A NOI to prepare an Environmental Impact Statement (EIS) was published in the Federal Register on September 20, 2010. The FHWA is issuing this notice to advise the public of a change to the environmental review process for the proposed North-South Corridor. The FHWA and the project sponsor, the Arizona Department of Transportation (ADOT), intend to use a tiered process in which a Tier 1 EIS will be prepared to evaluate potential corridor alternatives, along with a No- Action alternative, for a future project-specific alignment. The proposed tiering approach will allow FHWA and ADOT to evaluate a range of potential corridors within the North-South Corridor Study (NSCS) area boundaries and to broadly evaluate social, economic, and environmental impacts and mitigation approaches in the Tier 1 EIS. In addition, the NSCS area will be expanded to include an adjacent State Route 24 (SR 24) corridor study resulting in an updated study area encompassing the original study area between Interstate 10 (I-10) and U.S. Highway 60 (U.S. 60) and adding the extension of SR 24 from Ironwood Drive to the North-South Corridor in Pinal County, Arizona. The Tier 1 analysis will utilize technical data obtained thus far in the environmental review process and collect other information as required. If the Record of Decision identifies an Action (Build) corridor alternative, subsequent projects will complete a Tier 2 National Environmental Policy Act (NEPA) review where the agencies will evaluate project-level, site-specific impacts, and required mitigation and commitments.

Federal Register, Volume 81 Issue 191 (Monday, October 3, 2016)
[Federal Register Volume 81, Number 191 (Monday, October 3, 2016)]
[Notices]
[Pages 68095-68096]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-23784]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration


Revise Notice of Intent for an Environmental Impact Statement: 
North-South Corridor Study: Interstate 10 to U.S. Highway 60, Pinal 
County, Arizona

AGENCY: Federal Highway Administration (FHWA), United States Department 
of Transportation (USDOT).

ACTION: Revised Notice of Intent (NOI).

-----------------------------------------------------------------------

SUMMARY: A NOI to prepare an Environmental Impact Statement (EIS) was 
published in the Federal Register on September 20, 2010. The FHWA is 
issuing this notice to advise the public of a change to the 
environmental review process for the proposed North-South Corridor. The 
FHWA and the project sponsor, the Arizona Department of Transportation 
(ADOT), intend to use a tiered process in which a Tier 1 EIS will be 
prepared to evaluate potential corridor alternatives, along with a No-
Action alternative, for a future project-specific alignment.

[[Page 68096]]

    The proposed tiering approach will allow FHWA and ADOT to evaluate 
a range of potential corridors within the North-South Corridor Study 
(NSCS) area boundaries and to broadly evaluate social, economic, and 
environmental impacts and mitigation approaches in the Tier 1 EIS. In 
addition, the NSCS area will be expanded to include an adjacent State 
Route 24 (SR 24) corridor study resulting in an updated study area 
encompassing the original study area between Interstate 10 (I-10) and 
U.S. Highway 60 (U.S. 60) and adding the extension of SR 24 from 
Ironwood Drive to the North-South Corridor in Pinal County, Arizona.
    The Tier 1 analysis will utilize technical data obtained thus far 
in the environmental review process and collect other information as 
required. If the Record of Decision identifies an Action (Build) 
corridor alternative, subsequent projects will complete a Tier 2 
National Environmental Policy Act (NEPA) review where the agencies will 
evaluate project-level, site-specific impacts, and required mitigation 
and commitments.

FOR FURTHER INFORMATION CONTACT: Aryan Lirange, Senior Urban Engineer, 
Federal Highway Administration, 4000 N. Central Avenue, Suite 1500, 
Phoenix, AZ 85012, Telephone: (602) 382-8973, Email: 
[email protected].

SUPPLEMENTARY INFORMATION: On September 20, 2010, at 75 FR 57327, FHWA, 
in cooperation with ADOT, issued an NOI to prepare an EIS on a proposed 
40-mile-long project along a new route located between U.S. 60 on the 
north and I-10 on the south, in Pinal County, Arizona. The project is 
considered necessary to achieve a transportation objective identified 
in Pinal County's 2008 Regionally Significant Routes for Safety and 
Mobility. The Study would address current and future transportation 
needs in an area that currently exceeds existing road capacity and is 
expected to continue to worsen with the projected increase in traffic 
demand associated with regional growth. The project scope also 
incorporates the extension of SR 24 from Ironwood Drive to the NSCS 
boundary. Information and documents regarding the environmental review 
process will be made available for the duration of the Tier 1 EIS 
process on the following Web site: https://www.azdot.gov/projects/south-central/north-south-corridor-study.
    The Tier 1 EIS will use all existing data including the NSCS 
Alternatives Selection Report completed in October 2014 and 
engineering, environmental, and socioeconomic data collected since the 
issuance of the original NOI. The FHWA intends to issue a single Final 
Tier 1 EIS and Record of Decision document pursuant to Fixing America's 
Surface Transportation Act Section 1311 requirements, unless FHWA 
determines statutory criteria or practicability considerations preclude 
issuance of a combined document.
    Stakeholder and Public Involvement: Stakeholder and public outreach 
will continue throughout this Tier 1 EIS process to provide 
opportunities for agency and public input on the study. A public 
hearing will be held upon release of the Tier 1 Draft EIS for public 
and agency review.
    Alternatives: Corridor alternatives with widths appropriate for the 
evaluation of the full range of potential impacts will be developed 
within the updated study area. The Tier 1 EIS will evaluate a 
reasonable range of ``Action'' corridor alternatives and the ``No 
Action'' alternative.
    Environmental Review Process: The Tier 1 EIS will be developed in 
accordance with Council on Environmental Quality (CEQ) regulations (40 
Code of Federal Regulations [CFR] part 1500 et seq.) implementing NEPA 
(42 U.S.C. 4321 et seq.), and FHWA regulations. The FHWA and ADOT will 
use a tiered process, as provided for in 40 CFR 1508.28 and in 
accordance with FHWA guidance, in the completion of the environmental 
study.
    If the Record of Decision indicates that FHWA has selected one of 
the corridor alternatives as the environmentally preferred alternative, 
the evaluation of a specific highway alignment within the selected 
corridor would occur in a subsequent phase of the study. Subsequent 
Tier 2 assessment(s) would address a proposed highway alignment to be 
developed within the corridor alternative selected in the Tier 1 EIS, 
and would incorporate by reference the Tier 1 data, evaluations, and 
findings. The Tier 2 NEPA evaluation(s) would concentrate on site-
specific issues and alternatives relevant to implementing a new highway 
alignment within the selected Tier 1 alternative corridor, and would 
identify the environmental consequences and measures necessary to 
mitigate environmental impacts at a site-specific level of detail.

(Catalog of Federal Domestic Assistance Program Number 20.205, 
Highway Research, Planning and Construction. The regulations 
implementing Executive Order 12372 regarding intergovernmental 
consultation on Federal programs and activities apply to this 
program.)

    Authority:  23 U.S.C. 315; U.S.C. 771.123.

    Issued on: September 27, 2016.
Karla S. Petty,
Arizona Division Administrator, Federal Highway Administration.
[FR Doc. 2016-23784 Filed 9-30-16; 8:45 am]
 BILLING CODE 4910-22-P



                                                                             Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices                                                  68095

                                                up to 1.500 mgd (peak day) (Docket No.                  Wyoming County, Pa. Surface water                     Company, LLC. Project: Atlantic Sunrise
                                                20120912).                                              withdrawal of up to 2.592 mgd (peak                   (Susquehanna River-2), Montour
                                                  13. Project Sponsor and Facility:                     day).                                                 Township, Columbia County, Pa.
                                                Transcontinental Gas Pipe Line                            23. Project Sponsor and Facility:                   Application for consumptive water use
                                                Company, LLC. Project: Atlantic Sunrise                 Transcontinental Gas Pipe Line                        of up to 0.100 mgd (peak day).
                                                (Chiques Creek), West Hempfield                         Company, LLC. Project: Atlantic Sunrise                 7. Project Sponsor and Facility:
                                                Township, Lancaster County, Pa.                         (Susquehanna River), Eaton Township,                  Village of Windsor, Broome County,
                                                Surface water withdrawal of up to 2.880                 Wyoming County, Pa. Consumptive                       N.Y. Application for groundwater
                                                mgd (peak day).                                         water use of up to 0.100 mgd (peak day).              withdrawal of up to 0.380 mgd (30-day
                                                  14. Project Sponsor and Facility:                       24. Project Sponsor and Facility:                   average) from Well 2.
                                                Transcontinental Gas Pipe Line                          Transcontinental Gas Pipe Line                          8. Project Sponsor and Facility: West
                                                Company, LLC. Project: Atlantic Sunrise                 Company, LLC. Project: Atlantic Sunrise               Manchester Township Authority, West
                                                (Conestoga River-1), Conestoga                          (Susquehanna River-1), Montour                        Manchester Township, York County, Pa.
                                                Township, Lancaster County, Pa.                         Township and Catawissa Borough,                       Application for groundwater
                                                Surface water withdrawal of up to 0.360                 Columbia County, Pa. Surface water                    withdrawal of up to 0.216 mgd (30-day
                                                mgd (peak day).                                         withdrawal of up to 0.360 mgd (peak                   average) from Well 7.
                                                  15. Project Sponsor and Facility:                     day).
                                                Transcontinental Gas Pipe Line                            25. Project Sponsor and Facility:                   Project Application Withdrawn by
                                                Company, LLC. Project: Atlantic Sunrise                 Transcontinental Gas Pipe Line                        Project Sponsor
                                                (Conestoga River-1), Conestoga                          Company, LLC. Project: Atlantic Sunrise                 The following project sponsor
                                                Township, Lancaster County, Pa.                         (Susquehanna River-1), Montour                        withdrew its project application:
                                                Consumptive water use of up to 0.100                    Township and Catawissa Borough,                         1. Project Sponsor and Facility:
                                                mgd (peak day).                                         Columbia County, Pa. Consumptive                      Transcontinental Gas Pipe Line
                                                  16. Project Sponsor and Facility:                     water use of up to 0.100 mgd (peak day).              Company, LLC. Project: Atlantic Sunrise
                                                Transcontinental Gas Pipe Line                            26. Project Sponsor and Facility:                   (Little Fishing Creek), Mount Pleasant
                                                Company, LLC. Project: Atlantic Sunrise                 Transcontinental Gas Pipe Line                        Township, Columbia County, Pa.
                                                (Conestoga River-2), Conestoga                          Company, LLC. Project: Atlantic Sunrise               Application for surface water
                                                Township, Lancaster County, Pa.                         (Swatara Creek), East Hanover                         withdrawal of up to 2.880 mgd (peak
                                                Surface water withdrawal of up to 0.360                 Township, Lebanon County, Pa. Surface                 day).
                                                mgd (peak day).                                         water withdrawal of up to 2.880 mgd
                                                  17. Project Sponsor and Facility:                                                                             Authority: Pub.L. 91–575, 84 Stat. 1509 et
                                                                                                        (peak day).                                           seq., 18 CFR parts 806, 807, and 808.
                                                Transcontinental Gas Pipe Line
                                                Company, LLC. Project: Atlantic Sunrise                 Project Applications Tabled                             Dated: September 27, 2016.
                                                (Conestoga River-2), Conestoga                            The Commission tabled action on the                 Stephanie L. Richardson,
                                                Township, Lancaster County, Pa.                         following project applications:                       Secretary to the Commission.
                                                Consumptive water use of up to 0.100                      1. Project Sponsor: Exelon Generation               [FR Doc. 2016–23737 Filed 9–30–16; 8:45 am]
                                                mgd (peak day).                                         Company, LLC. Project Facility: Muddy                 BILLING CODE 7040–01–P
                                                  18. Project Sponsor and Facility:                     Run Pumped Storage Project, Drumore
                                                Transcontinental Gas Pipe Line                          and Martic Townships, Lancaster
                                                Company, LLC. Project: Atlantic Sunrise                 County, Pa. Application for an existing
                                                (Deep Creek), Hegins Township,                          hydroelectric facility.                               DEPARTMENT OF TRANSPORTATION
                                                Schuylkill County, Pa. Surface water                      2. Project Sponsor and Facility:                    Federal Highway Administration
                                                withdrawal of up to 2.880 mgd (peak                     Gilberton Power Company, West
                                                day).                                                   Mahanoy Township, Schuylkill County,                  Revise Notice of Intent for an
                                                  19. Project Sponsor and Facility:                     Pa. Application for renewal of                        Environmental Impact Statement:
                                                Transcontinental Gas Pipe Line                          consumptive water use of up to 1.510                  North-South Corridor Study: Interstate
                                                Company, LLC. Project: Atlantic Sunrise                 mgd (peak day) (Docket No. 19851202).                 10 to U.S. Highway 60, Pinal County,
                                                (Fishing Creek), Sugarloaf Township,                      3. Project Sponsor and Facility:                    Arizona
                                                Columbia County, Pa. Surface water                      Gilberton Power Company, West
                                                withdrawal of up to 2.592 mgd (peak                     Mahanoy Township, Schuylkill County,                  AGENCY:  Federal Highway
                                                day).                                                   Pa. Application for groundwater                       Administration (FHWA), United States
                                                  20. Project Sponsor and Facility:                     withdrawal of up to 1.870 mgd (30-day                 Department of Transportation (USDOT).
                                                Transcontinental Gas Pipe Line                          average) from the Gilberton Mine Pool.                ACTION: Revised Notice of Intent (NOI).
                                                Company, LLC. Project: Atlantic Sunrise                   4. Project Sponsor and Facility:
                                                (Pequea Creek), Martic Township,                        Manbel Devco I, LP, Manheim                           SUMMARY:   A NOI to prepare an
                                                Lancaster County, Pa. Surface water                     Township, Lancaster County, Pa.                       Environmental Impact Statement (EIS)
                                                withdrawal of up to 2.880 mgd (peak                     Application for groundwater                           was published in the Federal Register
                                                day).                                                   withdrawal of up to 4.320 mgd (30-day                 on September 20, 2010. The FHWA is
                                                  21. Project Sponsor and Facility:                     average) from the Belmont Quarry.                     issuing this notice to advise the public
                                                Transcontinental Gas Pipe Line                            5. Project Sponsor and Facility:                    of a change to the environmental review
                                                Company, LLC. Project: Atlantic Sunrise                 Transcontinental Gas Pipe Line                        process for the proposed North-South
                                                                                                                                                              Corridor. The FHWA and the project
sradovich on DSK3GMQ082PROD with NOTICES




                                                (Roaring Creek), Franklin Township,                     Company, LLC. Project: Atlantic Sunrise
                                                Columbia County, Pa. Surface water                      (Susquehanna River-2), Montour                        sponsor, the Arizona Department of
                                                withdrawal of up to 2.880 mgd (peak                     Township, Columbia County, Pa.                        Transportation (ADOT), intend to use a
                                                day).                                                   Application for surface water                         tiered process in which a Tier 1 EIS will
                                                  22. Project Sponsor and Facility:                     withdrawal of up to 2.880 mgd (peak                   be prepared to evaluate potential
                                                Transcontinental Gas Pipe Line                          day).                                                 corridor alternatives, along with a No-
                                                Company, LLC. Project: Atlantic Sunrise                   6. Project Sponsor and Facility:                    Action alternative, for a future project-
                                                (Susquehanna River), Eaton Township,                    Transcontinental Gas Pipe Line                        specific alignment.


                                           VerDate Sep<11>2014   17:56 Sep 30, 2016   Jkt 241001   PO 00000   Frm 00140   Fmt 4703   Sfmt 4703   E:\FR\FM\03OCN1.SGM   03OCN1


                                                68096                        Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices

                                                   The proposed tiering approach will                   the issuance of the original NOI. The                   Issued on: September 27, 2016.
                                                allow FHWA and ADOT to evaluate a                       FHWA intends to issue a single Final                  Karla S. Petty,
                                                range of potential corridors within the                 Tier 1 EIS and Record of Decision                     Arizona Division Administrator, Federal
                                                North-South Corridor Study (NSCS) area                  document pursuant to Fixing America’s                 Highway Administration.
                                                boundaries and to broadly evaluate                      Surface Transportation Act Section 1311               [FR Doc. 2016–23784 Filed 9–30–16; 8:45 am]
                                                social, economic, and environmental                     requirements, unless FHWA determines                  BILLING CODE 4910–22–P
                                                impacts and mitigation approaches in                    statutory criteria or practicability
                                                the Tier 1 EIS. In addition, the NSCS                   considerations preclude issuance of a
                                                area will be expanded to include an                     combined document.                                    DEPARTMENT OF TRANSPORTATION
                                                adjacent State Route 24 (SR 24) corridor                   Stakeholder and Public Involvement:
                                                study resulting in an updated study area                Stakeholder and public outreach will                  Federal Motor Carrier Safety
                                                encompassing the original study area                    continue throughout this Tier 1 EIS                   Administration
                                                between Interstate 10 (I–10) and U.S.                   process to provide opportunities for
                                                                                                                                                              [Docket No. FMCSA–2016–0003]
                                                Highway 60 (U.S. 60) and adding the                     agency and public input on the study.
                                                extension of SR 24 from Ironwood Drive                  A public hearing will be held upon                    Qualification of Drivers; Exemption
                                                to the North-South Corridor in Pinal                    release of the Tier 1 Draft EIS for public            Applications; Hearing
                                                County, Arizona.                                        and agency review.
                                                   The Tier 1 analysis will utilize                        Alternatives: Corridor alternatives                AGENCY: Federal Motor Carrier Safety
                                                technical data obtained thus far in the                 with widths appropriate for the                       Administration (FMCSA), DOT.
                                                environmental review process and                        evaluation of the full range of potential             ACTION: Notice of applications for
                                                collect other information as required. If               impacts will be developed within the                  exemption; request for comments.
                                                the Record of Decision identifies an                    updated study area. The Tier 1 EIS will
                                                                                                        evaluate a reasonable range of ‘‘Action’’             SUMMARY:   FMCSA announces receipt of
                                                Action (Build) corridor alternative,
                                                                                                        corridor alternatives and the ‘‘No                    applications from 26 individuals for an
                                                subsequent projects will complete a Tier
                                                                                                        Action’’ alternative.                                 exemption from the hearing requirement
                                                2 National Environmental Policy Act
                                                                                                           Environmental Review Process: The                  in the Federal Motor Carrier Safety
                                                (NEPA) review where the agencies will
                                                                                                        Tier 1 EIS will be developed in                       Regulations (FMCSRs) to operate
                                                evaluate project-level, site-specific
                                                                                                        accordance with Council on                            commercial motor vehicles (CMV) in
                                                impacts, and required mitigation and
                                                                                                        Environmental Quality (CEQ)                           interstate commerce. Granting these
                                                commitments.
                                                                                                        regulations (40 Code of Federal                       exemptions would enable these hard of
                                                FOR FURTHER INFORMATION CONTACT:                        Regulations [CFR] part 1500 et seq.)                  hearing and deaf individuals to operate
                                                Aryan Lirange, Senior Urban Engineer,                   implementing NEPA (42 U.S.C. 4321 et                  CMVs in interstate commerce.
                                                Federal Highway Administration, 4000                    seq.), and FHWA regulations. The                      DATES: Comments must be received on
                                                N. Central Avenue, Suite 1500, Phoenix,                 FHWA and ADOT will use a tiered                       or before November 2, 2016.
                                                AZ 85012, Telephone: (602) 382–8973,                    process, as provided for in 40 CFR                    ADDRESSES: You may submit comments
                                                Email: aryan.lirange@dot.gov.                           1508.28 and in accordance with FHWA                   bearing the Federal Docket Management
                                                SUPPLEMENTARY INFORMATION: On                           guidance, in the completion of the                    System (FDMS) Docket No. FMCSA–
                                                September 20, 2010, at 75 FR 57327,                     environmental study.                                  2016–0003 using any of the following
                                                FHWA, in cooperation with ADOT,                            If the Record of Decision indicates                methods:
                                                issued an NOI to prepare an EIS on a                    that FHWA has selected one of the                       • Federal eRulemaking Portal: Go to
                                                proposed 40-mile-long project along a                   corridor alternatives as the                          http://www.regulations.gov. Follow the
                                                new route located between U.S. 60 on                    environmentally preferred alternative,                online instructions for submitting
                                                the north and I–10 on the south, in Pinal               the evaluation of a specific highway                  comments.
                                                County, Arizona. The project is                         alignment within the selected corridor                  • Mail: Docket Management Facility;
                                                considered necessary to achieve a                       would occur in a subsequent phase of                  U.S. Department of Transportation, 1200
                                                transportation objective identified in                  the study. Subsequent Tier 2                          New Jersey Avenue SE., West Building
                                                Pinal County’s 2008 Regionally                          assessment(s) would address a proposed                Ground Floor, Room W12–140,
                                                Significant Routes for Safety and                       highway alignment to be developed                     Washington, DC 20590–0001.
                                                Mobility. The Study would address                       within the corridor alternative selected                • Hand Delivery: West Building
                                                current and future transportation needs                 in the Tier 1 EIS, and would incorporate              Ground Floor, Room W12–140, 1200
                                                in an area that currently exceeds                       by reference the Tier 1 data, evaluations,            New Jersey Avenue SE., Washington,
                                                existing road capacity and is expected to               and findings. The Tier 2 NEPA                         DC, between 9 a.m. and 5 p.m., Monday
                                                continue to worsen with the projected                   evaluation(s) would concentrate on site-              through Friday, except Federal
                                                increase in traffic demand associated                   specific issues and alternatives relevant             Holidays.
                                                with regional growth. The project scope                 to implementing a new highway                           • Fax: 1–202–493–2251.
                                                also incorporates the extension of SR 24                alignment within the selected Tier 1                    Instructions: Each submission must
                                                from Ironwood Drive to the NSCS                         alternative corridor, and would identify              include the Agency name and the
                                                boundary. Information and documents                     the environmental consequences and                    docket number(s) for this notice. Note
                                                regarding the environmental review                      measures necessary to mitigate                        that all comments received will be
                                                process will be made available for the                  environmental impacts at a site-specific              posted without change to http://
                                                duration of the Tier 1 EIS process on the               level of detail.                                      www.regulations.gov, including any
sradovich on DSK3GMQ082PROD with NOTICES




                                                following Web site: https://                            (Catalog of Federal Domestic Assistance               personal information provided. Please
                                                www.azdot.gov/projects/south-central/                   Program Number 20.205, Highway Research,              see the Privacy Act heading below for
                                                north-south-corridor-study.                             Planning and Construction. The regulations            further information.
                                                   The Tier 1 EIS will use all existing                 implementing Executive Order 12372                      Docket: For access to the docket to
                                                data including the NSCS Alternatives                    regarding intergovernmental consultation on           read background documents or
                                                Selection Report completed in October                   Federal programs and activities apply to this         comments, go to http://
                                                2014 and engineering, environmental,                    program.)                                             www.regulations.gov at any time or
                                                and socioeconomic data collected since                    Authority: 23 U.S.C. 315; U.S.C. 771.123.           Room W12–140 on the ground level of


                                           VerDate Sep<11>2014   17:56 Sep 30, 2016   Jkt 241001   PO 00000   Frm 00141   Fmt 4703   Sfmt 4703   E:\FR\FM\03OCN1.SGM   03OCN1



Document Created: 2018-02-13 14:11:12
Document Modified: 2018-02-13 14:11:12
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRevised Notice of Intent (NOI).
ContactAryan Lirange, Senior Urban Engineer, Federal Highway Administration, 4000 N. Central Avenue, Suite 1500, Phoenix, AZ 85012, Telephone: (602) 382-8973, Email: [email protected]
FR Citation81 FR 68095 