81_FR_74626 81 FR 74419 - Commission Information Collection Activities (FERC-725I); Comment Request

81 FR 74419 - Commission Information Collection Activities (FERC-725I); Comment Request

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 207 (October 26, 2016)

Page Range74419-74420
FR Document2016-25841

In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collection [FERC-725I (Mandatory Reliability Standards for the Northeast Power Coordinating Council)] to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously issued a Notice in the Federal Register (81 FR 54571, 8/16/2016) requesting public comments. The Commission received no comments in response to the RD16-8-000 60-day notice and is making this notation in its submittal to OMB.

Federal Register, Volume 81 Issue 207 (Wednesday, October 26, 2016)
[Federal Register Volume 81, Number 207 (Wednesday, October 26, 2016)]
[Notices]
[Pages 74419-74420]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-25841]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RD16-8-000]


Commission Information Collection Activities (FERC-725I); Comment 
Request

AGENCY: Federal Energy Regulatory Commission.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy Regulatory 
Commission (Commission or FERC) is submitting its information 
collection [FERC-725I (Mandatory Reliability Standards for the 
Northeast Power Coordinating Council)] to the Office of Management and 
Budget (OMB) for review of the information collection requirements. Any 
interested person may file comments directly with OMB and should 
address a copy of those comments to the Commission as explained below. 
The Commission previously issued a Notice in the Federal Register (81 
FR 54571, 8/16/2016) requesting public comments. The Commission 
received no comments in response to the RD16-8-000 60-day notice and is 
making this notation in its submittal to OMB.

DATES: Comments on the collection of information are due by November 
25, 2016.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0258, should be sent via email to the Office of Information and 
Regulatory Affairs: [email protected]. Attention: Federal Energy 
Regulatory Commission Desk Officer. The Desk Officer may also be 
reached via telephone at 202-395-4718.
    A copy of the comments should also be sent to the Commission, in 
Docket No. RD16-8-000, by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725I, Mandatory Reliability Standards for the Northeast 
Power Coordinating Council.
    OMB Control No.: 1902-0258.
    Type of Request: Three-year approval of the FERC-725I information 
collection requirements, as modified.
    Abstract: On June 9, 2016, the North American Electric Reliability 
Corporation (NERC) and the Northeast Power Coordination Council, Inc. 
(``NPCC'') filed a petition for Commission approval, pursuant to 
section 215(d)(1) of the Federal Power Act (``FPA'') \1\ and Section 
39.5 \2\ of the Federal Energy Regulatory Commission's regulations, of 
the retirement of NPCC Regional Reliability Standard PRC-002-NPCC-01 
(Disturbance Monitoring) and the two related NPCC regional definitions, 
Current Zero Time and Generating Plant.
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 824o (2012).
    \2\ 18 CFR 39.5 (2015).
---------------------------------------------------------------------------

    Type of Respondents: Public utilities.
    Estimate of Annual Burden: \3\ The Commission estimates the 
reduction (due to the retirement of Reliability Standard PRC-002-NPCC-
01) in the annual public reporting burden for the information 
collection as follows:
---------------------------------------------------------------------------

    \3\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.

[[Page 74420]]



----------------------------------------------------------------------------------------------------------------
                                                   Annual number
     Information collection          Number of     of responses    Total number   Average burden   Total annual
          requirements              respondents   per respondent   of responses        hours       burden hours
                                             (1)             (2)     (1) * (2) =             (4)     (3) * (4) =
                                                                             (3)                             (5)
----------------------------------------------------------------------------------------------------------------
R13: GO \4\ and TO to have                     1               1               1              10              10
 evidence it acquired and
 installed dynamic disturbance
 recorders and a mutually agreed
 upon implementation schedule
 with the RC (record retention).
R14.5: GO and TO to have                     169              12           2,028               5          10,140
 evidence of a maintenance and
 testing program for stand-alone
 disturbance monitoring
 equipment including monthly
 verification of active analog
 quantities.....................
R14.7: GO and TO to record                    33               1              33              10             330
 efforts to return failed units
 to service if it takes longer
 than 90 days \5\...............
R14.7: GO and TO record                       33               1              33              10             330
 retention......................
R17: RC provide certain                        5               1               5               5              25
 disturbance monitoring
 equipment data to the Regional
 Entity upon request............
R17: RC record retention........               5               1               5              10              50
                                 -------------------------------------------------------------------------------
    TOTAL REDUCTIONS............  ..............  ..............           2,105  ..............          10,885
----------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \4\ For purposes of these charts, generation owner is 
abbreviated to GO, transmission owner is abbreviated to TO, 
reliability coordinator is abbreviated to RC, and planning 
coordinator is abbreviated to PC.
    \5\ We estimate that an entity will experience a unit failure 
greater than 90 days once every five years. Therefore, 20 percent of 
NPCC's 169 generator owners and transmission owners will experience 
a unit failure of this duration each year.

    Dated: October 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-25841 Filed 10-25-16; 8:45 am]
BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 81, No. 207 / Wednesday, October 26, 2016 / Notices                                                     74419

                                                    authorization pursuant to section 7 of                    Dated: October 20, 2016.                               • Mail/Hand Delivery/Courier:
                                                    the NGA.                                                Kimberly D. Bose,                                     Federal Energy Regulatory Commission,
                                                       Pursuant to section 157.9 of the                     Secretary.                                            Secretary of the Commission, 888 First
                                                                                                            [FR Doc. 2016–25833 Filed 10–25–16; 8:45 am]          Street NE., Washington, DC 20426.
                                                    Commission’s rules, 18 CFR 157.9,
                                                    within 90 days of this Notice the                       BILLING CODE 6717–01–P                                   Instructions: All submissions must be
                                                                                                                                                                  formatted and filed in accordance with
                                                    Commission staff will either: complete
                                                                                                                                                                  submission guidelines at: http://
                                                    its environmental assessment (EA) and
                                                                                                            DEPARTMENT OF ENERGY                                  www.ferc.gov/help/submission-
                                                    place it into the Commission’s public
                                                                                                                                                                  guide.asp. For user assistance contact
                                                    record (eLibrary) for this proceeding, or               Federal Energy Regulatory                             FERC Online Support by email at
                                                    issue a Notice of Schedule for                          Commission                                            ferconlinesupport@ferc.gov, or by phone
                                                    Environmental Review. If a Notice of                                                                          at: (866) 208–3676 (toll-free), or (202)
                                                    Schedule for Environmental Review is                                                                          502–8659 for TTY.
                                                                                                            [Docket No. RD16–8–000]
                                                    issued, it will indicate, among other                                                                            Docket: Users interested in receiving
                                                    milestones, the anticipated date for the                Commission Information Collection                     automatic notification of activity in this
                                                    Commission staff’s issuance of the final                Activities (FERC–725I); Comment                       docket or in viewing/downloading
                                                    environmental impact statement (FEIS)                   Request                                               comments and issuances in this docket
                                                    or EA for this proposal. The filing of the                                                                    may do so at http://www.ferc.gov/docs-
                                                    EA in the Commission’s public record                    AGENCY:  Federal Energy Regulatory                    filing/docs-filing.asp.
                                                    for this proceeding or the issuance of a                Commission.
                                                                                                                                                                  FOR FURTHER INFORMATION CONTACT:
                                                    Notice of Schedule for Environmental                    ACTION: Comment request.                              Ellen Brown may be reached by email
                                                    Review will serve to notify federal and                                                                       at DataClearance@FERC.gov, by
                                                    state agencies of the timing for the                    SUMMARY:   In compliance with the
                                                                                                                                                                  telephone at (202) 502–8663, and by fax
                                                    completion of all necessary reviews, and                requirements of the Paperwork
                                                                                                                                                                  at (202) 273–0873.
                                                    the subsequent need to complete all                     Reduction Act of 1995, 44 U.S.C.
                                                                                                            3507(a)(1)(D), the Federal Energy                     SUPPLEMENTARY INFORMATION:
                                                    federal authorizations within 90 days of                                                                         Title: FERC–725I, Mandatory
                                                                                                            Regulatory Commission (Commission or
                                                    the date of issuance of the Commission                                                                        Reliability Standards for the Northeast
                                                                                                            FERC) is submitting its information
                                                    staff’s FEIS or EA.                                                                                           Power Coordinating Council.
                                                                                                            collection [FERC–725I (Mandatory
                                                       Persons who wish to comment only                     Reliability Standards for the Northeast                  OMB Control No.: 1902–0258.
                                                    on the environmental review of this                     Power Coordinating Council)] to the                      Type of Request: Three-year approval
                                                    project should submit an original and                   Office of Management and Budget                       of the FERC–725I information collection
                                                    two copies of their comments to the                     (OMB) for review of the information                   requirements, as modified.
                                                    Secretary of the Commission.                            collection requirements. Any interested                  Abstract: On June 9, 2016, the North
                                                    Environmental commenters will be                        person may file comments directly with                American Electric Reliability
                                                    placed on the Commission’s                              OMB and should address a copy of                      Corporation (NERC) and the Northeast
                                                    environmental mailing list, will receive                those comments to the Commission as                   Power Coordination Council, Inc.
                                                    copies of the environmental documents,                  explained below. The Commission                       (‘‘NPCC’’) filed a petition for
                                                    and will be notified of meetings                        previously issued a Notice in the                     Commission approval, pursuant to
                                                    associated with the Commission’s                        Federal Register (81 FR 54571, 8/16/                  section 215(d)(1) of the Federal Power
                                                    environmental review process.                           2016) requesting public comments. The                 Act (‘‘FPA’’) 1 and Section 39.5 2 of the
                                                    Environmental commenters will not be                    Commission received no comments in                    Federal Energy Regulatory
                                                    required to serve copies of filed                       response to the RD16–8–000 60-day                     Commission’s regulations, of the
                                                    documents on all other parties.                         notice and is making this notation in its             retirement of NPCC Regional Reliability
                                                                                                            submittal to OMB.                                     Standard PRC–002–NPCC–01
                                                    However, the non-party commenters,
                                                                                                            DATES: Comments on the collection of                  (Disturbance Monitoring) and the two
                                                    will not receive copies of all documents
                                                                                                            information are due by November 25,                   related NPCC regional definitions,
                                                    filed by other parties or issued by the
                                                                                                            2016.                                                 Current Zero Time and Generating
                                                    Commission (except for the mailing of                                                                         Plant.
                                                    environmental documents issued by the                   ADDRESSES:   Comments filed with OMB,                    Type of Respondents: Public utilities.
                                                    Commission) and will not have the right                 identified by the OMB Control No.                        Estimate of Annual Burden: 3 The
                                                    to seek court review of the                             1902–0258, should be sent via email to                Commission estimates the reduction
                                                    Commission’s final order.                               the Office of Information and Regulatory              (due to the retirement of Reliability
                                                      The Commission strongly encourages                    Affairs: oira_submission@omb.gov.                     Standard PRC–002–NPCC–01) in the
                                                                                                            Attention: Federal Energy Regulatory                  annual public reporting burden for the
                                                    electronic filings of comments, protests
                                                                                                            Commission Desk Officer. The Desk                     information collection as follows:
                                                    and interventions in lieu of paper using
                                                                                                            Officer may also be reached via
                                                    the ‘‘eFiling’’ link at http://
                                                                                                            telephone at 202–395–4718.                              1 16 U.S.C. 824o (2012).
                                                    www.ferc.gov. Persons unable to file
                                                                                                               A copy of the comments should also                   2 18 CFR 39.5 (2015).
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    electronically should submit an original
                                                                                                            be sent to the Commission, in Docket                    3 The Commission defines burden as the total
                                                    and seven copies of the protest or                      No. RD16–8–000, by either of the                      time, effort, or financial resources expended by
                                                    intervention to the Federal Energy                      following methods:                                    persons to generate, maintain, retain, or disclose or
                                                    Regulatory Commission, 888 First                           • eFiling at Commission’s Web site:
                                                                                                                                                                  provide information to or for a Federal agency. For
                                                    Street, NE., Washington, DC 20426.                                                                            further explanation of what is included in the
                                                                                                            http://www.ferc.gov/docs-filing/                      information collection burden, reference 5 Code of
                                                                                                            efiling.asp.                                          Federal Regulations 1320.3.




                                               VerDate Sep<11>2014   18:25 Oct 25, 2016   Jkt 241001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\26OCN1.SGM   26OCN1


                                                    74420                            Federal Register / Vol. 81, No. 207 / Wednesday, October 26, 2016 / Notices

                                                                                                                                                                         Annual                     Total
                                                                                                                                            Number of                   number of                                     Average                 Total annual
                                                                    Information collection requirements                                                                                          number of
                                                                                                                                           respondents               responses per                                  burden hours              burden hours
                                                                                                                                                                                                 responses
                                                                                                                                                                       respondent

                                                                                                                                                   (1)                        (2)               (1) * (2) = (3)             (4)               (3) * (4) = (5)

                                                    R13: GO 4 and TO to have evidence it acquired and in-
                                                      stalled dynamic disturbance recorders and a mutually
                                                      agreed upon implementation schedule with the RC
                                                      (record retention) ..............................................................                         1                         1                   1                       10                   10
                                                    R14.5: GO and TO to have evidence of a maintenance
                                                      and testing program for stand-alone disturbance moni-
                                                      toring equipment including monthly verification of active
                                                      analog quantities ..............................................................                     169                           12              2,028                          5             10,140
                                                    R14.7: GO and TO to record efforts to return failed units
                                                      to service if it takes longer than 90 days 5 .......................                                    33                           1                 33                       10                 330
                                                    R14.7: GO and TO record retention ....................................                                    33                           1                 33                       10                 330
                                                    R17: RC provide certain disturbance monitoring equipment
                                                      data to the Regional Entity upon request ........................                                        5                           1                  5                         5                  25
                                                    R17: RC record retention .....................................................                             5                           1                  5                        10                  50

                                                          TOTAL REDUCTIONS .................................................              ........................   ........................            2,105     ........................           10,885



                                                      Comments: Comments are invited on:                                 DEPARTMENT OF ENERGY                                                     a free service called eSubscription
                                                    (1) Whether the collection of                                                                                                                 (https://www.ferc.gov/docs-filing/
                                                    information is necessary for the proper                              Federal Energy Regulatory                                                esubscription.asp).
                                                    performance of the functions of the                                  Commission                                                                 Dated: October 20, 2016.
                                                    Commission, including whether the                                    [Docket No. CP15–138–000]                                                Kimberly D. Bose,
                                                    information will have practical utility;                                                                                                      Secretary.
                                                    (2) the accuracy of the agency’s estimate                            Transcontinental Gas Pipe Line
                                                                                                                                                                                                  [FR Doc. 2016–25834 Filed 10–25–16; 8:45 am]
                                                    of the burden and cost of the collection                             Company, LLC; Notice of Revised
                                                                                                                                                                                                  BILLING CODE 6717–01–P
                                                    of information, including the validity of                            Schedule for Environmental Review of
                                                    the methodology and assumptions used;                                the Atlantic Sunrise Project
                                                    (3) ways to enhance the quality, utility                                                                                                      DEPARTMENT OF ENERGY
                                                                                                                            This notice identifies the Federal
                                                    and clarity of the information collection;
                                                                                                                         Energy Regulatory Commission (FERC                                       Federal Energy Regulatory
                                                    and (4) ways to minimize the burden of                               or Commission) staff’s revised schedule
                                                    the collection of information on those                                                                                                        Commission
                                                                                                                         for the completion of the environmental
                                                    who are to respond, including the use                                impact statement (EIS) for                                               [Project No. 2485–073]
                                                    of automated collection techniques or                                Transcontinental Gas Pipe Line
                                                    other forms of information technology.                               Company, LLC’s (Transco) Atlantic                                        FirstLight Hydro Generating Company;
                                                      Dated: October 20, 2016.                                           Sunrise Project. The first notice of                                     Notice of Application Accepted for
                                                                                                                         schedule, issued on March 9, 2016,                                       Filing, Soliciting Comments, Motions
                                                    Kimberly D. Bose,
                                                                                                                         identified October 21, 2016 as the EIS                                   To Intervene, and Protests
                                                    Secretary.
                                                                                                                         issuance date. Based on additional
                                                    [FR Doc. 2016–25841 Filed 10–25–16; 8:45 am]
                                                                                                                         information filed by Transco, however,                                     Take notice that the following
                                                    BILLING CODE 6717–01–P                                               we intend to issue a draft General                                       hydroelectric application has been filed
                                                                                                                         Conformity Determination for the                                         with the Commission and is available
                                                                                                                         Atlantic Sunrise Project with a 30-day                                   for public inspection:
                                                                                                                         comment period. Commission staff has                                       a. Type of Application: Application
                                                                                                                         therefore revised the schedule for                                       for Temporary Amendment of Minimum
                                                                                                                         issuance of the final EIS.                                               and Maximum Reservoir Elevation
                                                                                                                                                                                                  Requirement.
                                                                                                                         Schedule for Environmental Review                                          b. Project No.: 2485–073.
                                                                                                                           Issuance of Notice of Availability of                                    c. Date Filed: September 16, 2016.
                                                                                                                         the final EIS—December 30, 2016.                                           d. Applicant: FirstLight Hydro
                                                                                                                           90-day Federal Authorization                                           Generating Company (FirstLight).
                                                                                                                         Decision Deadline—March 30, 2017.                                          e. Name of Project: Northfield
                                                                                                                           If a schedule change becomes                                           Mountain Pumped Storage Project.
                                                                                                                         necessary, an additional notice will be                                    f. Location: The project is located on
                                                                                                                                                                                                  the east side of the Connecticut River,
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                       4 For purposes of these charts, generation owner
                                                                                                                         provided so that the relevant agencies
                                                    is abbreviated to GO, transmission owner is                          are kept informed of the project’s                                       in the towns of Northfield and Erving,
                                                    abbreviated to TO, reliability coordinator is                                                                                                 in Franklin County, Massachusetts.
                                                                                                                         progress.
                                                    abbreviated to RC, and planning coordinator is
                                                                                                                                                                                                    g. Filed Pursuant to: Federal Power
                                                    abbreviated to PC.                                                   Additional Information                                                   Act, 16 U.S.C. 791(a)–825(r).
                                                       5 We estimate that an entity will experience a unit

                                                    failure greater than 90 days once every five years.
                                                                                                                            In order to receive notification of the                                 h. Applicant Contact: Mr. Gus Bakas,
                                                    Therefore, 20 percent of NPCC’s 169 generator                        issuance of the EIS and to keep track of                                 Director—Massachusetts Hydro,
                                                    owners and transmission owners will experience a                     all formal issuances and submittals in                                   FirstLight Hydro Generating Company,
                                                    unit failure of this duration each year.                             specific dockets, the Commission offers                                  Northfield Mountain Station, 99 Millers


                                               VerDate Sep<11>2014       18:25 Oct 25, 2016       Jkt 241001     PO 00000      Frm 00030      Fmt 4703        Sfmt 4703       E:\FR\FM\26OCN1.SGM         26OCN1



Document Created: 2016-10-26 02:17:25
Document Modified: 2016-10-26 02:17:25
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionComment request.
DatesComments on the collection of information are due by November 25, 2016.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation81 FR 74419 