81_FR_6877 81 FR 6851 - Castle Valley Special Service District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 6851 - Castle Valley Special Service District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 26 (February 9, 2016)

Page Range6851-6852
FR Document2016-02466

Federal Register, Volume 81 Issue 26 (Tuesday, February 9, 2016)
[Federal Register Volume 81, Number 26 (Tuesday, February 9, 2016)]
[Notices]
[Pages 6851-6852]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-02466]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-6-000]


Castle Valley Special Service District; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On January 27, 2016, the Castle Valley Special Service District 
filed a notice of intent to construct a qualifying conduit hydropower 
facility, pursuant to section 30 of the Federal Power Act (FPA), as 
amended by section 4 of the Hydropower Regulatory Efficiency Act of 
2013 (HREA). The proposed Ferron Water Treatment Plant Project would 
have an installed capacity of 6 kilowatts (kW) and would be located at 
a vault on an 8-inch-diameter water supply pipe entering the water 
treatment plant The project would be located near the town of Ferron in 
Emery County, Utah.
    Applicant Contact: Jacob Sharp, District Manager, Castle Valley 
Special Service District, 86 South 100 East, P.O. Box 877, Castle Dale, 
UT 84513, Phone No. (435) 381-5333.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed 6-kW turbine and pressure 
reducing valve to be built in the new water treatment plant building, 
fed by an 8-inch-diameter pipeline which splits off from a 24-inch-
diameter pipeline supplying untreated water to the treatment plant; and 
(2) appurtenant facilities. The proposed project would have an 
estimated annual generating capacity of 23 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

[[Page 6852]]



      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                            Satisfies (Y/
       Statutory provision               Description             N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by    The conduit the facility            Y
 HREA.                             uses a tunnel, canal,
                                   pipeline, aqueduct,
                                   flume, ditch, or
                                   similar manmade water
                                   conveyance that is
                                   operated for the
                                   distribution of water
                                   for agricultural,
                                   municipal, or
                                   industrial consumption
                                   and not primarily for
                                   the generation of
                                   electricity.
FPA 30(a)(3)(C)(i), as amended    The facility is                     Y
 by HREA.                          constructed, operated,
                                   or maintained for the
                                   generation of electric
                                   power and uses for such
                                   generation only the
                                   hydroelectric potential
                                   of a non-federally
                                   owned conduit.
FPA 30(a)(3)(C)(ii), as amended   The facility has an                 Y
 by HREA.                          installed capacity that
                                   does not exceed 5
                                   megawatts.
FPA 30(a)(3)(C)(iii), as amended  On or before August 9,              Y
 by HREA.                          2013, the facility is
                                   not licensed, or
                                   exempted from the
                                   licensing requirements
                                   of Part I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD16-6-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email [email protected]. For TTY, 
call (202) 502-8659.

    Dated: February 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-02466 Filed 2-8-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 81, No. 26 / Tuesday, February 9, 2016 / Notices                                                  6851

                                                     Any questions concerning this                        and the Regulations under the NGA (18                   Comment Date: 5:00 p.m. Eastern
                                                  application may be directed to Robert                   CFR 157.10). A person obtaining party                 Time on February 24, 2016.
                                                  Jackson, Manager, Certificates and                      status will be placed on the service list               Dated: February 3, 2016.
                                                  Regulatory Administration, ANR                          maintained by the Secretary of the                    Nathaniel J. Davis, Sr.,
                                                  Pipeline Company, 700 Louisiana                         Commission and will receive copies of
                                                                                                                                                                Deputy Secretary.
                                                  Street, Suite 700, Houston, Texas                       all documents filed by the applicant and
                                                  77002–2700; by calling (832) 320–5487;                  by all other parties. A party must submit             [FR Doc. 2016–02495 Filed 2–8–16; 8:45 am]
                                                  by faxing (832) 320–6487; or by                         seven copies of filings made in the                   BILLING CODE 6717–01–P

                                                  emailing robert_jackson@                                proceeding with the Commission and
                                                  transcanada.com.                                        must mail a copy to the applicant and
                                                     Specifically, the applicant proposes                 to every other party. Only parties to the             DEPARTMENT OF ENERGY
                                                  the Project will consist of modifications               proceeding can ask for court review of                Federal Energy Regulatory
                                                  to upgrade ANR’s existing Collierville                  Commission orders in the proceeding.
                                                                                                                                                                Commission
                                                  Meter Station, and install one (1) new                     However, a person does not have to
                                                  compressor station consisting of one (1)                intervene in order to have comments
                                                  new, approximately 4,700 horsepower                     considered. The second way to                         [Docket No. CD16–6–000]
                                                  turbine compressor unit and                             participate is by filing with the
                                                  appurtenant facilities. Upon                            Secretary of the Commission, as soon as               Castle Valley Special Service District;
                                                  completion, ANR avers that the Project                  possible, an original and two copies of               Notice of Preliminary Determination of
                                                  will expand the delivery capability of                  comments in support of or in opposition               a Qualifying Conduit Hydropower
                                                  ANR’s existing Collierville Meter                       to this project. The Commission will                  Facility and Soliciting Comments and
                                                  Station by an additional 200 million                    consider these comments in                            Motions To Intervene
                                                  cubic feet per day (MMcf/d), while                      determining the appropriate action to be
                                                                                                                                                                   On January 27, 2016, the Castle Valley
                                                  maintaining ANR’s current certificated                  taken, but the filing of a comment alone
                                                                                                                                                                Special Service District filed a notice of
                                                  capacity levels. ANR estimates the total                will not serve to make the filer a party
                                                                                                                                                                intent to construct a qualifying conduit
                                                  cost of the Project to be $36.7 million.                to the proceeding. The Commission’s
                                                     Pursuant to section 157.9 of the                     rules require that persons filing                     hydropower facility, pursuant to section
                                                  Commission’s rules (18 CFR 157.9),                      comments in opposition to the project                 30 of the Federal Power Act (FPA), as
                                                  within 90 days of this Notice, the                      provide copies of their protests only to              amended by section 4 of the
                                                  Commission staff will either: complete                  the party or parties directly involved in             Hydropower Regulatory Efficiency Act
                                                  its environmental assessment (EA) and                   the protest.                                          of 2013 (HREA). The proposed Ferron
                                                  place it into the Commission’s public                      Persons who wish to comment only                   Water Treatment Plant Project would
                                                  record (eLibrary) for this proceeding; or               on the environmental review of this                   have an installed capacity of 6 kilowatts
                                                  issue a Notice of Schedule for                          project should submit an original and                 (kW) and would be located at a vault on
                                                  Environmental Review. If a Notice of                    two copies of their comments to the                   an 8-inch-diameter water supply pipe
                                                  Schedule for Environmental Review is                    Secretary of the Commission.                          entering the water treatment plant The
                                                  issued, it will indicate, among other                   Environmental commentors will be                      project would be located near the town
                                                  milestones, the anticipated date for the                placed on the Commission’s                            of Ferron in Emery County, Utah.
                                                  Commission staff’s issuance of the final                environmental mailing list, will receive                 Applicant Contact: Jacob Sharp,
                                                  environmental impact statement (FEIS)                   copies of the environmental documents,                District Manager, Castle Valley Special
                                                  or EA for this proposal. The filing of the              and will be notified of meetings                      Service District, 86 South 100 East, P.O.
                                                  EA in the Commission’s public record                    associated with the Commission’s                      Box 877, Castle Dale, UT 84513, Phone
                                                  for this proceeding or the issuance of a                environmental review process.                         No. (435) 381–5333.
                                                  Notice of Schedule for Environmental                    Environmental commentors will not be                     FERC Contact: Robert Bell, Phone No.
                                                  Review will serve to notify federal and                 required to serve copies of filed                     (202) 502–6062, email:
                                                  state agencies of the timing for the                    documents on all other parties.                       robert.bell@ferc.gov.
                                                  completion of all necessary reviews, and                However, the non-party commentors
                                                  the subsequent need to complete all                     will not receive copies of all documents                 Qualifying Conduit Hydropower
                                                  federal authorizations within 90 days of                filed by other parties or issued by the               Facility Description: The proposed
                                                  the date of issuance of the Commission                  Commission (except for the mailing of                 project would consist of: (1) A proposed
                                                  staff’s FEIS or EA.                                     environmental documents issued by the                 6-kW turbine and pressure reducing
                                                     There are two ways to become                         Commission) and will not have the right               valve to be built in the new water
                                                  involved in the Commission’s review of                  to seek court review of the                           treatment plant building, fed by an 8-
                                                  this project. First, any person wishing to              Commission’s final order.                             inch-diameter pipeline which splits off
                                                  obtain legal status by becoming a party                    The Commission strongly encourages                 from a 24-inch-diameter pipeline
                                                  to the proceedings for this project                     electronic filings of comments, protests              supplying untreated water to the
                                                  should, on or before the comment date                   and interventions in lieu of paper using              treatment plant; and (2) appurtenant
                                                  stated below file with the Federal                      the ‘‘eFiling’’ link at http://                       facilities. The proposed project would
                                                  Energy Regulatory Commission, 888                       www.ferc.gov. Persons unable to file                  have an estimated annual generating
                                                  First Street NE., Washington, DC 20426,                 electronically should submit an original              capacity of 23 megawatt-hours.
                                                  a motion to intervene in accordance                     and 7 copies of the protest or                           A qualifying conduit hydropower
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  with the requirements of the                            intervention to the Federal Energy                    facility is one that is determined or
                                                  Commission’s Rules of Practice and                      Regulatory Commission, 888 First Street               deemed to meet all of the criteria shown
                                                  Procedure (18 CFR 385.214 or 385.211)                   NE., Washington, DC 20426.                            in the table below.




                                             VerDate Sep<11>2014   17:54 Feb 08, 2016   Jkt 238001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\09FEN1.SGM   09FEN1


                                                  6852                          Federal Register / Vol. 81, No. 26 / Tuesday, February 9, 2016 / Notices

                                                                                       TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                       Satisfies
                                                                 Statutory provision                                                            Description                                             (Y/N)

                                                  FPA 30(a)(3)(A), as amended by HREA ...              The conduit the facility uses a tunnel, canal, pipeline, aqueduct, flume, ditch, or simi-          Y
                                                                                                         lar manmade water conveyance that is operated for the distribution of water for ag-
                                                                                                         ricultural, municipal, or industrial consumption and not primarily for the generation
                                                                                                         of electricity.
                                                  FPA 30(a)(3)(C)(i), as amended by HREA               The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                         power and uses for such generation only the hydroelectric potential of a non-feder-
                                                                                                         ally owned conduit.
                                                  FPA 30(a)(3)(C)(ii), as amended by HREA              The facility has an installed capacity that does not exceed 5 megawatts .....................      Y
                                                  FPA 30(a)(3)(C)(iii), as amended by                  On or before August 9, 2013, the facility is not licensed, or exempted from the licens-            Y
                                                    HREA.                                                ing requirements of Part I of the FPA.



                                                     Preliminary Determination: Based                      ecomment.asp. You must include your                   DEPARTMENT OF ENERGY
                                                  upon the above criteria, Commission                      name and contact information at the end
                                                  staff preliminarily determines that the                  of your comments. For assistance,                     Federal Energy Regulatory
                                                  proposal satisfies the requirements for a                please contact FERC Online Support at                 Commission
                                                  qualifying conduit hydropower facility,                  FERCOnlineSupport@ferc.gov, (866)                     [Docket No. ER16–759–000]
                                                  which is not required to be licensed or                  208–3676 (toll free), or (202) 502–8659
                                                  exempted from licensing.                                 (TTY). In lieu of electronic filing, please           Innovative Solar 43, LLC;
                                                     Comments and Motions to Intervene:                    send a paper copy to: Secretary, Federal              Supplemental Notice That Initial
                                                  Deadline for filing comments contesting                                                                        Market-Based Rate Filing Includes
                                                                                                           Energy Regulatory Commission, 888
                                                  whether the facility meets the qualifying                                                                      Request for Blanket Section 204
                                                                                                           First Street NE., Washington, DC 20426.
                                                  criteria is 45 days from the issuance                                                                          Authorization
                                                  date of this notice.                                     A copy of all other filings in reference
                                                     Deadline for filing motions to                        to this application must be accompanied                  This is a supplemental notice in the
                                                  intervene is 30 days from the issuance                   by proof of service on all persons listed             above-referenced proceeding of
                                                  date of this notice.                                     in the service list prepared by the                   Innovative Solar 43, LLC’s application
                                                     Anyone may submit comments or a                       Commission in this proceeding, in                     for market-based rate authority, with an
                                                  motion to intervene in accordance with                   accordance with 18 CFR 4.34(b) and                    accompanying rate tariff, noting that
                                                  the requirements of Rules of Practice                    385.2010.                                             such application includes a request for
                                                  and Procedure, 18 CFR 385.210 and                          Locations of Notice of Intent: Copies               blanket authorization, under 18 CFR
                                                  385.214. Any motions to intervene must                   of the notice of intent can be obtained               part 34, of future issuances of securities
                                                  be received on or before the specified                                                                         and assumptions of liability.
                                                                                                           directly from the applicant or such
                                                  deadline date for the particular                                                                                  Any person desiring to intervene or to
                                                                                                           copies can be viewed and reproduced at                protest should file with the Federal
                                                  proceeding.
                                                     Filing and Service of Responsive                      the Commission in its Public Reference                Energy Regulatory Commission, 888
                                                  Documents: All filings must (1) bear in                  Room, Room 2A, 888 First Street NE.,                  First Street NE., Washington, DC 20426,
                                                  all capital letters the ‘‘COMMENTS                       Washington, DC 20426. The filing may                  in accordance with Rules 211 and 214
                                                  CONTESTING QUALIFICATION FOR A                           also be viewed on the web at http://                  of the Commission’s Rules of Practice
                                                  CONDUIT HYDROPOWER FACILITY’’                            www.ferc.gov/docs-filing/elibrary.asp                 and Procedure (18 CFR 385.211 and
                                                  or ‘‘MOTION TO INTERVENE,’’ as                           using the ‘‘eLibrary’’ link. Enter the                385.214). Anyone filing a motion to
                                                  applicable; (2) state in the heading the                 docket number (e.g., CD16–6–000) in                   intervene or protest must serve a copy
                                                  name of the applicant and the project                    the docket number field to access the                 of that document on the Applicant.
                                                  number of the application to which the                   document. For assistance, call toll-free                 Notice is hereby given that the
                                                  filing responds; (3) state the name,                     1–866–208–3676 or email                               deadline for filing protests with regard
                                                  address, and telephone number of the                     FERCOnlineSupport@ferc.gov. For TTY,                  to the applicant’s request for blanket
                                                  person filing; and (4) otherwise comply                  call (202) 502–8659.                                  authorization, under 18 CFR part 34, of
                                                  with the requirements of sections                                                                              future issuances of securities and
                                                                                                             Dated: February 2, 2016.
                                                  385.2001 through 385.2005 of the                                                                               assumptions of liability, is February 23,
                                                  Commission’s regulations.1 All                           Nathaniel J. Davis, Sr.,                              2016.
                                                  comments contesting Commission staff’s                   Deputy Secretary.                                        The Commission encourages
                                                  preliminary determination that the                       [FR Doc. 2016–02466 Filed 2–8–16; 8:45 am]            electronic submission of protests and
                                                  facility meets the qualifying criteria                   BILLING CODE 6717–01–P                                interventions in lieu of paper, using the
                                                  must set forth their evidentiary basis.                                                                        FERC Online links at http://
                                                     The Commission strongly encourages                                                                          www.ferc.gov. To facilitate electronic
                                                  electronic filing. Please file motions to                                                                      service, persons with Internet access
                                                  intervene and comments using the                                                                               who will eFile a document and/or be
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Commission’s eFiling system at http://                                                                         listed as a contact for an intervenor
                                                  www.ferc.gov/docs-filing/efiling.asp.                                                                          must create and validate an
                                                  Commenters can submit brief comments                                                                           eRegistration account using the
                                                  up to 6,000 characters, without prior                                                                          eRegistration link. Select the eFiling
                                                  registration, using the eComment system                                                                        link to log on and submit the
                                                  at http://www.ferc.gov/docs-filing/                                                                            intervention or protests.
                                                                                                                                                                    Persons unable to file electronically
                                                    1 18   CFR 385.2001–2005 (2015).                                                                             should submit an original and 5 copies


                                             VerDate Sep<11>2014    17:54 Feb 08, 2016   Jkt 238001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\09FEN1.SGM   09FEN1



Document Created: 2018-02-02 14:30:23
Document Modified: 2018-02-02 14:30:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 6851 