81_FR_70456 81 FR 70260 - Environmental Impact Statement for the Long Bridge Project in Washington, DC

81 FR 70260 - Environmental Impact Statement for the Long Bridge Project in Washington, DC

DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration

Federal Register Volume 81, Issue 196 (October 11, 2016)

Page Range70260-70260
FR Document2016-24522

On August 26, 2016, FRA published a Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) for the Long Bridge Project jointly with the District of Columbia Department of Transportation (DDOT) (81 FR 59036). The Proposed Action consists of potential improvements to Long Bridge and related railroad infrastructure located between the Virginia Railway Express (VRE) Crystal City Station in Arlington, Virginia and Control Point (CP) Virginia in Washington, DC. In announcing its intent, FRA and DDOT established a 30-day public comment period that was scheduled to end on September 26, 2016. In consideration of requests for additional time to comment, FRA and DDOT are extending the scoping comment period to October 14, 2016. The extension provides agencies and the public with 30 days to submit comments following public and interagency scoping meetings held on September 14, 2016.

Federal Register, Volume 81 Issue 196 (Tuesday, October 11, 2016)
[Federal Register Volume 81, Number 196 (Tuesday, October 11, 2016)]
[Notices]
[Page 70260]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-24522]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration


Environmental Impact Statement for the Long Bridge Project in 
Washington, DC

AGENCY: Federal Railroad Administration (FRA), U.S. Department of 
Transportation (DOT).

ACTION: Extension of agency and public scoping comment period, Long 
Bridge project.

-----------------------------------------------------------------------

SUMMARY: On August 26, 2016, FRA published a Notice of Intent (NOI) to 
prepare an Environmental Impact Statement (EIS) for the Long Bridge 
Project jointly with the District of Columbia Department of 
Transportation (DDOT) (81 FR 59036). The Proposed Action consists of 
potential improvements to Long Bridge and related railroad 
infrastructure located between the Virginia Railway Express (VRE) 
Crystal City Station in Arlington, Virginia and Control Point (CP) 
Virginia in Washington, DC. In announcing its intent, FRA and DDOT 
established a 30-day public comment period that was scheduled to end on 
September 26, 2016. In consideration of requests for additional time to 
comment, FRA and DDOT are extending the scoping comment period to 
October 14, 2016. The extension provides agencies and the public with 
30 days to submit comments following public and interagency scoping 
meetings held on September 14, 2016.

DATES: The scoping comment period for the Long Bridge Project is 
extended to October 14, 2016.

ADDRESSES: Scoping comments can be mailed to the address identified 
under the FOR FURTHER INFORMATION CONTACT caption below. Internet and 
email correspondence may be submitted through the Long Bridge Project 
Web site http://longbridgeproject.com/ or at 
[email protected].

FOR FURTHER INFORMATION CONTACT: Ms. Amanda Murphy, Environmental 
Protection Specialist, Office of Railroad Policy and Development, 
Federal Railroad Administration, 1200 New Jersey Avenue SE., (Mail 
Stop-20), Washington, DC 20590; telephone: (202) 493-0624.

SUPPLEMENTARY INFORMATION: More information about the Long Bridge 
Project is available at http://longbridgeproject.com/.

    Issued in Washington, DC, on October 5, 2016.
Felicia B. Young,
Acting Director, Office of Program Delivery.
[FR Doc. 2016-24522 Filed 10-7-16; 8:45 am]
 BILLING CODE 4910-06-P



                                                    70260                        Federal Register / Vol. 81, No. 196 / Tuesday, October 11, 2016 / Notices

                                                    additional public notification. The                     FOR FURTHER INFORMATION CONTACT:      Ms.             1977 when NTD reporting began. While
                                                    format of the meeting will consist of a                 Amanda Murphy, Environmental                          the NTD has undergone numerous and
                                                    presentation describing the proposed                    Protection Specialist, Office of Railroad             substantial changes in the past 38 years,
                                                    Coachella Valley—San Gorgonio Pass                      Policy and Development, Federal                       the USOA was last updated for minor
                                                    Corridor Service Project, objectives, and               Railroad Administration, 1200 New                     changes in 1995. The notice described
                                                    existing conditions. Following the                      Jersey Avenue SE., (Mail Stop–20),                    various proposed changes to the USOA
                                                    presentation, scoping meeting attendees                 Washington, DC 20590; telephone: (202)                to better align with today’s NTD and
                                                    will be able to participate in an open                  493–0624.                                             accounting practices and to address
                                                    house format that encourages questions                  SUPPLEMENTARY INFORMATION: More                       FTA data needs and common questions
                                                    and comments on the Project from the                    information about the Long Bridge                     among NTD reporters. In the initial
                                                    public.                                                 Project is available at http://                       notice, FTA proposed the following
                                                    Felicia Young,                                          longbridgeproject.com/.                               changes:
                                                    Acting Director, Office of Program Delivery.              Issued in Washington, DC, on October 5,             A. Separation of ‘‘Passenger-Paid Fares’’
                                                    [FR Doc. 2016–24597 Filed 10–6–16; 4:15 pm]             2016.                                                      and ‘‘Organization-Paid Fares’’
                                                                                                            Felicia B. Young,                                     B. Separation of ‘‘Paid Absences’’ from
                                                    BILLING CODE 4910–06–P
                                                                                                            Acting Director, Office of Program Delivery.
                                                                                                                                                                       ‘‘Fringe Benefits’’
                                                                                                                                                                  C. Consolidation of ‘‘Casualty and
                                                                                                            [FR Doc. 2016–24522 Filed 10–7–16; 8:45 am]
                                                    DEPARTMENT OF TRANSPORTATION                                                                                       Liability Costs’’ under General
                                                                                                            BILLING CODE 4910–06–P
                                                                                                                                                                       Administration Function
                                                    Federal Railroad Administration                                                                               D. Expansion of Assets and Liabilities
                                                                                                                                                                       Object Classes (F–60)
                                                                                                            DEPARTMENT OF TRANSPORTATION                          E. Addition of ‘‘Voluntary Non-
                                                    Environmental Impact Statement for
                                                    the Long Bridge Project in                              Federal Transit Administration                             Exchange Transactions’’
                                                    Washington, DC                                                                                                F. Addition of ‘‘Sales and Disposals of
                                                                                                            [Docket No. FTA–2016–009]                                  Assets’’
                                                    AGENCY:  Federal Railroad                                                                                     G. Simplification of State Fund
                                                    Administration (FRA), U.S. Department                   Final Notice on Updates to the Uniform                     Reporting
                                                    of Transportation (DOT).                                System of Accounts (USOA) and                         H. Reorganization of B–30 Contractual
                                                    ACTION: Extension of agency and public                  Changes to the National Transit                            Relationship
                                                    scoping comment period, Long Bridge                     Database (NTD) Reporting
                                                    project.                                                Requirements                                             Additionally, the initial notice
                                                                                                                                                                  proposed changes to the NTD reporting
                                                    SUMMARY:    On August 26, 2016, FRA                     AGENCY:    Federal Transit Administration,            requirements that are not directly
                                                    published a Notice of Intent (NOI) to                   DOT.                                                  addressed in the updated USOA, which
                                                    prepare an Environmental Impact                         ACTION:   Notice, response to comments.               are as follows:
                                                    Statement (EIS) for the Long Bridge                                                                           I. Separation of Operators’ and Non-
                                                    Project jointly with the District of                    SUMMARY:   This Notice finalizes updates                   Operators’ Work Hours and Counts
                                                    Columbia Department of Transportation                   to the USOA and changes to NTD                        J. Enhanced Auditor’s Review
                                                    (DDOT) (81 FR 59036). The Proposed                      Automatic Passenger Counter                           K. Revised Automatic Passenger
                                                    Action consists of potential                            Certification requirements.                                Counter (APC) Certification Process
                                                    improvements to Long Bridge and                         DATES: Full implementation required in                   In the initial notice, FTA proposed
                                                    related railroad infrastructure located                 report year 2018.                                     that it would begin implementing the
                                                    between the Virginia Railway Express                    FOR FURTHER INFORMATION CONTACT:                      proposed reporting requirements
                                                    (VRE) Crystal City Station in Arlington,                Maggie Schilling, National Transit                    beginning with the FY 2017 NTD
                                                    Virginia and Control Point (CP) Virginia                Database Deputy Program Manager, FTA                  reporting cycle.
                                                    in Washington, DC. In announcing its                    Office of Budget and Policy, (202) 366–
                                                    intent, FRA and DDOT established a 30-                  2054 or margaret.schilling@dot.gov.                   B. Response to Comments on Proposed
                                                    day public comment period that was                      SUPPLEMENTARY INFORMATION:
                                                                                                                                                                  Updates to the USOA and Changes to
                                                    scheduled to end on September 26,                                                                             NTD Reporting Requirements
                                                    2016. In consideration of requests for                  Table of Contents
                                                                                                                                                                     The comment period for the initial
                                                    additional time to comment, FRA and                     A. Background                                         notice closed on April 4, 2016. The
                                                    DDOT are extending the scoping                          B. Response to Comments on Proposed                   following is a summary of the comments
                                                    comment period to October 14, 2016.                         Updates to the USOA and Changes to                from the initial notice related to the
                                                    The extension provides agencies and the                     NTD Reporting Requirements                        updates to the USOA and NTD reporting
                                                    public with 30 days to submit                           C. Response to Comments on the Revised
                                                                                                                APC Certification Process
                                                                                                                                                                  requirements.
                                                    comments following public and                                                                                    Comment: Three commenters raised a
                                                                                                            D. Overview of Final Updates to the USOA,
                                                    interagency scoping meetings held on                                                                          concern over the separation of
                                                                                                                NTD Reporting Requirements and APC
                                                    September 14, 2016.                                         Certification                                     ‘‘Passenger-Paid Fares’’ and
                                                    DATES: The scoping comment period for                                                                         ‘‘Organization-Paid Fares.’’ Commenters
                                                    the Long Bridge Project is extended to                  A. Background                                         opposed the separation of ‘‘Passenger-
                                                    October 14, 2016.                                          On February 3, 2016, FTA published                 Paid Fares’’ and ‘‘Organization-Paid
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    ADDRESSES: Scoping comments can be                      a Federal Register notice (initial notice)            Fares’’ stating that the additional
                                                    mailed to the address identified under                  (Docket No. FTA–2016–009) for                         information will add little, if any, value
                                                    the FOR FURTHER INFORMATION CONTACT                     comment on proposed updates to the                    to the NTD report. Commenters noted
                                                    caption below. Internet and email                       USOA and changes to NTD reporting                     that adding these additional reporting
                                                    correspondence may be submitted                         requirements. The USOA is the basic                   requirements will only increase the cost
                                                    through the Long Bridge Project Web                     reference document that describes how                 of compliance for reporting agencies.
                                                    site http://longbridgeproject.com/ or at                transit agencies are to report to the NTD.            One commenter specifically raised a
                                                    info@longbridgeproject.com.                             The USOA was originally published in                  concern stating that the proposed


                                               VerDate Sep<11>2014   20:12 Oct 07, 2016   Jkt 241001   PO 00000   Frm 00176   Fmt 4703   Sfmt 4703   E:\FR\FM\11OCN1.SGM   11OCN1



Document Created: 2018-02-13 16:33:52
Document Modified: 2018-02-13 16:33:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExtension of agency and public scoping comment period, Long Bridge project.
DatesThe scoping comment period for the Long Bridge Project is extended to October 14, 2016.
ContactMs. Amanda Murphy, Environmental Protection Specialist, Office of Railroad Policy and Development, Federal Railroad Administration, 1200 New Jersey Avenue SE., (Mail Stop-20), Washington, DC 20590; telephone: (202) 493-0624.
FR Citation81 FR 70260 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR