DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 207 (October 26, 2016)

Page Range74425-74425
FR Document2016-25840

Federal Register, Volume 81 Issue 207 (Wednesday, October 26, 2016)
[Federal Register Volume 81, Number 207 (Wednesday, October 26, 2016)]
[Notices]
[Page 74425]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-25840]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14801-000]


Skandana, LLC; Notice of Preliminary Permit Application Accepted 
for Filing and Soliciting Comments, Motions To Intervene, and Competing 
Applications

    On September 7, 2016, Skandana, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Eagleville 
Hydroelectric Project (project) to be located on the Chenango River, 
near the Village of Morrisville, Madison County, New York. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following new facilities: 
(1) An approximately 750-foot-long and 35-foot-wide concrete dam; (2) 
an impoundment with a surface area of 80 acres and a volume of 459.1 
acre-feet at a normal water surface elevation of 1,330.0 feet above 
mean sea level; (3) a concrete spillway; (4) a steel penstock; (5) a 
three story high concrete, wood and steel powerhouse 120 feet wide by 
249 feet long; (6) two turbine-generating units with a total installed 
capacity of 1,000 kilowatts; (7) a tailrace; (8) an approximately 8-
mile-long, 115-kilovolt transmission line from the powerhouse to the 
Cody Road substation; and (9) appurtenant facilities. The estimated 
annual generation of the Eagleville Hydroelectric Project would be 
8,500,000 kilowatt-hours.
    Applicant Contact: Mr. Stephen T. Helmer, 105 Marangale Road, 
Manlius, New York 13104-1008; phone: (315) 233-8286.
    FERC Contact: Tim Looney; phone: (202) 502-6096.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14801-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14801) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: October 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-25840 Filed 10-25-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                    Federal Register / Vol. 81, No. 207 / Wednesday, October 26, 2016 / Notices                                                                           74425

                                                                                  FERC–577 (NATURAL GAS FACILITIES: ENVIRONMENTAL REVIEW AND COMPLIANCE)
                                                                                                                       Annual                                                                            Total annual burden       Cost per
                                                                                          Number of                   number of               Total number       Average burden and                        hours and total        respondent
                                                                                         respondents               responses per              of responses       cost per response 2                         annual cost              ($)
                                                                                                                     respondent

                                                                                                 (1)                        (2)               (1) * (2) = (3)                  (4)                          (3) * (4) = (5)          (5) ÷ (1)

                                                    Gas Pipeline Certifi-                                  92                         16               1,472    193.518 hrs.; $14,417                   284,858 hrs.;                    $230,672
                                                      cates 3.                                                                                                                                            $21,221,824.
                                                    Landowner Notification 4                              165                        144              23,760    2 hrs.; $149 .................          47,520 hrs.;                         21,456
                                                                                                                                                                                                          $3,540,240.

                                                         Total ......................   ........................   ........................           25,232    .....................................   332,378 hrs.;           ........................
                                                                                                                                                                                                          $24,762,064.



                                                      Comments: Comments are invited on:                                   near the Village of Morrisville, Madison                            Commenters can submit brief comments
                                                    (1) Whether the collection of                                          County, New York. The sole purpose of                               up to 6,000 characters, without prior
                                                    information is necessary for the proper                                a preliminary permit, if issued, is to                              registration, using the eComment system
                                                    performance of the functions of the                                    grant the permit holder priority to file                            at http://www.ferc.gov/docs-filing/
                                                    Commission, including whether the                                      a license application during the permit                             ecomment.asp. You must include your
                                                    information will have practical utility;                               term. A preliminary permit does not                                 name and contact information at the end
                                                    (2) the accuracy of the agency’s estimate                              authorize the permit holder to perform                              of your comments. For assistance,
                                                    of the burden and cost of the collection                               any land-disturbing activities or                                   please contact FERC Online Support at
                                                    of information, including the validity of                              otherwise enter upon lands or waters                                FERCOnlineSupport@ferc.gov, (866)
                                                    the methodology and assumptions used;                                  owned by others without the owners’                                 208–3676 (toll free), or (202) 502–8659
                                                    (3) ways to enhance the quality, utility                               express permission.                                                 (TTY). In lieu of electronic filing, please
                                                    and clarity of the information collection;                                The proposed project would consist of                            send a paper copy to: Secretary, Federal
                                                    and (4) ways to minimize the burden of                                 the following new facilities: (1) An                                Energy Regulatory Commission, 888
                                                    the collection of information on those                                 approximately 750-foot-long and 35-                                 First Street NE., Washington, DC 20426.
                                                    who are to respond, including the use                                  foot-wide concrete dam; (2) an                                      The first page of any filing should
                                                    of automated collection techniques or                                  impoundment with a surface area of 80                               include docket number P–14801–000.
                                                    other forms of information technology.                                 acres and a volume of 459.1 acre-feet at                               More information about this project,
                                                      Dated: October 19, 2016.                                             a normal water surface elevation of                                 including a copy of the application, can
                                                    Kimberly D. Bose,                                                      1,330.0 feet above mean sea level; (3) a                            be viewed or printed on the ‘‘eLibrary’’
                                                    Secretary.                                                             concrete spillway; (4) a steel penstock;                            link of the Commission’s Web site at
                                                                                                                           (5) a three story high concrete, wood                               http://www.ferc.gov/docs-filing/
                                                    [FR Doc. 2016–25791 Filed 10–25–16; 8:45 am]
                                                                                                                           and steel powerhouse 120 feet wide by                               elibrary.asp. Enter the docket number
                                                    BILLING CODE 6717–01–P
                                                                                                                           249 feet long; (6) two turbine-generating                           (P–14801) in the docket number field to
                                                                                                                           units with a total installed capacity of                            access the document. For assistance,
                                                    DEPARTMENT OF ENERGY                                                   1,000 kilowatts; (7) a tailrace; (8) an                             contact FERC Online Support.
                                                                                                                           approximately 8-mile-long, 115-kilovolt                               Dated: October 20, 2016.
                                                    Federal Energy Regulatory                                              transmission line from the powerhouse                               Kimberly D. Bose,
                                                    Commission                                                             to the Cody Road substation; and (9)
                                                                                                                                                                                               Secretary.
                                                                                                                           appurtenant facilities. The estimated
                                                    [Project No. 14801–000]                                                                                                                    [FR Doc. 2016–25840 Filed 10–25–16; 8:45 am]
                                                                                                                           annual generation of the Eagleville
                                                                                                                                                                                               BILLING CODE 6717–01–P
                                                    Skandana, LLC; Notice of Preliminary                                   Hydroelectric Project would be
                                                    Permit Application Accepted for Filing                                 8,500,000 kilowatt-hours.
                                                    and Soliciting Comments, Motions To                                       Applicant Contact: Mr. Stephen T.
                                                                                                                                                                                               DEPARTMENT OF ENERGY
                                                    Intervene, and Competing Applications                                  Helmer, 105 Marangale Road, Manlius,
                                                                                                                           New York 13104–1008; phone: (315)                                   Federal Energy Regulatory
                                                      On September 7, 2016, Skandana,                                      233–8286.                                                           Commission
                                                    LLC, filed an application for a                                           FERC Contact: Tim Looney; phone:
                                                    preliminary permit, pursuant to section                                (202) 502–6096.                                                     [Project No. 14728–001]
                                                    4(f) of the Federal Power Act (FPA),                                      Deadline for filing comments, motions
                                                    proposing to study the feasibility of the                              to intervene, competing applications                                Pyramid Lake Paiute Tribe; Notice of
                                                    Eagleville Hydroelectric Project (project)                             (without notices of intent), or notices of                          Intent To File License Application,
                                                    to be located on the Chenango River,                                   intent to file competing applications: 60                           Filing of Pre-Application Document,
                                                                                                                           days from the issuance of this notice.                              Approving Use of the Traditional
                                                      2 The estimates for cost per response are derived
                                                                                                                           Competing applications and notices of                               Licensing Process
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    using the following formula: Average Burden Hours
                                                    per Response * $74.50 per Hour = Average Cost per
                                                                                                                           intent must meet the requirements of 18                               a. Type of Filing: Notice of Intent to
                                                    Response. The Commission staff believes that the                       CFR 4.36.                                                           a File License Application and Request
                                                    industry’s level and skill set are comparable to                          The Commission strongly encourages                               to Use the Traditional Licensing
                                                    FERC, so the FERC 2016 average hourly cost (for                        electronic filing. Please file comments,
                                                    salary plus benefits) of $74.50 per hour is used.
                                                                                                                                                                                               Process.
                                                      3 Requirements are found in 18 CFR Parts: 157,
                                                                                                                           motions to intervene, notices of intent,                              b. Project No.: 14728–001.
                                                    284, 2, and 380.                                                       and competing applications using the                                  c. Date Filed: August 29, 2016.
                                                      4 Requirements are found in 18 CFR Parts: 2.55(b),                   Commission’s eFiling system at http://                                d. Submitted By: Pyramid Lake Paiute
                                                    157.203(d), 380.15, and 2.55(a).                                       www.ferc.gov/docs-filing/efiling.asp.                               Tribe.


                                               VerDate Sep<11>2014      18:25 Oct 25, 2016       Jkt 241001        PO 00000       Frm 00035     Fmt 4703   Sfmt 4703   E:\FR\FM\26OCN1.SGM               26OCN1



Document Created: 2016-10-26 02:18:13
Document Modified: 2016-10-26 02:18:13
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: