81_FR_70304 81 FR 70108 - Water Street Land, LLC; Notice of Application Accepted for Filing With the Commission, Intent To Waive Scoping, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, and Recommendations, and Establishing an Expedited Schedule for Processing

81 FR 70108 - Water Street Land, LLC; Notice of Application Accepted for Filing With the Commission, Intent To Waive Scoping, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, and Recommendations, and Establishing an Expedited Schedule for Processing

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 196 (October 11, 2016)

Page Range70108-70109
FR Document2016-24604

Federal Register, Volume 81 Issue 196 (Tuesday, October 11, 2016)
[Federal Register Volume 81, Number 196 (Tuesday, October 11, 2016)]
[Notices]
[Pages 70108-70109]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-24604]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14680-002]


Water Street Land, LLC; Notice of Application Accepted for Filing 
With the Commission, Intent To Waive Scoping, Soliciting Motions To 
Intervene and Protests, Ready for Environmental Analysis, and 
Soliciting Comments, Terms and Conditions, and Recommendations, and 
Establishing an Expedited Schedule for Processing

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Exemption from Licensing
    b. Project No.: 14680-002
    c. Date filed: July 13, 2016
    d. Applicant: Water Street Land, LLC
    e. Name of Project: Natick Pond Dam Hydroelectric Project
    f. Location: On the Pawtuxet River, in the Towns of Warwick and 
West Warwick, Kent County, Rhode Island. No federal lands would be 
occupied by project works or located within the project boundary.
    g. Filed Pursuant to: Public Utility Regulatory Policies Act of 
1978, 16 U.S.C. 2705, 2708 (2012), amended by the Hydropower Regulatory 
Efficiency Act of 2013, Public Law 113-23, 127 Stat. 493 (2013).
    h. Applicant Contact: Mr. Rob Cioe, Water Street Land, LLC, P.O. 
Box 358, North Kingstown, RI 02852; (480) 797-3077.
    i. FERC Contact: John Ramer, (202) 502-8969, or email at 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
terms and conditions, and recommendations: Due to the small size and 
location of this project and the close coordination with state and 
federal agencies during preparation of the application, the 60- day 
timeframe in 18 CFR 4.34(b) is shortened. Instead, motions to intervene 
and protests, comments, terms and conditions, and recommendations are 
due 30 days from the issuance date of this notice. All reply comments 
must be filed with the Commission within 45 days from the issuance date 
of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, and recommendations using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14680-002.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The proposed Natick Pond Dam Hydroelectric Project would consist 
of: (1) An existing 265-foot-long granite block dam with a 19.3-foot-
high, 166-foot-long spillway; (2) an existing 58-foot to 125.3-foot-
wide, 1-foot- to 28-foot-deep earth embankment; (3) an existing 44-
foot-long, 4-foot- to 20-foot-high south granite block training wall; 
(4) an existing 1,244-foot-long, 18-foot- to 41.25-foot-high granite 
block and cobble stone north training wall; (5) an existing 4-foot-
wide, 6-foot-high granite

[[Page 70109]]

block low level outlet; (6) an existing 46.0-acre impoundment (Natick 
Pond) with a normal surface elevation of about 48.5 feet North American 
Vertical Datum of 1988; (7) a new 97-foot-long, 32.2-foot-wide, 6.6-
foot-deep concrete intake channel; (8) four new 7.6-foot-high, 11.1-
foot-wide steel sluice gates each with new 8.3-foot-high, 32.2-foot-
wide steel trashracks with 6-inch clear bar spacing; (9) a new 20.8-
foot-high, 23.7-foot-long, 27.7-foot-wide concrete powerhouse; (10) two 
new 12-foot-high, 92-foot-long, 28-foot-wide concrete turbine bays 
containing two 42.7-foot-long, 9.2-foot-diameter Archimedes screw 
turbine-generator units each rated at 180 kilowatts (kW) for a total 
installed capacity of 360 kW; (11) a new 43-foot long, 29-foot-wide, 5-
foot-deep tailrace; (12) a new 54-foot-long, 4.5-foot-wide aluminum eel 
passage facility; (13) a new water-level sensor and automatic sluice 
gate controller; (14) a new 40-foot-long, 480-volt below-ground 
transmission line connecting the powerhouse electrical panel to a new 
15-kilovolt-amp (kVA) step-up transformer connecting a new 220-foot-
long, 12.47-kilovolt above-ground transmission line to National Grid's 
distribution system; and (15) appurtenant facilities. The estimated 
annual generation of the proposed Natick Pond Dam Project would be 
about 1,800 megawatt-hours. The applicant proposes to operate the 
project in a run-of-river mode. There are no federal or state lands 
associated with the project.
    m. Due to the applicant's close coordination with federal and state 
agencies during the preparation of the application, completed studies 
during pre-filing consultation, and agency recommended preliminary 
terms and conditions, we intend to waive scoping and expedite the 
exemption process. Based on a review of the application, resource 
agency consultation letters including the preliminary 30(c) terms and 
conditions, and comments filed to date, Commission staff intends to 
prepare a single environmental assessment (EA). Commission staff 
determined that the issues that need to be addressed in its EA have 
been adequately identified during the pre-filing period, which included 
a public scoping meeting and site visit, and no new issues are likely 
to be identified through additional scoping. The EA will consider 
assessing the potential effects of project construction and operation 
on geology and soils, aquatic, terrestrial, threatened and endangered 
species, recreation and land use, aesthetic, and cultural and historic 
resources.
    n. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. For assistance, contact FERC Online Support. A 
copy is also available for inspection and reproduction at the address 
in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit comments, a protest, or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, .211, .214. In determining the appropriate action to take, 
the Commission will consider all protests or other comments filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' or ``TERMS AND CONDITIONS;'' 
(2) set forth in the heading the name of the applicant and the project 
number of the application to which the filing responds; (3) furnish the 
name, address, and telephone number of the person protesting or 
intervening; and (4) otherwise comply with the requirements of 18 CFR 
385.2001 through 385.2005. All comments, recommendations, terms and 
conditions or prescriptions must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    p. Procedural Schedule: The application will be processed according 
to the following procedural schedule. Revisions to the schedule may be 
made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Notice of the availability of the EA...  February 2017.
------------------------------------------------------------------------


    Dated: October 5, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-24604 Filed 10-7-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    70108                          Federal Register / Vol. 81, No. 196 / Tuesday, October 11, 2016 / Notices

                                                    the applicant specified in the particular                 1, 2017.1 The project would have been                     i. FERC Contact: John Ramer, (202)
                                                    application.                                              located in the Pacific Ocean between 2.5               502–8969, or email at john.ramer@
                                                      Dated: October 4, 2016.                                 and 3.0 miles off the coast of San Luis                ferc.gov.
                                                                                                              Obispo County, California, and on land                    j. Deadline for filing motions to
                                                    Kimberly D. Bose,
                                                                                                              near the town of Morro Bay.                            intervene and protests, comments, terms
                                                    Secretary.
                                                                                                                 The preliminary permit for Project                  and conditions, and recommendations:
                                                    [FR Doc. 2016–24471 Filed 10–7–16; 8:45 am]                                                                      Due to the small size and location of
                                                                                                              No. 14584 will remain in effect until the
                                                    BILLING CODE 6717–01–P
                                                                                                              close of business, November 3, 2016.                   this project and the close coordination
                                                                                                              But, if the Commission is closed on this               with state and federal agencies during
                                                                                                              day, then the permit remains in effect                 preparation of the application, the 60-
                                                    DEPARTMENT OF ENERGY                                                                                             day timeframe in 18 CFR 4.34(b) is
                                                                                                              until the close of business on the next
                                                    Federal Energy Regulatory                                 day in which the Commission is open.2                  shortened. Instead, motions to intervene
                                                                                                              New applications for this site may not                 and protests, comments, terms and
                                                    Commission
                                                                                                              be submitted until after the permit                    conditions, and recommendations are
                                                    [Project No. 14585–001]                                   surrender is effective.                                due 30 days from the issuance date of
                                                                                                                                                                     this notice. All reply comments must be
                                                    Dynegy Estero Bay Wave Park, LLC;                           Dated: October 4, 2016.
                                                                                                                                                                     filed with the Commission within 45
                                                    Notice of Surrender of Preliminary                        Kimberly D. Bose,                                      days from the issuance date of this
                                                    Permit                                                    Secretary.                                             notice.
                                                                                                              [FR Doc. 2016–24473 Filed 10–7–16; 8:45 am]               The Commission strongly encourages
                                                       Take notice that Dynegy Estero Bay                                                                            electronic filing. Please file motions to
                                                                                                              BILLING CODE 6717–01–P
                                                    Wave Park, LLC, permittee for the                                                                                intervene, protests, comments, and
                                                    proposed Estero Bay Wave Park Project,                                                                           recommendations using the
                                                    has requested that its preliminary                        DEPARTMENT OF ENERGY                                   Commission’s eFiling system at http://
                                                    permit be terminated. The permit was                                                                             www.ferc.gov/docs-filing/efiling.asp.
                                                    issued on October 28, 2014, and would                     Federal Energy Regulatory                              Commenters can submit brief comments
                                                    have expired on November 1, 2017.1                        Commission                                             up to 6,000 characters, without prior
                                                    The project would have been located in                                                                           registration, using the eComment system
                                                                                                              [Project No. 14680–002]
                                                    coastal waters between 2.5 and 3.0 miles                                                                         at http://www.ferc.gov/docs-filing/
                                                    off the coast of San Luis Obispo County,                  Water Street Land, LLC; Notice of                      ecomment.asp. You must include your
                                                    California, and on land near the town of                  Application Accepted for Filing With                   name and contact information at the end
                                                    Morro Bay.                                                the Commission, Intent To Waive                        of your comments. For assistance,
                                                       The preliminary permit for Project                     Scoping, Soliciting Motions To                         please contact FERC Online Support at
                                                    No. 14585 will remain in effect until the                 Intervene and Protests, Ready for                      FERCOnlineSupport@ferc.gov, (866)
                                                    close of business, November 3, 2016.                      Environmental Analysis, and Soliciting                 208–3676 (toll free), or (202) 502–8659
                                                    But, if the Commission is closed on this                  Comments, Terms and Conditions, and                    (TTY). In lieu of electronic filing, please
                                                    day, then the permit remains in effect                    Recommendations, and Establishing                      send a paper copy to: Secretary, Federal
                                                    until the close of business on the next                   an Expedited Schedule for Processing                   Energy Regulatory Commission, 888
                                                    day in which the Commission is open.2                                                                            First Street NE., Washington, DC 20426.
                                                    New applications for this site may not                       Take notice that the following                      The first page of any filing should
                                                    be submitted until after the permit                       hydroelectric application has been filed               include docket number P–14680–002.
                                                    surrender is effective.                                   with the Commission and is available                      The Commission’s Rules of Practice
                                                      Dated: October 4, 2016.                                 for public inspection.                                 require all intervenors filing documents
                                                    Kimberly D. Bose,                                            a. Type of Application: Exemption                   with the Commission to serve a copy of
                                                    Secretary.                                                from Licensing                                         that document on each person on the
                                                    [FR Doc. 2016–24475 Filed 10–7–16; 8:45 am]
                                                                                                                 b. Project No.: 14680–002                           official service list for the project.
                                                    BILLING CODE 6717–01–P
                                                                                                                 c. Date filed: July 13, 2016                        Further, if an intervenor files comments
                                                                                                                 d. Applicant: Water Street Land, LLC                or documents with the Commission
                                                                                                                 e. Name of Project: Natick Pond Dam                 relating to the merits of an issue that
                                                    DEPARTMENT OF ENERGY                                      Hydroelectric Project                                  may affect the responsibilities of a
                                                                                                                 f. Location: On the Pawtuxet River, in              particular resource agency, they must
                                                    Federal Energy Regulatory                                 the Towns of Warwick and West                          also serve a copy of the document on
                                                    Commission                                                Warwick, Kent County, Rhode Island.                    that resource agency.
                                                                                                              No federal lands would be occupied by                     k. This application has been accepted
                                                    [Project No. 14584–001]
                                                                                                              project works or located within the                    for filing and is now ready for
                                                    Dynegy Point Estero Wave Park, LLC;                       project boundary.                                      environmental analysis.
                                                    Notice of Surrender of Preliminary                           g. Filed Pursuant to: Public Utility                   l. The proposed Natick Pond Dam
                                                    Permit                                                    Regulatory Policies Act of 1978, 16                    Hydroelectric Project would consist of:
                                                                                                              U.S.C. 2705, 2708 (2012), amended by                   (1) An existing 265-foot-long granite
                                                      Take notice that Dynegy Point Estero                    the Hydropower Regulatory Efficiency                   block dam with a 19.3-foot-high, 166-
                                                                                                                                                                     foot-long spillway; (2) an existing 58-
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    Wave Park, LLC, permittee for the                         Act of 2013, Public Law 113–23, 127
                                                    proposed Point Estero Wave Park                           Stat. 493 (2013).                                      foot to 125.3-foot-wide, 1-foot- to 28-
                                                    Project, has requested that its                              h. Applicant Contact: Mr. Rob Cioe,                 foot-deep earth embankment; (3) an
                                                    preliminary permit be terminated. The                     Water Street Land, LLC, P.O. Box 358,                  existing 44-foot-long, 4-foot- to 20-foot-
                                                    permit was issued on October 28, 2014,                    North Kingstown, RI 02852; (480) 797–                  high south granite block training wall;
                                                    and would have expired on November                        3077.                                                  (4) an existing 1,244-foot-long, 18-foot-
                                                                                                                                                                     to 41.25-foot-high granite block and
                                                      1 149   FERC ¶ 62,059.                                    1 149   FERC ¶ 62,058.                               cobble stone north training wall; (5) an
                                                      2 18   CFR 385.2007(a)(2) (2016).                         2 18   CFR 385.2007(a)(2) (2016).                    existing 4-foot-wide, 6-foot-high granite


                                               VerDate Sep<11>2014     20:12 Oct 07, 2016   Jkt 241001   PO 00000   Frm 00024    Fmt 4703   Sfmt 4703   E:\FR\FM\11OCN1.SGM   11OCN1


                                                                                 Federal Register / Vol. 81, No. 196 / Tuesday, October 11, 2016 / Notices                                                70109

                                                    block low level outlet; (6) an existing                    n. A copy of the application is                    which the filing responds; (3) furnish
                                                    46.0-acre impoundment (Natick Pond)                     available for review at the Commission                the name, address, and telephone
                                                    with a normal surface elevation of about                in the Public Reference Room or may be                number of the person protesting or
                                                    48.5 feet North American Vertical                       viewed on the Commission’s Web site at                intervening; and (4) otherwise comply
                                                    Datum of 1988; (7) a new 97-foot-long,                  http://www.ferc.gov using the                         with the requirements of 18 CFR
                                                    32.2-foot-wide, 6.6-foot-deep concrete                  ‘‘eLibrary’’ link. Enter the docket                   385.2001 through 385.2005. All
                                                    intake channel; (8) four new 7.6-foot-                  number excluding the last three digits in             comments, recommendations, terms and
                                                    high, 11.1-foot-wide steel sluice gates                 the docket number field to access the                 conditions or prescriptions must set
                                                    each with new 8.3-foot-high, 32.2-foot-                 document. For assistance, contact FERC                forth their evidentiary basis and
                                                    wide steel trashracks with 6-inch clear                 Online Support. For assistance, contact               otherwise comply with the requirements
                                                    bar spacing; (9) a new 20.8-foot-high,                  FERC Online Support. A copy is also                   of 18 CFR 4.34(b). Agencies may obtain
                                                    23.7-foot-long, 27.7-foot-wide concrete                 available for inspection and                          copies of the application directly from
                                                    powerhouse; (10) two new 12-foot-high,                  reproduction at the address in item h                 the applicant. A copy of any protest or
                                                    92-foot-long, 28-foot-wide concrete                     above.                                                motion to intervene must be served
                                                    turbine bays containing two 42.7-foot-                     You may also register online at http://            upon each representative of the
                                                    long, 9.2-foot-diameter Archimedes                      www.ferc.gov/docs-filing/                             applicant specified in the particular
                                                    screw turbine-generator units each rated                esubscription.asp to be notified via                  application. A copy of all other filings
                                                    at 180 kilowatts (kW) for a total                       email of new filings and issuances                    in reference to this application must be
                                                    installed capacity of 360 kW; (11) a new                related to this or other pending projects.            accompanied by proof of service on all
                                                    43-foot long, 29-foot-wide, 5-foot-deep                 For assistance, contact FERC Online                   persons listed in the service list
                                                    tailrace; (12) a new 54-foot-long, 4.5-                 Support.                                              prepared by the Commission in this
                                                    foot-wide aluminum eel passage facility;                   o. Any qualified applicant desiring to             proceeding, in accordance with 18 CFR
                                                    (13) a new water-level sensor and                       file a competing application must                     4.34(b) and 385.2010.
                                                    automatic sluice gate controller; (14) a                submit to the Commission, on or before                  p. Procedural Schedule: The
                                                    new 40-foot-long, 480-volt below-                       the specified intervention deadline date,             application will be processed according
                                                    ground transmission line connecting the                 a competing development application,                  to the following procedural schedule.
                                                    powerhouse electrical panel to a new                    or a notice of intent to file such an                 Revisions to the schedule may be made
                                                    15-kilovolt-amp (kVA) step-up                           application. Submission of a timely                   as appropriate.
                                                    transformer connecting a new 220-foot-                  notice of intent allows an interested
                                                    long, 12.47-kilovolt above-ground                       person to file the competing                                    Milestone               Target date
                                                    transmission line to National Grid’s                    development application no later than
                                                                                                            120 days after the specified intervention             Notice of the availability of   February 2017.
                                                    distribution system; and (15)
                                                                                                            deadline date. Applications for                         the EA.
                                                    appurtenant facilities. The estimated
                                                                                                            preliminary permits will not be
                                                    annual generation of the proposed
                                                                                                            accepted in response to this notice.                    Dated: October 5, 2016.
                                                    Natick Pond Dam Project would be                           A notice of intent must specify the
                                                    about 1,800 megawatt-hours. The                                                                               Kimberly D. Bose,
                                                                                                            exact name, business address, and
                                                    applicant proposes to operate the                       telephone number of the prospective                   Secretary.
                                                    project in a run-of-river mode. There are               applicant, and must include an                        [FR Doc. 2016–24604 Filed 10–7–16; 8:45 am]
                                                    no federal or state lands associated with               unequivocal statement of intent to                    BILLING CODE 6717–01–P
                                                    the project.                                            submit a development application. A
                                                       m. Due to the applicant’s close                      notice of intent must be served on the
                                                    coordination with federal and state                     applicant(s) named in this public notice.             ENVIRONMENTAL PROTECTION
                                                    agencies during the preparation of the                     Anyone may submit comments, a                      AGENCY
                                                    application, completed studies during                   protest, or a motion to intervene in
                                                    pre-filing consultation, and agency                                                                           [FRL–9954–01–OA]
                                                                                                            accordance with the requirements of
                                                    recommended preliminary terms and                       Rules of Practice and Procedure, 18 CFR               Farm, Ranch, and Rural Communities
                                                    conditions, we intend to waive scoping                  385.210, .211, .214. In determining the               Committee Teleconference
                                                    and expedite the exemption process.                     appropriate action to take, the
                                                    Based on a review of the application,                   Commission will consider all protests or              AGENCY: Environmental Protection
                                                    resource agency consultation letters                    other comments filed, but only those                  Agency (EPA).
                                                    including the preliminary 30(c) terms                   who file a motion to intervene in                     ACTION: Notice of Public Advisory
                                                    and conditions, and comments filed to                   accordance with the Commission’s                      Committee Teleconference.
                                                    date, Commission staff intends to                       Rules may become a party to the
                                                    prepare a single environmental                          proceeding. Any comments, protests, or                SUMMARY:   Under the Federal Advisory
                                                    assessment (EA). Commission staff                       motions to intervene must be received                 Committee Act, Public Law 92–463,
                                                    determined that the issues that need to                 on or before the specified comment date               EPA gives notice of a teleconference
                                                    be addressed in its EA have been                        for the particular application.                       meeting of the Farm, Ranch, and Rural
                                                    adequately identified during the pre-                      All filings must (1) bear in all capital           Communities Committee (FRRCC). The
                                                    filing period, which included a public                  letters the title ‘‘PROTEST’’, ‘‘MOTION               FRRCC is a policy-oriented committee
                                                    scoping meeting and site visit, and no                  TO INTERVENE’’, ‘‘NOTICE OF                           that provides policy advice,
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    new issues are likely to be identified                  INTENT TO FILE COMPETING                              information, and recommendations to
                                                    through additional scoping. The EA will                 APPLICATION,’’ ‘‘COMPETING                            the EPA Administrator on a range of
                                                    consider assessing the potential effects                APPLICATION,’’ ‘‘COMMENTS,’’                          environmental issues and policies that
                                                    of project construction and operation on                ‘‘REPLY COMMENTS,’’                                   are of importance to agriculture and
                                                    geology and soils, aquatic, terrestrial,                ‘‘RECOMMENDATIONS,’’ or ‘‘TERMS                       rural communities.
                                                    threatened and endangered species,                      AND CONDITIONS;’’ (2) set forth in the                  Purpose of Meeting: The purpose of
                                                    recreation and land use, aesthetic, and                 heading the name of the applicant and                 this teleconference is to discuss specific
                                                    cultural and historic resources.                        the project number of the application to              recommendations that were drafted by


                                               VerDate Sep<11>2014   20:12 Oct 07, 2016   Jkt 241001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\11OCN1.SGM   11OCN1



Document Created: 2018-02-13 16:33:56
Document Modified: 2018-02-13 16:33:56
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 70108 