81_FR_76846 81 FR 76633 - Restart of a Nuclear Power Plant Shut Down by a Seismic Event

81 FR 76633 - Restart of a Nuclear Power Plant Shut Down by a Seismic Event

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 213 (November 3, 2016)

Page Range76633-76634
FR Document2016-26524

The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG) DG-1337, ``Restart of a Nuclear Power Plant Shut Down by a Seismic Event.'' It represents proposed Revision 1 of Regulatory Guide (RG) 1.167. The guide describes methods acceptable to the NRC staff that can be used to demonstrate that a nuclear power plant is safe for restarting after a shutdown caused by a seismic event.

Federal Register, Volume 81 Issue 213 (Thursday, November 3, 2016)
[Federal Register Volume 81, Number 213 (Thursday, November 3, 2016)]
[Notices]
[Pages 76633-76634]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-26524]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2016-0224]


Restart of a Nuclear Power Plant Shut Down by a Seismic Event

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft regulatory guide; request for comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for 
public comment draft regulatory guide (DG) DG-1337, ``Restart of a 
Nuclear Power Plant Shut Down by a Seismic Event.'' It represents 
proposed Revision 1 of Regulatory Guide (RG) 1.167. The guide describes 
methods acceptable to the NRC staff that can be used to demonstrate 
that a nuclear power plant is safe for restarting after a shutdown 
caused by a seismic event.

DATES: Submit comments by January 3, 2017. Comments received after this 
date will be considered if it is practical to do so, but the NRC is 
able to ensure consideration only for comments received on or before 
this date. Although a time limit is given, comments and suggestions in 
connection with items for inclusion in guides currently being developed 
or improvements in all published guides are encouraged at any time.

ADDRESSES: You may submit comments by any of the following methods 
(unless this document describes a different method for submitting 
comments on a specified subject):
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0224. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop: OWFN-12H08, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-

[[Page 76634]]

0001. For additional direction on accessing information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Thomas Weaver, telephone: 301-415-
2383, email: [email protected] and Edward O'Donnell, telephone: 
301-415-3317 email: [email protected]. Both are staff of the 
Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2016-0224 when contacting the NRC 
about the availability of information regarding this action. You may 
obtain publically-available information related to this action, by any 
of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0224.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
DG is electronically available in ADAMS under Accession No. 
ML16182A321.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2016-0224 in your comment submission. 
The NRC cautions you not to include identifying or contact information 
that you do not want to be publicly disclosed in your comment 
submission. The NRC posts all comment submissions at http://www.regulations.gov as well as enters the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Additional Information

    The NRC is issuing for public comment a DG in the NRC's 
``Regulatory Guide'' series. This series was developed to describe and 
make available to the public information regarding methods that are 
acceptable to the NRC staff for implementing specific parts of the 
NRC's regulations, techniques that the staff uses in evaluating 
specific issues or postulated events, and data that the staff needs in 
its review of applications for permits and licenses.
    The DG, entitled ``Restart of a Nuclear Power Plant Shut Down by a 
Seismic Event,'' is a proposed revised guide temporarily identified by 
its task number, DG-1337. The proposed revision of RG 1.167 describes 
methods acceptable to the NRC staff that can be used to demonstrate 
that a nuclear power plant is safe for restarting after a shutdown 
caused by a seismic event. It incorporates lessons learned following 
the shutdown of nuclear power plants due to earthquake ground shaking 
and post-earthquake evaluations since Revision 0 was issued in 1997. 
They include experience gained through the shutdown and restart process 
of the North Anna nuclear power plant following the Mineral, Virginia 
earthquake in 2011. It endorses, with some exceptions, sections of ANS/
ANSI-2.23-2016, ``Nuclear Power Plant Response to an Earthquake,'' that 
relate to post-shutdown inspections and tests, inspection criteria, 
documentation, and long-term evaluations. The guidance includes an 
action level matrix to direct actions based on the earthquake level and 
observed damage levels at a nuclear power plant.

III. Backfitting and Issue Finality

    DG-1337 describes methods acceptable to the NRC staff that can be 
used to demonstrate that a nuclear power plant is safe for restarting 
after a shutdown caused by a seismic event. Issuance of this DG, if 
finalized, would not constitute backfitting as defined in 10 CFR 50.109 
(the Backfit Rule) and would not otherwise be inconsistent with the 
issue finality provisions in 10 CFR part 52. As discussed in the 
``Implementation'' section of this DG, the NRC has no current intention 
to impose this guide, if finalized, on holders of current operating 
licenses or combined licenses.
    This DG may be applied to applications for operating licenses, 
combined licenses, early site permits, and certified design rules 
docketed by the NRC as of the date of issuance of the final regulatory 
guide, as well as future applications submitted after the issuance of 
the regulatory guide. Such action would not constitute backfitting as 
defined in the Backfit Rule or be otherwise inconsistent with the 
applicable issue finality provision in 10 CFR part 52, inasmuch as such 
applicants or potential applicants are not within the scope of entities 
protected by the Backfit Rule or the relevant issue finality provisions 
in part 52.

    Dated: October 28, 2016.

    For the Nuclear Regulatory Commission.

Thomas H. Boyce,
Chief, Regulatory Guidance and Generic Issues Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2016-26524 Filed 11-2-16; 8:45 am]
 BILLING CODE 7590-01-P



                                                                             Federal Register / Vol. 81, No. 213 / Thursday, November 3, 2016 / Notices                                                76633

                                                  3:35–4:25 p.m. CSB Subcommittee on                      • CPP Chair’s Opening Remarks                         • Report from the Congressional
                                                    Facilities (SCF)                                      • Approval of Prior Minutes                               Engagement Working Group
                                                  4:25–5:00 p.m. Joint session—SCF and                    • CY 2017 Schedule of Planned Action                  • Overview of NSF’s Relocation
                                                    CPP                                                       and Information Items                             • Open Committee Reports
                                                                                                          • Review of NSB’s Delegation of Award                 Meeting Adjourns—2:55 P.M.
                                                  November 9, 2016
                                                                                                              Authority
                                                  12:55–2:55 p.m. (Plenary)                               • Advanced Computing Infrastructure                   Chris Blair,
                                                  Closed Sessions                                             and Polar Realignment Updates                     Executive Assistant, National Science Board
                                                                                                          • Overview of BIO Portfolio: Status and               Office.
                                                  November 9, 2016                                            Timelines                                         [FR Doc. 2016–26744 Filed 11–1–16; 4:15 pm]
                                                  9:00–10:05 a.m. (CSB)                                   CSB Subcommittee on Facilities (SCF)                  BILLING CODE 7555–01–P
                                                  10:05–10:25 a.m. (CPP)
                                                  10:45–11:10 a.m. (Plenary)                              Open session: 3:35–4:25 p.m.
                                                  11:00–11:25 a.m. (Plenary Executive)                    • SCF Chair’s Opening Remarks
                                                                                                          • Approval of Prior Minutes                           NUCLEAR REGULATORY
                                                  Matters to be Discussed                                 • Discussion of Facilities-related                    COMMISSION
                                                  Tuesday, November 8, 2016                                   Information Products                              [NRC–2016–0224]

                                                  Plenary Board meeting                                   Joint Session of SCF and CPP                          Restart of a Nuclear Power Plant Shut
                                                  Open session: 8:00–8:35 a.m.                            Open session: 4:25–5:00 p.m.                          Down by a Seismic Event
                                                  • NSB Chair’s Opening Remarks                           • Committee Chairs’ Opening Remarks
                                                                                                                                                                AGENCY: Nuclear Regulatory
                                                    Announcement of New Members and                       • Discussion of Facilities Roles and
                                                                                                                                                                Commission.
                                                      Ceremonial Oath of Office                               Responsibilities
                                                                                                          • Discussion of the Annual Facility                   ACTION: Draft regulatory guide; request
                                                    Overview of Major Issues for Meeting                                                                        for comment.
                                                    Report on Site Visits                                     Plan
                                                    Highlights from Board Retreat                         Matters to be Discussed                               SUMMARY:    The U.S. Nuclear Regulatory
                                                  • NSF Director’s Remarks                                                                                      Commission (NRC) is issuing for public
                                                                                                          Wednesday, November 9, 2016                           comment draft regulatory guide (DG)
                                                  Committee on Strategy and Budget
                                                                                                          Committee on Strategy and Budget                      DG–1337, ‘‘Restart of a Nuclear Power
                                                  Open session: 8:35–9:35 a.m.                                                                                  Plant Shut Down by a Seismic Event.’’
                                                  • Committee Chairs’ Opening Remarks                     Closed session: 9:00–10:05 a.m.                       It represents proposed Revision 1 of
                                                  • Approval of Prior Minutes                             • CSB Chair’s Opening Remarks                         Regulatory Guide (RG) 1.167. The guide
                                                  • Update on FY 2017 Budget                              • Approval of Prior Minutes                           describes methods acceptable to the
                                                  • Ongoing Development of 2018–2022                      • Update on NSF FY 2018 Budget                        NRC staff that can be used to
                                                      Strategic Plan                                          Request Development                               demonstrate that a nuclear power plant
                                                  Committee on Audit and Oversight                        Committee on Programs and Plans                       is safe for restarting after a shutdown
                                                  (A&O)                                                                                                         caused by a seismic event.
                                                                                                          Closed Session: 10:05–10:25 a.m.
                                                                                                          • Committee Chair’s Opening Remarks                   DATES: Submit comments by January 3,
                                                  Open session: 9:50–10:50 a.m.
                                                  • A&O Chair’s Opening Remarks                           • Approval of Prior Minutes                           2017. Comments received after this date
                                                    OIG Semiannual Report                                 • NEON Operations and Maintenance                     will be considered if it is practical to do
                                                  • Approval of Prior Minutes                                 Update                                            so, but the NRC is able to ensure
                                                  • National Academy of Public                                                                                  consideration only for comments
                                                                                                          Plenary Board                                         received on or before this date.
                                                      Administration (NAPA) Report:
                                                      Implementation of                                   Closed session: 10:45–11:00 a.m.                      Although a time limit is given,
                                                      Recommendation on Management                        • NSB Chair’s Opening Remarks                         comments and suggestions in
                                                      Fee                                                 • Approval of Prior Minutes                           connection with items for inclusion in
                                                  • Merit Review Pilot Report                             • NSF Director’s Remarks                              guides currently being developed or
                                                  • Inspector General’s Update                            • Closed Committee Reports                            improvements in all published guides
                                                    Update on Financial Statement Audit                                                                         are encouraged at any time.
                                                                                                          Plenary Board (Executive)                             ADDRESSES: You may submit comments
                                                    Introduction of New Inspector
                                                      General for Audit                                   Closed session: 11:00 a.m.–11:25 a.m.                 by any of the following methods (unless
                                                    OIG FY 2017 Audit Plan                                • NSB Chair’s Opening Remarks                         this document describes a different
                                                  • Chief Financial Officer’s Update                      • Approval of Prior Minutes                           method for submitting comments on a
                                                  • NSF Intergovernmental Personnel Act                   • Recommendations for 2017 NSB                        specified subject):
                                                      Program Update                                          Vannevar Bush and Public Service                     • Federal Rulemaking Web site: Go to
                                                                                                              Awards                                            http://www.regulations.gov and search
                                                  Committee on Science and Engineering                                                                          for Docket ID NRC–2016–0224. Address
                                                  Indicators (SEI)                                        Plenary Board
                                                                                                                                                                questions about NRC dockets to Carol
                                                  Open session: 10:50–11:45 a.m.                          Open session: 12:55–2:55 p.m.                         Gallagher; telephone: 301–415–3463;
                                                  • SEI Chair’s Opening Remarks                           • NSB Chair’s Opening Remarks                         email: Carol.Gallagher@nrc.gov. For
                                                  • Approval of Prior Minutes                             • Approval of Prior Minutes                           technical questions, contact the
mstockstill on DSK3G9T082PROD with NOTICES




                                                  • Update on STEM Ph.D.s Career                          • NSF Director’s Remarks                              individuals listed in the FOR FURTHER
                                                      Pathways Companion Brief                            • Action Item: Changes to the                         INFORMATION CONTACT section of this
                                                  • Discussion: Indicators 2018 Overview                      Waterman Award Terms                              document.
                                                      and Transmittal Letter                              • Changes to the Annual Facility Plan                    • Mail comments to: Cindy Bladey,
                                                                                                          • Discussion of NSB Structure                         Office of Administration, Mail Stop:
                                                  Committee on Programs and Plans                         • Discussion of Materials for the                     OWFN–12H08, U.S. Nuclear Regulatory
                                                  Open session: 1:15–3:15 p.m.                                Presidential Transition                           Commission, Washington, DC 20555–


                                             VerDate Sep<11>2014   17:54 Nov 02, 2016   Jkt 241001   PO 00000   Frm 00081   Fmt 4703   Sfmt 4703   E:\FR\FM\03NON1.SGM   03NON1


                                                  76634                      Federal Register / Vol. 81, No. 213 / Thursday, November 3, 2016 / Notices

                                                  0001. For additional direction on                       inform those persons not to include                   ‘‘Implementation’’ section of this DG,
                                                  accessing information and submitting                    identifying or contact information that               the NRC has no current intention to
                                                  comments, see ‘‘Obtaining Information                   they do not want to be publicly                       impose this guide, if finalized, on
                                                  and Submitting Comments’’ in the                        disclosed in their comment submission.                holders of current operating licenses or
                                                  SUPPLEMENTARY INFORMATION section of                    Your request should state that the NRC                combined licenses.
                                                  this document.                                          does not routinely edit comment                          This DG may be applied to
                                                  FOR FURTHER INFORMATION CONTACT:                        submissions to remove such information                applications for operating licenses,
                                                  Thomas Weaver, telephone: 301–415–                      before making the comment                             combined licenses, early site permits,
                                                  2383, email: Thomas.Weaver@nrc.gov                      submissions available to the public or                and certified design rules docketed by
                                                  and Edward O’Donnell, telephone: 301–                   entering the comment submissions into                 the NRC as of the date of issuance of the
                                                  415–3317 email: Edward.ODonnell@                        ADAMS.                                                final regulatory guide, as well as future
                                                  nrc.gov. Both are staff of the Office of                                                                      applications submitted after the
                                                                                                          II. Additional Information
                                                  Nuclear Regulatory Research, U.S.                                                                             issuance of the regulatory guide. Such
                                                  Nuclear Regulatory Commission,                             The NRC is issuing for public                      action would not constitute backfitting
                                                  Washington, DC 20555–0001.                              comment a DG in the NRC’s ‘‘Regulatory                as defined in the Backfit Rule or be
                                                                                                          Guide’’ series. This series was                       otherwise inconsistent with the
                                                  SUPPLEMENTARY INFORMATION:
                                                                                                          developed to describe and make                        applicable issue finality provision in 10
                                                  I. Obtaining Information and                            available to the public information                   CFR part 52, inasmuch as such
                                                  Submitting Comments                                     regarding methods that are acceptable to              applicants or potential applicants are
                                                                                                          the NRC staff for implementing specific               not within the scope of entities
                                                  A. Obtaining Information                                parts of the NRC’s regulations,                       protected by the Backfit Rule or the
                                                     Please refer to Docket ID NRC–2016–                  techniques that the staff uses in                     relevant issue finality provisions in part
                                                  0224 when contacting the NRC about                      evaluating specific issues or postulated              52.
                                                  the availability of information regarding               events, and data that the staff needs in
                                                  this action. You may obtain publically-                 its review of applications for permits                  Dated: October 28, 2016.
                                                  available information related to this                   and licenses.                                           For the Nuclear Regulatory Commission.
                                                  action, by any of the following methods:                   The DG, entitled ‘‘Restart of a Nuclear            Thomas H. Boyce,
                                                     • Federal Rulemaking Web site: Go to                 Power Plant Shut Down by a Seismic                    Chief, Regulatory Guidance and Generic
                                                  http://www.regulations.gov and search                   Event,’’ is a proposed revised guide                  Issues Branch, Division of Engineering, Office
                                                  for Docket ID NRC–2016–0224.                            temporarily identified by its task                    of Nuclear Regulatory Research.
                                                     • NRC’s Agencywide Documents                         number, DG–1337. The proposed                         [FR Doc. 2016–26524 Filed 11–2–16; 8:45 am]
                                                  Access and Management System                            revision of RG 1.167 describes methods                BILLING CODE 7590–01–P
                                                  (ADAMS): You may obtain publicly                        acceptable to the NRC staff that can be
                                                  available documents online in the                       used to demonstrate that a nuclear
                                                  ADAMS Public Documents collection at                    power plant is safe for restarting after a            NUCLEAR REGULATORY
                                                  http://www.nrc.gov/reading-rm/                          shutdown caused by a seismic event. It                COMMISSION
                                                  adams.html. To begin the search, select                 incorporates lessons learned following
                                                                                                                                                                [NRC–2016–0225]
                                                  ‘‘ADAMS Public Documents’’ and then                     the shutdown of nuclear power plants
                                                  select ‘‘Begin Web-based ADAMS                          due to earthquake ground shaking and                  Guidance for Electronic Submissions
                                                  Search.’’ For problems with ADAMS,                      post-earthquake evaluations since                     to the NRC
                                                  please contact the NRC’s Public                         Revision 0 was issued in 1997. They
                                                  Document Room (PDR) reference staff at                  include experience gained through the                 AGENCY: Nuclear Regulatory
                                                  1–800–397–4209, 301–415–4737, or by                     shutdown and restart process of the                   Commission.
                                                  email to pdr.resource@nrc.gov. The DG                   North Anna nuclear power plant                        ACTION: Notice of availability; request
                                                  is electronically available in ADAMS                    following the Mineral, Virginia                       for comment.
                                                  under Accession No. ML16182A321.                        earthquake in 2011. It endorses, with
                                                     • NRC’s PDR: You may examine and                     some exceptions, sections of ANS/                     SUMMARY:   The U.S. Nuclear Regulatory
                                                  purchase copies of public documents at                  ANSI–2.23–2016, ‘‘Nuclear Power Plant                 Commission (NRC) is updating and
                                                  the NRC’s PDR, Room O1–F21, One                         Response to an Earthquake,’’ that relate              requesting comments on its guidance for
                                                  White Flint North, 11555 Rockville                      to post-shutdown inspections and tests,               electronic submittals to reflect changes
                                                  Pike, Rockville, Maryland 20852.                        inspection criteria, documentation, and               in technology by posting the latest
                                                                                                          long-term evaluations. The guidance                   version of its ‘‘Guidance for Electronic
                                                  B. Submitting Comments                                                                                        Submissions to the NRC (Revision 8).’’
                                                                                                          includes an action level matrix to direct
                                                    Please include Docket ID NRC–2016–                    actions based on the earthquake level                 This guidance document will provide
                                                  0224 in your comment submission. The                    and observed damage levels at a nuclear               direction for the electronic transmission
                                                  NRC cautions you not to include                         power plant.                                          and submittal of documents to the NRC.
                                                  identifying or contact information that                                                                       DATES: Submit comments by December
                                                  you do not want to be publicly                          III. Backfitting and Issue Finality                   5, 2016. Comments received after this
                                                  disclosed in your comment submission.                      DG–1337 describes methods                          date will be considered if it is practical
                                                  The NRC posts all comment                               acceptable to the NRC staff that can be               to do so, but the Commission is able to
                                                  submissions at http://                                  used to demonstrate that a nuclear                    ensure consideration only for comments
                                                  www.regulations.gov as well as enters                   power plant is safe for restarting after a            received before this date.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  the comment submissions into ADAMS.                     shutdown caused by a seismic event.                   ADDRESSES: You may submit comment
                                                  The NRC does not routinely edit                         Issuance of this DG, if finalized, would              by any of the following methods (unless
                                                  comment submissions to remove                           not constitute backfitting as defined in              this document describes a different
                                                  identifying or contact information.                     10 CFR 50.109 (the Backfit Rule) and                  method for submitting comments on a
                                                    If you are requesting or aggregating                  would not otherwise be inconsistent                   specific subject):
                                                  comments from other persons for                         with the issue finality provisions in 10                 • Federal Rulemaking Web site: Go to
                                                  submission to the NRC, then you should                  CFR part 52. As discussed in the                      http://www.regulations.gov and search


                                             VerDate Sep<11>2014   17:54 Nov 02, 2016   Jkt 241001   PO 00000   Frm 00082   Fmt 4703   Sfmt 4703   E:\FR\FM\03NON1.SGM   03NON1



Document Created: 2016-11-03 03:24:00
Document Modified: 2016-11-03 03:24:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDraft regulatory guide; request for comment.
DatesSubmit comments by January 3, 2017. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. Although a time limit is given, comments and suggestions in connection with items for inclusion in guides currently being developed or improvements in all published guides are encouraged at any time.
ContactThomas Weaver, telephone: 301-415- 2383, email: [email protected] and Edward O'Donnell, telephone: 301-415-3317 email: [email protected] Both are staff of the Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation81 FR 76633 