DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 196 (October 11, 2016)

Page Range70106-70106
FR Document2016-24472

Federal Register, Volume 81 Issue 196 (Tuesday, October 11, 2016)
[Federal Register Volume 81, Number 196 (Tuesday, October 11, 2016)]
[Notices]
[Page 70106]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-24472]



[[Page 70106]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-23-000]


California American Water, Southern Division; Notice of 
Preliminary Determination of a Qualifying Conduit Hydropower Facility 
and Soliciting Comments and Motions To Intervene

    On September 28, 2016, the California American Water, Southern 
Division filed a notice of intent to construct a qualifying conduit 
hydropower facility, pursuant to section 30 of the Federal Power Act 
(FPA), as amended by section 4 of the Hydropower Regulatory Efficiency 
Act of 2013 (HREA). The proposed Highland Tank Pressure Reducing Valve 
Modernization Project would have an installed capacity of 177 kilowatts 
(kW) and would be located in the Highland Tank Pressure Reducing 
Station on an existing 24-inch-diameter water supply pipe. The project 
would be located near the City of San Diego in San Diego County, 
California.
    Applicant Contact: Mark Reifer, California American Water, Southern 
Division, 8657 Grand Avenue, Rosemead, CA 91770, Phone No. (626) 614-
2517.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed 10-foot long, 14-inch-diameter 
intake pipe off the 24-inch main pipeline, (2) a proposed powerhouse 
bypassing the existing pressure reducing valve station, containing two 
generating units with a total installed capacity of 177-kW, (3) a 
proposed 350-foot-long 14-inch diameter outlet pipe returning to the 
24-inch main pipeline, and (4) appurtenant facilities. The proposed 
project would have an estimated annual generating capacity of 916.650 
megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
              Statutory provision                                 Description                    Satisfies (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA...........  The conduit is a tunnel, canal, pipeline,                     Y
                                                 aqueduct, flume, ditch, or similar manmade
                                                 water conveyance that is operated for the
                                                 distribution of water for agricultural,
                                                 municipal, or industrial consumption and not
                                                 primarily for the generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA........  The facility is constructed, operated, or                     Y
                                                 maintained for the generation of electric
                                                 power and uses for such generation only the
                                                 hydroelectric potential of a non-federally
                                                 owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA.......  The facility has an installed capacity that                   Y
                                                 does not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA......  On or before August 9, 2013, the facility is                  Y
                                                 not licensed, or exempted from the licensing
                                                 requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff has preliminarily determined that the proposal 
satisfies the requirements for a qualifying conduit hydropower facility 
under 16 U.S.C. 823a, and is exempted from the licensing requirements 
of the FPA.
    Comments and Motions To Intervene: The deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    The deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD16-23-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email [email protected]. For TTY, 
call (202) 502-8659.

    Dated: October 4, 2016.
Kimberly Bose,
Secretary.
[FR Doc. 2016-24472 Filed 10-7-16; 8:45 am]
BILLING CODE 6717-01-P



                                                    70106                        Federal Register / Vol. 81, No. 196 / Tuesday, October 11, 2016 / Notices

                                                    DEPARTMENT OF ENERGY                                    Efficiency Act of 2013 (HREA). The                       Qualifying Conduit Hydropower
                                                                                                            proposed Highland Tank Pressure                        Facility Description: The proposed
                                                    Federal Energy Regulatory                               Reducing Valve Modernization Project                   project would consist of: (1) A proposed
                                                    Commission                                              would have an installed capacity of 177                10-foot long, 14-inch-diameter intake
                                                                                                            kilowatts (kW) and would be located in                 pipe off the 24-inch main pipeline, (2)
                                                    [Docket No. CD16–23–000]                                                                                       a proposed powerhouse bypassing the
                                                                                                            the Highland Tank Pressure Reducing
                                                    California American Water, Southern                     Station on an existing 24-inch-diameter                existing pressure reducing valve station,
                                                    Division; Notice of Preliminary                         water supply pipe. The project would be                containing two generating units with a
                                                    Determination of a Qualifying Conduit                   located near the City of San Diego in                  total installed capacity of 177-kW, (3) a
                                                    Hydropower Facility and Soliciting                      San Diego County, California.                          proposed 350-foot-long 14-inch
                                                    Comments and Motions To Intervene                                                                              diameter outlet pipe returning to the 24-
                                                                                                              Applicant Contact: Mark Reifer,                      inch main pipeline, and (4) appurtenant
                                                       On September 28, 2016, the California                California American Water, Southern                    facilities. The proposed project would
                                                    American Water, Southern Division                       Division, 8657 Grand Avenue,                           have an estimated annual generating
                                                    filed a notice of intent to construct a                 Rosemead, CA 91770, Phone No. (626)                    capacity of 916.650 megawatt-hours.
                                                    qualifying conduit hydropower facility,                 614–2517.                                                A qualifying conduit hydropower
                                                    pursuant to section 30 of the Federal                     FERC Contact: Robert Bell, Phone No.                 facility is one that is determined or
                                                    Power Act (FPA), as amended by section                  (202) 502–6062, email: robert.bell@                    deemed to meet all of the criteria shown
                                                    4 of the Hydropower Regulatory                          ferc.gov.                                              in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                       Satisfies
                                                                     Statutory provision                                                             Description                                        (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ...............           The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar             Y
                                                                                                                    manmade water conveyance that is operated for the distribution of water
                                                                                                                    for agricultural, municipal, or industrial consumption and not primarily for
                                                                                                                    the generation of electricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA ............           The facility is constructed, operated, or maintained for the generation of               Y
                                                                                                                    electric power and uses for such generation only the hydroelectric poten-
                                                                                                                    tial of a non-federally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amended by HREA ...........           The facility has an installed capacity that does not exceed 5 megawatts .....            Y
                                                    FPA 30(a)(3)(C)(iii), as amended by HREA ..........           On or before August 9, 2013, the facility is not licensed, or exempted from              Y
                                                                                                                    the licensing requirements of Part I of the FPA.



                                                       Preliminary Determination: Based                     filing responds; (3) state the name,                   by proof of service on all persons listed
                                                    upon the above criteria, Commission                     address, and telephone number of the                   in the service list prepared by the
                                                    staff has preliminarily determined that                 person filing; and (4) otherwise comply                Commission in this proceeding, in
                                                    the proposal satisfies the requirements                 with the requirements of sections                      accordance with 18 CFR 4.34(b) and
                                                    for a qualifying conduit hydropower                     385.2001 through 385.2005 of the                       385.2010.
                                                    facility under 16 U.S.C. 823a, and is                   Commission’s regulations.1 All
                                                                                                                                                                     Locations of Notice of Intent: Copies
                                                    exempted from the licensing                             comments contesting Commission staff’s
                                                    requirements of the FPA.                                preliminary determination that the                     of the notice of intent can be obtained
                                                       Comments and Motions To Intervene:                   facility meets the qualifying criteria                 directly from the applicant or such
                                                    The deadline for filing comments                        must set forth their evidentiary basis.                copies can be viewed and reproduced at
                                                    contesting whether the facility meets the                  The Commission strongly encourages                  the Commission in its Public Reference
                                                    qualifying criteria is 45 days from the                 electronic filing. Please file motions to              Room, Room 2A, 888 First Street NE.,
                                                    issuance date of this notice.                           intervene and comments using the                       Washington, DC 20426. The filing may
                                                       The deadline for filing motions to                   Commission’s eFiling system at http://                 also be viewed on the web at http://
                                                    intervene is 30 days from the issuance                  www.ferc.gov/docs-filing/efiling.asp.                  www.ferc.gov/docs-filing/elibrary.asp
                                                    date of this notice.                                    Commenters can submit brief comments                   using the ‘‘eLibrary’’ link. Enter the
                                                       Anyone may submit comments or a                      up to 6,000 characters, without prior                  docket number (e.g., CD16–23–000) in
                                                    motion to intervene in accordance with                  registration, using the eComment system                the docket number field to access the
                                                    the requirements of Rules of Practice                   at http://www.ferc.gov/docs-filing/                    document. For assistance, call toll-free
                                                    and Procedure, 18 CFR 385.210 and                       ecomment.asp. You must include your                    1–866–208–3676 or email
                                                    385.214. Any motions to intervene must                  name and contact information at the end                FERCOnlineSupport@ferc.gov. For TTY,
                                                    be received on or before the specified                  of your comments. For assistance,                      call (202) 502–8659.
                                                    deadline date for the particular                        please contact FERC Online Support at
                                                    proceeding.                                             FERCOnlineSupport@ferc.gov, (866)                        Dated: October 4, 2016.
                                                       Filing and Service of Responsive
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            208–3676 (toll free), or (202) 502–8659                Kimberly Bose,
                                                    Documents: All filings must (1) bear in                 (TTY). In lieu of electronic filing, please            Secretary.
                                                    all capital letters the ‘‘COMMENTS                      send a paper copy to: Secretary, Federal               [FR Doc. 2016–24472 Filed 10–7–16; 8:45 am]
                                                    CONTESTING QUALIFICATION FOR A                          Energy Regulatory Commission, 888                      BILLING CODE 6717–01–P
                                                    CONDUIT HYDROPOWER FACILITY’’                           First Street NE., Washington, DC 20426.
                                                    or ‘‘MOTION TO INTERVENE,’’ as                          A copy of all other filings in reference
                                                    applicable; (2) state in the heading the                to this application must be accompanied
                                                    name of the applicant and the project
                                                    number of the application to which the                    1 18   CFR 385.2001–2005 (2015).



                                               VerDate Sep<11>2014   20:12 Oct 07, 2016   Jkt 241001   PO 00000   Frm 00022   Fmt 4703   Sfmt 9990   E:\FR\FM\11OCN1.SGM   11OCN1



Document Created: 2018-02-13 16:33:34
Document Modified: 2018-02-13 16:33:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 70106 