81_FR_68285 81 FR 68094 - Actions Taken at September 8, 2016, Meeting

81 FR 68094 - Actions Taken at September 8, 2016, Meeting

SUSQUEHANNA RIVER BASIN COMMISSION

Federal Register Volume 81, Issue 191 (October 3, 2016)

Page Range68094-68095
FR Document2016-23737

As part of its regular business meeting held on September 8, 2016, in Cooperstown, New York, the Commission took the following actions: approved or tabled the applications of certain water resources projects; and took additional actions, as set forth in the Supplementary Information below.

Federal Register, Volume 81 Issue 191 (Monday, October 3, 2016)
[Federal Register Volume 81, Number 191 (Monday, October 3, 2016)]
[Notices]
[Pages 68094-68095]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-23737]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Actions Taken at September 8, 2016, Meeting

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: As part of its regular business meeting held on September 8, 
2016, in Cooperstown, New York, the Commission took the following 
actions: approved or tabled the applications of certain water resources 
projects; and took additional actions, as set forth in the 
Supplementary Information below.

DATES: The business meeting was held on September 8, 2016. Please refer 
to the notice published in 81 FR 64812, September 21, 2016, for 
additional information on the proposed rulemaking, including public 
hearing dates and locations. Comments on the proposed consumptive use 
mitigation policy may be submitted to the Commission on or before 
January 6, 2017.

ADDRESSES: Comments may be mailed to: Jason E. Oyler, Esq., General 
Counsel, Susquehanna River Basin Commission, 4423 N. Front Street, 
Harrisburg, PA 17110-1788, or submitted electronically at http://www.srbc.net/pubinfo/publicparticipation/PublicComments.aspx?type=5&cat=20.

FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel, 
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email: 
[email protected]. Regular mail inquiries may be sent to the above 
address. See also Commission Web site at www.srbc.net.

SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects 
identified in the summary above and the listings below, the following 
items were also presented or acted upon at the business meeting: (1) 
rescission of the Commission's Information Technology Services Fee; (2) 
approval/ratification of a contract and several grants; (3) release of 
proposed rulemaking to clarify application requirements and standards 
for review of projects, amend the rules dealing with the mitigation of 
consumptive uses, add a subpart to provide for registration of 
grandfathered projects, and revise requirements dealing with hearings 
and enforcement actions, and release of a consumptive use mitigation 
policy; (4) a report on delegated settlements with the following 
project sponsors, pursuant to SRBC Resolution 2014-15: Lackawanna 
Energy Center, in the amount of $2,000; and Troy Borough Municipal 
Authority, in the amount of $5,000.; 5) approval to extend the term of 
an emergency certificate with Furman Foods, Inc. to November 30, 2016; 
and 6) continuance of the Show Cause proceeding granted to Montage 
Mountain Resorts, LP, to the December 2016 Commission meeting.

Project Applications Approved

    The Commission approved the following project applications:
    1. Project Sponsor and Facility: Bloomfield Borough Water 
Authority, Centre Township, Perry County, Pa. Groundwater withdrawal of 
up to 0.180 mgd (30-day average) from Well 3.
    2. Project Sponsor and Facility: Cabot Oil & Gas Corporation 
(Susquehanna River), Great Bend Township, Susquehanna County, Pa. 
Renewal of surface water withdrawal of up to 2.000 mgd (peak day) 
(Docket No. 20120904).
    3. Project Sponsor and Facility: Elizabethtown Area Water 
Authority, Elizabethtown Borough, Lancaster County, Pa. Groundwater 
withdrawal of up to 0.201 mgd (30-day average) from Well 1.
    4. Project Sponsor and Facility: Elizabethtown Area Water 
Authority, Mount Joy Township, Lancaster County, Pa. Groundwater 
withdrawal of up to 0.106 mgd (30-day average) from Well 3.
    5. Project Sponsor and Facility: Elizabethtown Area Water 
Authority, Elizabethtown Borough, Lancaster County, Pa. Groundwater 
withdrawal of up to 0.130 mgd (30-day average) from Well 4.
    6. Project Sponsor and Facility: Elizabethtown Area Water 
Authority, Mount Joy Township, Lancaster County, Pa. Groundwater 
withdrawal of up to 0.187 mgd (30-day average) from Well 8.
    7. Project Sponsor and Facility: Elizabethtown Area Water 
Authority, Mount Joy Township, Lancaster County, Pa. Groundwater 
withdrawal of up to 0.216 mgd (30-day average) from Well 9.
    8. Project Sponsor and Facility: Geisinger Health System, Mahoning 
Township, Montour County, Pa. Modification to increase consumptive 
water use by an additional 0.319 mgd (peak day), for a total 
consumptive water use of up to 0.499 mgd (peak day) (Docket No. 
19910103).
    9. Project Sponsor: Pennsylvania American Water Company. Project 
Facility: Nittany Water System, Walker Township, Centre County, Pa. 
Groundwater withdrawal of up to 0.262 mgd (30-day average) from Nittany 
Well 1.
    10. Project Sponsor and Facility: Republic Services of 
Pennsylvania, LLC, Windsor and Lower Windsor Townships, York County, 
Pa. Renewal of groundwater withdrawal of up to 0.350 mgd (30-day 
average) from groundwater remediation wells (Docket No. 19860903).
    11. Project Sponsor and Facility: SWN Production Company, LLC, 
Herrick Township, Bradford County, Pa. Groundwater withdrawal of up to 
0.101 mgd (30-day average) from the Fields Supply Well.
    12. Project Sponsor and Facility: Talisman Energy USA Inc. 
(Susquehanna River), Sheshequin Township, Bradford County, Pa. Renewal 
of surface water withdrawal of

[[Page 68095]]

up to 1.500 mgd (peak day) (Docket No. 20120912).
    13. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Chiques Creek), West Hempfield 
Township, Lancaster County, Pa. Surface water withdrawal of up to 2.880 
mgd (peak day).
    14. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Conestoga River-1), Conestoga 
Township, Lancaster County, Pa. Surface water withdrawal of up to 0.360 
mgd (peak day).
    15. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Conestoga River-1), Conestoga 
Township, Lancaster County, Pa. Consumptive water use of up to 0.100 
mgd (peak day).
    16. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Conestoga River-2), Conestoga 
Township, Lancaster County, Pa. Surface water withdrawal of up to 0.360 
mgd (peak day).
    17. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Conestoga River-2), Conestoga 
Township, Lancaster County, Pa. Consumptive water use of up to 0.100 
mgd (peak day).
    18. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Deep Creek), Hegins Township, 
Schuylkill County, Pa. Surface water withdrawal of up to 2.880 mgd 
(peak day).
    19. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Fishing Creek), Sugarloaf 
Township, Columbia County, Pa. Surface water withdrawal of up to 2.592 
mgd (peak day).
    20. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Pequea Creek), Martic 
Township, Lancaster County, Pa. Surface water withdrawal of up to 2.880 
mgd (peak day).
    21. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Roaring Creek), Franklin 
Township, Columbia County, Pa. Surface water withdrawal of up to 2.880 
mgd (peak day).
    22. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Susquehanna River), Eaton 
Township, Wyoming County, Pa. Surface water withdrawal of up to 2.592 
mgd (peak day).
    23. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Susquehanna River), Eaton 
Township, Wyoming County, Pa. Consumptive water use of up to 0.100 mgd 
(peak day).
    24. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-1), Montour 
Township and Catawissa Borough, Columbia County, Pa. Surface water 
withdrawal of up to 0.360 mgd (peak day).
    25. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-1), Montour 
Township and Catawissa Borough, Columbia County, Pa. Consumptive water 
use of up to 0.100 mgd (peak day).
    26. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Swatara Creek), East Hanover 
Township, Lebanon County, Pa. Surface water withdrawal of up to 2.880 
mgd (peak day).

Project Applications Tabled

    The Commission tabled action on the following project applications:
    1. Project Sponsor: Exelon Generation Company, LLC. Project 
Facility: Muddy Run Pumped Storage Project, Drumore and Martic 
Townships, Lancaster County, Pa. Application for an existing 
hydroelectric facility.
    2. Project Sponsor and Facility: Gilberton Power Company, West 
Mahanoy Township, Schuylkill County, Pa. Application for renewal of 
consumptive water use of up to 1.510 mgd (peak day) (Docket No. 
19851202).
    3. Project Sponsor and Facility: Gilberton Power Company, West 
Mahanoy Township, Schuylkill County, Pa. Application for groundwater 
withdrawal of up to 1.870 mgd (30-day average) from the Gilberton Mine 
Pool.
    4. Project Sponsor and Facility: Manbel Devco I, LP, Manheim 
Township, Lancaster County, Pa. Application for groundwater withdrawal 
of up to 4.320 mgd (30-day average) from the Belmont Quarry.
    5. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-2), Montour 
Township, Columbia County, Pa. Application for surface water withdrawal 
of up to 2.880 mgd (peak day).
    6. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-2), Montour 
Township, Columbia County, Pa. Application for consumptive water use of 
up to 0.100 mgd (peak day).
    7. Project Sponsor and Facility: Village of Windsor, Broome County, 
N.Y. Application for groundwater withdrawal of up to 0.380 mgd (30-day 
average) from Well 2.
    8. Project Sponsor and Facility: West Manchester Township 
Authority, West Manchester Township, York County, Pa. Application for 
groundwater withdrawal of up to 0.216 mgd (30-day average) from Well 7.

Project Application Withdrawn by Project Sponsor

    The following project sponsor withdrew its project application:
    1. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Little Fishing Creek), Mount 
Pleasant Township, Columbia County, Pa. Application for surface water 
withdrawal of up to 2.880 mgd (peak day).

    Authority: Pub.L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: September 27, 2016.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2016-23737 Filed 9-30-16; 8:45 am]
 BILLING CODE 7040-01-P



                                                68094                        Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices

                                                Railroad—Abandonment Portion                            certain water resources projects; and                 Groundwater withdrawal of up to 0.180
                                                Goshen Branch Between Firth &                           took additional actions, as set forth in              mgd (30-day average) from Well 3.
                                                Ammon, in Bingham & Bonneville                          the Supplementary Information below.                     2. Project Sponsor and Facility: Cabot
                                                Counties, Idaho, 360 I.C.C. 91 (1979). To               DATES: The business meeting was held                  Oil & Gas Corporation (Susquehanna
                                                address whether this condition                          on September 8, 2016. Please refer to the             River), Great Bend Township,
                                                adequately protects affected employees,                 notice published in 81 FR 64812,                      Susquehanna County, Pa. Renewal of
                                                a petition for partial revocation under                 September 21, 2016, for additional                    surface water withdrawal of up to 2.000
                                                49 U.S.C. 10502(d) must be filed.                       information on the proposed                           mgd (peak day) (Docket No. 20120904).
                                                   Provided no formal expression of                     rulemaking, including public hearing                     3. Project Sponsor and Facility:
                                                intent to file an offer of financial                    dates and locations. Comments on the                  Elizabethtown Area Water Authority,
                                                assistance (OFA) to subsidize continued                 proposed consumptive use mitigation                   Elizabethtown Borough, Lancaster
                                                rail service has been received, this                    policy may be submitted to the                        County, Pa. Groundwater withdrawal of
                                                exemption will be effective on                          Commission on or before January 6,                    up to 0.201 mgd (30-day average) from
                                                November 2, 2016, unless stayed                         2017.                                                 Well 1.
                                                pending reconsideration. Petitions to                                                                            4. Project Sponsor and Facility:
                                                                                                        ADDRESSES: Comments may be mailed
                                                stay that do not involve environmental                                                                        Elizabethtown Area Water Authority,
                                                                                                        to: Jason E. Oyler, Esq., General                     Mount Joy Township, Lancaster County,
                                                issues and formal expressions of intent                 Counsel, Susquehanna River Basin
                                                to file an OFA to subsidize continued                                                                         Pa. Groundwater withdrawal of up to
                                                                                                        Commission, 4423 N. Front Street,
                                                rail service under 49 CFR 1152.27(c)(2) 3                                                                     0.106 mgd (30-day average) from Well 3.
                                                                                                        Harrisburg, PA 17110–1788, or                            5. Project Sponsor and Facility:
                                                must be filed by October 13, 2016.4                     submitted electronically at http://
                                                Petitions to reopen must be filed by                                                                          Elizabethtown Area Water Authority,
                                                                                                        www.srbc.net/pubinfo/                                 Elizabethtown Borough, Lancaster
                                                October 21, 2016, with the Surface                      publicparticipation/
                                                Transportation Board, 395 E Street SW.,                                                                       County, Pa. Groundwater withdrawal of
                                                                                                        PublicComments.aspx?type=5&cat=20.                    up to 0.130 mgd (30-day average) from
                                                Washington, DC 20423–0001.
                                                   A copy of any petition filed with the                FOR FURTHER INFORMATION CONTACT:                      Well 4.
                                                Board should be sent to Florida                         Jason E. Oyler, General Counsel,                         6. Project Sponsor and Facility:
                                                Northern’s representative: Audrey L.                    telephone: (717) 238–0423, ext. 1312;                 Elizabethtown Area Water Authority,
                                                Brodrick, Fletcher & Sippel LLC, 29                     fax: (717) 238–2436; email: joyler@                   Mount Joy Township, Lancaster County,
                                                North Wacker Drive, Suite 920, Chicago,                 srbc.net. Regular mail inquiries may be               Pa. Groundwater withdrawal of up to
                                                IL 60606.                                               sent to the above address. See also                   0.187 mgd (30-day average) from Well 8.
                                                   If the verified notice contains false or             Commission Web site at www.srbc.net.                     7. Project Sponsor and Facility:
                                                misleading information, the exemption                   SUPPLEMENTARY INFORMATION: In                         Elizabethtown Area Water Authority,
                                                is void ab initio.                                      addition to the actions taken on projects             Mount Joy Township, Lancaster County,
                                                   Board decisions and notices are                      identified in the summary above and the               Pa. Groundwater withdrawal of up to
                                                available on our Web site at                            listings below, the following items were              0.216 mgd (30-day average) from Well 9.
                                                ‘‘WWW.STB.GOV.’’                                        also presented or acted upon at the                      8. Project Sponsor and Facility:
                                                                                                        business meeting: (1) rescission of the               Geisinger Health System, Mahoning
                                                  Decided: September 27, 2016.
                                                                                                        Commission’s Information Technology                   Township, Montour County, Pa.
                                                  By the Board, Rachel D. Campbell,
                                                                                                        Services Fee; (2) approval/ratification of            Modification to increase consumptive
                                                Director, Office of Proceedings.
                                                                                                        a contract and several grants; (3) release            water use by an additional 0.319 mgd
                                                Tia Delano,
                                                                                                        of proposed rulemaking to clarify                     (peak day), for a total consumptive
                                                Clearance Clerk.                                        application requirements and standards                water use of up to 0.499 mgd (peak day)
                                                [FR Doc. 2016–23727 Filed 9–30–16; 8:45 am]             for review of projects, amend the rules               (Docket No. 19910103).
                                                BILLING CODE 4915–01–P                                  dealing with the mitigation of                           9. Project Sponsor: Pennsylvania
                                                                                                        consumptive uses, add a subpart to                    American Water Company. Project
                                                                                                        provide for registration of grandfathered             Facility: Nittany Water System, Walker
                                                SUSQUEHANNA RIVER BASIN                                 projects, and revise requirements                     Township, Centre County, Pa.
                                                COMMISSION                                              dealing with hearings and enforcement                 Groundwater withdrawal of up to 0.262
                                                                                                        actions, and release of a consumptive                 mgd (30-day average) from Nittany Well
                                                Actions Taken at September 8, 2016,                     use mitigation policy; (4) a report on                1.
                                                Meeting                                                 delegated settlements with the following                 10. Project Sponsor and Facility:
                                                                                                        project sponsors, pursuant to SRBC                    Republic Services of Pennsylvania, LLC,
                                                AGENCY: Susquehanna River Basin                                                                               Windsor and Lower Windsor
                                                                                                        Resolution 2014–15: Lackawanna
                                                Commission.                                                                                                   Townships, York County, Pa. Renewal
                                                                                                        Energy Center, in the amount of $2,000;
                                                ACTION: Notice.                                                                                               of groundwater withdrawal of up to
                                                                                                        and Troy Borough Municipal Authority,
                                                SUMMARY: As part of its regular business                in the amount of $5,000.; 5) approval to              0.350 mgd (30-day average) from
                                                meeting held on September 8, 2016, in                   extend the term of an emergency                       groundwater remediation wells (Docket
                                                Cooperstown, New York, the                              certificate with Furman Foods, Inc. to                No. 19860903).
                                                                                                        November 30, 2016; and 6) continuance                    11. Project Sponsor and Facility: SWN
                                                Commission took the following actions:
                                                                                                        of the Show Cause proceeding granted                  Production Company, LLC, Herrick
                                                approved or tabled the applications of
                                                                                                        to Montage Mountain Resorts, LP, to the               Township, Bradford County, Pa.
sradovich on DSK3GMQ082PROD with NOTICES




                                                  3 Each OFA must be accompanied by the filing          December 2016 Commission meeting.                     Groundwater withdrawal of up to 0.101
                                                fee, which is currently set at $1,600. See 49 CFR                                                             mgd (30-day average) from the Fields
                                                1002.2(f)(25).                                          Project Applications Approved                         Supply Well.
                                                  4 Because this is a discontinue proceeding and
                                                                                                          The Commission approved the                            12. Project Sponsor and Facility:
                                                not an abandonment, interim trail use/rail banking      following project applications:                       Talisman Energy USA Inc.
                                                and public use conditions are not appropriate.
                                                Because there will be an environmental review
                                                                                                          1. Project Sponsor and Facility:                    (Susquehanna River), Sheshequin
                                                during abandonment, this discontinuance does not        Bloomfield Borough Water Authority,                   Township, Bradford County, Pa.
                                                require an environmental review.                        Centre Township, Perry County, Pa.                    Renewal of surface water withdrawal of


                                           VerDate Sep<11>2014   17:56 Sep 30, 2016   Jkt 241001   PO 00000   Frm 00139   Fmt 4703   Sfmt 4703   E:\FR\FM\03OCN1.SGM   03OCN1


                                                                             Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices                                                  68095

                                                up to 1.500 mgd (peak day) (Docket No.                  Wyoming County, Pa. Surface water                     Company, LLC. Project: Atlantic Sunrise
                                                20120912).                                              withdrawal of up to 2.592 mgd (peak                   (Susquehanna River-2), Montour
                                                  13. Project Sponsor and Facility:                     day).                                                 Township, Columbia County, Pa.
                                                Transcontinental Gas Pipe Line                            23. Project Sponsor and Facility:                   Application for consumptive water use
                                                Company, LLC. Project: Atlantic Sunrise                 Transcontinental Gas Pipe Line                        of up to 0.100 mgd (peak day).
                                                (Chiques Creek), West Hempfield                         Company, LLC. Project: Atlantic Sunrise                 7. Project Sponsor and Facility:
                                                Township, Lancaster County, Pa.                         (Susquehanna River), Eaton Township,                  Village of Windsor, Broome County,
                                                Surface water withdrawal of up to 2.880                 Wyoming County, Pa. Consumptive                       N.Y. Application for groundwater
                                                mgd (peak day).                                         water use of up to 0.100 mgd (peak day).              withdrawal of up to 0.380 mgd (30-day
                                                  14. Project Sponsor and Facility:                       24. Project Sponsor and Facility:                   average) from Well 2.
                                                Transcontinental Gas Pipe Line                          Transcontinental Gas Pipe Line                          8. Project Sponsor and Facility: West
                                                Company, LLC. Project: Atlantic Sunrise                 Company, LLC. Project: Atlantic Sunrise               Manchester Township Authority, West
                                                (Conestoga River-1), Conestoga                          (Susquehanna River-1), Montour                        Manchester Township, York County, Pa.
                                                Township, Lancaster County, Pa.                         Township and Catawissa Borough,                       Application for groundwater
                                                Surface water withdrawal of up to 0.360                 Columbia County, Pa. Surface water                    withdrawal of up to 0.216 mgd (30-day
                                                mgd (peak day).                                         withdrawal of up to 0.360 mgd (peak                   average) from Well 7.
                                                  15. Project Sponsor and Facility:                     day).
                                                Transcontinental Gas Pipe Line                            25. Project Sponsor and Facility:                   Project Application Withdrawn by
                                                Company, LLC. Project: Atlantic Sunrise                 Transcontinental Gas Pipe Line                        Project Sponsor
                                                (Conestoga River-1), Conestoga                          Company, LLC. Project: Atlantic Sunrise                 The following project sponsor
                                                Township, Lancaster County, Pa.                         (Susquehanna River-1), Montour                        withdrew its project application:
                                                Consumptive water use of up to 0.100                    Township and Catawissa Borough,                         1. Project Sponsor and Facility:
                                                mgd (peak day).                                         Columbia County, Pa. Consumptive                      Transcontinental Gas Pipe Line
                                                  16. Project Sponsor and Facility:                     water use of up to 0.100 mgd (peak day).              Company, LLC. Project: Atlantic Sunrise
                                                Transcontinental Gas Pipe Line                            26. Project Sponsor and Facility:                   (Little Fishing Creek), Mount Pleasant
                                                Company, LLC. Project: Atlantic Sunrise                 Transcontinental Gas Pipe Line                        Township, Columbia County, Pa.
                                                (Conestoga River-2), Conestoga                          Company, LLC. Project: Atlantic Sunrise               Application for surface water
                                                Township, Lancaster County, Pa.                         (Swatara Creek), East Hanover                         withdrawal of up to 2.880 mgd (peak
                                                Surface water withdrawal of up to 0.360                 Township, Lebanon County, Pa. Surface                 day).
                                                mgd (peak day).                                         water withdrawal of up to 2.880 mgd
                                                  17. Project Sponsor and Facility:                                                                             Authority: Pub.L. 91–575, 84 Stat. 1509 et
                                                                                                        (peak day).                                           seq., 18 CFR parts 806, 807, and 808.
                                                Transcontinental Gas Pipe Line
                                                Company, LLC. Project: Atlantic Sunrise                 Project Applications Tabled                             Dated: September 27, 2016.
                                                (Conestoga River-2), Conestoga                            The Commission tabled action on the                 Stephanie L. Richardson,
                                                Township, Lancaster County, Pa.                         following project applications:                       Secretary to the Commission.
                                                Consumptive water use of up to 0.100                      1. Project Sponsor: Exelon Generation               [FR Doc. 2016–23737 Filed 9–30–16; 8:45 am]
                                                mgd (peak day).                                         Company, LLC. Project Facility: Muddy                 BILLING CODE 7040–01–P
                                                  18. Project Sponsor and Facility:                     Run Pumped Storage Project, Drumore
                                                Transcontinental Gas Pipe Line                          and Martic Townships, Lancaster
                                                Company, LLC. Project: Atlantic Sunrise                 County, Pa. Application for an existing
                                                (Deep Creek), Hegins Township,                          hydroelectric facility.                               DEPARTMENT OF TRANSPORTATION
                                                Schuylkill County, Pa. Surface water                      2. Project Sponsor and Facility:                    Federal Highway Administration
                                                withdrawal of up to 2.880 mgd (peak                     Gilberton Power Company, West
                                                day).                                                   Mahanoy Township, Schuylkill County,                  Revise Notice of Intent for an
                                                  19. Project Sponsor and Facility:                     Pa. Application for renewal of                        Environmental Impact Statement:
                                                Transcontinental Gas Pipe Line                          consumptive water use of up to 1.510                  North-South Corridor Study: Interstate
                                                Company, LLC. Project: Atlantic Sunrise                 mgd (peak day) (Docket No. 19851202).                 10 to U.S. Highway 60, Pinal County,
                                                (Fishing Creek), Sugarloaf Township,                      3. Project Sponsor and Facility:                    Arizona
                                                Columbia County, Pa. Surface water                      Gilberton Power Company, West
                                                withdrawal of up to 2.592 mgd (peak                     Mahanoy Township, Schuylkill County,                  AGENCY:  Federal Highway
                                                day).                                                   Pa. Application for groundwater                       Administration (FHWA), United States
                                                  20. Project Sponsor and Facility:                     withdrawal of up to 1.870 mgd (30-day                 Department of Transportation (USDOT).
                                                Transcontinental Gas Pipe Line                          average) from the Gilberton Mine Pool.                ACTION: Revised Notice of Intent (NOI).
                                                Company, LLC. Project: Atlantic Sunrise                   4. Project Sponsor and Facility:
                                                (Pequea Creek), Martic Township,                        Manbel Devco I, LP, Manheim                           SUMMARY:   A NOI to prepare an
                                                Lancaster County, Pa. Surface water                     Township, Lancaster County, Pa.                       Environmental Impact Statement (EIS)
                                                withdrawal of up to 2.880 mgd (peak                     Application for groundwater                           was published in the Federal Register
                                                day).                                                   withdrawal of up to 4.320 mgd (30-day                 on September 20, 2010. The FHWA is
                                                  21. Project Sponsor and Facility:                     average) from the Belmont Quarry.                     issuing this notice to advise the public
                                                Transcontinental Gas Pipe Line                            5. Project Sponsor and Facility:                    of a change to the environmental review
                                                Company, LLC. Project: Atlantic Sunrise                 Transcontinental Gas Pipe Line                        process for the proposed North-South
                                                                                                                                                              Corridor. The FHWA and the project
sradovich on DSK3GMQ082PROD with NOTICES




                                                (Roaring Creek), Franklin Township,                     Company, LLC. Project: Atlantic Sunrise
                                                Columbia County, Pa. Surface water                      (Susquehanna River-2), Montour                        sponsor, the Arizona Department of
                                                withdrawal of up to 2.880 mgd (peak                     Township, Columbia County, Pa.                        Transportation (ADOT), intend to use a
                                                day).                                                   Application for surface water                         tiered process in which a Tier 1 EIS will
                                                  22. Project Sponsor and Facility:                     withdrawal of up to 2.880 mgd (peak                   be prepared to evaluate potential
                                                Transcontinental Gas Pipe Line                          day).                                                 corridor alternatives, along with a No-
                                                Company, LLC. Project: Atlantic Sunrise                   6. Project Sponsor and Facility:                    Action alternative, for a future project-
                                                (Susquehanna River), Eaton Township,                    Transcontinental Gas Pipe Line                        specific alignment.


                                           VerDate Sep<11>2014   17:56 Sep 30, 2016   Jkt 241001   PO 00000   Frm 00140   Fmt 4703   Sfmt 4703   E:\FR\FM\03OCN1.SGM   03OCN1



Document Created: 2018-02-13 14:11:41
Document Modified: 2018-02-13 14:11:41
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesThe business meeting was held on September 8, 2016. Please refer to the notice published in 81 FR 64812, September 21, 2016, for additional information on the proposed rulemaking, including public hearing dates and locations. Comments on the proposed consumptive use mitigation policy may be submitted to the Commission on or before January 6, 2017.
ContactJason E. Oyler, General Counsel, telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email: [email protected] Regular mail inquiries may be sent to the above
FR Citation81 FR 68094 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR