NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 26 (February 9, 2016)

Page Range6895-6897
FR Document2016-02588

The U.S. Nuclear Regulatory Commission (NRC) is issuing a final revision to several sections in Chapter 11, ``Radioactive Waste Management,'' of NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.'' On September 17, 2014, the NRC published for public comment the proposed revisions to Chapter 11 of the SRP. The NRC made changes to the proposed revisions after the consideration of comments received. Among other changes, the revisions include (1) revision of the title of SRP Section 11.1 to ``Coolant Source Terms,'' (2) implementation of Interim Staff Guidance (ISG), COL/DC-ISG-013, and (3) the revision also harmonizes SRP Section 11.2 with Branch Technical Position (BTP) 11.6 regarding the guidance of COL/DC-ISG-013 for calculating doses to members of the public and identifying acceptable criteria in assessing the radiological consequences of accidental releases due to tank failures.

Federal Register, Volume 81 Issue 26 (Tuesday, February 9, 2016)
[Federal Register Volume 81, Number 26 (Tuesday, February 9, 2016)]
[Notices]
[Pages 6895-6897]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-02588]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2014-0198]


Revisions to Radioactive Waste Management Guidance for NRC Staff

AGENCY: Nuclear Regulatory Commission.

ACTION: Standard review plan-final section revision; issuance

-----------------------------------------------------------------------

[[Page 6896]]

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
final revision to several sections in Chapter 11, ``Radioactive Waste 
Management,'' of NUREG-0800, ``Standard Review Plan (SRP) for the 
Review of Safety Analysis Reports for Nuclear Power Plants: LWR 
Edition.'' On September 17, 2014, the NRC published for public comment 
the proposed revisions to Chapter 11 of the SRP. The NRC made changes 
to the proposed revisions after the consideration of comments received. 
Among other changes, the revisions include (1) revision of the title of 
SRP Section 11.1 to ``Coolant Source Terms,'' (2) implementation of 
Interim Staff Guidance (ISG), COL/DC-ISG-013, and (3) the revision also 
harmonizes SRP Section 11.2 with Branch Technical Position (BTP) 11.6 
regarding the guidance of COL/DC-ISG-013 for calculating doses to 
members of the public and identifying acceptable criteria in assessing 
the radiological consequences of accidental releases due to tank 
failures.

DATES: The effective date of this Standard Review Plan update is March 
10, 2016.

ADDRESSES: Please refer to Docket ID NRC-2014-0198 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2014-0198. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that a document is referenced. In 
addition, for the convenience of the reader, the ADAMS accession 
numbers are provided in a table in the ``Availability of Documents'' 
section of this document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Mark Notich, telephone: 301-415-3053; 
email: [email protected]; or Nishka Devaser, telephone: 301-415-5196; 
email: [email protected]; both are staff of the Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001.

SUPPLEMENTARY INFORMATION:

I. Background

    A summary of the comments and the NRC staff's disposition of the 
comments are available in a separate document, ``Response to Public 
Comments on Draft SRP Sections in Chapter 11'' (ADAMS Accession No. 
ML15033A417).
    The Office of New Reactors and the Office of Nuclear Reactor 
Regulation are revising these sections from their current revisions. 
Details of specific changes in the proposed revisions are included at 
the end of each of the proposed sections.
    The changes to this SRP chapter reflect current NRC staff's review 
methods and practices based on lessons learned from the NRC's reviews 
of design certification and combined license applications completed 
since the last revision of this chapter.

II. Backfitting and Finality Provisions

    Issuance of these revised SRP sections does not constitute 
backfitting as defined in Sec.  50.109 of title 10 of the Code of 
Federal Regulations (10 CFR), ``Backfitting,'' (the Backfit Rule) or 
otherwise be inconsistent with the issue finality provisions in 10 CFR 
part 52. The NRC's position is based upon the following considerations.
    1. The SRP positions do not constitute backfitting, inasmuch as the 
SRP is internal guidance directed at the NRC staff with respect to 
their regulatory responsibilities.
    The SRP provides guidance to the staff on how to review an 
application for the NRC's regulatory approval in the form of licensing. 
Changes in internal staff guidance are not matters for which either 
nuclear power plant applicants or licensees are protected under either 
the Backfit Rule or the issue finality provisions of 10 CFR part 52.
    2. The NRC staff has no intention to impose the SRP positions on 
current licensees and regulatory approvals either now or in the future.
    The staff does not intend to impose or apply the positions 
described in the SRP to existing (already issued) licenses and 
regulatory approvals. Therefore, the issuance of a final SRP--even if 
considered guidance that is within the purview of the issue finality 
provisions in 10 CFR part 52--need not be evaluated as if it were a 
backfit or as being inconsistent with issue finality provisions. If, in 
the future, the staff seeks to impose a position in the SRP on holders 
of already issued licenses in a manner which does not provide issue 
finality as described in the applicable issue finality provision, then 
the staff must make the showing as set forth in the Backfit Rule or 
address the criteria for avoiding issue finality as described in the 
applicable issue finality provision.
    3. Backfitting and issue finality do not--with limited exceptions 
not applicable here--protect current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. This is because neither the Backfit 
Rule nor the issue finality provisions under 10 CFR part 52--with 
certain exclusions discussed in the next paragraph--were intended to 
apply to every NRC action which substantially changes the expectations 
of current and future applicants.
    The exceptions to the general principle are applicable whenever an 
applicant references a 10 CFR part 52 license (e.g., an early site 
permit) and/or NRC regulatory approval (e.g., a design certification 
rule) with specified issue finality provisions. The staff does not, at 
this time, intend to impose the positions represented in the SRP in a 
manner that is inconsistent with any issue finality provisions. If, in 
the future, the staff seeks to impose a position in the SRP in a manner 
which does not provide issue finality as described in the applicable 
issue finality provision, then the staff must address the criteria for 
avoiding issue finality as described in the applicable issue finality 
provision.

III. Congressional Review Act

    In accordance with the Congressional Review Act, the NRC has 
determined that this action is not a major rule and has verified this 
determination with the Office of Information and Regulatory Affairs of 
the Office of Management and Budget.

IV. Availability of Documents

    The documents identified in the following table are available to 
interested persons through one or more of the following methods, as 
indicated.

[[Page 6897]]



------------------------------------------------------------------------
               Document                       ADAMS accession No.
------------------------------------------------------------------------
Section 11.1, ``Coolant Source         ML15029A022
 Terms,'' Revision 4.
Section 11.2, ``Liquid Waste           ML15029A032
 Management System,'' Revision 5.
Section 11.3, ``Gaseous Waste          ML15029A039
 Management System,'' Revision 4.
Section 11.4, ``Solid Waste            ML15029A174
 Management System,'' Revision 4.
Section 11.5, ``Process and Effluent   ML15029A182
 Radiological Monitoring
 Instrumentation and Sampling
 Systems,'' Revision 6.
BTP 11-3, ``Design Guidance for Solid  ML15027A198
 Radioactive Waste Management Systems
 Installed in Light-Water-Cooled
 Nuclear Power Reactor Plants,''
 Revision 4*.
BTP 11-5, ``Postulated Radioactive     ML15027A302
 Releases Due to a Waste Gas System
 Leak or Failure,'' Revision 4 *.
BTP 11-6, ``Postulated Radioactive     ML15027A401
 Releases due to Liquid Containing
 Tank Failures,'' Revision 4 *.
------------------------------------------------------------------------
* No changes resulting from public comments. See documents in the
  package at ADAMS Accession Number ML14113A532 to see changes made
  since last revision.


    Dated at Rockville, Maryland, this 8th day of January, 2016.

    For the Nuclear Regulatory Commission.
Kimyata Morgan Butler,
Chief, New Reactor Rulemaking and Guidance Branch, Division of Advanced 
Reactors and Rulemaking, Office of New Reactors.
[FR Doc. 2016-02588 Filed 2-8-16; 8:45 am]
 BILLING CODE 3410-16-P



                                                                                          Federal Register / Vol. 81, No. 26 / Tuesday, February 9, 2016 / Notices                                                                                       6895

                                                  United States citizens, permanent                                           individual-level treatment and control                                 design typically is necessary. At the
                                                  residents, and nationals, particularly                                      groups for future third-party study or for                             individual project level funding can be
                                                  those individuals traditionally                                             internal evaluation); (2) project                                      adjusted based on individual project’s
                                                  underemployed in the STEM research                                          implementation characteristics (also                                   responses to some of the surveys. Some
                                                  workforce, including but not limited to                                     necessary for future use to identify well-                             data collected under this collection will
                                                  women, persons with disabilities, and                                       matched comparison groups); and (3)                                    serve as baseline data for separate
                                                  racial and ethnic minorities.                                               project outputs (necessary to measure                                  research and evaluation studies.
                                                     The scope of this information                                            baseline for pre- and post-NSF-funding-                                   NSF-funded contract or grantee
                                                  collection request will primarily cover                                     level impacts).                                                        researchers and internal or external
                                                  descriptive information gathered from                                          Use of the Information: This                                        evaluators in part may identify control,
                                                  education and training (E&T) projects                                       information is required for effective                                  comparison, or treatment groups for
                                                  that are funded by NSF. NSF will                                            administration, communication,                                         NSF’s E&T portfolio using some of the
                                                  primarily use the data from this                                            program and project monitoring and                                     descriptive data gathered through this
                                                  collection for program planning,                                            evaluation, and for measuring                                          collection to conduct well-designed,
                                                  management, and audit purposes to                                           attainment of NSF’s program, project,                                  rigorous research and portfolio
                                                  respond to queries from the Congress,                                       and strategic goals, and as identified by                              evaluation studies.
                                                  the public, NSF’s external merit                                            the President’s Accountability in                                         Respondents: Individuals or
                                                  reviewers who serve as advisors,                                            Government Initiative; GPRA, and the                                   households, not-for-profit institutions,
                                                  including Committees of Visitors                                            NSF’s Strategic Plan. The Foundation’s                                 business or other for profit, and Federal,
                                                  (COVs), the NSF’s Office of the                                             FY 2014–2018 Strategic Plan may be                                     State, local, or tribal government.
                                                  Inspector General, and as a basis for                                       found at: http://www.nsf.gov/pubs/                                        Number of Respondents: 7,284.
                                                  either internal or third-party evaluations                                  2014/nsf14043/nsf14043.pdf.                                               Burden on the Public: NSF estimates
                                                  of individual programs.                                                        Since this collection will primarily be                             that a total reporting and recordkeeping
                                                     The collections will generally include                                   used for accountability and evaluation                                 burden of 58,449 hours will result from
                                                  three categories of descriptive data: (1)                                   purposes, including responding to                                      activities to monitor EHR STEM
                                                  Staff and project participants (data that                                   queries from COVs and other scientific                                 education programs. The calculation is
                                                  are also necessary to determine                                             experts, a census rather than sampling                                 shown in table 1.

                                                     TABLE 1—ANTICIPATED PROGRAMS THAT WILL COLLECT DATA ON PROJECT PROGRESS AND OUTCOMES ALONG WITH
                                                                    THE NUMBER OF RESPONDENTS AND BURDEN HOURS PER COLLECTION PER YEAR

                                                                                                                                                                                            Number of                                              Annual hour
                                                                                                       Collection title                                                                                       Number of responses
                                                                                                                                                                                           respondents                                               burden

                                                  Advancing Information STEM Learning (AISL) Monitoring System .............................                                                        155    155 ................................           1,921
                                                  Centers of Research Excellence in Science and Technology (CREST) and Histori-                                                                      40    40 ..................................          1,810
                                                     cally Black Colleges and Universities Research Infrastructure for Science and En-
                                                     gineering (HBCU–RISE) Monitoring System.
                                                  Graduate STEM Fellows in K–12 Education (GK–12) Monitoring System ..................                                                             1,267   1,267 .............................            3,529
                                                  Integrative Graduate Education and Research Traineeship Program (IGERT) Moni-                                                                    3,307   3,307 .............................           12,282
                                                     toring System.
                                                  Louis Stokes Alliances for Minority Participation (LSAMP) Monitoring System ..........                                                            563    563 ................................          12,949
                                                  Louis Stokes Alliances for Minority Participation Bridge to the Doctorate (LSAMP–                                                                  55    55 ..................................          2,090
                                                     BD) Monitoring System.
                                                  Robert Noyce Teacher Scholarship Program (Noyce) Monitoring System .................                                                              422    422 ................................           5,908
                                                  Research in Disabilities Education (RDE) Monitoring System .....................................                                                   12    12 ..................................          1,368
                                                  Scholarships in Science, Technology, Engineering, and Mathematics (S–STEM)                                                                        500    1,000 .............................            6,000
                                                     Monitoring System.                                                                                                                                    (500 respondents × 2
                                                                                                                                                                                                             responses/yr.).
                                                  Science, Technology, Engineering, and Mathematics Talent Expansion Program                                                                        277    277 ................................           6,648
                                                    (STEP) Monitoring System.
                                                  Transforming Undergraduate Education in Science, Technology, Engineering, and                                                                     686    686 ................................           2,744
                                                    Mathematics (TUES) Monitoring System.
                                                  Additional Collections not Specified .............................................................................                                900    900 ................................           1,200

                                                        Total .......................................................................................................................              8,184   8,684 .............................           58,449



                                                     The total estimate for this collection                                     Dated: February 3, 2016.                                             NUCLEAR REGULATORY
                                                  is 58,449 annual burden hours. The                                          Suzanne H. Plimpton,                                                   COMMISSION
                                                  average annual reporting burden is                                          Reports Clearance Officer, National Science
                                                  between 1.7 and 114 hours per                                               Foundation.                                                            [NRC–2014–0198]
                                                  ‘‘respondent,’’ depending on whether a                                      [FR Doc. 2016–02520 Filed 2–8–16; 8:45 am]
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  respondent is a direct participant who is                                   BILLING CODE 7555–01–P
                                                                                                                                                                                                     Revisions to Radioactive Waste
                                                  self-reporting or representing a project                                                                                                           Management Guidance for NRC Staff
                                                  and reporting on behalf of many project
                                                  participants.                                                                                                                                      AGENCY:  Nuclear Regulatory
                                                                                                                                                                                                     Commission.
                                                                                                                                                                                                     ACTION: Standard review plan-final
                                                                                                                                                                                                     section revision; issuance



                                             VerDate Sep<11>2014         17:54 Feb 08, 2016         Jkt 238001       PO 00000        Frm 00068        Fmt 4703       Sfmt 4703          E:\FR\FM\09FEN1.SGM   09FEN1


                                                  6896                         Federal Register / Vol. 81, No. 26 / Tuesday, February 9, 2016 / Notices

                                                  SUMMARY:    The U.S. Nuclear Regulatory                 of Documents’’ section of this                        to existing (already issued) licenses and
                                                  Commission (NRC) is issuing a final                     document.                                             regulatory approvals. Therefore, the
                                                  revision to several sections in Chapter                   • NRC’s PDR: You may examine and                    issuance of a final SRP—even if
                                                  11, ‘‘Radioactive Waste Management,’’                   purchase copies of public documents at                considered guidance that is within the
                                                  of NUREG–0800, ‘‘Standard Review                        the NRC’s PDR, Room O1–F21, One                       purview of the issue finality provisions
                                                  Plan (SRP) for the Review of Safety                     White Flint North, 11555 Rockville                    in 10 CFR part 52—need not be
                                                  Analysis Reports for Nuclear Power                      Pike, Rockville, Maryland 20852.                      evaluated as if it were a backfit or as
                                                  Plants: LWR Edition.’’ On September 17,                 FOR FURTHER INFORMATION CONTACT:                      being inconsistent with issue finality
                                                  2014, the NRC published for public                      Mark Notich, telephone: 301–415–3053;                 provisions. If, in the future, the staff
                                                  comment the proposed revisions to                       email: Mark.Notich@nrc.gov; or Nishka                 seeks to impose a position in the SRP on
                                                  Chapter 11 of the SRP. The NRC made                     Devaser, telephone: 301–415–5196;                     holders of already issued licenses in a
                                                  changes to the proposed revisions after                 email: Nishka.Devaser@nrc.gov; both are               manner which does not provide issue
                                                  the consideration of comments received.                 staff of the Office of New Reactors, U.S.             finality as described in the applicable
                                                  Among other changes, the revisions                      Nuclear Regulatory Commission,                        issue finality provision, then the staff
                                                  include (1) revision of the title of SRP                Washington, DC 20555–0001.                            must make the showing as set forth in
                                                  Section 11.1 to ‘‘Coolant Source Terms,’’               SUPPLEMENTARY INFORMATION:                            the Backfit Rule or address the criteria
                                                  (2) implementation of Interim Staff                                                                           for avoiding issue finality as described
                                                  Guidance (ISG), COL/DC–ISG–013, and                     I. Background                                         in the applicable issue finality
                                                  (3) the revision also harmonizes SRP                       A summary of the comments and the                  provision.
                                                  Section 11.2 with Branch Technical                      NRC staff’s disposition of the comments                  3. Backfitting and issue finality do
                                                  Position (BTP) 11.6 regarding the                       are available in a separate document,                 not—with limited exceptions not
                                                  guidance of COL/DC–ISG–013 for                          ‘‘Response to Public Comments on Draft                applicable here—protect current or
                                                  calculating doses to members of the                     SRP Sections in Chapter 11’’ (ADAMS                   future applicants.
                                                  public and identifying acceptable                       Accession No. ML15033A417).                              Applicants and potential applicants
                                                  criteria in assessing the radiological                     The Office of New Reactors and the                 are not, with certain exceptions,
                                                  consequences of accidental releases due                 Office of Nuclear Reactor Regulation are              protected by either the Backfit Rule or
                                                  to tank failures.                                       revising these sections from their                    any issue finality provisions under 10
                                                                                                          current revisions. Details of specific                CFR part 52. This is because neither the
                                                  DATES: The effective date of this
                                                                                                          changes in the proposed revisions are                 Backfit Rule nor the issue finality
                                                  Standard Review Plan update is March
                                                                                                          included at the end of each of the                    provisions under 10 CFR part 52—with
                                                  10, 2016.
                                                                                                          proposed sections.                                    certain exclusions discussed in the next
                                                  ADDRESSES: Please refer to Docket ID
                                                                                                             The changes to this SRP chapter                    paragraph—were intended to apply to
                                                  NRC–2014–0198 when contacting the                       reflect current NRC staff’s review                    every NRC action which substantially
                                                  NRC about the availability of                           methods and practices based on lessons                changes the expectations of current and
                                                  information regarding this document.                    learned from the NRC’s reviews of                     future applicants.
                                                  You may obtain publicly-available                       design certification and combined                        The exceptions to the general
                                                  information related to this document                    license applications completed since the              principle are applicable whenever an
                                                  using any of the following methods:                     last revision of this chapter.                        applicant references a 10 CFR part 52
                                                     • Federal Rulemaking Web site: Go to                                                                       license (e.g., an early site permit) and/
                                                  http://www.regulations.gov and search                   II. Backfitting and Finality Provisions               or NRC regulatory approval (e.g., a
                                                  for Docket ID NRC–2014–0198. Address                       Issuance of these revised SRP sections             design certification rule) with specified
                                                  questions about NRC dockets to Carol                    does not constitute backfitting as                    issue finality provisions. The staff does
                                                  Gallagher; telephone: 301–415–3463;                     defined in § 50.109 of title 10 of the                not, at this time, intend to impose the
                                                  email: Carol.Gallagher@nrc.gov. For                     Code of Federal Regulations (10 CFR),                 positions represented in the SRP in a
                                                  technical questions, contact the                        ‘‘Backfitting,’’ (the Backfit Rule) or                manner that is inconsistent with any
                                                  individuals listed in the FOR FURTHER                   otherwise be inconsistent with the issue              issue finality provisions. If, in the
                                                  INFORMATION CONTACT section of this                     finality provisions in 10 CFR part 52.                future, the staff seeks to impose a
                                                  document.                                               The NRC’s position is based upon the                  position in the SRP in a manner which
                                                     • NRC’s Agencywide Documents                         following considerations.                             does not provide issue finality as
                                                  Access and Management System                               1. The SRP positions do not constitute             described in the applicable issue finality
                                                  (ADAMS): You may obtain publicly-                       backfitting, inasmuch as the SRP is                   provision, then the staff must address
                                                  available documents online in the                       internal guidance directed at the NRC                 the criteria for avoiding issue finality as
                                                  ADAMS Public Documents collection at                    staff with respect to their regulatory                described in the applicable issue finality
                                                  http://www.nrc.gov/reading-rm/                          responsibilities.                                     provision.
                                                  adams.html. To begin the search, select                    The SRP provides guidance to the
                                                  ‘‘ADAMS Public Documents’’ and then                     staff on how to review an application for             III. Congressional Review Act
                                                  select ‘‘Begin Web-based ADAMS                          the NRC’s regulatory approval in the                     In accordance with the Congressional
                                                  Search.’’ For problems with ADAMS,                      form of licensing. Changes in internal                Review Act, the NRC has determined
                                                  please contact the NRC’s Public                         staff guidance are not matters for which              that this action is not a major rule and
                                                  Document Room (PDR) reference staff at                  either nuclear power plant applicants or              has verified this determination with the
                                                  1–800–397–4209, 301–415–4737, or by                     licensees are protected under either the              Office of Information and Regulatory
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  email to pdr.resource@nrc.gov. The                      Backfit Rule or the issue finality                    Affairs of the Office of Management and
                                                  ADAMS accession number for each                         provisions of 10 CFR part 52.                         Budget.
                                                  document referenced (if it is available in                 2. The NRC staff has no intention to
                                                  ADAMS) is provided the first time that                  impose the SRP positions on current                   IV. Availability of Documents
                                                  a document is referenced. In addition,                  licensees and regulatory approvals                      The documents identified in the
                                                  for the convenience of the reader, the                  either now or in the future.                          following table are available to
                                                  ADAMS accession numbers are                                The staff does not intend to impose or             interested persons through one or more
                                                  provided in a table in the ‘‘Availability               apply the positions described in the SRP              of the following methods, as indicated.


                                             VerDate Sep<11>2014   17:54 Feb 08, 2016   Jkt 238001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\09FEN1.SGM   09FEN1


                                                                                     Federal Register / Vol. 81, No. 26 / Tuesday, February 9, 2016 / Notices                                                                        6897

                                                                                                                                                                                                                           ADAMS accession
                                                                                                                              Document                                                                                          No.

                                                  Section 11.1, ‘‘Coolant Source Terms,’’ Revision 4 ...................................................................................................................   ML15029A022
                                                  Section 11.2, ‘‘Liquid Waste Management System,’’ Revision 5 ...............................................................................................             ML15029A032
                                                  Section 11.3, ‘‘Gaseous Waste Management System,’’ Revision 4 ...........................................................................................                ML15029A039
                                                  Section 11.4, ‘‘Solid Waste Management System,’’ Revision 4 .................................................................................................            ML15029A174
                                                  Section 11.5, ‘‘Process and Effluent Radiological Monitoring Instrumentation and Sampling Systems,’’ Revision 6 ...............                                          ML15029A182
                                                  BTP 11–3, ‘‘Design Guidance for Solid Radioactive Waste Management Systems Installed in Light-Water-Cooled Nuclear                                                       ML15027A198
                                                    Power Reactor Plants,’’ Revision 4*.
                                                  BTP 11–5, ‘‘Postulated Radioactive Releases Due to a Waste Gas System Leak or Failure,’’ Revision 4 * ...........................                                        ML15027A302
                                                  BTP 11–6, ‘‘Postulated Radioactive Releases due to Liquid Containing Tank Failures,’’ Revision 4 * .....................................                                 ML15027A401
                                                   * No changes resulting from public comments. See documents in the package at ADAMS Accession Number ML14113A532 to see changes
                                                  made since last revision.


                                                    Dated at Rockville, Maryland, this 8th day                      INFORMATION CONTACT    section of this                             I. Background
                                                  of January, 2016.                                                 document.                                                             On December 8, 2014 (79 FR 72709),
                                                    For the Nuclear Regulatory Commission.
                                                                                                                       • NRC’s Agencywide Documents                                    the NRC published for public comment
                                                  Kimyata Morgan Butler,                                            Access and Management System                                       a proposed revision to this section of the
                                                  Chief, New Reactor Rulemaking and                                 (ADAMS): You may obtain publicly-                                  SRP. The staff made changes to the
                                                  Guidance Branch, Division of Advanced                                                                                                proposed revision after consideration of
                                                                                                                    available documents online in the
                                                  Reactors and Rulemaking, Office of New
                                                                                                                    ADAMS Public Documents collection at                               comments received. A summary of the
                                                  Reactors.
                                                                                                                    http://www.nrc.gov/reading-rm/                                     comments and the staff’s disposition of
                                                  [FR Doc. 2016–02588 Filed 2–8–16; 8:45 am]
                                                                                                                    adams.html. To begin the search, select                            the comments are available in a separate
                                                  BILLING CODE 3410–16–P
                                                                                                                    ‘‘ADAMS Public Documents’’ and then                                document, ‘‘Response to Public
                                                                                                                    select ‘‘Begin Web-based ADAMS                                     Comments on Draft SRP Section 19.0’’
                                                                                                                    Search.’’ For problems with ADAMS,                                 (ADAMS Accession No. ML15086A472).
                                                  NUCLEAR REGULATORY                                                                                                                      The changes to this SRP section
                                                  COMMISSION                                                        please contact the NRC’s Public
                                                                                                                    Document Room (PDR) reference staff at                             reflect current staff review methods and
                                                  [NRC–2012–0232]                                                   1–800–397–4209, 301–415–4737, or by                                practices based on lessons learned from
                                                                                                                                                                                       NRC reviews of design certification (DC)
                                                                                                                    email to pdr.resource@nrc.gov. The
                                                  Revision Probabilistic Risk                                                                                                          and combined license (COL)
                                                                                                                    ADAMS accession number for each
                                                  Assessment and Severe Accident                                                                                                       applications completed since the last
                                                                                                                    document referenced (if it available in
                                                  Evaluation for New Reactors                                                                                                          revision of this chapter. Changes
                                                                                                                    ADAMS) is provided the first time that                             include: (1) Incorporation of guidance
                                                  AGENCY:  Nuclear Regulatory                                       a document is referenced. The final                                previously published in Interim Staff
                                                  Commission.                                                       revision for the SRP, Section 19.0,                                Guidance (ISG) DC/COL–ISG–003
                                                  ACTION: Standard review plan—final                                Revision 3, ‘‘Probabilistic Risk                                   (ADAMS Accession No. ML081430087)
                                                  section revision; issuance.                                       Assessment and Severe Accident                                     concerning the review of probabilistic
                                                                                                                    Evaluation for New Reactors,’’ is                                  risk assessment (PRA) information and
                                                  SUMMARY:    The U.S. Nuclear Regulatory                           available in ADAMS under Accession                                 severe accident assessments submitted
                                                  Commission (NRC) is issuing a final                               No. ML15089A068. A redline strikeout                               to support DC and COL applications, (2)
                                                  revision to the following section in                              comparing the proposed revision to the                             incorporation of guidance for DC and
                                                  Chapter 19 of NUREG–0800, ‘‘Standard                              final revision can be found in ADAMS                               COL applicants previously published in
                                                  Review Plan (SRP) for the Review of                               under Accession No. ML15089A115.                                   ISG DC/COL–ISG–020 (ADAMS
                                                  Safety Analysis Reports for Nuclear                               The responses to public comments can                               Accession No. ML100491233)
                                                  Power Plants: LWR Edition,’’ Section                              be found in ADAMS under Accession                                  concerning review of information from
                                                  19.0, ‘‘Probabilistic Risk Assessment                             No. ML15086A472.                                                   PRA-based seismic margin analyses
                                                  and Severe Accident Evaluation for New                                                                                               submitted in support of DC and COL
                                                  Reactors.’’                                                          • NRC’s PDR: You may examine and
                                                                                                                    purchase copies of public documents at                             applications, (3) incorporation of
                                                  DATES: The effective date of this                                                                                                    guidance previously published in ISG
                                                                                                                    the NRC’s PDR, Room O1–F21, One
                                                  Standard Review Plan update is March                                                                                                 Digital Instrumentation and Controls
                                                  10, 2016.                                                         White Flint North, 11555 Rockville
                                                                                                                    Pike, Rockville, Maryland 20852.                                   (DI&C)/COL–ISG–003 (ADAMS
                                                  ADDRESSES: Please refer to Docket ID                                                                                                 Accession No. ML080570048)
                                                  NRC–2012–0232 when contacting the                                    • The NRC posts its issued staff                                concerning review of DI&C system
                                                  NRC about the availability of                                     guidance on the NRC’s external Web                                 PRAs, including treatment of common
                                                  information regarding this document.                              page: http://www.nrc.gov/reading-rm/                               cause failure (CCFs) in PRAs and
                                                  You may access publicly-available                                 doc-collections/nuregs/staff/sr0800/.                              uncertainty analysis associated with
                                                  information related to this document                              FOR FURTHER INFORMATION CONTACT:                                   new reactor digital systems, (4)
                                                  using any of the following methods:                               Mark Notich, telephone: 301–415–3053,                              incorporation of additional procedures
                                                    • Federal Rulemaking Web site: Go to
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                    email: Mark.Notich@nrc.gov or Nishka                               for review of PRA information and
                                                  http://www.regulations.gov and search                             Devaser, telephone: 301–415–5196,                                  severe accident assessments developed
                                                  for Docket ID NRC–2012–0232. Address                              email: Nishka.Devaser@nrc.gov, both are                            during NRC reviews of DC and COL
                                                  questions about NRC dockets to Carol                              staff of the Office of New Reactors, U.S.                          applications completed after Revision 2
                                                  Gallagher; telephone: 301–415–3463;                                                                                                  of SRP Section 19.0 was issued, (5)
                                                                                                                    Nuclear Regulatory Commission,
                                                  email: Carol.Gallagher@nrc.gov. For                                                                                                  additional proposed acceptance criteria
                                                                                                                    Washington, DC 20555–0001.
                                                  technical questions, contact the                                                                                                     and review procedures for the staff’s
                                                  individual(s) listed in the FOR FURTHER                           SUPPLEMENTARY INFORMATION:                                         review of an applicant’s assessment of


                                             VerDate Sep<11>2014      17:54 Feb 08, 2016      Jkt 238001     PO 00000     Frm 00070      Fmt 4703     Sfmt 4703     E:\FR\FM\09FEN1.SGM          09FEN1



Document Created: 2018-02-02 14:30:28
Document Modified: 2018-02-02 14:30:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionStandard review plan-final section revision; issuance
DatesThe effective date of this Standard Review Plan update is March 10, 2016.
ContactMark Notich, telephone: 301-415-3053; email: [email protected]; or Nishka Devaser, telephone: 301-415-5196; email: [email protected]; both are staff of the Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001.
FR Citation81 FR 6895 