81_FR_79011 81 FR 78794 - Notice of Intent To Prepare a Draft Environment Impact Statement and Conduct a Public Scoping Meeting for the Proposed Thousand Palms Flood Control Project Within the Thousand Palms Area of Coachella Valley, Riverside County, California (Corps File No. SPL-2014-00238-RJV)

81 FR 78794 - Notice of Intent To Prepare a Draft Environment Impact Statement and Conduct a Public Scoping Meeting for the Proposed Thousand Palms Flood Control Project Within the Thousand Palms Area of Coachella Valley, Riverside County, California (Corps File No. SPL-2014-00238-RJV)

DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers

Federal Register Volume 81, Issue 217 (November 9, 2016)

Page Range78794-78795
FR Document2016-27063

The purpose of this notice is to initiate a 45-day scoping process for preparation of a Draft Environmental Impact Statement (DEIS) for the Coachella Valley Water District's (CVWD) proposed Thousand Palms Flood Control Project.

Federal Register, Volume 81 Issue 217 (Wednesday, November 9, 2016)
[Federal Register Volume 81, Number 217 (Wednesday, November 9, 2016)]
[Notices]
[Pages 78794-78795]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-27063]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Notice of Intent To Prepare a Draft Environment Impact Statement 
and Conduct a Public Scoping Meeting for the Proposed Thousand Palms 
Flood Control Project Within the Thousand Palms Area of Coachella 
Valley, Riverside County, California (Corps File No. SPL-2014-00238-
RJV)

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The purpose of this notice is to initiate a 45-day scoping 
process for preparation of a Draft Environmental Impact Statement 
(DEIS) for the Coachella Valley Water District's (CVWD) proposed 
Thousand Palms Flood Control Project.

DATES: Submit comments concerning this notice on or before December 19, 
2016. A public scoping meeting will be held on December 6, 2016 at 6:00 
p.m. (PST).

ADDRESSES: The scoping meeting location is: Thousand Palms Community 
Center, 31-189 Roberts Road, Thousand Palms, CA 92276.
    Mail written comments concerning this notice to: U.S. Army Corps of 
Engineers, Los Angeles District, Regulatory Division, Carlsbad Field 
Office, ATIN: SPL-2014-00238-RJV, 5900 La Place Court, Suite 100, 
Carlsbad, CA 92008. Comment letters should include the commenter's 
physical mailing address, the project title and the Corps file number 
in the subject line.

FOR FURTHER INFORMATION CONTACT: Michelle Lynch, U.S. Army Corps of 
Engineers, Los Angeles District, Regulatory Division, Carlsbad Field 
Office, ATTN: SPL-2014-00238-RJV, 5900 La Place Court, Suite 100, 
Carlsbad, CA 92008, (760) 602-4850, [email protected].

SUPPLEMENTARY INFORMATION: In accordance with the National 
Environmental Policy Act (NEPA), the Corps is preparing an 
Environmental Impact Statement (EIS) prior to any permit action. The 
Corps may ultimately make a determination to permit or deny the 
proposed project or a modified version of the proposed project. The 
primary Federal concerns are the discharge of fill material into waters 
of the United States.
    Authority: 33 U.S.C. 1344.
    1. Project Description. CVWD is proposing to construct a flood 
control project that is linear in nature, consists of four reaches, and 
is generally located on the northern and eastern margins of the 
community of Thousand Palms. Components of the project include levees, 
channels, culverts, and a sediment basin. The levees and channels would 
be comprised of compacted native soil with a layer of soil cement to 
protect the structures from erosion. Reach 1 is comprised of a 2.4 mile 
long levee with varying height from 5 to 14 feet, a minimum 12-foot 
access (patrol) road on the top of the levee, as well as an unpaved 
embankment access road on the downstream (west side) of the levee for 
operations and maintenance (O&M) purposes. Reach 2 is comprised of a 
0.33 mile long levee with a height of approximately 5 feet, a minimum 
12-foot access (patrol) road on the top of the levee, as well as an 
unpaved embankment access road on the downstream (west side) of the 
levee for O&M purposes and would be positioned in the mid-alluvial fan 
area just northeast of an existing electrical substation, to protect 
the substation and adjacent development. Reach 3 is comprised of a 1.23 
mile long levee, an access road, and a 1.01 mile channel. The levee 
height would vary from 5 to 14 feet and would initiate approximately 
2,000 feet southwest of the downstream end of Reach 2, roughly 1,000 
feet south of Ramon Road. The channel would divert flows from Levee 3 
towards the existing stormwater conveyance system at the Classic Club 
Golf Course. Reach 4 is comprised of an approximately two-mile long 
channel that would divert stormwater flows from the southeast end of 
the Classic Club Golf Course and continue south then east, adjacent to 
the re-aligned Avenue 38, and would terminate at Washington Street with 
construction of a conveyance system to direct stormwater flows into 
existing stormwater conveyance facilities in the Del Webb/Sun City 
development.
    2. Issues. Potentially significant impacts associated with the 
proposed project may include: Aesthetics/visual impacts, air quality 
emissions, biological resource impacts, noise, traffic and 
transportation, and

[[Page 78795]]

cumulative impacts from past, present and reasonably foreseeable future 
projects.
    3. Alternatives. The Draft EIS will include a co-equal analysis of 
several alternatives. Project alternatives will be further developed 
during this scoping process. Additional alternatives that may be 
developed during scoping will also be considered in the Draft EIS.
    4. Scoping. The Corps and CVWD will jointly conduct a public 
scoping meeting to receive public comment regarding the appropriate 
scope and preparation of the Draft EIS. Participation by Federal, 
state, and local agencies and other interested organizations and 
persons is encouraged.
    5. The Draft EIS is expected to be available for public review and 
comment 6 to 12 months after the scoping meeting, and a public meeting 
may be held after its publication.

    Dated: October 25, 2016.
David Castanon,
Chief, Regulatory Division.
[FR Doc. 2016-27063 Filed 11-8-16; 8:45 am]
 BILLING CODE 3720-58-P



                                                78794                    Federal Register / Vol. 81, No. 217 / Wednesday, November 9, 2016 / Notices

                                                   Type of Request: Reinstatement.                      Directives Division, 4800 Mark Center                 Impact Statement (EIS) prior to any
                                                   Number of Respondents: 1,670.                        Drive, East Tower, Suite 03F09,                       permit action. The Corps may ultimately
                                                   Responses per Respondent: 56.                        Alexandria, VA 22350–3100.                            make a determination to permit or deny
                                                   Annual Responses: 93,520.                              Dated: November 3, 2016.                            the proposed project or a modified
                                                   Average Burden per Response: 30                                                                            version of the proposed project. The
                                                                                                        Aaron Siegel,
                                                minutes.                                                                                                      primary Federal concerns are the
                                                   Annual Burden Hours: 46,760.                         Alternate OSD Federal Register Liaison
                                                                                                                                                              discharge of fill material into waters of
                                                   Needs and Uses: The information                      Officer, Department of Defense.
                                                                                                                                                              the United States.
                                                collection requirement is necessary to                  [FR Doc. 2016–27009 Filed 11–8–16; 8:45 am]              Authority: 33 U.S.C. 1344.
                                                comply with section 861 of Public Law                   BILLING CODE 5001–06–P                                   1. Project Description. CVWD is
                                                110–181 and DoD Instruction 3020.41,                                                                          proposing to construct a flood control
                                                ‘‘Operational Contract Support’’ and                                                                          project that is linear in nature, consists
                                                other appropriate policy, Memoranda of                  DEPARTMENT OF DEFENSE                                 of four reaches, and is generally located
                                                Understanding, and regulations. The                                                                           on the northern and eastern margins of
                                                                                                        Department of the Army, Corps of
                                                Department of Defense, the Department                                                                         the community of Thousand Palms.
                                                                                                        Engineers
                                                of State (DoS), and the United States                                                                         Components of the project include
                                                Agency for International Development                    Notice of Intent To Prepare a Draft                   levees, channels, culverts, and a
                                                (USAID) require that Government                         Environment Impact Statement and                      sediment basin. The levees and
                                                contract companies enter their                          Conduct a Public Scoping Meeting for                  channels would be comprised of
                                                employee’s data into the Synchronized                   the Proposed Thousand Palms Flood                     compacted native soil with a layer of
                                                Predeployment and Operational Tracker                   Control Project Within the Thousand                   soil cement to protect the structures
                                                (SPOT) System before contractors are                    Palms Area of Coachella Valley,                       from erosion. Reach 1 is comprised of a
                                                deployed outside of the United States.                  Riverside County, California (Corps                   2.4 mile long levee with varying height
                                                SPOT is also used during Homeland                       File No. SPL–2014–00238–RJV)                          from 5 to 14 feet, a minimum 12-foot
                                                Defense and Defense Support of Civil                                                                          access (patrol) road on the top of the
                                                Authority Operations in the United                      AGENCY: Department of the Army, U.S.                  levee, as well as an unpaved
                                                States. Any persons who choose not to                   Army Corps of Engineers, DoD.                         embankment access road on the
                                                have data collected will not be entitled                ACTION: Notice of intent.                             downstream (west side) of the levee for
                                                to employment opportunities which                                                                             operations and maintenance (O&M)
                                                require this data to be collected.                      SUMMARY:    The purpose of this notice is             purposes. Reach 2 is comprised of a 0.33
                                                   Affected Public: Business or other for-              to initiate a 45-day scoping process for              mile long levee with a height of
                                                profit.                                                 preparation of a Draft Environmental                  approximately 5 feet, a minimum 12-
                                                   Frequency: On occasion.                              Impact Statement (DEIS) for the                       foot access (patrol) road on the top of
                                                   Respondent’s Obligation: Voluntary.                  Coachella Valley Water District’s                     the levee, as well as an unpaved
                                                   OMB Desk Officer: Ms. Jasmeet                        (CVWD) proposed Thousand Palms                        embankment access road on the
                                                Seehra.                                                 Flood Control Project.                                downstream (west side) of the levee for
                                                   Comments and recommendations on                      DATES: Submit comments concerning                     O&M purposes and would be positioned
                                                the proposed information collection                     this notice on or before December 19,                 in the mid-alluvial fan area just
                                                should be emailed to Ms. Jasmeet                        2016. A public scoping meeting will be                northeast of an existing electrical
                                                Seehra, DoD Desk Officer, at Oira_                      held on December 6, 2016 at 6:00 p.m.                 substation, to protect the substation and
                                                submission@omb.eop.gov. Please                          (PST).                                                adjacent development. Reach 3 is
                                                identify the proposed information                       ADDRESSES: The scoping meeting
                                                                                                                                                              comprised of a 1.23 mile long levee, an
                                                collection by DoD Desk Officer and the                  location is: Thousand Palms                           access road, and a 1.01 mile channel.
                                                Docket ID number and title of the                       Community Center, 31–189 Roberts                      The levee height would vary from 5 to
                                                information collection.                                 Road, Thousand Palms, CA 92276.                       14 feet and would initiate
                                                   You may also submit comments and                        Mail written comments concerning                   approximately 2,000 feet southwest of
                                                recommendations, identified by Docket                   this notice to: U.S. Army Corps of                    the downstream end of Reach 2, roughly
                                                ID number and title, by the following                                                                         1,000 feet south of Ramon Road. The
                                                                                                        Engineers, Los Angeles District,
                                                method:                                                                                                       channel would divert flows from Levee
                                                                                                        Regulatory Division, Carlsbad Field
                                                   • Federal eRulemaking Portal: http://                                                                      3 towards the existing stormwater
                                                                                                        Office, ATIN: SPL–2014–00238–RJV,
                                                www.regulations.gov. Follow the                                                                               conveyance system at the Classic Club
                                                                                                        5900 La Place Court, Suite 100,
                                                instructions for submitting comments.                                                                         Golf Course. Reach 4 is comprised of an
                                                                                                        Carlsbad, CA 92008. Comment letters
                                                   Instructions: All submissions received                                                                     approximately two-mile long channel
                                                                                                        should include the commenter’s
                                                must include the agency name, Docket                                                                          that would divert stormwater flows from
                                                                                                        physical mailing address, the project
                                                ID number and title for this Federal                                                                          the southeast end of the Classic Club
                                                                                                        title and the Corps file number in the
                                                Register document. The general policy                                                                         Golf Course and continue south then
                                                                                                        subject line.
                                                for comments and other submissions                                                                            east, adjacent to the re-aligned Avenue
                                                from members of the public is to make                   FOR FURTHER INFORMATION CONTACT:                      38, and would terminate at Washington
                                                these submissions available for public                  Michelle Lynch, U.S. Army Corps of                    Street with construction of a
                                                viewing on the Internet at http://                      Engineers, Los Angeles District,                      conveyance system to direct stormwater
                                                www.regulations.gov as they are                         Regulatory Division, Carlsbad Field                   flows into existing stormwater
                                                                                                        Office, ATTN: SPL–2014–00238–RJV,
sradovich on DSK3GMQ082PROD with NOTICES




                                                received without change, including any                                                                        conveyance facilities in the Del Webb/
                                                personal identifiers or contact                         5900 La Place Court, Suite 100,                       Sun City development.
                                                information.                                            Carlsbad, CA 92008, (760) 602–4850,                      2. Issues. Potentially significant
                                                   DOD Clearance Officer: Mr. Frederick                 michelle.r.lynch@usace.army.mil.                      impacts associated with the proposed
                                                Licari.                                                 SUPPLEMENTARY INFORMATION: In                         project may include: Aesthetics/visual
                                                   Written requests for copies of the                   accordance with the National                          impacts, air quality emissions,
                                                information collection proposal should                  Environmental Policy Act (NEPA), the                  biological resource impacts, noise,
                                                be sent to Mr. Licari at WHS/ESD                        Corps is preparing an Environmental                   traffic and transportation, and


                                           VerDate Sep<11>2014   16:29 Nov 08, 2016   Jkt 241001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\09NON1.SGM   09NON1


                                                                         Federal Register / Vol. 81, No. 217 / Wednesday, November 9, 2016 / Notices                                           78795

                                                cumulative impacts from past, present                   DATES:   Responses must be received no                particularly if construction of a dam or
                                                and reasonably foreseeable future                       later than 5:00 p.m. (ET) on Friday,                  diversion is required. Construction of
                                                projects.                                               December 16, 2016.                                    barriers in a natural waterway can affect
                                                   3. Alternatives. The Draft EIS will                  ADDRESSES: Responses to this RFI must                 fish migration, channel geomorphology,
                                                include a co-equal analysis of several                  be submitted electronically to                        sediment transport, habitat connectivity,
                                                alternatives. Project alternatives will be              HydroNextFOA@ee.doe.gov as Microsoft                  water quality, and flow regimes. The
                                                further developed during this scoping                   Word (.docx) attachments to an email,                 unique nature of new stream-reach
                                                process. Additional alternatives that                   and no more than 6 pages in length, 12                development can also add cost, time,
                                                may be developed during scoping will                    point font, 1 inch margins. It is                     and uncertainty to the development
                                                also be considered in the Draft EIS.                    recommended that attachments with file                process. These factors have hindered the
                                                   4. Scoping. The Corps and CVWD will                  sizes exceeding 25 MB be compressed                   development of this resource in recent
                                                jointly conduct a public scoping                        (i.e., zipped) to ensure message delivery.            decades.
                                                meeting to receive public comment                       Please include in the subject line                       To realize sustainable and responsible
                                                regarding the appropriate scope and                     ‘‘Comments for RFI’’. Only electronic                 hydropower development and to protect
                                                preparation of the Draft EIS.                           responses will be accepted.                           the integrity of existing streams, the
                                                Participation by Federal, state, and local                                                                    Program is seeking information
                                                                                                        FOR FURTHER INFORMATION CONTACT:
                                                agencies and other interested                                                                                 regarding transformative and/or
                                                                                                        Questions may be directed to: Rajesh
                                                organizations and persons is                                                                                  innovative hydropower technologies
                                                                                                        Dham, Water Power Technologies
                                                encouraged.                                                                                                   that reduce or eliminate environmental
                                                                                                        Office, U.S. Department of Energy, 1000
                                                   5. The Draft EIS is expected to be                                                                         concerns and are financially viable.
                                                                                                        Independence Avenue SW.,
                                                available for public review and                         Washington, DC 20585, Phone: (202)                    II. Purpose
                                                comment 6 to 12 months after the                        287–6675, Email:                                         The purpose of this RFI is to solicit
                                                scoping meeting, and a public meeting                   Rajesh.Dham@ee.doe.gov.                               feedback from industry, academia,
                                                may be held after its publication.
                                                                                                        SUPPLEMENTARY INFORMATION:                            research laboratories, government
                                                  Dated: October 25, 2016.                                                                                    agencies, and other stakeholders on
                                                David Castanon,                                         Table of Contents
                                                                                                                                                              issues related to development of
                                                Chief, Regulatory Division.                             I. Background                                         hydropower in new stream-reaches.
                                                [FR Doc. 2016–27063 Filed 11–8–16; 8:45 am]             II. Purpose                                           EERE is specifically interested in
                                                                                                        III. Request for Information Categories and           information on the costs/benefits and
                                                BILLING CODE 3720–58–P
                                                                                                              Questions                                       environmental effects associated with
                                                                                                        IV. Guidance for Submitting Documents
                                                                                                                                                              such development, and possible
                                                                                                        I. Background                                         solutions to address the related
                                                DEPARTMENT OF ENERGY                                                                                          challenges. EERE is also seeking input
                                                                                                           Through its HydroNEXT initiative,                  on the focus and structure of a potential
                                                Office of Energy Efficiency and                         WPTO’s Hydropower Program (the                        funding opportunity to support research
                                                Renewable Energy                                        Program) invests in the development of                and development of advanced and/or
                                                                                                        innovative technologies that lower cost,              non-traditional transformative
                                                Challenges and Opportunities for
                                                                                                        improve performance, and promote                      hydropower technologies and project
                                                Sustainable Development of
                                                                                                        environmental stewardship of                          designs capable of avoiding or
                                                Hydropower in Undeveloped Stream
                                                                                                        hydropower development across three                   minimizing environmental and social
                                                Reaches of the United States; Request
                                                                                                        resource classes:                                     effects of new cost-competitive
                                                for Information
                                                                                                        • Existing non-powered dams (NPD)                     hydropower development in
                                                AGENCY:  Water Power Technologies                       • Pumped storage hydropower (PSH)                     undeveloped stream-reaches of the
                                                Office, Office of Energy Efficiency and                 • New stream-reach development (NSD)                  United States. This is solely a request
                                                Renewable Energy, Department of                            Under a Fiscal Year (FY) 2016                      for information and not a Funding
                                                Energy (DOE).                                           Funding Opportunity Announcement                      Opportunity Announcement (FOA);
                                                ACTION: Request for information (RFI).                  (FOA) DE–FOA–0001455 titled,                          EERE is not accepting applications.
                                                                                                        ‘‘Innovative Technologies to Advance
                                                SUMMARY:    The Water Power                                                                                   III. Request for Information Categories
                                                                                                        Non-Powered Dam and Pumped Storage
                                                Technologies Office (WPTO), within the                                                                        and Questions
                                                                                                        Hydropower Development,’’ the
                                                Department of Energy (DOE) is issuing                   Program made federal funding available                A. Category 1: New Stream-Reach
                                                this request for information (RFI) to                   to research and develop innovative                    Development (NSD) Challenges and
                                                invite input from the public regarding                  solutions for NPD and PSH                             Opportunities
                                                challenges and opportunities associated                 development. In FY 2017, the Program                    To accelerate the deployment of
                                                with hydropower development in                          seeks to overcome challenges associated               sustainable and responsible hydropower
                                                undeveloped stream-reaches. Through                     with furthering the development of                    in new stream-reaches while protecting
                                                this RFI, the WPTO is also seeking input                hydropower in new stream-reaches.                     their social and environmental value,
                                                on the focus and structure of a potential                  Development of hydropower in new                   EERE is seeking input on the main
                                                funding opportunity to support research                 stream-reaches refers to new projects in              challenges and potential opportunities
                                                and development of advanced and/or                      stream segments and waterways that do                 for developing this resource.
                                                non-traditional transformative                          not currently have hydroelectric
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                Specifically, we welcome feedback on
                                                hydropower technologies and project                     facilities. New stream-reach                          the following questions:
                                                designs capable of avoiding or                          development projects are subject to                     (1) How can advances in technology
                                                minimizing environmental and social                     more scrutiny than projects for other                 more readily address environmental
                                                effects of new cost-competitive                         hydropower resources (i.e. NPDs,                      challenges associated with hydropower
                                                hydropower development in                               refurbishments) because such                          development in undeveloped streams?
                                                undeveloped stream-reaches of the                       development can have more extensive                     (2) What are the technical challenges
                                                United States.                                          environmental and social effects,                     associated with new stream-reach


                                           VerDate Sep<11>2014   16:29 Nov 08, 2016   Jkt 241001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\09NON1.SGM   09NON1



Document Created: 2016-11-09 01:39:23
Document Modified: 2016-11-09 01:39:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of intent.
DatesSubmit comments concerning this notice on or before December 19, 2016. A public scoping meeting will be held on December 6, 2016 at 6:00 p.m. (PST).
ContactMichelle Lynch, U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division, Carlsbad Field Office, ATTN: SPL-2014-00238-RJV, 5900 La Place Court, Suite 100, Carlsbad, CA 92008, (760) 602-4850, [email protected]
FR Citation81 FR 78794 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR