consultations
                                                Mainline VM–108 and VM–109 at                              • endangered and threatened species;               under section 106.
                                                Boswell’s Tavern Compressor Station bi-                    • public safety; and
                                                directional, install a new point of                        • cumulative impacts.                              Environmental Mailing List
                                                delivery meter station adjacent to                         We will also evaluate reasonable                      The environmental mailing list
                                                Columbia’s Goochland Compressor                         alternatives to the proposed project or               includes federal, state, and local
                                                Station, and install other appurtenant                  portions of the project, and make                     government representatives and
                                                facilities.                                             recommendations on how to lessen or                   agencies; elected officials;
                                                  The Central Virginia Connector                        avoid impacts on the various resource                 environmental and public interest
                                                Project is in Louisa and Goochland                      areas.                                                groups; Native American Tribes; other
                                                Counties, Virginia and would provide                       The EA will present our independent                interested parties; and local libraries
                                                45,000 cubic feet per day of natural gas                analysis of the issues. The EA will be                and newspapers. This list also includes
                                                on its system and modernize                             available in the public record through                all affected landowners (as defined in
                                                compression at the Louisa Compressor                    eLibrary. Depending on the comments                   the Commission’s regulations) who are
                                                Station.                                                received during the scoping process, we               potential right-of-way grantors, whose
                                                  The general location of the project                   may also publish and distribute the EA                property may be used temporarily for
                                                facilities is shown in appendix 1.1                     to the public for an allotted comment                 project purposes, or who own homes
                                                Land Requirements for Construction                      period. We will consider all comments                 within certain distances of aboveground
                                                                                                        on the EA before making our                           facilities, and anyone who submits
                                                  Construction of the proposed facilities               recommendations to the Commission.                    comments on the project. We will
                                                would temporarily disturb about 13.3                    To ensure we have the opportunity to                  update the environmental mailing list as
                                                acres of land. Following construction,                  consider and address your comments,                   the analysis proceeds to ensure that we
                                                Columbia Gas would maintain about 0.9                   please carefully follow the instructions              send the information related to this
                                                acre for permanent operation of the                     in the Public Participation section,                  environmental review to all individuals,
                                                project’s facilities; the remaining                     beginning on page 2.                                  organizations, and government entities
                                                acreage would be restored and revert to                    With this notice, we are asking                    interested in and/or potentially affected
                                                former uses.                                            agencies with jurisdiction by law and/                by the proposed project.
                                                The EA Process                                          or special expertise with respect to the                 If we publish and distribute the EA,
                                                                                                        environmental issues of this project to               copies of the EA will be sent to the
                                                   The National Environmental Policy                    formally cooperate with us in the                     environmental mailing list for public
                                                Act (NEPA) requires the Commission to                   preparation of the EA.3 Agencies that                 review and comment. If you would
                                                take into account the environmental                     would like to request cooperating                     prefer to receive a paper copy of the
                                                impacts that could result from an action                agency status should follow the                       document instead of the CD version or
                                                whenever it considers the issuance of a                 instructions for filing comments                      would like to remove your name from
                                                Certificate of Public Convenience and                   provided under the Public Participation               the mailing list, please return the
                                                Necessity. NEPA also requires us 2 to                   section of this notice.                               attached Information Request (appendix
                                                discover and address concerns the                                                                             2).
                                                public may have about proposals. This                   Consultations Under Section 106 of the
                                                process is referred to as ‘‘scoping.’’ The              National Historic Preservation Act                    Becoming an Intervenor
                                                main goal of the scoping process is to                    In accordance with the Advisory                        In addition to involvement in the EA
                                                focus the analysis in the EA on the                     Council on Historic Preservation’s                    scoping process, you may want to
                                                important environmental issues. By this                 implementing regulations for section                  become an ‘‘intervenor’’ which is an
                                                notice, the Commission requests public                  106 of the National Historic                          official party to the Commission’s
                                                comments on the scope of the issues to                  Preservation Act, we are using this                   proceeding. Intervenors play a more
                                                address in the EA. We will consider all                 notice to initiate consultation with the              formal role in the process and are able
                                                filed comments during the preparation                   applicable State Historic Preservation                to file briefs, appear at hearings, and be
                                                of the EA.                                              Office (SHPO), and to solicit their views             heard by the courts if they choose to
                                                                                                        and those of other government agencies,               appeal the Commission’s final ruling.
                                                  1 The appendices referenced in this notice would
                                                                                                        interested Indian tribes, and the public              An intervenor formally participates in
                                                not appear in the Federal Register. Copies of           on the project’s potential effects on                 the proceeding by filing a request to
                                                appendices were sent to all those receiving this                                                              intervene. Instructions for becoming an
sradovich on DSK3GMQ082PROD with NOTICES




                                                notice in the mail and are available at www.ferc.gov    historic properties.4 We will define the
                                                                                                                                                              intervenor are in the ‘‘Document-less
                                                using the link called ‘‘eLibrary’’ or from the
                                                Commission’s Public Reference Room, 888 First             3 The Council on Environmental Quality              Intervention Guide’’ under the ‘‘e-filing’’
                                                Street NE., Washington, DC 20426, or call (202)         regulations addressing cooperating agency             link on the Commission’s Web site.
                                                502–8371. For instructions on connecting to             responsibilities are at Title 40, Code of Federal
                                                eLibrary, refer to the last page of this notice.        Regulations, Part 1501.6.                             historic properties as any prehistoric or historic
                                                  2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the              4 The Advisory Council on Historic Preservation’s   district, site, building, structure, or object included
                                                environmental staff of the Commission’s Office of       regulations are at Title 36, Code of Federal          in or eligible for inclusion in the National Register
                                                Energy Projects.                                        Regulations, Part 800. Those regulations define       of Historic Places.



                                           VerDate Sep<11>2014   17:56 Sep 30, 2016   Jkt 241001   PO 00000   Frm 00054   Fmt 4703   Sfmt 4703   E:\FR\FM\03OCN1.SGM   03OCN1


                                                68010                        Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices

                                                Motions to intervene are more fully                        Accession Number: 20160926–5285.                      Description: § 205(d) Rate Filing:
                                                described at http://www.ferc.gov/                          Comments Due: 5 p.m. ET 10/17/16.                  20160927_SAP Production Clean Up to
                                                resources/guides/how-to/intervene.asp.                     Take notice that the Commission                    be effective 1/1/2016.
                                                                                                        received the following electric rate                     Filed Date: 9/27/16.
                                                Additional Information                                                                                           Accession Number: 20160927–5112.
                                                                                                        filings:
                                                   Additional information about the                                                                              Comments Due: 5 p.m. ET 10/18/16.
                                                                                                           Docket Numbers: ER10–2302–006.
                                                project is available from the                              Applicants: Public Service Company                    Docket Numbers: ER16–2674–000.
                                                Commission’s Office of External Affairs,                of New Mexico.                                           Applicants: Public Service Company
                                                at (866) 208–FERC, or on the FERC Web                      Description: Supplement to December                of Colorado.
                                                site at www.ferc.gov using the                          29, 2015 Public Service Company of                       Description: § 205(d) Rate Filing:
                                                ‘‘eLibrary’’ link. Click on the eLibrary                New Mexico submits Triennial Market                   20160927_SAP Production Formula
                                                link, click on ‘‘General Search’’ and                   Power Update. [CD being filed under                   Rate to be effective 4/16/2016.
                                                enter the docket number, excluding the                  separate cover].                                         Filed Date: 9/27/16.
                                                last three digits in the Docket Number                     Filed Date: 9/27/16.                                  Accession Number: 20160927–5113.
                                                field (i.e., CP16–493). Be sure you have                   Accession Number: 20160927–5084.                      Comments Due: 5 p.m. ET 10/18/16.
                                                selected an appropriate date range. For                    Comments Due: 5 p.m. ET 10/18/16.                     Docket Numbers: ER16–2675–000.
                                                assistance, please contact FERC Online                     Docket Numbers: ER10–2633–027;                        Applicants: AltaGas Pomona Energy
                                                Support at FercOnlineSupport@ferc.gov                   ER10–2570–027; ER10–2717–027;                         Storage Inc.
                                                or toll free at (866) 208–3676, or for                  ER10–3140–027; ER13–55–017.                              Description: Baseline eTariff Filing:
                                                TTY, contact (202) 502–8659. The                           Applicants: Birchwood Power                        AltaGas Pomona Energy Storage Inc.
                                                eLibrary link also provides access to the               Partners, L.P., Shady Hills Power                     MBR Tariff to be effective 10/1/2016.
                                                texts of formal documents issued by the                 Company, L.L.C., EFS Parlin Holdings,                    Filed Date: 9/27/16.
                                                Commission, such as orders, notices,                    LLC, Inland Empire Energy Center, LLC,                   Accession Number: 20160927–5137.
                                                and rulemakings.                                        Homer City Generation, L.P.                              Comments Due: 5 p.m. ET 10/18/16.
                                                   In addition, the Commission offers a                    Description: Notice of Non-Material                   The filings are accessible in the
                                                free service called eSubscription which                 Change in Status of the GE Companies.                 Commission’s eLibrary system by
                                                allows you to keep track of all formal                     Filed Date: 9/26/16.                               clicking on the links or querying the
                                                issuances and submittals in specific                       Accession Number: 20160926–5219.                   docket number.
                                                dockets. This can reduce the amount of                     Comments Due: 5 p.m. ET 10/17/16.                     Any person desiring to intervene or
                                                time you spend researching proceedings                                                                        protest in any of the above proceedings
                                                                                                           Docket Numbers: ER16–2669–000.
                                                by automatically providing you with                        Applicants: Consumers Energy                       must file in accordance with Rules 211
                                                notification of these filings, document                 Company.                                              and 214 of the Commission’s
                                                summaries, and direct links to the                         Description: Initial rate filing:                  Regulations (18 CFR 385.211 and
                                                documents. Go to www.ferc.gov/docs-                     Blackstart Service to be effective 10/1/              385.214) on or before 5:00 p.m. Eastern
                                                filing/esubscription.asp.                               2016.                                                 time on the specified comment date.
                                                   Finally, public meetings or site visits                 Filed Date: 9/26/16.                               Protests may be considered, but
                                                would be posted on the Commission’s                        Accession Number: 20160926–5214.                   intervention is necessary to become a
                                                calendar located at www.ferc.gov/                          Comments Due: 5 p.m. ET 10/17/16.                  party to the proceeding.
                                                EventCalendar/EventsList.aspx along                                                                              eFiling is encouraged. More detailed
                                                                                                           Docket Numbers: ER16–2670–000.
                                                with other related information.                                                                               information relating to filing
                                                                                                           Applicants: Orange and Rockland
                                                  Dated: September 27, 2016.                            Utilities, Inc.                                       requirements, interventions, protests,
                                                Kimberly D. Bose,                                          Description: Tariff Cancellation:                  service, and qualifying facilities filings
                                                Secretary.                                              Cancellation of Tariff Identifier ER16–               can be found at: http://www.ferc.gov/
                                                [FR Doc. 2016–23818 Filed 9–30–16; 8:45 am]             896 to be effective 12/31/9998.                       docs-filing/efiling/filing-req.pdf. For
                                                BILLING CODE 6717–01–P                                     Filed Date: 9/26/16.                               other information, call (866) 208–3676
                                                                                                           Accession Number: 20160926–5216.                   (toll free). For TTY, call (202) 502–8659.
                                                                                                           Comments Due: 5 p.m. ET 10/17/16.                    Dated: September 27, 2016.
                                                DEPARTMENT OF ENERGY                                       Docket Numbers: ER16–2671–000.                     Nathaniel J. Davis, Sr.,
                                                                                                           Applicants: FirstEnergy Solutions                  Deputy Secretary.
                                                Federal Energy Regulatory                               Corp.
                                                Commission                                                                                                    [FR Doc. 2016–23844 Filed 9–30–16; 8:45 am]
                                                                                                           Description: § 205(d) Rate Filing:
                                                                                                                                                              BILLING CODE 6717–01–P
                                                                                                        Normal filing 2016 to be effective 11/26/
                                                Combined Notice of Filings #1                           2015.
                                                   Take notice that the Commission                         Filed Date: 9/27/16.
                                                                                                                                                              DEPARTMENT OF ENERGY
                                                received the following electric corporate                  Accession Number: 20160927–5072.
                                                filings:                                                   Comments Due: 5 p.m. ET 10/18/16.                  Federal Energy Regulatory
                                                   Docket Numbers: EC16–192–000.                           Docket Numbers: ER16–2672–000.                     Commission
                                                   Applicants: Boulder Solar II, LLC,                      Applicants: Georgia Power Company.
                                                                                                           Description: § 205(d) Rate Filing:                 [Docket No. ER16–2659–000]
                                                Avangrid Renewables, LLC.
                                                   Description: Joint Application of                    Amendment of Georgia Power Company
                                                                                                                                                              Grant Plains Wind, LLC; Supplemental
                                                                                                        Rate Schedule No. 850 to be effective
sradovich on DSK3GMQ082PROD with NOTICES




                                                Boulder Solar II, LLC, et. al. for                                                                            Notice That Initial Market-Based Rate
                                                Authorization of Transaction Under                      11/1/2016.
                                                                                                                                                              Filing Includes Request for Blanket
                                                Section 203 of the FPA, and Requests                       Filed Date: 9/27/16.
                                                                                                                                                              Section 204 Authorization
                                                for Shortened Comment Period,                              Accession Number: 20160927–5098.
                                                Expedited Action, Waivers of Filing                        Comments Due: 5 p.m. ET 10/18/16.                    This is a supplemental notice in the
                                                Requirements and Confidential                              Docket Numbers: ER16–2673–000.                     above-referenced proceeding of Grant
                                                Treatment.                                                 Applicants: Public Service Company                 Plains Wind, LLC’s application for
                                                   Filed Date: 9/26/16.                                 of Colorado.                                          market-based rate authority, with an


                                           VerDate Sep<11>2014   17:56 Sep 30, 2016   Jkt 241001   PO 00000   Frm 00055   Fmt 4703   Sfmt 4703   E:\FR\FM\03OCN1.SGM   03OCN1



Document Created: 2018-02-13 14:11:12
Document Modified: 2018-02-13 14:11:12
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 68008 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR