81_FR_70301 81 FR 70105 - GreenGenStorage LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

81 FR 70105 - GreenGenStorage LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 196 (October 11, 2016)

Page Range70105-70105
FR Document2016-24474

Federal Register, Volume 81 Issue 196 (Tuesday, October 11, 2016)
[Federal Register Volume 81, Number 196 (Tuesday, October 11, 2016)]
[Notices]
[Page 70105]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-24474]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14796-000


GreenGenStorage LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On July 19, 2016, GreenGenStorage LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Mokelumne Pumped 
Storage Project, to be located on the North Fork Mokelumne River, Bear 
River, and Cole Creek, in Amador and Calaveras County, California. The 
sole purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The project concept envisions the construction of a pumped storage 
generating facility consisting of: (1) The existing Salt Springs 
Reservoir (part of PG&E's currently licensed Mokelumne River Project 
No. 137) as the lower pool; (2) an upper reservoir using either the 
existing Upper Bear or Lower Bear River reservoirs (also part of PG&E's 
Mokelumne River Project); (3) a 16,000-foot to 20,000-foot power tunnel 
connecting the upper reservoir, pump turbines, and the lower reservoir; 
(4) an underground powerhouse containing the pump-turbines and motor-
generators; (5) an approximately 3,000-foot-long transmission line; and 
(6) appurtenant facilities. GreenGenStorage states that based on 
preliminary analyses, the project would have from one to three 380-
megawatt generating units and an average annual electricity production 
of between 523 and 742 gigawatt-hours. GreenGenStorage plans to conduct 
studies to help further refine the range of suitable generation 
capabilities and other project characteristics.
    Applicant Contact: Mr. Edward Cooper, Managing Director and Project 
Manager, GreenGenStorage LLC, P.O. Box 537, Summerland, CA 93067, (805) 
450-2867 or [email protected].
    FERC Contact: John M. Mudre; phone: (202) 502-8902 or 
[email protected].
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14796-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14796) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: October 4, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-24474 Filed 10-7-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 81, No. 196 / Tuesday, October 11, 2016 / Notices                                                70105

                                                      Dated: October 5, 2016.                               (TTY). In lieu of electronic filing, please           to conduct studies to help further refine
                                                    Kate Mullan,                                            send a paper copy to: Secretary, Federal              the range of suitable generation
                                                    Acting Director, Information Collection                 Energy Regulatory Commission, 888                     capabilities and other project
                                                    Clearance Division, Office of the Chief Privacy         First Street NE., Washington, DC 20426.               characteristics.
                                                    Officer, Office of Management.                          The first page of any filing should                      Applicant Contact: Mr. Edward
                                                    [FR Doc. 2016–24448 Filed 10–7–16; 8:45 am]             include docket number P–9088–050.
                                                                                                                                                                  Cooper, Managing Director and Project
                                                    BILLING CODE 4000–01–P                                    Dated: October 4, 2016.                             Manager, GreenGenStorage LLC, P.O.
                                                                                                            Kimberly D. Bose,                                     Box 537, Summerland, CA 93067, (805)
                                                                                                            Secretary.                                            450–2867 or edward@
                                                    DEPARTMENT OF ENERGY
                                                                                                            [FR Doc. 2016–24470 Filed 10–7–16; 8:45 am]           greengenstorage.com.
                                                    Federal Energy Regulatory                               BILLING CODE 6717–01–P                                   FERC Contact: John M. Mudre; phone:
                                                    Commission                                                                                                    (202) 502–8902 or john.mudre@ferc.gov.
                                                    [Project No. 9088–050]                                  DEPARTMENT OF ENERGY                                     Deadline for filing comments, motions
                                                                                                                                                                  to intervene, competing applications
                                                    Lower Village Hydroelectric                             Federal Energy Regulatory                             (without notices of intent), or notices of
                                                    Associates, L.P., Sugar River Power                     Commission                                            intent to file competing applications: 60
                                                    LLC; Notice of Application for Transfer                                                                       days from the issuance of this notice.
                                                    of License and Soliciting Comments,                     [Project No. 14796–000
                                                                                                                                                                  Competing applications and notices of
                                                    Motions To Intervene, and Protests
                                                                                                            GreenGenStorage LLC; Notice of                        intent must meet the requirements of 18
                                                       On September 15, 2016, Lower Village                 Preliminary Permit Application                        CFR 4.36.
                                                    Hydroelectric Associates, L.P.                          Accepted for Filing and Soliciting                       The Commission strongly encourages
                                                    (transferor) and Sugar River Power LLC                  Comments, Motions To Intervene, and                   electronic filing. Please file comments,
                                                    (transferee) filed an application for the               Competing Applications                                motions to intervene, notices of intent,
                                                    transfer of license of the Lower Village
                                                                                                               On July 19, 2016, GreenGenStorage                  and competing applications using the
                                                    Project No. 9088. The project is located
                                                    on the Sugar River in Sullivan County,                  LLC filed an application for a                        Commission’s eFiling system at http://
                                                    New Hampshire.                                          preliminary permit, pursuant to section               www.ferc.gov/docs-filing/efiling.asp.
                                                       The applicants seek Commission                       4(f) of the Federal Power Act (FPA),                  Commenters can submit brief comments
                                                    approval to transfer the license for the                proposing to study the feasibility of the             up to 6,000 characters, without prior
                                                    Lower Village Project from Lower                        Mokelumne Pumped Storage Project, to                  registration, using the eComment system
                                                    Village Hydroelectric Associates, L.P. to               be located on the North Fork                          at http://www.ferc.gov/docs-filing/
                                                    Sugar River Power LLC.                                  Mokelumne River, Bear River, and Cole                 ecomment.asp. You must include your
                                                       Applicants Contact: For transferor:                  Creek, in Amador and Calaveras County,                name and contact information at the end
                                                    Mr. John Webster, General Partner,                      California. The sole purpose of a                     of your comments. For assistance,
                                                    Lower Village Hydroelectric Associates,                 preliminary permit, if issued, is to grant            please contact FERC Online Support at
                                                    L.P., P.O. Box 178, South Berwick, ME                   the permit holder priority to file a                  FERCOnlineSupport@ferc.gov, (866)
                                                    03908, Email: hydromagnt@gwi.net. For                   license application during the permit                 208–3676 (toll free), or (202) 502–8659
                                                    transferee: Mr. Robert King, Manager,                   term. A preliminary permit does not                   (TTY). In lieu of electronic filing, please
                                                    Sugar River Power LLC, 42 Hurricane                     authorize the permit holder to perform                send a paper copy to: Secretary, Federal
                                                    Road, Keene, NH 03431, Phone: 603–                      any land-disturbing activities or                     Energy Regulatory Commission, 888
                                                    352–3444, Email: bking31415@                            otherwise enter upon lands or waters
                                                                                                                                                                  First Street NE., Washington, DC 20426.
                                                    gmail.com and Ms. Elizabeth W.                          owned by others without the owners’
                                                                                                                                                                  The first page of any filing should
                                                    Whittle, Nixon Peabody, LLP, 799 Ninth                  express permission.
                                                                                                               The project concept envisions the                  include docket number P–14796–000.
                                                    Street NW., Suite 500, Washington, DC
                                                    20004, Phone: 202–585–8338, Email:                      construction of a pumped storage                         More information about this project,
                                                    ewhittle@nixonpeabody.com.                              generating facility consisting of: (1) The            including a copy of the application, can
                                                       FERC Contact: Patricia W. Gillis, (202)              existing Salt Springs Reservoir (part of              be viewed or printed on the ‘‘eLibrary’’
                                                    502–8735, patricia.gillis@ferc.gov.                     PG&E’s currently licensed Mokelumne                   link of Commission’s Web site at http://
                                                       Deadline for filing comments, motions                River Project No. 137) as the lower pool;             www.ferc.gov/docs-filing/elibrary.asp.
                                                    to intervene, and protests: 30 days from                (2) an upper reservoir using either the               Enter the docket number (P–14796) in
                                                    the date that the Commission issues this                existing Upper Bear or Lower Bear River               the docket number field to access the
                                                    notice. The Commission strongly                         reservoirs (also part of PG&E’s                       document. For assistance, contact FERC
                                                    encourages electronic filing. Please file               Mokelumne River Project); (3) a 16,000-               Online Support.
                                                    comments, motions to intervene, and                     foot to 20,000-foot power tunnel
                                                                                                                                                                    Dated: October 4, 2016.
                                                    protests using the Commission’s eFiling                 connecting the upper reservoir, pump
                                                    system at http://www.ferc.gov/docs-                     turbines, and the lower reservoir; (4) an             Kimberly D. Bose,
                                                    filing/efiling.asp. Commenters can                      underground powerhouse containing                     Secretary.
                                                    submit brief comments up to 6,000                       the pump-turbines and motor-                          [FR Doc. 2016–24474 Filed 10–7–16; 8:45 am]
                                                    characters, without prior registration,                 generators; (5) an approximately 3,000-
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                  BILLING CODE 6717–01–P
                                                    using the eComment system at http://                    foot-long transmission line; and (6)
                                                    www.ferc.gov/docs-filing/                               appurtenant facilities. GreenGenStorage
                                                    ecomment.asp. You must include your                     states that based on preliminary
                                                    name and contact information at the end                 analyses, the project would have from
                                                    of your comments. For assistance,                       one to three 380-megawatt generating
                                                    please contact FERC Online Support at                   units and an average annual electricity
                                                    FERCOnlineSupport@ferc.gov, (866)                       production of between 523 and 742
                                                    208–3676 (toll free), or (202) 502–8659                 gigawatt-hours. GreenGenStorage plans


                                               VerDate Sep<11>2014   20:12 Oct 07, 2016   Jkt 241001   PO 00000   Frm 00021   Fmt 4703   Sfmt 9990   E:\FR\FM\11OCN1.SGM   11OCN1



Document Created: 2018-02-13 16:33:45
Document Modified: 2018-02-13 16:33:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 70105 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR