Castleton Commodities Merchant Trading L.P. (Applicant or Castleton) has applied for authority to transmit electric energy from the United States to Mexico pursuant to section 202(e) of the Federal Power Act.

Federal Register, Volume 81 Issue 211 (Tuesday, November 1, 2016)
[Federal Register Volume 81, Number 211 (Tuesday, November 1, 2016)]
[Notices]
[Pages 75813-75814]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-26332]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-432]


Application To Export Electric Energy; Castleton Commodities 
Merchant Trading L.P.

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of Application.

-----------------------------------------------------------------------

SUMMARY: Castleton Commodities Merchant Trading L.P. (Applicant or 
Castleton) has applied for authority to transmit electric energy from 
the United States to Mexico pursuant to section 202(e) of the Federal 
Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before December 1, 2016.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity Delivery 
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 
1000 Independence Avenue SW, Washington, DC 20585-0350. Because of 
delays in handling conventional mail, it is recommended that documents 
be transmitted by overnight mail, by electronic mail to 
[email protected], or by facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On October 11, 2016, DOE received an application from Castleton for 
authority to transmit electric energy from the United States to Mexico 
as a power marketer for a five-year term using existing international 
transmission facilities.
    In its application, Castleton states that it does not own or 
control any electric generation or transmission facilities, and it does 
not have a franchised service area. The electric energy that Castleton 
proposes to export to Mexico would be surplus energy purchased from 
third parties such as electric utilities and Federal power marketing 
agencies pursuant to voluntary agreements. The existing international 
transmission facilities to be utilized by the Applicant have previously 
been authorized by Presidential Permits issued pursuant to Executive 
Order 10485, as amended, and are appropriate for open access 
transmission by third parties.

PROCEDURAL MATTERS: Any person desiring to be heard in this proceeding 
should file a comment or protest to the application at the address 
provided above. Protests should be filed in accordance with Rule 211 of 
the Federal Energy Regulatory Commission's (FERC) Rules of Practice and 
Procedures (18 CFR 385.211). Any person desiring to become a party to 
these proceedings should file a motion to intervene at the above 
address in accordance with FERC Rule 214 (18 CFR 385.214). Five copies 
of such comments, protests, or motions to intervene should be sent to 
the address provided above on or before the date listed above.
    Comments and other filings concerning Castleton's application to 
export electric energy to Mexico should be clearly marked with OE 
Docket No. EA-432. An additional copy is to be provided to both 
Castleton Commodities International LLC, 811 Main Street Suite 3500, 
Houston, TX 77002 and Daniel E. Frank, Sutherland Asbill & Brennan LLP, 
700 Sixth Street, NW., Suite 700, Washington, DC 20001.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the sufficiency of supply or reliability of 
the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program Web site at http://energy.gov/node/11845, or by 
emailing Angela Troy at [email protected].



[[Page 75814]]

    Issued in Washington, DC, on October 26, 2016.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2016-26332 Filed 10-31-16; 8:45 am]
 BILLING CODE 6450-01-P



                                                                               Federal Register / Vol. 81, No. 211 / Tuesday, November 1, 2016 / Notices                                              75813

                                                    postal mail or delivery should be                       expenditure, and the total appropriation              United States to Mexico as a power
                                                    addressed to the Director of the                        available. Applicants provide the data                marketer for a five-year term using
                                                    Information Collection Clearance                        required for funding electronically, and              existing international transmission
                                                    Division, U.S. Department of Education,                 the Office of Indian Education (OIE) is               facilities.
                                                    400 Maryland Avenue SW., LBJ, Room                      able to apply electronic tools to                        In its application, Castleton states that
                                                    2E–349, Washington, DC 20202–4537.                      facilitate the review and analysis                    it does not own or control any electric
                                                    FOR FURTHER INFORMATION CONTACT: For                    leading to grant awards. The system has               generation or transmission facilities,
                                                    specific questions related to collection                been named Formula Grant Electronic                   and it does not have a franchised service
                                                    activities, please contact Kimberly                     Application System for Indian                         area. The electric energy that Castleton
                                                    Smith, 202–453–6469.                                    Education (EASIE), and is located in the              proposes to export to Mexico would be
                                                    SUPPLEMENTARY INFORMATION: The                          EDFacts System (ESS) Web site.                        surplus energy purchased from third
                                                    Department of Education (ED), in                          Dated: October 27, 2016.                            parties such as electric utilities and
                                                    accordance with the Paperwork                           Tomakie Washington,                                   Federal power marketing agencies
                                                    Reduction Act of 1995 (PRA) (44 U.S.C.                  Acting Director, Information Collection               pursuant to voluntary agreements. The
                                                    3506(c)(2)(A)), provides the general                    Clearance Division, Office of the Chief Privacy       existing international transmission
                                                    public and Federal agencies with an                     Officer, Office of Management.                        facilities to be utilized by the Applicant
                                                    opportunity to comment on proposed,                     [FR Doc. 2016–26380 Filed 10–31–16; 8:45 am]          have previously been authorized by
                                                    revised, and continuing collections of                  BILLING CODE 4000–01–P
                                                                                                                                                                  Presidential Permits issued pursuant to
                                                    information. This helps the Department                                                                        Executive Order 10485, as amended,
                                                    assess the impact of its information                                                                          and are appropriate for open access
                                                    collection requirements and minimize                                                                          transmission by third parties.
                                                                                                            DEPARTMENT OF ENERGY
                                                    the public’s reporting burden. It also                                                                        PROCEDURAL MATTERS: Any person
                                                    helps the public understand the                         [OE Docket No. EA–432]                                desiring to be heard in this proceeding
                                                    Department’s information collection                                                                           should file a comment or protest to the
                                                    requirements and provide the requested                  Application To Export Electric Energy;                application at the address provided
                                                    data in the desired format. ED is                       Castleton Commodities Merchant                        above. Protests should be filed in
                                                    soliciting comments on the proposed                     Trading L.P.                                          accordance with Rule 211 of the Federal
                                                    information collection request (ICR) that               AGENCY: Office of Electricity Delivery                Energy Regulatory Commission’s (FERC)
                                                    is described below. The Department of                   and Energy Reliability, DOE.                          Rules of Practice and Procedures (18
                                                    Education is especially interested in                                                                         CFR 385.211). Any person desiring to
                                                                                                            ACTION: Notice of Application.
                                                    public comment addressing the                                                                                 become a party to these proceedings
                                                    following issues: (1) Is this collection                SUMMARY:   Castleton Commodities                      should file a motion to intervene at the
                                                    necessary to the proper functions of the                Merchant Trading L.P. (Applicant or                   above address in accordance with FERC
                                                    Department; (2) will this information be                Castleton) has applied for authority to               Rule 214 (18 CFR 385.214). Five copies
                                                    processed and used in a timely manner;                  transmit electric energy from the United              of such comments, protests, or motions
                                                    (3) is the estimate of burden accurate;                 States to Mexico pursuant to section                  to intervene should be sent to the
                                                    (4) how might the Department enhance                    202(e) of the Federal Power Act.                      address provided above on or before the
                                                    the quality, utility, and clarity of the                                                                      date listed above.
                                                                                                            DATES: Comments, protests, or motions
                                                    information to be collected; and (5) how                                                                         Comments and other filings
                                                                                                            to intervene must be submitted on or
                                                    might the Department minimize the                                                                             concerning Castleton’s application to
                                                                                                            before December 1, 2016.
                                                    burden of this collection on the                                                                              export electric energy to Mexico should
                                                    respondents, including through the use                  ADDRESSES: Comments, protests,
                                                                                                            motions to intervene, or requests for                 be clearly marked with OE Docket No.
                                                    of information technology. Please note                                                                        EA–432. An additional copy is to be
                                                    that written comments received in                       more information should be addressed
                                                                                                            to: Office of Electricity Delivery and                provided to both Castleton Commodities
                                                    response to this notice will be                                                                               International LLC, 811 Main Street Suite
                                                    considered public records.                              Energy Reliability, Mail Code: OE–20,
                                                                                                            U.S. Department of Energy, 1000                       3500, Houston, TX 77002 and Daniel E.
                                                       Title of Collection: Formula Grant                                                                         Frank, Sutherland Asbill & Brennan
                                                    EASIE (Electronic Application System                    Independence Avenue SW, Washington,
                                                                                                            DC 20585–0350. Because of delays in                   LLP, 700 Sixth Street, NW., Suite 700,
                                                    for Indian Education).                                                                                        Washington, DC 20001.
                                                       OMB Control Number: 1810–0021.                       handling conventional mail, it is
                                                                                                            recommended that documents be                            A final decision will be made on this
                                                       Type of Review: A revision of an
                                                                                                            transmitted by overnight mail, by                     application after the environmental
                                                    existing information collection.
                                                                                                            electronic mail to Electricity.Exports@               impacts have been evaluated pursuant
                                                       Respondents/Affected Public: State,
                                                                                                            hq.doe.gov, or by facsimile to 202–586–               to DOE’s National Environmental Policy
                                                    Local, and Tribal Governments.
                                                                                                            8008.                                                 Act Implementing Procedures (10 CFR
                                                       Total Estimated Number of Annual
                                                                                                            SUPPLEMENTARY INFORMATION: Exports of
                                                                                                                                                                  part 1021) and after a determination is
                                                    Responses: 11,300.
                                                                                                            electricity from the United States to a               made by DOE that the proposed action
                                                       Total Estimated Number of Annual
                                                                                                            foreign country are regulated by the                  will not have an adverse impact on the
                                                    Burden Hours: 9,590.
                                                       Abstract: The Indian Education                       Department of Energy (DOE) pursuant to                sufficiency of supply or reliability of the
                                                    Formula Grant (CFDA 84.060A) requires                   sections 301(b) and 402(f) of the                     U.S. electric power supply system.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    the annual submission of the                            Department of Energy Organization Act                    Copies of this application will be
                                                    application from the local educational                  (42 U.S.C. 7151(b), 7172(f)) and require              made available, upon request, for public
                                                    agency and/or tribe. The amount of each                 authorization under section 202(e) of                 inspection and copying at the address
                                                    applicant’s award is determined by                      the Federal Power Act (16 U.S.C.                      provided above, by accessing the
                                                    formula, based upon the reported                        824a(e)).                                             program Web site at http://energy.gov/
                                                    number of American Indian/Alaska                           On October 11, 2016, DOE received an               node/11845, or by emailing Angela Troy
                                                    Native students identified in the                       application from Castleton for authority              at Angela.Troy@hq.doe.gov.
                                                    application, the state per pupil                        to transmit electric energy from the


                                               VerDate Sep<11>2014   00:01 Nov 01, 2016   Jkt 241001   PO 00000   Frm 00009   Fmt 4703   Sfmt 4703   E:\FR\FM\01NON1.SGM   01NON1


                                                    75814                      Federal Register / Vol. 81, No. 211 / Tuesday, November 1, 2016 / Notices

                                                      Issued in Washington, DC, on October 26,              publication of this Federal Register                     Southwestern markets power from 24
                                                    2016.                                                   notice and will end on December 1,                    multi-purpose reservoir projects with
                                                    Christopher Lawrence,                                   2016. If requested, a combined Public                 hydroelectric power facilities
                                                    Electricity Policy Analyst, Office of Electricity       Information and Comment Forum                         constructed and operated by the U.S.
                                                    Delivery and Energy Reliability.                        (Forum) will be held at 9:00 a.m. on                  Army Corps of Engineers (Corps). These
                                                    [FR Doc. 2016–26332 Filed 10–31–16; 8:45 am]            November 17, 2016. If requested,                      projects are located in the states of
                                                    BILLING CODE 6450–01–P                                  persons desiring the Forum to be held                 Arkansas, Missouri, Oklahoma, and
                                                                                                            should indicate in writing to Mr.                     Texas. Southwestern’s marketing area
                                                                                                            Marshall Boyken, Senior Vice President                includes these states plus Kansas and
                                                    DEPARTMENT OF ENERGY                                    and Chief Operating Officer (see FOR                  Louisiana. The costs associated with the
                                                                                                            FURTHER INFORMATION CONTACT) by                       hydropower facilities of 22 of the 24
                                                    Southwestern Power Administration                       November 8, 2016, their request for such              projects are repaid via revenues
                                                                                                            Forum. If no request is received, no                  received under the Integrated System
                                                    Integrated System Power Rates                                                                                 rates, as are those of Southwestern’s
                                                                                                            such Forum will be held. Persons
                                                    AGENCY:  Southwestern Power                             interested in speaking at the Forum, if               transmission facilities, which consist of
                                                    Administration, DOE.                                    held, should submit a request to Mr.                  1,380 miles of high-voltage transmission
                                                                                                            Marshall Boyken, Senior Vice President                lines, 26 substations, and 46
                                                    ACTION: Notice of Proposed Change to
                                                                                                            and Chief Operating Officer (see FOR                  communication sites. Costs associated
                                                    Southwestern Power Administration
                                                                                                            FURTHER INFORMATION CONTACT) by                       with the Sam Rayburn and Robert D.
                                                    Integrated System Non-Federal
                                                                                                            November 10, 2016, so that a list of                  Willis Dams, two Corps projects that are
                                                    Transmission Service Rate Schedule
                                                                                                            Forum participants can be developed.                  isolated hydraulically, electrically, and
                                                    and Opportunity for Public Review and
                                                                                                            All comments on the proposed Section                  financially from the Integrated System,
                                                    Comment.
                                                                                                            2.3.6 addition to Southwestern’s NFTS                 are repaid under separate rate schedules
                                                    SUMMARY:   The Administrator,                           Rate Schedule, whether provided to                    and are not addressed in this notice.
                                                    Southwestern Power Administration                       Southwestern in written or electronic                 Rate Schedule Change
                                                    (Southwestern), has determined that an                  copy (MS Word format), are due on or
                                                                                                            before December 1, 2016.                                 The current NFTS–13 Rate Schedule
                                                    additional Section outlining a new
                                                                                                                                                                  includes a stated rate for NITS that is
                                                    methodology within Southwestern’s                       ADDRESSES:  If requested, the Forum will              calculated by dividing Southwestern’s
                                                    existing Integrated System Non-Federal                  be held in Southwestern’s offices, Room               monthly revenue requirement, derived
                                                    Transmission Service (NFTS–13) Rate                     1460, Williams Center Tower I, One                    from Southwestern’s NFTS ARR
                                                    Schedule is necessary to better align                   West Third Street, Tulsa, Oklahoma                    identified within the 2013 PRS, by the
                                                    Southwestern’s rate schedule with                       74103. Comments should be submitted                   net transmission capacity available for
                                                    standard practices utilized by the                      to Mr. Marshall Boyken, Senior Vice                   NITS. Modifying Southwestern’s rate
                                                    Southwest Power Pool, Inc. (SPP)                        President and Chief Operating Officer                 schedule to include an ARR for SPP
                                                    Regional Transmission Organization. A                   (see FOR FURTHER INFORMATION CONTACT).                NITS, rather than applying a stated rate,
                                                    new section 2.3.6 is proposed that                                                                            is necessary to better align with
                                                    establishes a procedure for determining                 FOR FURTHER INFORMATION CONTACT:   Mr.
                                                                                                            Marshall Boyken, Senior Vice President,               standard practices utilized by SPP.
                                                    an Annual Revenue Requirement (ARR)                                                                           Therefore, in place of applying the NITS
                                                    for customers that choose to contract for               Chief Operating Officer, Office of
                                                                                                            Corporate Operations, Southwestern                    stated rate for SPP NITS on
                                                    Network Integration Transmission                                                                              Southwestern’s transmission system, the
                                                    Service (NITS) on Southwestern’s                        Power Administration, U.S. Department
                                                                                                            of Energy, One West Third Street, Tulsa,              proposed Section 2.3.6 includes a
                                                    transmission system pursuant to the                                                                           procedure for determining (and
                                                    SPP Open Access Transmission Tariff                     Oklahoma 74103, (918) 595–6646,
                                                                                                            marshall.boyken@swpa.gov, or facsimile                updating) an SPP NITS ARR, as a
                                                    (OATT).                                                                                                       portion of Southwestern’s NFTS ARR,
                                                       The proposed Section 2.3.6 does not                  transmission (918) 595–6646.
                                                                                                                                                                  based on the amount of revenue
                                                    change Southwestern’s NFTS ARR, as                      SUPPLEMENTARY INFORMATION:      Originally            assumed to be recovered on an annual
                                                    determined in its 2013 Integrated                       established by Secretarial Order No.                  basis from NITS customers in each
                                                    System Power Repayment Studies (2013                    1865 dated August 31, 1943,                           approved PRS. If additional customers
                                                    PRS), but rather replaces the current                   Southwestern is an agency within the                  choose to contract for SPP NITS on
                                                    stated-rate for SPP NITS with a revenue-                U.S. Department of Energy created by                  Southwestern’s transmission system, the
                                                    requirement based methodology that                      the Department of Energy Organization                 proposed Section 2.3.6 methodology
                                                    includes determining the SPP NITS                       Act, Public Law 95–91, dated August 4,                updates the SPP NITS ARR and
                                                    ARR portion of Southwestern’s NFTS                      1977. Guidelines for preparation of                   eliminates the need for Southwestern to
                                                    ARR. Furthermore, the proposed                          power repayment studies are included                  revise its NFTS Rate Schedule each time
                                                    Section 2.3.6 affects only those                        in DOE Order No. RA 6120.2 entitled                   additional customers contract for SPP
                                                    customers that choose to contract for                   Power Marketing Administration                        NITS on Southwestern’s transmission
                                                    SPP NITS on Southwestern’s                              Financial Reporting. Procedures for                   system.
                                                    transmission system under the SPP                       public participation in power and                        The title of the NFTS–13 Rate
                                                    OATT.                                                   transmission rate adjustments of the                  Schedule was changed to NFTS–13A to
                                                       Southwestern has determined that                     Power Marketing Administrations are                   reflect the addition of Section 2.3.6. A
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    Section 2.3.6 will provide a more                       found at title 10, part 903, subpart A of             redlined version of the NFTS–13 Rate
                                                    appropriate methodology for revenue                     the Code of Federal Regulations (10 CFR               Schedule, which shows the revision
                                                    recovery from NFTS customers that                       part 903). Procedures for the                         proposed by rate schedule NFTS–13A,
                                                    choose to contract for SPP NITS on                      confirmation and approval of rates for                will be made available upon request. To
                                                    Southwestern’s transmission system                      the Federal Power Marketing                           request a copy, please contact Mr.
                                                    under the SPP OATT.                                     Administrations are found at title 18,                Marshall Boyken, Senior Vice President
                                                    DATES: The consultation and comment                     part 300, subpart L of the Code of                    and Chief Operating Officer, (see FOR
                                                    period will begin on the date of                        Federal Regulations (18 CFR part 300).                FURTHER INFORMATION CONTACT).



                                               VerDate Sep<11>2014   00:01 Nov 01, 2016   Jkt 241001   PO 00000   Frm 00010   Fmt 4703   Sfmt 4703   E:\FR\FM\01NON1.SGM   01NON1



Document Created: 2016-11-01 02:36:21
Document Modified: 2016-11-01 02:36:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Application.
DatesComments, protests, or motions to intervene must be submitted on or before December 1, 2016.
FR Citation81 FR 75813 