DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 207 (October 26, 2016)

Page Range74420-74421
FR Document2016-25836

Federal Register, Volume 81 Issue 207 (Wednesday, October 26, 2016)
[Federal Register Volume 81, Number 207 (Wednesday, October 26, 2016)]
[Notices]
[Pages 74420-74421]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-25836]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2485-073]


FirstLight Hydro Generating Company; Notice of Application 
Accepted for Filing, Soliciting Comments, Motions To Intervene, and 
Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application for Temporary Amendment of 
Minimum and Maximum Reservoir Elevation Requirement.
    b. Project No.: 2485-073.
    c. Date Filed: September 16, 2016.
    d. Applicant: FirstLight Hydro Generating Company (FirstLight).
    e. Name of Project: Northfield Mountain Pumped Storage Project.
    f. Location: The project is located on the east side of the 
Connecticut River, in the towns of Northfield and Erving, in Franklin 
County, Massachusetts.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Gus Bakas, Director--Massachusetts Hydro, 
FirstLight Hydro Generating Company, Northfield Mountain Station, 99 
Millers

[[Page 74421]]

Falls Road, Northfield, MA 01360. Phone (413) 422-5915.
    i. FERC Contact: Mr. Christopher Chaney, (202) 502-6778, or 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance date of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests, or comments using the Commission's eFiling 
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. Please include the project number (P-
2485-073) on any comments, motions to intervene, or protests filed.
    k. Description of Request: FirstLight is seeking authorization to 
modify the upper reservoir's upper and lower water surface elevation 
limits from 1,000.5 feet mean sea level (msl) and 938 feet msl, to 
1,004.5 feet msl and 920 feet msl, respectively. FirstLight proposes to 
use the additional storage capacity between December 1, 2016, and March 
31, 2017. According to FirstLight, approval of changes in the water 
surface elevation limits would result in an increase in the maximum 
daily generation from 8,729 megawatt-hours (MWh) to 10,779 MWh, and 
provide Independent System Operator-New England with additional 
resources to address winter reliability needs.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document (i.e., P-2485). You 
may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208- 3676 or email [email protected], for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the 
address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to the amendment request. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application. If an intervener files 
comments or documents with the Commission relating to the merits of an 
issue that may affect the responsibilities of a particular resource 
agency, they must also serve a copy of the document on that resource 
agency. A copy of all other filings in reference to this application 
must be accompanied by proof of service on all persons listed in the 
service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: October 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-25836 Filed 10-25-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    74420                            Federal Register / Vol. 81, No. 207 / Wednesday, October 26, 2016 / Notices

                                                                                                                                                                         Annual                     Total
                                                                                                                                            Number of                   number of                                     Average                 Total annual
                                                                    Information collection requirements                                                                                          number of
                                                                                                                                           respondents               responses per                                  burden hours              burden hours
                                                                                                                                                                                                 responses
                                                                                                                                                                       respondent

                                                                                                                                                   (1)                        (2)               (1) * (2) = (3)             (4)               (3) * (4) = (5)

                                                    R13: GO 4 and TO to have evidence it acquired and in-
                                                      stalled dynamic disturbance recorders and a mutually
                                                      agreed upon implementation schedule with the RC
                                                      (record retention) ..............................................................                         1                         1                   1                       10                   10
                                                    R14.5: GO and TO to have evidence of a maintenance
                                                      and testing program for stand-alone disturbance moni-
                                                      toring equipment including monthly verification of active
                                                      analog quantities ..............................................................                     169                           12              2,028                          5             10,140
                                                    R14.7: GO and TO to record efforts to return failed units
                                                      to service if it takes longer than 90 days 5 .......................                                    33                           1                 33                       10                 330
                                                    R14.7: GO and TO record retention ....................................                                    33                           1                 33                       10                 330
                                                    R17: RC provide certain disturbance monitoring equipment
                                                      data to the Regional Entity upon request ........................                                        5                           1                  5                         5                  25
                                                    R17: RC record retention .....................................................                             5                           1                  5                        10                  50

                                                          TOTAL REDUCTIONS .................................................              ........................   ........................            2,105     ........................           10,885



                                                      Comments: Comments are invited on:                                 DEPARTMENT OF ENERGY                                                     a free service called eSubscription
                                                    (1) Whether the collection of                                                                                                                 (https://www.ferc.gov/docs-filing/
                                                    information is necessary for the proper                              Federal Energy Regulatory                                                esubscription.asp).
                                                    performance of the functions of the                                  Commission                                                                 Dated: October 20, 2016.
                                                    Commission, including whether the                                    [Docket No. CP15–138–000]                                                Kimberly D. Bose,
                                                    information will have practical utility;                                                                                                      Secretary.
                                                    (2) the accuracy of the agency’s estimate                            Transcontinental Gas Pipe Line
                                                                                                                                                                                                  [FR Doc. 2016–25834 Filed 10–25–16; 8:45 am]
                                                    of the burden and cost of the collection                             Company, LLC; Notice of Revised
                                                                                                                                                                                                  BILLING CODE 6717–01–P
                                                    of information, including the validity of                            Schedule for Environmental Review of
                                                    the methodology and assumptions used;                                the Atlantic Sunrise Project
                                                    (3) ways to enhance the quality, utility                                                                                                      DEPARTMENT OF ENERGY
                                                                                                                            This notice identifies the Federal
                                                    and clarity of the information collection;
                                                                                                                         Energy Regulatory Commission (FERC                                       Federal Energy Regulatory
                                                    and (4) ways to minimize the burden of                               or Commission) staff’s revised schedule
                                                    the collection of information on those                                                                                                        Commission
                                                                                                                         for the completion of the environmental
                                                    who are to respond, including the use                                impact statement (EIS) for                                               [Project No. 2485–073]
                                                    of automated collection techniques or                                Transcontinental Gas Pipe Line
                                                    other forms of information technology.                               Company, LLC’s (Transco) Atlantic                                        FirstLight Hydro Generating Company;
                                                      Dated: October 20, 2016.                                           Sunrise Project. The first notice of                                     Notice of Application Accepted for
                                                                                                                         schedule, issued on March 9, 2016,                                       Filing, Soliciting Comments, Motions
                                                    Kimberly D. Bose,
                                                                                                                         identified October 21, 2016 as the EIS                                   To Intervene, and Protests
                                                    Secretary.
                                                                                                                         issuance date. Based on additional
                                                    [FR Doc. 2016–25841 Filed 10–25–16; 8:45 am]
                                                                                                                         information filed by Transco, however,                                     Take notice that the following
                                                    BILLING CODE 6717–01–P                                               we intend to issue a draft General                                       hydroelectric application has been filed
                                                                                                                         Conformity Determination for the                                         with the Commission and is available
                                                                                                                         Atlantic Sunrise Project with a 30-day                                   for public inspection:
                                                                                                                         comment period. Commission staff has                                       a. Type of Application: Application
                                                                                                                         therefore revised the schedule for                                       for Temporary Amendment of Minimum
                                                                                                                         issuance of the final EIS.                                               and Maximum Reservoir Elevation
                                                                                                                                                                                                  Requirement.
                                                                                                                         Schedule for Environmental Review                                          b. Project No.: 2485–073.
                                                                                                                           Issuance of Notice of Availability of                                    c. Date Filed: September 16, 2016.
                                                                                                                         the final EIS—December 30, 2016.                                           d. Applicant: FirstLight Hydro
                                                                                                                           90-day Federal Authorization                                           Generating Company (FirstLight).
                                                                                                                         Decision Deadline—March 30, 2017.                                          e. Name of Project: Northfield
                                                                                                                           If a schedule change becomes                                           Mountain Pumped Storage Project.
                                                                                                                         necessary, an additional notice will be                                    f. Location: The project is located on
                                                                                                                                                                                                  the east side of the Connecticut River,
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                       4 For purposes of these charts, generation owner
                                                                                                                         provided so that the relevant agencies
                                                    is abbreviated to GO, transmission owner is                          are kept informed of the project’s                                       in the towns of Northfield and Erving,
                                                    abbreviated to TO, reliability coordinator is                                                                                                 in Franklin County, Massachusetts.
                                                                                                                         progress.
                                                    abbreviated to RC, and planning coordinator is
                                                                                                                                                                                                    g. Filed Pursuant to: Federal Power
                                                    abbreviated to PC.                                                   Additional Information                                                   Act, 16 U.S.C. 791(a)–825(r).
                                                       5 We estimate that an entity will experience a unit

                                                    failure greater than 90 days once every five years.
                                                                                                                            In order to receive notification of the                                 h. Applicant Contact: Mr. Gus Bakas,
                                                    Therefore, 20 percent of NPCC’s 169 generator                        issuance of the EIS and to keep track of                                 Director—Massachusetts Hydro,
                                                    owners and transmission owners will experience a                     all formal issuances and submittals in                                   FirstLight Hydro Generating Company,
                                                    unit failure of this duration each year.                             specific dockets, the Commission offers                                  Northfield Mountain Station, 99 Millers


                                               VerDate Sep<11>2014       18:25 Oct 25, 2016       Jkt 241001     PO 00000      Frm 00030      Fmt 4703        Sfmt 4703       E:\FR\FM\26OCN1.SGM         26OCN1


                                                                              Federal Register / Vol. 81, No. 207 / Wednesday, October 26, 2016 / Notices                                                74421

                                                    Falls Road, Northfield, MA 01360.                       FERCOnlineSupport@ferc.gov, for TTY,                    Dated: October 20, 2016.
                                                    Phone (413) 422–5915.                                   call (202) 502–8659. A copy is also                   Kimberly D. Bose,
                                                       i. FERC Contact: Mr. Christopher                     available for inspection and                          Secretary.
                                                    Chaney, (202) 502–6778, or                              reproduction at the address in item (h)               [FR Doc. 2016–25836 Filed 10–25–16; 8:45 am]
                                                    christopher.chaney@ferc.gov.                            above.                                                BILLING CODE 6717–01–P
                                                       j. Deadline for filing comments,
                                                    motions to intervene, and protests is 30                   m. Individuals desiring to be included
                                                    days from the issuance date of this                     on the Commission’s mailing list should
                                                                                                            so indicate by writing to the Secretary               DEPARTMENT OF ENERGY
                                                    notice by the Commission. The
                                                    Commission strongly encourages                          of the Commission.
                                                                                                                                                                  Federal Energy Regulatory
                                                    electronic filing. Please file motions to                  n. Comments, Protests, or Motions to               Commission
                                                    intervene, protests, or comments using                  Intervene: Anyone may submit
                                                    the Commission’s eFiling system at                                                                            [Project No. 2531–075]
                                                                                                            comments, a protest, or a motion to
                                                    http://www.ferc.gov/docs-filing/                        intervene in accordance with the                      Brookfield White Pine Hydro LLC;
                                                    efiling.asp. Commenters can submit                      requirements of Rules of Practice and                 Notice of Application Accepted for
                                                    brief comments up to 6,000 characters,                  Procedure, 18 CFR 385.210, .211, .214.                Filing, Soliciting Motions To Intervene
                                                    without prior registration, using the                   In determining the appropriate action to              and Protests, Ready for Environmental
                                                    eComment system at http://                              take, the Commission will consider all                Analysis, and Soliciting Comments,
                                                    www.ferc.gov/docs-filing/                               protests or other comments filed, but                 Recommendations, Preliminary Terms
                                                    ecomment.asp. You must include your                     only those who file a motion to                       and Conditions, and Preliminary
                                                    name and contact information at the end                 intervene in accordance with the                      Fishway Prescriptions
                                                    of your comments. For assistance,                       Commission’s Rules may become a
                                                    please contact FERC Online Support at                   party to the proceeding. Any comments,                   Take notice that the following
                                                    FERCOnlineSupport@ferc.gov, (866)                       protests, or motions to intervene must                hydroelectric application has been filed
                                                    208–3676 (toll free), or (202) 502–8659                 be received on or before the specified                with the Commission and is available
                                                    (TTY). In lieu of electronic filing, please                                                                   for public inspection.
                                                                                                            comment date for the particular
                                                    send a paper copy to: Secretary, Federal                                                                         a. Type of Application: New Major
                                                                                                            application.
                                                    Energy Regulatory Commission, 888                                                                             License.
                                                    First Street NE., Washington, DC 20426.                    o. Filing and Service of Responsive                   b. Project No.: 2531–075.
                                                    Please include the project number (P–                   Documents: Any filing must (1) bear in                   c. Date filed: December 15, 2015.
                                                    2485–073) on any comments, motions to                   all capital letters the title                            d. Applicant: Brookfield White Pine
                                                    intervene, or protests filed.                           ‘‘COMMENTS’’, ‘‘PROTEST’’, or                         Hydro LLC (White Pine Hydro).
                                                       k. Description of Request: FirstLight is             ‘‘MOTION TO INTERVENE’’ as                               e. Name of Project: West Buxton
                                                    seeking authorization to modify the                     applicable; (2) set forth in the heading              Hydroelectric Project.
                                                    upper reservoir’s upper and lower water                 the name of the applicant and the                        f. Location: The existing project is
                                                    surface elevation limits from 1,000.5                   project number of the application to                  located on the Saco River in the Towns
                                                    feet mean sea level (msl) and 938 feet                  which the filing responds; (3) furnish                of Buxton, Hollis, and Standish, within
                                                    msl, to 1,004.5 feet msl and 920 feet                   the name, address, and telephone                      York and Cumberland Counties, Maine.
                                                    msl, respectively. FirstLight proposes to               number of the person protesting or                    The project does not affect federal lands.
                                                    use the additional storage capacity                     intervening; and (4) otherwise comply                    g. Filed Pursuant to: Federal Power
                                                    between December 1, 2016, and March                     with the requirements of 18 CFR                       Act 16 U.S.C. 791(a)–825(r).
                                                    31, 2017. According to FirstLight,                      385.2001 through 385.2005. All                           h. Applicant Contact: Frank Dunlap,
                                                    approval of changes in the water surface                comments, motions to intervene, or                    Licensing Specialist, Brookfield White
                                                    elevation limits would result in an                     protests must set forth their evidentiary             Pine Hydro LLC, 150 Main Street,
                                                    increase in the maximum daily                           basis and otherwise comply with the                   Lewiston, ME 04240; Telephone—(207)
                                                    generation from 8,729 megawatt-hours                    requirements of 18 CFR 4.34(b). All                   755–5603; Email—Frank.Dunlap@
                                                    (MWh) to 10,779 MWh, and provide                        comments, motions to intervene, or                    BrookfieldRenewable.com OR Kelley
                                                    Independent System Operator-New                                                                               Maloney, Manager of licensing and
                                                                                                            protests should relate to the amendment
                                                    England with additional resources to                                                                          Compliance, Brookfield White Pine
                                                                                                            request. Agencies may obtain copies of
                                                    address winter reliability needs.                                                                             Hydro LLC, 150 Maine Street, Lewiston,
                                                       l. Locations of the Application: A                   the application directly from the
                                                                                                                                                                  ME 04240; Telephone—(207) 755–5606.
                                                    copy of the application is available for                applicant. A copy of any protest or
                                                                                                                                                                     i. FERC Contact: Allan Creamer, (202)
                                                    inspection and reproduction at the                      motion to intervene must be served                    502–8365, or allan.creamer@ferc.gov.
                                                    Commission’s Public Reference Room,                     upon each representative of the                          j. Deadline for filing motions to
                                                    located at 888 First Street NE., Room                   applicant specified in the particular                 intervene and protests, comments,
                                                    2A, Washington, DC 20426, or by calling                 application. If an intervener files                   recommendations, preliminary terms
                                                    (202) 502–8371. This filing may also be                 comments or documents with the                        and conditions, and preliminary
                                                    viewed on the Commission’s Web site at                  Commission relating to the merits of an               prescriptions: 60 days from the issuance
                                                    http://www.ferc.gov/docs-filing/                        issue that may affect the responsibilities            date of this notice; reply comments are
                                                    elibrary.asp. Enter the docket number                   of a particular resource agency, they                 due 105 days from the issuance date of
                                                    excluding the last three digits in the                  must also serve a copy of the document                this notice.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    docket number field to access the                       on that resource agency. A copy of all                   The Commission strongly encourages
                                                    document (i.e., P–2485). You may also                   other filings in reference to this                    electronic filing. Please file motions to
                                                    register online at http://www.ferc.gov/                 application must be accompanied by                    intervene, protests, comments,
                                                    docs-filing/esubscription.asp to be                     proof of service on all persons listed in             recommendations, preliminary terms
                                                    notified via email of new filings and                   the service list prepared by the                      and conditions, and preliminary
                                                    issuances related to this or other                      Commission in this proceeding, in                     fishway prescriptions using the
                                                    pending projects. For assistance, call 1–               accordance with 18 CFR 4.34(b) and                    Commission’s eFiling system at http://
                                                    866–208- 3676 or email                                  385.2010.                                             www.ferc.gov/docs-filing/efiling.asp.


                                               VerDate Sep<11>2014   18:25 Oct 25, 2016   Jkt 241001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\26OCN1.SGM   26OCN1



Document Created: 2016-10-26 02:18:16
Document Modified: 2016-10-26 02:18:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 74420 