81_FR_76114 81 FR 75903 - Notice of Proposed Buy America Waiver for Ultrastraight Rail

81 FR 75903 - Notice of Proposed Buy America Waiver for Ultrastraight Rail

DEPARTMENT OF TRANSPORTATION
Federal Transit Administration

Federal Register Volume 81, Issue 211 (November 1, 2016)

Page Range75903-75904
FR Document2016-26316

The Federal Transit Administration (FTA) received a request from the Central Puget Sound Transit Authority (Sound Transit) for a Buy America non-availability waiver for the procurement of ultrastraight rail. Sound Transit seeks to procure ultrastraight rail for a portion of its Northgate Link light rail extension to avoid exceedance of contractually-mandated vibration thresholds. Sound Transit seeks a waiver because there is no domestic manufacturer available to produce rail that has passed the applicable vibration testing standards. In accordance with 49 U.S.C. 5323(j)(3)(A), FTA is providing notice of the waiver request and seeks public comment before deciding whether to grant the request. If granted, the waiver would apply to a one-time FTA-funded procurement by Sound Transit.

Federal Register, Volume 81 Issue 211 (Tuesday, November 1, 2016)
[Federal Register Volume 81, Number 211 (Tuesday, November 1, 2016)]
[Notices]
[Pages 75903-75904]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-26316]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration

[Docket No. FTA-2016-0037]


Notice of Proposed Buy America Waiver for Ultrastraight Rail

AGENCY: Federal Transit Administration, DOT.

ACTION: Notice of proposed Buy America waiver and request for comment.

-----------------------------------------------------------------------

SUMMARY: The Federal Transit Administration (FTA) received a request 
from the Central Puget Sound Transit Authority (Sound Transit) for a 
Buy America non-availability waiver for the procurement of 
ultrastraight rail. Sound Transit seeks to procure ultrastraight rail 
for a portion of its Northgate Link light rail extension to avoid 
exceedance of contractually-mandated vibration thresholds. Sound 
Transit seeks a waiver because there is no domestic manufacturer 
available to produce rail that has passed the applicable vibration 
testing standards. In accordance with 49 U.S.C. 5323(j)(3)(A), FTA is 
providing notice of the waiver request and seeks public comment before 
deciding whether to grant the request. If granted, the waiver would 
apply to a one-time FTA-funded procurement by Sound Transit.

DATES: Comments must be received by November 8, 2016. Late-filed 
comments will be considered to the extent practicable.

ADDRESSES: Please submit your comments by one of the following means, 
identifying your submissions by docket number FTA-2016-0037.
    1. Web site: http://www.regulations.gov. Follow the instructions 
for submitting comments on the U.S. Government electronic docket site.
    2. Fax: (202) 493-2251.
    3. Mail: U.S. Department of Transportation, 1200 New Jersey Avenue 
SE., Docket Operations, M-30, West Building, Ground Floor, Room W12-
140, Washington, DC 20590-0001.
    4. Hand Delivery: U.S. Department of Transportation, 1200 New 
Jersey Avenue SE., Docket Operations, M-30, West Building, Ground 
Floor, Room W12-140, Washington, DC 20590-0001 between 9 a.m. and 5 
p.m., Monday through Friday, except Federal holidays.
    Instructions: All submissions must make reference to the ``Federal 
Transit Administration'' and include docket number FTA-2016-0037. Due 
to the security procedures in effect since October 2011, mail received 
through the U.S. Postal Service may be subject to delays. Parties 
making submissions responsive to this notice should consider using an 
express mail firm to ensure the prompt filing of any submissions not 
filed electronically or by hand. Note that all submissions received, 
including any personal information therein, will be posted without 
change or alteration to http://www.regulations.gov. For more

[[Page 75904]]

information, you may review DOT's complete Privacy Act Statement in the 
Federal Register published April 11, 2000 (65 FR 19477), or you may 
visit http://www.regulations.gov.

FOR FURTHER INFORMATION CONTACT: Cecelia Comito, Assistant Chief 
Counsel, at (202) 366-2217 or [email protected].

SUPPLEMENTARY INFORMATION: The purpose of this notice is to provide 
notice and seek comment on whether the FTA should grant a non-
availability waiver for Sound Transit's purchase of approximately 
15,100 feet of ultrastraight rail. On February 23, 2016, Sound Transit 
requested a Buy America waiver for the ultrastraight rail because the 
as-installed condition of ultrastraight rail, procured from a domestic 
manufacturer, failed to meet applicable vibration threshold 
requirements. Sound Transit estimates that the ultrastraight rail will 
cost approximately $300,000.
    Sound Transit's Northgate Link extension is a $1.9 billion rail 
project that consists of 4.3 miles and 3 new stations, and runs through 
residential and employment areas, including the University of 
Washington. Approximately 15,100 feet of that extension will run under 
the University of Washington's Health Sciences and Physics-Astronomy 
buildings, which house precision-measurement laboratories and 
experiments conducted by Nobel Prize winning faculty. The project's 
potential impact on the University's buildings was considered as part 
of the environmental review process required by the National 
Environmental Policy Act (NEPA). In 2006, FTA issued a final Record of 
Decision (ROD) for the project, and required implementation of 
mitigation measures, including a measure that would minimize vibration 
under the University buildings. Sound Transit then executed a 2007 
agreement with the University of Washington in which Sound Transit 
agreed to not exceed specified vibration thresholds, which could be met 
through use of ultrastraight rail, with parameters for that rail based 
on American Railway Engineers Maintenance-of-Way Association 
(``AREMA'') standards.
    Sound Transit contacted domestic rail manufacturers regarding their 
ability to produce ultrastraight rail within the agreed upon AREMA 
specifications for the rail. Two leading manufacturers, Steel Dynamics, 
Inc. (SDI) and EVRAZ North America (EVRAZ), stated unequivocally that 
they are unable to fabricate rail that meets the specification. Sound 
Transit subsequently explored using domestically-sourced, milled rail. 
However, testing of the as-installed milled rail found that the rail 
failed to meet the applicable vibration thresholds. Due to its 
unsuccessful efforts to procure domestically-sourced ultrastraight rail 
within the vibration thresholds, Sound Transit seeks a non-availability 
waiver of the Buy America requirements for domestically-sourced steel.
    With certain exceptions, FTA's Buy America requirements prevent FTA 
from obligating an amount that may be appropriated to carry out its 
program for a project unless ``the steel, iron, and manufactured goods 
used in the project are produced in the United States.'' 49 U.S.C. 
5323(j)(1). The steel and iron requirements apply to all construction 
materials made primarily of steel or iron and used in infrastructure 
projects such as transit or maintenance facilities, rail lines, and 
bridges. These items include, but are not limited to, structural steel 
or iron, steel or iron beams and columns, running rail and contact 
rail. For steel or iron to be considered produced in the United States, 
all steel and iron manufacturing processes must take place in the 
United States, except metallurgical processes involving refinement of 
steel additives. 49 CFR 661.5.
    If, however, FTA determines that ``the steel, iron, and goods 
produced in the United States are not produced in a sufficient and 
reasonably available amount or are not of a satisfactory quality,'' 
then FTA may issue a waiver (non-availability waiver). 49 U.S.C. 
5323(j)(2)(B); 49 CFR 661.7(c). Any non-availability waiver granted 
would be effective for a one-time procurement of the rail and would 
expire upon completion of that procurement.
    Finally, under 49 U.S.C. 5323(j)(6), FTA cannot deny an application 
for a waiver based on non-availability unless FTA can certify that (i) 
the steel, iron, or manufactured good (the ``item'') is produced in the 
United States in a sufficient and reasonably available amount; and (ii) 
the item produced in the United States is of a satisfactory quality. 
Additionally, FTA must provide a list of known manufacturers in the 
United States from which the item can be obtained. FTA is not aware of 
any manufacturers who produce ultrastraight rail that would meet the 
required parameters in the United States.
    Sound Transit conducted an extensive search for a domestic 
manufacturer of ultrastraight rail, including testing domestically-
sourced, milled rail. Unfortunately, testing of the as-installed milled 
rail found that the rail failed to meet the applicable vibration 
thresholds. Due to its unsuccessful efforts to procure domestically-
sourced ultrastraight rail within the vibration thresholds, FTA 
proposes to grant Sound Transit a non-availability waiver of the Buy 
America requirements for 15,100 feet of ultrastraight rail, as required 
in the 2007 agreement between Sound Transit and the University. This 
non-availability waiver would be effective for a one-time procurement 
of the rail and would expire upon completion of that procurement.
    The purpose of this notice is to publish Sound Transit's request 
and seek public comment from all interested parties in accordance with 
49 U.S.C. 5323(j)(3)(A). Comments will help FTA understand completely 
the facts surrounding the request, including the effects of a potential 
waiver and the merits of the request. After consideration of the 
comments, FTA will publish a second notice in the Federal Register with 
a response to comments and noting any changes made to the proposed 
waiver as a result of the comments received.

Ellen Partridge,
Chief Counsel.
[FR Doc. 2016-26316 Filed 10-31-16; 8:45 am]
 BILLING CODE P



                                                                               Federal Register / Vol. 81, No. 211 / Tuesday, November 1, 2016 / Notices                                           75903

                                                    they are not produced in the United                     are produced in the United States.’’ 49               ACTION: Notice of proposed Buy America
                                                    States in sufficiently and reasonably                   U.S.C. 5323(j)(1). A manufactured                     waiver and request for comment.
                                                    available quantities or of a satisfactory               product is considered produced in the
                                                    quality. 49 U.S.C. 5323(j)(2)(B); 49 CFR                United States if: (1) All of the                      SUMMARY:    The Federal Transit
                                                    661.7(c).                                               manufacturing processes for the product               Administration (FTA) received a request
                                                       GDRTA is a public transit agency that                take place in the United States; and (2)              from the Central Puget Sound Transit
                                                    serves Montgomery and Western Green                     all of the components of the product are              Authority (Sound Transit) for a Buy
                                                    counties in Ohio. GDRTA provides more                   of U.S. origin. A component is                        America non-availability waiver for the
                                                    than 9 million passenger trips per year                 considered of U.S. origin if it is                    procurement of ultrastraight rail. Sound
                                                    on 31 routes throughout the region. In                  manufactured in the United States,                    Transit seeks to procure ultrastraight
                                                    January 2014, GDRTA conducted a                         regardless of the origin of its                       rail for a portion of its Northgate Link
                                                    technology scope development project                    subcomponents. 49 CFR 661.5(d). If,                   light rail extension to avoid exceedance
                                                    to determine how technology                             however, FTA determines that ‘‘the                    of contractually-mandated vibration
                                                    enhancements could improve its                          steel, iron, and goods produced in the                thresholds. Sound Transit seeks a
                                                    operational efficiency; this included a                 United States are not produced in a                   waiver because there is no domestic
                                                    voice and data communication                            sufficient and reasonably available                   manufacturer available to produce rail
                                                    alternatives analysis. GDRTA                            amount or are not of a satisfactory                   that has passed the applicable vibration
                                                    comprehensively examined various                        quality,’’ then FTA may issue a waiver                testing standards. In accordance with 49
                                                    technologies available for its voice and                (non-availability waiver). 49 U.S.C.                  U.S.C. 5323(j)(3)(A), FTA is providing
                                                    data communication needs. GDRTA                         5323(j)(2)(B); 49 CFR 661.7(c).                       notice of the waiver request and seeks
                                                    compared and evaluated the differences                     Finally, under 49 U.S.C. 5323(j)(6),               public comment before deciding
                                                    between radio and cellular-based                        FTA cannot deny an application for a                  whether to grant the request. If granted,
                                                    communication, including a cost                         waiver based on non-availability unless               the waiver would apply to a one-time
                                                    analysis, reliability assessment, and                   FTA can certify that (i) the steel, iron,             FTA-funded procurement by Sound
                                                    long-range maintenance and operational                  or manufactured good (the ‘‘item’’) is                Transit.
                                                    differences. On August 5, 2014, the                     produced in the United States in a                    DATES:  Comments must be received by
                                                    GDRTA Board approved the adoption of                    sufficient and reasonably available                   November 8, 2016. Late-filed comments
                                                    a mixed communication system for the                    amount; and (ii) the item produced in                 will be considered to the extent
                                                    agency, which would employ both voice                   the United States is of a satisfactory                practicable.
                                                    and cellular data systems. GDRTA                        quality. Additionally, FTA must provide
                                                    would join Montgomery County’s                                                                                ADDRESSES:   Please submit your
                                                                                                            a list of known manufacturers in the                  comments by one of the following
                                                    800MHz analog trunked system, instead                   United States from which the item can
                                                    of continuing to own a 450 MHz radio                                                                          means, identifying your submissions by
                                                                                                            be obtained. FTA is not aware of any                  docket number FTA–2016–0037.
                                                    system.                                                 manufacturers who produce the
                                                       Montgomery County’s analog system                                                                            1. Web site: http://
                                                                                                            required radio consoles in the United                 www.regulations.gov. Follow the
                                                    uses proprietary Motorola
                                                                                                            States.                                               instructions for submitting comments
                                                    SmartNetTrunking, and all equipment
                                                    must be original equipment                                 The purpose of this notice is to                   on the U.S. Government electronic
                                                    manufacturer (OEM) Motorola devices.                    publish GDRTA’s request and seek                      docket site.
                                                    All equipment must also be                              public comment from all interested                      2. Fax: (202) 493–2251.
                                                    programmed to use the County’s                          parties in accordance with 49 U.S.C.                    3. Mail: U.S. Department of
                                                    800MHz analog system and have the                       5323(j)(3)(A). Comments will help FTA                 Transportation, 1200 New Jersey
                                                    ability to work on the MARCS 800 MHz                    understand completely the facts                       Avenue SE., Docket Operations, M–30,
                                                    digital system without any additional                   surrounding the request, including the                West Building, Ground Floor, Room
                                                    hardware. In November 2014, GDRTA                       effects of a potential waiver and the                 W12–140, Washington, DC 20590–0001.
                                                    purchased Motorola mobile and                           merits of the request. After                            4. Hand Delivery: U.S. Department of
                                                    portable radios for its supervisors and                 consideration of the comments, FTA                    Transportation, 1200 New Jersey
                                                    its diesel, trolly, paratransit,                        will publish a second notice in the                   Avenue SE., Docket Operations, M–30,
                                                    maintenance, and support vehicles. The                  Federal Register with a response to                   West Building, Ground Floor, Room
                                                    procurement and installation of the                     comments and noting any changes made                  W12–140, Washington, DC 20590–0001
                                                    radio consoles is the final step to move                to the proposed waiver as a result of the             between 9 a.m. and 5 p.m., Monday
                                                    GDRTA’s communication system to                         comments received.                                    through Friday, except Federal holidays.
                                                    Montgomery County’s system.                             Ellen Partridge,                                        Instructions: All submissions must
                                                       Motorola manufactures equipment                                                                            make reference to the ‘‘Federal Transit
                                                                                                            Chief Counsel.
                                                    both domestically and overseas. While                                                                         Administration’’ and include docket
                                                                                                            [FR Doc. 2016–26317 Filed 10–31–16; 8:45 am]
                                                    the voice processing module portion of                                                                        number FTA–2016–0037. Due to the
                                                                                                            BILLING CODE P
                                                    the radio consoles are currently                                                                              security procedures in effect since
                                                    manufactured in Illinois, the other                                                                           October 2011, mail received through the
                                                    components are manufactured in                                                                                U.S. Postal Service may be subject to
                                                                                                            DEPARTMENT OF TRANSPORTATION
                                                    Mexico. Thus, GDRTA is seeking a Buy                                                                          delays. Parties making submissions
                                                    America non-availability waiver under                                                                         responsive to this notice should
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            Federal Transit Administration
                                                    49 CFR 661.7(c)(1) for the radio                                                                              consider using an express mail firm to
                                                    consoles.                                                                                                     ensure the prompt filing of any
                                                                                                            [Docket No. FTA–2016–0037]
                                                       With certain exceptions, FTA’s Buy                                                                         submissions not filed electronically or
                                                    America requirements prevent FTA                        Notice of Proposed Buy America                        by hand. Note that all submissions
                                                    from obligating an amount that may be                   Waiver for Ultrastraight Rail                         received, including any personal
                                                    appropriated to carry out its program for                                                                     information therein, will be posted
                                                    a project unless ‘‘the steel, iron, and                 AGENCY:    Federal Transit Administration,            without change or alteration to http://
                                                    manufactured goods used in the project                  DOT.                                                  www.regulations.gov. For more


                                               VerDate Sep<11>2014   00:01 Nov 01, 2016   Jkt 241001   PO 00000   Frm 00099   Fmt 4703   Sfmt 4703   E:\FR\FM\01NON1.SGM   01NON1


                                                    75904                      Federal Register / Vol. 81, No. 211 / Tuesday, November 1, 2016 / Notices

                                                    information, you may review DOT’s                       subsequently explored using                           milled rail found that the rail failed to
                                                    complete Privacy Act Statement in the                   domestically-sourced, milled rail.                    meet the applicable vibration
                                                    Federal Register published April 11,                    However, testing of the as-installed                  thresholds. Due to its unsuccessful
                                                    2000 (65 FR 19477), or you may visit                    milled rail found that the rail failed to             efforts to procure domestically-sourced
                                                    http://www.regulations.gov.                             meet the applicable vibration                         ultrastraight rail within the vibration
                                                    FOR FURTHER INFORMATION CONTACT:                        thresholds. Due to its unsuccessful                   thresholds, FTA proposes to grant
                                                    Cecelia Comito, Assistant Chief                         efforts to procure domestically-sourced               Sound Transit a non-availability waiver
                                                    Counsel, at (202) 366–2217 or                           ultrastraight rail within the vibration               of the Buy America requirements for
                                                    cecelia.comito@dot.gov.                                 thresholds, Sound Transit seeks a non-                15,100 feet of ultrastraight rail, as
                                                    SUPPLEMENTARY INFORMATION: The
                                                                                                            availability waiver of the Buy America                required in the 2007 agreement between
                                                    purpose of this notice is to provide                    requirements for domestically-sourced                 Sound Transit and the University. This
                                                    notice and seek comment on whether                      steel.                                                non-availability waiver would be
                                                                                                               With certain exceptions, FTA’s Buy                 effective for a one-time procurement of
                                                    the FTA should grant a non-availability
                                                                                                            America requirements prevent FTA                      the rail and would expire upon
                                                    waiver for Sound Transit’s purchase of
                                                                                                            from obligating an amount that may be                 completion of that procurement.
                                                    approximately 15,100 feet of
                                                                                                            appropriated to carry out its program for                The purpose of this notice is to
                                                    ultrastraight rail. On February 23, 2016,
                                                                                                            a project unless ‘‘the steel, iron, and               publish Sound Transit’s request and
                                                    Sound Transit requested a Buy America
                                                                                                            manufactured goods used in the project                seek public comment from all interested
                                                    waiver for the ultrastraight rail because               are produced in the United States.’’ 49
                                                    the as-installed condition of                                                                                 parties in accordance with 49 U.S.C.
                                                                                                            U.S.C. 5323(j)(1). The steel and iron                 5323(j)(3)(A). Comments will help FTA
                                                    ultrastraight rail, procured from a                     requirements apply to all construction
                                                    domestic manufacturer, failed to meet                                                                         understand completely the facts
                                                                                                            materials made primarily of steel or iron             surrounding the request, including the
                                                    applicable vibration threshold                          and used in infrastructure projects such
                                                    requirements. Sound Transit estimates                                                                         effects of a potential waiver and the
                                                                                                            as transit or maintenance facilities, rail            merits of the request. After
                                                    that the ultrastraight rail will cost                   lines, and bridges. These items include,
                                                    approximately $300,000.                                                                                       consideration of the comments, FTA
                                                                                                            but are not limited to, structural steel or           will publish a second notice in the
                                                      Sound Transit’s Northgate Link                        iron, steel or iron beams and columns,
                                                    extension is a $1.9 billion rail project                                                                      Federal Register with a response to
                                                                                                            running rail and contact rail. For steel              comments and noting any changes made
                                                    that consists of 4.3 miles and 3 new                    or iron to be considered produced in the
                                                    stations, and runs through residential                                                                        to the proposed waiver as a result of the
                                                                                                            United States, all steel and iron                     comments received.
                                                    and employment areas, including the                     manufacturing processes must take
                                                    University of Washington.                               place in the United States, except                    Ellen Partridge,
                                                    Approximately 15,100 feet of that                       metallurgical processes involving                     Chief Counsel.
                                                    extension will run under the University                 refinement of steel additives. 49 CFR                 [FR Doc. 2016–26316 Filed 10–31–16; 8:45 am]
                                                    of Washington’s Health Sciences and                     661.5.                                                BILLING CODE P
                                                    Physics-Astronomy buildings, which                         If, however, FTA determines that ‘‘the
                                                    house precision-measurement                             steel, iron, and goods produced in the
                                                    laboratories and experiments conducted                  United States are not produced in a                   DEPARTMENT OF TRANSPORTATION
                                                    by Nobel Prize winning faculty. The                     sufficient and reasonably available
                                                    project’s potential impact on the                                                                             [Docket No. DOT–MARAD 2016–0110]
                                                                                                            amount or are not of a satisfactory
                                                    University’s buildings was considered                   quality,’’ then FTA may issue a waiver                Agency Requests for Renewal of a
                                                    as part of the environmental review                     (non-availability waiver). 49 U.S.C.                  Previously Approved Information
                                                    process required by the National                        5323(j)(2)(B); 49 CFR 661.7(c). Any non-              Collection(s): Approval of Underwriters
                                                    Environmental Policy Act (NEPA). In                     availability waiver granted would be                  of Marine Hull Insurance
                                                    2006, FTA issued a final Record of                      effective for a one-time procurement of
                                                    Decision (ROD) for the project, and                     the rail and would expire upon                        AGENCY: Maritime Administration,
                                                    required implementation of mitigation                   completion of that procurement.                       Department of Transportation.
                                                    measures, including a measure that                         Finally, under 49 U.S.C. 5323(j)(6),               ACTION: Notice and request for
                                                    would minimize vibration under the                      FTA cannot deny an application for a                  comments.
                                                    University buildings. Sound Transit                     waiver based on non-availability unless
                                                    then executed a 2007 agreement with                     FTA can certify that (i) the steel, iron,             SUMMARY:    The Maritime Administration
                                                    the University of Washington in which                   or manufactured good (the ‘‘item’’) is                (MARAD) invites public comments
                                                    Sound Transit agreed to not exceed                      produced in the United States in a                    about our intention to request the Office
                                                    specified vibration thresholds, which                   sufficient and reasonably available                   of Management and Budget (OMB)
                                                    could be met through use of                             amount; and (ii) the item produced in                 approval to renew an information
                                                    ultrastraight rail, with parameters for                 the United States is of a satisfactory                collection. The information is needed in
                                                    that rail based on American Railway                     quality. Additionally, FTA must provide               order for Maritime Administration
                                                    Engineers Maintenance-of-Way                            a list of known manufacturers in the                  officials to evaluate the underwriters
                                                    Association (‘‘AREMA’’) standards.                      United States from which the item can                 and determine their suitability for
                                                      Sound Transit contacted domestic rail                 be obtained. FTA is not aware of any                  providing marine hull insurance on
                                                    manufacturers regarding their ability to                manufacturers who produce                             Maritime Administration vessels. We
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    produce ultrastraight rail within the                   ultrastraight rail that would meet the                are required to publish this notice in the
                                                    agreed upon AREMA specifications for                    required parameters in the United                     Federal Register by the Paperwork
                                                    the rail. Two leading manufacturers,                    States.                                               Reduction Act of 1995, Public Law 104–
                                                    Steel Dynamics, Inc. (SDI) and EVRAZ                       Sound Transit conducted an extensive               13.
                                                    North America (EVRAZ), stated                           search for a domestic manufacturer of                 DATES: Written comments should be
                                                    unequivocally that they are unable to                   ultrastraight rail, including testing                 submitted by January 3, 2017.
                                                    fabricate rail that meets the                           domestically-sourced, milled rail.                    ADDRESSES: You may submit comments
                                                    specification. Sound Transit                            Unfortunately, testing of the as-installed            [identified by Docket No. DOT–


                                               VerDate Sep<11>2014   00:01 Nov 01, 2016   Jkt 241001   PO 00000   Frm 00100   Fmt 4703   Sfmt 4703   E:\FR\FM\01NON1.SGM   01NON1



Document Created: 2016-11-01 02:36:19
Document Modified: 2016-11-01 02:36:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of proposed Buy America waiver and request for comment.
DatesComments must be received by November 8, 2016. Late-filed comments will be considered to the extent practicable.
ContactCecelia Comito, Assistant Chief Counsel, at (202) 366-2217 or [email protected]
FR Citation81 FR 75903 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR