81_FR_74624 81 FR 74417 - Dominion Carolina Gas Transmission, LLC; Notice of Availability of the Environmental Assessment for the Proposed Transco to Charleston Project

81 FR 74417 - Dominion Carolina Gas Transmission, LLC; Notice of Availability of the Environmental Assessment for the Proposed Transco to Charleston Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 207 (October 26, 2016)

Page Range74417-74418
FR Document2016-25792

Federal Register, Volume 81 Issue 207 (Wednesday, October 26, 2016)
[Federal Register Volume 81, Number 207 (Wednesday, October 26, 2016)]
[Notices]
[Pages 74417-74418]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-25792]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-98-000]


Dominion Carolina Gas Transmission, LLC; Notice of Availability 
of the Environmental Assessment for the Proposed Transco to Charleston 
Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the 
Transco to Charleston Project (Project), proposed by Dominion Carolina 
Gas Transmission, LLC (Dominion) in the above-referenced docket. 
Dominion requests authorization to construct and operate new pipeline 
and compressor station facilities in South Carolina.
    The EA assesses the potential environmental effects of the 
construction and operation of the Project in accordance with the 
requirements of the National Environmental Policy Act (NEPA). The FERC 
staff concludes that approval of the proposed Project, with appropriate 
mitigating measures, would not constitute a major federal action 
significantly affecting the quality of the human environment.
    The proposed Project includes the following facilities:
     Approximately 55 miles of 12-inch-diameter pipeline in 
Spartanburg, Laurens, Newberry, and Greenwood Counties (Moore to 
Chappells Pipeline);
     approximately 5 miles of 4-inch-diameter pipeline in 
Dillon County (Dillon Pipeline);
     installation of two new 1,400-horsepower (hp) compressor 
units at the existing Moore Compressor Station in Spartanburg County;
     construction of a new 3,150-hp compressor station in 
Dorchester County (Dorchester Compressor Station);
     conversion of an existing 1,050-hp compressor unit from 
standby to base load at the existing Southern Compressor Station in 
Aiken County;
     upgrades to the existing Charleston Town Border Station in 
Charleston County and to the existing Greenwood Town Border Station in 
Greenwood County; and
     associated pipeline support facilities (metering and 
regulating stations, pig launcher and receiver assemblies, valves, and 
pipeline interconnects).
    The FERC staff mailed copies of the EA to federal, state, and local 
government representatives and

[[Page 74418]]

agencies; elected officials; environmental and public interest groups; 
Native American tribes; potentially affected landowners and other 
interested individuals and groups; newspapers and libraries in the 
Project area; and parties to this proceeding. In addition, the EA is 
available for public viewing on the FERC's Web site (www.ferc.gov) 
using the eLibrary link. A limited number of copies of the EA are 
available for distribution and public inspection at: Federal Energy 
Regulatory Commission, Public Reference Room, 888 First Street NE., 
Room 2A, Washington, DC 20426, (202) 502-8371.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
The more specific your comments, the more useful they will be. To 
ensure that the Commission has the opportunity to consider your 
comments prior to making its decision on this Project, it is important 
that we receive your comments in Washington, DC on or before November 
18, 2016.
    For your convenience, there are three methods you can use to file 
your comments with the Commission. In all instances please reference 
the Project docket number (CP16-98-000) with your submission. The 
Commission encourages electronic filing of comments and has expert 
staff available to assist you at (202) 502-8258 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature located on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. This is an easy method for submitting 
brief, text-only comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's Web site at www.ferc.gov under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214).\1\ Only intervenors have the 
right to seek rehearing of the Commission's decision. The Commission 
grants affected landowners and others with environmental concerns 
intervenor status upon showing good cause by stating that they have a 
clear and direct interest in this proceeding which no other party can 
adequately represent. Simply filing environmental comments will not 
give you intervenor status, but you do not need intervenor status to 
have your comments considered.
---------------------------------------------------------------------------

    \1\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP16-
98). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: October 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-25792 Filed 10-25-16; 8:45 am]
BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 81, No. 207 / Wednesday, October 26, 2016 / Notices                                           74417

                                                       Description: Application under                          Description: § 205(d) Rate Filing:                 DEPARTMENT OF ENERGY
                                                    Section 203 of the Federal Power Act, et                Quarterly Filing of City and County of
                                                    al. of Empire Generating Co, LLC, et al.                San Francisco’s WDT SA 275 for Q3                     Federal Energy Regulatory
                                                       Filed Date: 10/18/16.                                2016 to be effective 9/30/2016.                       Commission
                                                       Accession Number: 20161018–5110.                        Filed Date: 10/18/16.                              [Docket No. CP16–98–000]
                                                       Comments Due: 5 p.m. ET 11/8/16.                        Accession Number: 20161018–5000.
                                                       Take notice that the Commission                         Comments Due: 5 p.m. ET 11/8/16.                   Dominion Carolina Gas Transmission,
                                                    received the following exempt                                                                                 LLC; Notice of Availability of the
                                                    wholesale generator filings:                               Docket Numbers: ER17–132–000.
                                                                                                                                                                  Environmental Assessment for the
                                                       Docket Numbers: EG17–14–000.                            Applicants: Portland General Electric              Proposed Transco to Charleston
                                                       Applicants: ESS Rabbit Hill Project,                 Company.                                              Project
                                                    LLC.                                                       Description: § 205(d) Rate Filing:
                                                       Description: Notice of Self-                         PGE11 MBR Sec 6 waiver revision to be                   The staff of the Federal Energy
                                                    Certification of Exempt Wholesale                       effective 8/29/2016.                                  Regulatory Commission (FERC or
                                                    Generator Status of ESS Rabbit Hill                        Filed Date: 10/18/16.                              Commission) has prepared an
                                                    Project, LLC.                                                                                                 environmental assessment (EA) for the
                                                                                                               Accession Number: 20161018–5002.
                                                       Filed Date: 10/17/16.                                                                                      Transco to Charleston Project (Project),
                                                                                                               Comments Due: 5 p.m. ET 11/8/16.                   proposed by Dominion Carolina Gas
                                                       Accession Number: 20161017–5177.
                                                       Comments Due: 5 p.m. ET 11/7/16.                        Docket Numbers: ER17–133–000.                      Transmission, LLC (Dominion) in the
                                                                                                               Applicants: PJM Interconnection,                   above-referenced docket. Dominion
                                                       Take notice that the Commission
                                                                                                            L.L.C.                                                requests authorization to construct and
                                                    received the following electric rate
                                                                                                               Description: § 205(d) Rate Filing: ISA             operate new pipeline and compressor
                                                    filings:
                                                                                                            No. 4541, Queue W1–124/AA2–049,                       station facilities in South Carolina.
                                                       Docket Numbers: ER10–2564–007;                                                                               The EA assesses the potential
                                                                                                            Notice of Cancellation of 2840, 2926,
                                                    ER10–2600–007; ER10–2289–007.                                                                                 environmental effects of the
                                                                                                            3061 to be effective 5/10/2011.
                                                       Applicants: Tucson Electric Power                                                                          construction and operation of the
                                                    Company, UNS Electric, Inc., UniSource                     Filed Date: 10/18/16.
                                                                                                               Accession Number: 20161018–5054.                   Project in accordance with the
                                                    Energy Development Company.                                                                                   requirements of the National
                                                       Description: Notification of Changes                    Comments Due: 5 p.m. ET 11/8/16.
                                                                                                                                                                  Environmental Policy Act (NEPA). The
                                                    in Status of Tucson Electric Power                         Docket Numbers: ER17–134–000.                      FERC staff concludes that approval of
                                                    Company, et al.                                            Applicants: American Transmission                  the proposed Project, with appropriate
                                                       Filed Date: 10/17/16.                                Systems, Incorporation, PJM                           mitigating measures, would not
                                                       Accession Number: 20161017–5179.                     Interconnection, L.L.C.                               constitute a major federal action
                                                       Comments Due: 5 p.m. ET 11/7/16.
                                                                                                               Description: § 205(d) Rate Filing:                 significantly affecting the quality of the
                                                       Docket Numbers: ER10–2794–020;                       American Transmission Systems, Inc.                   human environment.
                                                    ER14–2672–005; ER12–1825–018.                           Submits ECSA No. 4553 to be effective                   The proposed Project includes the
                                                       Applicants: EDF Trading North                        12/9/2016.                                            following facilities:
                                                    America, LLC, EDF Energy Services,                                                                              • Approximately 55 miles of 12-inch-
                                                                                                               Filed Date: 10/18/16.
                                                    LLC, EDF Industrial Power Services                                                                            diameter pipeline in Spartanburg,
                                                    (CA), LLC.                                                 Accession Number: 20161018–5105.
                                                                                                               Comments Due: 5 p.m. ET 11/8/16.                   Laurens, Newberry, and Greenwood
                                                       Description: Notice of Non-Material                                                                        Counties (Moore to Chappells Pipeline);
                                                    Change in Status of EDF Trading North                      The filings are accessible in the                    • approximately 5 miles of 4-inch-
                                                    America, LLC, et al.                                    Commission’s eLibrary system by                       diameter pipeline in Dillon County
                                                       Filed Date: 10/17/16.                                clicking on the links or querying the                 (Dillon Pipeline);
                                                       Accession Number: 20161017–5178.                     docket number.                                          • installation of two new 1,400-
                                                       Comments Due: 5 p.m. ET 11/7/16.                        Any person desiring to intervene or                horsepower (hp) compressor units at the
                                                       Docket Numbers: ER16–1483–004.                       protest in any of the above proceedings               existing Moore Compressor Station in
                                                       Applicants: California Independent                   must file in accordance with Rules 211                Spartanburg County;
                                                    System Operator Corporation.                            and 214 of the Commission’s                             • construction of a new 3,150-hp
                                                       Description: Compliance filing: 2016–                Regulations (18 CFR 385.211 and                       compressor station in Dorchester
                                                    10–17 Compliance Filing with Sept. 16                   385.214) on or before 5:00 p.m. Eastern               County (Dorchester Compressor
                                                    Order Frequency Response to be                          time on the specified comment date.                   Station);
                                                    effective 8/15/2016.                                    Protests may be considered, but                         • conversion of an existing 1,050-hp
                                                       Filed Date: 10/17/16.                                intervention is necessary to become a                 compressor unit from standby to base
                                                       Accession Number: 20161017–5138.                     party to the proceeding.                              load at the existing Southern
                                                       Comments Due: 5 p.m. ET 11/7/16.                        eFiling is encouraged. More detailed               Compressor Station in Aiken County;
                                                       Docket Numbers: ER17–114–001.                        information relating to filing                          • upgrades to the existing Charleston
                                                       Applicants: California Independent                   requirements, interventions, protests,                Town Border Station in Charleston
                                                    System Operator Corporation.                            service, and qualifying facilities filings            County and to the existing Greenwood
                                                       Description: Compliance filing: 2016–                can be found at: http://www.ferc.gov/                 Town Border Station in Greenwood
                                                    10–17 Errata to Order 827 Order 828
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            docs-filing/efiling/filing-req.pdf. For               County; and
                                                    Compliance Filing to be effective 9/21/                 other information, call (866) 208–3676                  • associated pipeline support
                                                    2016.                                                   (toll free). For TTY, call (202) 502–8659.            facilities (metering and regulating
                                                       Filed Date: 10/17/16.                                                                                      stations, pig launcher and receiver
                                                       Accession Number: 20161017–5141.                       Dated: October 18, 2016.
                                                                                                                                                                  assemblies, valves, and pipeline
                                                       Comments Due: 5 p.m. ET 11/7/16.                     Nathaniel J. Davis, Sr.,                              interconnects).
                                                       Docket Numbers: ER17–131–000.                        Deputy Secretary.                                       The FERC staff mailed copies of the
                                                       Applicants: Pacific Gas and Electric                 [FR Doc. 2016–25876 Filed 10–25–16; 8:45 am]          EA to federal, state, and local
                                                    Company.                                                BILLING CODE 6717–01–P                                government representatives and


                                               VerDate Sep<11>2014   18:25 Oct 25, 2016   Jkt 241001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\26OCN1.SGM   26OCN1


                                                    74418                     Federal Register / Vol. 81, No. 207 / Wednesday, October 26, 2016 / Notices

                                                    agencies; elected officials;                            intervene pursuant to Rule 214 of the                 Docket No. CP17–1–000 a prior notice
                                                    environmental and public interest                       Commission’s Rules of Practice and                    request pursuant to sections 157.205,
                                                    groups; Native American tribes;                         Procedures (18 CFR 385.214).1 Only                    157.208 and 157.210 of the
                                                    potentially affected landowners and                     intervenors have the right to seek                    Commission’s regulations under the
                                                    other interested individuals and groups;                rehearing of the Commission’s decision.               Natural Gas Act (NGA), and Equitrans’
                                                    newspapers and libraries in the Project                 The Commission grants affected                        blanket certificate issued in Docket No.
                                                    area; and parties to this proceeding. In                landowners and others with                            CP96–352–000, to construct and operate
                                                    addition, the EA is available for public                environmental concerns intervenor                     its H–125 Uprate Project for system
                                                    viewing on the FERC’s Web site                          status upon showing good cause by                     flexibility and reliability. Equitrans
                                                    (www.ferc.gov) using the eLibrary link.                 stating that they have a clear and direct             requests authorization to retest certain
                                                    A limited number of copies of the EA                    interest in this proceeding which no                  portions and increase the Maximum
                                                    are available for distribution and public               other party can adequately represent.                 Allowable Operating Pressure (MAOP)
                                                    inspection at: Federal Energy Regulatory                Simply filing environmental comments                  of its existing H–125 pipeline in
                                                    Commission, Public Reference Room,                      will not give you intervenor status, but              Washington County, Pennsylvania, as
                                                    888 First Street NE., Room 2A,                          you do not need intervenor status to                  well as replace, remove or modify
                                                    Washington, DC 20426, (202) 502–8371.                   have your comments considered.                        appurtenant facilities located in
                                                       Any person wishing to comment on                        Additional information about the                   Allegheny and Washington Counties,
                                                    the EA may do so. Your comments                         Project is available from the                         Pennsylvania. Equitrans states that the
                                                    should focus on the potential                           Commission’s Office of External Affairs,              proposed project will result in an
                                                    environmental effects, reasonable                       at (866) 208–FERC, or on the FERC Web                 increase in MAOP of the H–125 pipeline
                                                    alternatives, and measures to avoid or                  site (www.ferc.gov) using the eLibrary                from 328 pounds per square inch gauge
                                                    lessen environmental impacts. The more                  link. Click on the eLibrary link, click on            (psig) to 546 psig. Equitrans asserts that
                                                    specific your comments, the more useful                 ‘‘General Search,’’ and enter the docket              this modifications will allow for more
                                                    they will be. To ensure that the                        number excluding the last three digits in             flexibility for its customers to better
                                                    Commission has the opportunity to                       the Docket Number field (i.e., CP16–98).              serve Pittsburgh and surrounding
                                                    consider your comments prior to                         Be sure you have selected an                          markets, and that the proposed uprate is
                                                    making its decision on this Project, it is              appropriate date range. For assistance,               not intended to increase or decrease
                                                    important that we receive your                          please contact FERC Online Support at                 available capacity on its system.
                                                    comments in Washington, DC on or                        FercOnlineSupport@ferc.gov or toll free               Equitrans estimates the cost of the
                                                    before November 18, 2016.                               at (866) 208–3676, or for TTY, contact                project to be $3,750,685, all as more
                                                       For your convenience, there are three                (202) 502–8659. The eLibrary link also                fully set forth in the application which
                                                    methods you can use to file your                        provides access to the texts of formal                is on file with the Commission and open
                                                    comments with the Commission. In all                    documents issued by the Commission,                   to public inspection. The filing may also
                                                    instances please reference the Project                  such as orders, notices, and                          be viewed on the web at http://
                                                    docket number (CP16–98–000) with                        rulemakings.                                          www.ferc.gov using the ‘‘eLibrary’’ link.
                                                    your submission. The Commission                            In addition, the Commission offers a
                                                                                                                                                                  Enter the docket number excluding the
                                                    encourages electronic filing of                         free service called eSubscription which
                                                                                                                                                                  last three digits in the docket number
                                                    comments and has expert staff available                 allows you to keep track of all formal
                                                                                                                                                                  field to access the document. For
                                                    to assist you at (202) 502–8258 or                      issuances and submittals in specific
                                                                                                                                                                  assistance, please contact FERC Online
                                                    efiling@ferc.gov.                                       dockets. This can reduce the amount of
                                                       (1) You can file your comments                                                                             Support at FERCOnlineSupport@
                                                                                                            time you spend researching proceedings
                                                    electronically using the eComment                                                                             ferc.gov or toll free at (866) 208–3676, or
                                                                                                            by automatically providing you with
                                                    feature located on the Commission’s                                                                           TTY, contact (202) 502–8659.
                                                                                                            notification of these filings, document
                                                    Web site (www.ferc.gov) under the link                  summaries, and direct links to the                       Any questions concerning this
                                                    to Documents and Filings. This is an                    documents. Go to www.ferc.gov/docs-                   application may be directed to Paul W.
                                                    easy method for submitting brief, text-                 filing/esubscription.asp.                             Diehl, Counsel—Midstream, Equitrans,
                                                    only comments on a project;                                                                                   LP, 625 Liberty Avenue, Suite 1700,
                                                                                                              Dated: October 19, 2016.                            Pittsburgh, PA 15222, by telephone at
                                                       (2) You can also file your comments
                                                                                                            Kimberly D. Bose,                                     (412) 395–5540, by facsimile at (412)
                                                    electronically using the eFiling feature
                                                                                                            Secretary.                                            553–7781, or by email at pdiehl@
                                                    on the Commission’s Web site at
                                                    www.ferc.gov under the link to                          [FR Doc. 2016–25792 Filed 10–25–16; 8:45 am]          eqt.com.
                                                    Documents and Filings. With eFiling,                    BILLING CODE 6717–01–P                                   Any person or the Commission’s staff
                                                    you can provide comments in a variety                                                                         may, within 60 days after issuance of
                                                    of formats by attaching them as a file                                                                        the instant notice by the Commission,
                                                    with your submission. New eFiling                       DEPARTMENT OF ENERGY                                  file pursuant to Rule 214 of the
                                                    users must first create an account by                                                                         Commission’s Procedural Rules (18 CFR
                                                                                                            Federal Energy Regulatory
                                                    clicking on ‘‘eRegister.’’ You must select                                                                    385.214) a motion to intervene or notice
                                                                                                            Commission
                                                    the type of filing you are making. If you                                                                     of intervention and pursuant to section
                                                    are filing a comment on a particular                    [Docket No. CP17–1–000]                               157.205 of the regulations under the
                                                    project, please select ‘‘Comment on a                                                                         NGA (18 CFR 157.205), a protest to the
                                                                                                            Equitrans, LP; Notice of Request                      request. If no protest is filed within the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    Filing’’; or
                                                       (3) You can file a paper copy of your                Under Blanket Authorization                           time allowed therefore, the proposed
                                                    comments by mailing them to the                           Take notice that on October 13, 2016,               activity shall be deemed to be
                                                    following address: Kimberly D. Bose,                    Equitrans, LP (Equitrans), 625 Liberty                authorized effective the day after the
                                                    Secretary, Federal Energy Regulatory                    Avenue, Suite 1700, Pittsburgh,                       time allowed for filing a protest. If a
                                                    Commission, 888 First Street NE., Room                  Pennsylvania 15222–3111, filed in                     protest is filed and not withdrawn
                                                    1A, Washington, DC 20426.                                                                                     within 30 days after the allowed time
                                                       Any person seeking to become a party                    1 See the previous discussion on the methods for   for filing a protest, the instant request
                                                    to the proceeding must file a motion to                 filing comments.                                      shall be treated as an application for


                                               VerDate Sep<11>2014   18:25 Oct 25, 2016   Jkt 241001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\26OCN1.SGM   26OCN1



Document Created: 2016-10-26 02:17:37
Document Modified: 2016-10-26 02:17:37
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 74417 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR