NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 201 (October 18, 2016)

Page Range71769-71770
FR Document2016-25124

On June 27, 2016, the U.S. Nuclear Regulatory Commission (NRC) received from LaCrosseSolutions, LLC (LS) a request for approval to remove portions of the site from the operating license for the La Crosse Boiling Water Reactor. Specifically, LS intends to remove and release five radiologically non-impacted portions of the site from its license. The partial site release request was submitted concurrently with the La Crosse License Termination Plan and supports ongoing decommissioning activities at the site. The NRC is requesting public comments on LS's partial site release request and the La Crosse License Termination Plan.

Federal Register, Volume 81 Issue 201 (Tuesday, October 18, 2016)
[Federal Register Volume 81, Number 201 (Tuesday, October 18, 2016)]
[Notices]
[Pages 71769-71770]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-25124]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-409; NRC-2015-0279]


LaCrosseSolutions, LLC; La Crosse Boiling Water Reactor Partial 
Site Release

AGENCY: Nuclear Regulatory Commission.

ACTION: Request for comment.

-----------------------------------------------------------------------

SUMMARY: On June 27, 2016, the U.S. Nuclear Regulatory Commission (NRC) 
received from LaCrosseSolutions, LLC (LS) a request for approval to 
remove portions of the site from the operating license for the La 
Crosse Boiling Water Reactor. Specifically, LS intends to remove and 
release five radiologically non-impacted portions of the site from its 
license. The partial site release request was submitted concurrently 
with the La Crosse License Termination Plan and supports ongoing 
decommissioning activities at the site. The NRC is requesting public 
comments on LS's partial site release request and the La Crosse License 
Termination Plan.

DATES: Submit comments by November 17, 2016. Comments received after 
this date will be considered if it is practical to do so, but the 
Commission is able to ensure consideration only for comments received 
on or before this date.

ADDRESSES: You may submit comments by any of the following methods 
(unless this document describes a different method for submitting 
comments on a specific subject):
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0279. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual in the FOR FURTHER INFORMATION CONTACT section of this 
document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Marlayna Vaaler, Office of Nuclear 
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-415-3178; email: 
[email protected].

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2015-0279 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0279.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in the 
SUPPLEMENTARY INFORMATION section.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2015-0279 in in the subject line of 
your comment submission, in order to ensure that the NRC is able to 
make your comment submission available to the public in this docket.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Discussion

    The La Crosse Boiling Water Reactor (LACBWR) was an Atomic Energy 
Commission (AEC) Demonstration Project Reactor that first went critical 
in 1967, commenced commercial operation in November 1969, and was 
capable of producing 50 megawatts electric. The reactor is located on 
the east bank of the Mississippi River in Vernon County, Wisconsin. The 
Allis-Chalmers Company was the original licensee; the AEC later sold 
the plant to the Dairyland Power Cooperative (DPC) and granted it 
Provisional Operating License No. DPR-45 on August 28, 1973.
    The reactor permanently ceased operations on April 30, 1987, and 
reactor defueling was completed on June 11, 1987. In a letter dated 
August 4, 1987, the NRC terminated DPC's authority to operate LACBWR 
under Provisional Operating License No. DPR-

[[Page 71770]]

45, and granted the licensee a possess-but-not-operate status. By 
letter dated August 18, 1988, the NRC amended DPC's Provisional 
Operating License No. DPR-45 to Possession Only License No. DPR-45 to 
reflect the permanently defueled configuration at LACBWR. Therefore, 
pursuant to the provisions of Sec. Sec.  50.82(a)(1)(iii) and 
50.82(a)(2) of title 10 of the Code of Federal Regulations (10 CFR), 
DPC's part 50 license does not authorize operation of LACBWR or 
emplacement or retention of fuel into the reactor vessel.
    The NRC issued an order to authorize decommissioning of LACBWR and 
approve the licensee's proposed Decommissioning Plan (DP) on August 7, 
1991. Because the NRC approved DPC's DP before August 28, 1996, 
pursuant to 10 CFR 50.82, the DP is considered the Post-Shutdown 
Decommissioning Activities Report (PSDAR) for LACBWR. The PSDAR public 
meeting was held on May 13, 1998, and subsequent updates to the LACBWR 
decommissioning report have combined the DP and PSDAR into the ``LACBWR 
Decommissioning Plan and Post-Shutdown Decommissioning Activities 
Report'' (D-Plan/PSDAR).
    The DPC developed an on-site independent spent fuel storage 
installation (ISFSI) and completed the movement of all 333 spent 
nuclear fuel elements from the Fuel Element Storage Well to dry cask 
storage at the ISFSI by September 19, 2012 (ADAMS Accession No. 
ML12290A027). The remaining associated buildings and structures are 
ready for dismantlement and decommissioning activities.
    By Order dated May 20, 2016 (ADAMS Accession No. ML16123A073), the 
NRC approved the direct transfer of Possession Only License No. DPR-45 
for LACBWR from DPC to LaCrosseSolutions, LLC (LS), a wholly-owned 
subsidiary of EnergySolutions, LLC, and approved a conforming license 
amendment, pursuant to 10 CFR 50.80 and 50.90, to reflect the change. 
The Order was published in the Federal Register on June 2, 2016 (81 FR 
35383). The transfer assigns DPC's licensed possession, maintenance, 
and decommissioning authorities for LACBWR to LS in order to implement 
expedited decommissioning at the LACBWR site. Decommissioning of LACBWR 
is scheduled to be completed in 2018.
    By letter dated June 27, 2016 (ADAMS Accession No. ML16200A095), LS 
submitted the License Termination Plan (LTP) for LACBWR in accordance 
with 10 CFR 50.82(a)(9). The LTP includes a site characterization to 
ensure that final radiation surveys (FRS) cover all areas where 
contamination existed, remains, or has the potential to exist or 
remain; identification of remaining dismantlement activities; plans for 
site remediation; a description of the FRS plan to confirm that LACBWR 
will meet the release criteria in 10 CFR part 20, subpart E; dose-
modeling scenarios that ensure compliance with the radiological 
criteria for license termination; an estimate of the remaining site-
specific decommissioning costs; and a supplement to the Environmental 
Report describing any new information or significant environmental 
changes associated with proposed license termination activities. The 
LACBWR LTP is currently being reviewed by the NRC.
    By letter dated June 27, 2016 (ADAMS Accession No. ML16181A068), LS 
submitted a request for approval to remove portions of the site from 
the part 50 License, No. DPR-45. Specifically, LS intends to remove and 
release five radiologically non-impacted portions of the site from its 
part 50 license in accordance with 10 CFR 50.83(b), ``Release of part 
of a power reactor facility or site for unrestricted use.'' This 
request is the subject of this notice.

    Dated at Rockville, Maryland this 12th day of October 2016.

    For The Nuclear Regulatory Commission.
Ted Carter,
Acting Chief, Reactor Decommissioning Branch, Division of 
Decommissioning, Uranium Recovery, and Waste Programs, Office of 
Nuclear Material Safety and Safeguards.
[FR Doc. 2016-25124 Filed 10-17-16; 8:45 am]
 BILLING CODE 7590-01-P



                                                                          Federal Register / Vol. 81, No. 201 / Tuesday, October 18, 2016 / Notices                                           71769

                                             Performance Review Board for the                        on LS’s partial site release request and              1–800–397–4209, 301–415–4737, or by
                                             Office of Inspector General and the                     the La Crosse License Termination Plan.               email to pdr.resource@nrc.gov. The
                                             National Science Board Office Senior                    DATES: Submit comments by November                    ADAMS accession number for each
                                             Executive Service positions.                            17, 2016. Comments received after this                document referenced (if it is available in
                                                                                                     date will be considered if it is practical            ADAMS) is provided the first time that
                                             SUMMARY:   This announcement of the                                                                           it is mentioned in the SUPPLEMENTARY
                                                                                                     to do so, but the Commission is able to
                                             membership of the National Science                                                                            INFORMATION section.
                                                                                                     ensure consideration only for comments
                                             Foundation’s Office of Inspector General
                                                                                                     received on or before this date.                         • NRC’s PDR: You may examine and
                                             and National Science Board Office                                                                             purchase copies of public documents at
                                             Senior Executive Service Performance                    ADDRESSES: You may submit comments
                                                                                                                                                           the NRC’s PDR, Room O1–F21, One
                                             Review Board is made in compliance                      by any of the following methods (unless               White Flint North, 11555 Rockville
                                             with 5 U.S.C. 4314(c)(4).                               this document describes a different                   Pike, Rockville, Maryland 20852.
                                                                                                     method for submitting comments on a
                                             ADDRESSES: Comments should be
                                                                                                     specific subject):                                    B. Submitting Comments
                                             addressed to Division Director, Division
                                                                                                       • Federal Rulemaking Web site: Go to                  Please include Docket ID NRC–2015–
                                             of Human Resource Management,
                                                                                                     http://www.regulations.gov and search                 0279 in in the subject line of your
                                             National Science Foundation, Room
                                                                                                     for Docket ID NRC–2015–0279. Address                  comment submission, in order to ensure
                                             315, 4201 Wilson Boulevard, Arlington,
                                                                                                     questions about NRC dockets to Carol                  that the NRC is able to make your
                                             VA 22230.
                                                                                                     Gallagher; telephone: 301–415–3463;                   comment submission available to the
                                             FOR FURTHER INFORMATION CONTACT: Ms.                    email: Carol.Gallagher@nrc.gov. For                   public in this docket.
                                             Dianne Campbell Krieger at the above                    technical questions, contact the                        The NRC cautions you not to include
                                             address or (703) 292–5194.                              individual in the FOR FURTHER                         identifying or contact information that
                                             SUPPLEMENTARY INFORMATION: The                          INFORMATION CONTACT section of this                   you do not want to be publicly
                                             membership of the National Science                      document.                                             disclosed in your comment submission.
                                             Board’s Senior Executive Service                          • Mail comments to: Cindy Bladey,                   The NRC posts all comment
                                             Performance Review Board is as follows:                 Office of Administration, Mail Stop:                  submissions at http://
                                             Diane L. Souvaine, Vice Chair, National                 OWFN–12–H08, U.S. Nuclear                             www.regulations.gov as well as entering
                                                  Science Board                                      Regulatory Commission, Washington,                    the comment submissions into ADAMS.
                                             Dianne Campbell Krieger, Division                       DC 20555–0001.                                        The NRC does not routinely edit
                                                  Director, Division of Human                          For additional direction on obtaining               comment submissions to remove
                                                  Resource Management                                information and submitting comments,                  identifying or contact information.
                                             Plus three members to be selected from                  see ‘‘Obtaining Information and                         If you are requesting or aggregating
                                             the IG community.                                       Submitting Comments’’ in the                          comments from other persons for
                                                                                                     SUPPLEMENTARY INFORMATION section of                  submission to the NRC, then you should
                                               Dated: October 3, 2016.                               this document.                                        inform those persons not to include
                                             Dianne Campbell Krieger,                                                                                      identifying or contact information that
                                                                                                     FOR FURTHER INFORMATION CONTACT:
                                             Division Director, Division of Human                    Marlayna Vaaler, Office of Nuclear                    they do not want to be publicly
                                             Resource Management.                                                                                          disclosed in their comment submission.
                                                                                                     Material Safety and Safeguards, U.S.
                                             [FR Doc. 2016–24961 Filed 10–17–16; 8:45 am]                                                                  Your request should state that the NRC
                                                                                                     Nuclear Regulatory Commission,
                                             BILLING CODE 7555–01–M                                  Washington, DC 20555–0001; telephone:                 does not routinely edit comment
                                                                                                     301–415–3178; email:                                  submissions to remove such information
                                                                                                     Marlayna.Vaaler@nrc.gov.                              before making the comment
                                             NUCLEAR REGULATORY                                      SUPPLEMENTARY INFORMATION:                            submissions available to the public or
                                             COMMISSION                                                                                                    entering the comment submissions into
                                                                                                     I. Obtaining Information and                          ADAMS.
                                             [Docket No. 50–409; NRC–2015–0279]
                                                                                                     Submitting Comments
                                                                                                                                                           II. Discussion
                                             LaCrosseSolutions, LLC; La Crosse                       A. Obtaining Information
                                             Boiling Water Reactor Partial Site                                                                               The La Crosse Boiling Water Reactor
                                                                                                        Please refer to Docket ID NRC–2015–                (LACBWR) was an Atomic Energy
                                             Release
                                                                                                     0279 when contacting the NRC about                    Commission (AEC) Demonstration
                                             AGENCY:  Nuclear Regulatory                             the availability of information for this              Project Reactor that first went critical in
                                             Commission.                                             action. You may obtain publicly-                      1967, commenced commercial operation
                                             ACTION: Request for comment.                            available information related to this                 in November 1969, and was capable of
                                                                                                     action by any of the following methods:               producing 50 megawatts electric. The
                                             SUMMARY:   On June 27, 2016, the U.S.                      • Federal Rulemaking Web site: Go to               reactor is located on the east bank of the
                                             Nuclear Regulatory Commission (NRC)                     http://www.regulations.gov and search                 Mississippi River in Vernon County,
                                             received from LaCrosseSolutions, LLC                    for Docket ID NRC–2015–0279.                          Wisconsin. The Allis-Chalmers
                                             (LS) a request for approval to remove                      • NRC’s Agencywide Documents                       Company was the original licensee; the
                                             portions of the site from the operating                 Access and Management System                          AEC later sold the plant to the
                                             license for the La Crosse Boiling Water                 (ADAMS): You may obtain publicly-                     Dairyland Power Cooperative (DPC) and
                                             Reactor. Specifically, LS intends to                    available documents online in the                     granted it Provisional Operating License
                                             remove and release five radiologically                  ADAMS Public Documents collection at                  No. DPR–45 on August 28, 1973.
Lhorne on DSK30JT082PROD with NOTICES




                                             non-impacted portions of the site from                  http://www.nrc.gov/reading-rm/                           The reactor permanently ceased
                                             its license. The partial site release                   adams.html. To begin the search, select               operations on April 30, 1987, and
                                             request was submitted concurrently                      ‘‘ADAMS Public Documents’’ and then                   reactor defueling was completed on
                                             with the La Crosse License Termination                  select ‘‘Begin Web-based ADAMS                        June 11, 1987. In a letter dated August
                                             Plan and supports ongoing                               Search.’’ For problems with ADAMS,                    4, 1987, the NRC terminated DPC’s
                                             decommissioning activities at the site.                 please contact the NRC’s Public                       authority to operate LACBWR under
                                             The NRC is requesting public comments                   Document Room (PDR) reference staff at                Provisional Operating License No. DPR–


                                        VerDate Sep<11>2014   13:19 Oct 17, 2016   Jkt 241001   PO 00000   Frm 00081   Fmt 4703   Sfmt 4703   E:\FR\FM\18OCN1.SGM   18OCN1


                                             71770                        Federal Register / Vol. 81, No. 201 / Tuesday, October 18, 2016 / Notices

                                             45, and granted the licensee a possess-                 where contamination existed, remains,                 interested persons regarding this matter.
                                             but-not-operate status. By letter dated                 or has the potential to exist or remain;              The Subcommittee will gather
                                             August 18, 1988, the NRC amended                        identification of remaining                           information, analyze relevant issues and
                                             DPC’s Provisional Operating License                     dismantlement activities; plans for site              facts, and formulate proposed positions
                                             No. DPR–45 to Possession Only License                   remediation; a description of the FRS                 and actions, as appropriate, for
                                             No. DPR–45 to reflect the permanently                   plan to confirm that LACBWR will meet                 deliberation by the Full Committee.
                                             defueled configuration at LACBWR.                       the release criteria in 10 CFR part 20,
                                                                                                                                                              Members of the public desiring to
                                             Therefore, pursuant to the provisions of                subpart E; dose-modeling scenarios that
                                             §§ 50.82(a)(1)(iii) and 50.82(a)(2) of title            ensure compliance with the radiological               provide oral statements and/or written
                                             10 of the Code of Federal Regulations                   criteria for license termination; an                  comments should notify the Designated
                                             (10 CFR), DPC’s part 50 license does not                estimate of the remaining site-specific               Federal Official (DFO), Girija Shukla
                                             authorize operation of LACBWR or                        decommissioning costs; and a                          (Telephone 301–415–6855 or Email:
                                             emplacement or retention of fuel into                   supplement to the Environmental                       Girija.Shukla@nrc.gov) five days prior to
                                             the reactor vessel.                                     Report describing any new information                 the meeting, if possible, so that
                                                The NRC issued an order to authorize                 or significant environmental changes                  appropriate arrangements can be made.
                                             decommissioning of LACBWR and                           associated with proposed license                      Thirty-five hard copies of each
                                             approve the licensee’s proposed                         termination activities. The LACBWR                    presentation or handout should be
                                             Decommissioning Plan (DP) on August                     LTP is currently being reviewed by the                provided to the DFO thirty minutes
                                             7, 1991. Because the NRC approved                       NRC.                                                  before the meeting. In addition, one
                                             DPC’s DP before August 28, 1996,                           By letter dated June 27, 2016 (ADAMS               electronic copy of each presentation
                                             pursuant to 10 CFR 50.82, the DP is                     Accession No. ML16181A068), LS                        should be emailed to the DFO one day
                                             considered the Post-Shutdown                            submitted a request for approval to                   before the meeting. If an electronic copy
                                             Decommissioning Activities Report                       remove portions of the site from the part             cannot be provided within this
                                             (PSDAR) for LACBWR. The PSDAR                           50 License, No. DPR–45. Specifically,                 timeframe, presenters should provide
                                             public meeting was held on May 13,                      LS intends to remove and release five                 the DFO with a CD containing each
                                             1998, and subsequent updates to the                     radiologically non-impacted portions of               presentation at least thirty minutes
                                             LACBWR decommissioning report have                      the site from its part 50 license in                  before the meeting. Electronic
                                             combined the DP and PSDAR into the                      accordance with 10 CFR 50.83(b),                      recordings will be permitted only
                                             ‘‘LACBWR Decommissioning Plan and                       ‘‘Release of part of a power reactor                  during those portions of the meeting
                                             Post-Shutdown Decommissioning                           facility or site for unrestricted use.’’              that are open to the public. Detailed
                                             Activities Report’’ (D-Plan/PSDAR).                     This request is the subject of this notice.           procedures for the conduct of and
                                                The DPC developed an on-site
                                                                                                       Dated at Rockville, Maryland this 12th day          participation in ACRS meetings were
                                             independent spent fuel storage
                                                                                                     of October 2016.                                      published in the Federal Register on
                                             installation (ISFSI) and completed the
                                             movement of all 333 spent nuclear fuel                    For The Nuclear Regulatory Commission.              October 21, 2015 (80 FR 63846).
                                             elements from the Fuel Element Storage                  Ted Carter,                                              Detailed meeting agendas and meeting
                                             Well to dry cask storage at the ISFSI by                Acting Chief, Reactor Decommissioning                 transcripts are available on the NRC
                                             September 19, 2012 (ADAMS Accession                     Branch, Division of Decommissioning,                  Web site at http://www.nrc.gov/reading-
                                                                                                     Uranium Recovery, and Waste Programs,
                                             No. ML12290A027). The remaining                                                                               rm/doc-collections/acrs. Information
                                                                                                     Office of Nuclear Material Safety and
                                             associated buildings and structures are                 Safeguards.                                           regarding topics to be discussed,
                                             ready for dismantlement and                                                                                   changes to the agenda, whether the
                                                                                                     [FR Doc. 2016–25124 Filed 10–17–16; 8:45 am]
                                             decommissioning activities.                                                                                   meeting has been canceled or
                                                                                                     BILLING CODE 7590–01–P
                                                By Order dated May 20, 2016                                                                                rescheduled, and the time allotted to
                                             (ADAMS Accession No. ML16123A073),                                                                            present oral statements can be obtained
                                             the NRC approved the direct transfer of                                                                       from the Web site cited above or by
                                                                                                     NUCLEAR REGULATORY
                                             Possession Only License No. DPR–45 for                                                                        contacting the identified DFO.
                                                                                                     COMMISSION
                                             LACBWR from DPC to                                                                                            Moreover, in view of the possibility that
                                             LaCrosseSolutions, LLC (LS), a wholly-                  Advisory Committee On Reactor                         the schedule for ACRS meetings may be
                                             owned subsidiary of EnergySolutions,                    Safeguards (ACRS) Meeting of the                      adjusted by the Chairman as necessary
                                             LLC, and approved a conforming license                  ACRS Subcommittee On Economic                         to facilitate the conduct of the meeting,
                                             amendment, pursuant to 10 CFR 50.80                     Simplified Boiling Water Reactors                     persons planning to attend should check
                                             and 50.90, to reflect the change. The                   (ESBWR); Notice of Meeting                            with these references if such
                                             Order was published in the Federal
                                                                                                        The ACRS Subcommittee on ESBWR                     rescheduling would result in a major
                                             Register on June 2, 2016 (81 FR 35383).
                                                                                                     will hold a meeting on October 20,                    inconvenience.
                                             The transfer assigns DPC’s licensed
                                             possession, maintenance, and                            2016, Room T–2B1, 11545 Rockville                        If attending this meeting, please enter
                                             decommissioning authorities for                         Pike, Rockville, Maryland.                            through the One White Flint North
                                             LACBWR to LS in order to implement                         The meeting will be open to public                 building, 11555 Rockville Pike,
                                             expedited decommissioning at the                        attendance.                                           Rockville, MD. After registering with
                                             LACBWR site. Decommissioning of                            The agenda for the subject meeting                 security, please contact Mr. Theron
                                             LACBWR is scheduled to be completed                     shall be as follows:                                  Brown (240–888–9835) to be escorted to
                                             in 2018.                                                Thursday, October 20, 2016—8:30 a.m.                  the meeting room.
                                                                                                        until 5:00 p.m.
Lhorne on DSK30JT082PROD with NOTICES




                                                By letter dated June 27, 2016 (ADAMS                                                                         Dated: October 12, 2016.
                                             Accession No. ML16200A095), LS                          The Subcommittee will review the
                                             submitted the License Termination Plan                  North Anna Unit 3 Combined License                    Michael Snodderly,
                                             (LTP) for LACBWR in accordance with                     Application (COLA). The Subcommittee                  Chief, Technical Support Branch, Advisory
                                             10 CFR 50.82(a)(9). The LTP includes a                  will hear presentations by and hold                   Committee on Reactor Safeguards.
                                             site characterization to ensure that final              discussions with representatives of the               [FR Doc. 2016–25134 Filed 10–17–16; 8:45 am]
                                             radiation surveys (FRS) cover all areas                 NRC staff, Dominion, and other                        BILLING CODE 7590–01–P




                                        VerDate Sep<11>2014   13:19 Oct 17, 2016   Jkt 241001   PO 00000   Frm 00082   Fmt 4703   Sfmt 9990   E:\FR\FM\18OCN1.SGM   18OCN1



Document Created: 2016-10-17 23:52:49
Document Modified: 2016-10-17 23:52:49
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRequest for comment.
DatesSubmit comments by November 17, 2016. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
ContactMarlayna Vaaler, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3178; email: [email protected]